SUMMARY OF 900MM CBP WALL (Latest)

Reinforcement Bar (20T32) Helical Link(T12@150c/c)


Series Soil Length Pile Length Drilling Pile Concrete Concrete Lap Total
Location Pile Ref No. of Pile No of x conc. Length Total Weight Length x conv Total Weight
no. from GL (m) (m) in Soil (m) (m) (m3) Length Length
Bar kg/m kg/m
m kg m m m kg

1 Left CBP 1 - 9 9 11.850 16.35 106.65 147.15 93.61 20 6.31 17 19308.60 257.38 11.58 268.96 0.888 2149.53
2 Center CBP 10 - 23 14 15.800 22.30 221.20 312.20 198.61 20 6.31 23 40636.40 351.04 15.80 366.84 0.888 4560.54
3 Right CBP 24 - 37 14 13.350 18.10 186.90 253.40 161.21 20 6.31 19 33569.20 284.93 12.82 297.75 0.888 3701.61

37 514.75 712.75 453.43 93514.20 10411.68

SUMMARY OF 900MM CBP WALL (Previous)

Reinforcement Bar (12T25) Helical Link(T12@150c/c)


Series Soil Length Pile Length Drilling Pile Concrete Concrete Lap Total
Location Pile Ref No. of Pile No of x conc. Length Total Weight Length x conv Total Weight
no. from GL (m) (m) in Soil (m) (m) (m3) Length Length
Bar kg/m kg/m
m kg m m m kg

1 Left CBP 1 - 9 9 11.850 16.35 106.65 147.15 93.61 12 3.85 17 7068.60 257.38 11.58 268.96 0.888 2149.53
2 Center CBP 10 - 23 14 15.800 22.30 221.20 312.20 198.61 12 3.85 23 14876.40 351.04 15.80 366.84 0.888 4560.54
3 Right CBP 24 - 37 14 13.350 18.10 186.90 253.40 161.21 12 3.85 19 12289.20 284.93 12.82 297.75 0.888 3701.61

37 514.75 712.75 453.43 34234.20 10411.68

Diff 59280.00 173.16% increase over previous version

1 Lot 25954_Taking-off_900mm CBP Wall900mm Dia. CBP Walls


PROJECT : LOT 25954
ELEMENT : EARTHWORK TAKER OFF : MS DRAWING :
ITEM : CAPPING BEAM DRAWING NO . :
POUNDAGE : 206.34 KG/M3
Note : Don’t delete number/( - ) in `red' colour, it contain formula green lette formula to be copied/inserted DATE : 6-Oct-18
Note : Please insert number/dimension in 'blue' box. original foformula to be copied from
SCHEDULE OF REMEASUREMENT FOR UPPER FLOOR BEAM
Size of capping beam VRC. Formwork Diameter Main Bar Stirrups
Length Of Bar (Main Bar) Length Of Bar (Stirrups) Bar Reinforcement
No of Length Width Height factor Grade Main Bar Stirrups Bar No Total cover Spacing total add total
Bil Reference (m) (m) (m) 40 Girth Total H.T ( Y @ T ) (T @ R) Bar nos 1 a b c d Lappin Total 2a 2b 24d Total High Tensile Mild Steel
Beam
Add
(m3) (m) (m2) 32 25 20 16 12 10 6 25 16 6 (m) (m) column/ +42d T32 T25 T20 T16 T12 T10 T6 T25 T16 R6
beam (+)

1 Wall 1-900mm dia 1.00 37.000 1.050 1.050 1 40.793 2.100 77.700
top-T25-150 c/c 1.00 37.000 1.050 1.050 - - - 1 8 8 0.050 - - - 37.00 - 3.24 40.24 - 321.90 - - - - - - - -
bottom-T25-150 c/c 1.00 37.000 1.050 1.050 - - - 1 8 8 0.050 - - - 37.00 - 3.24 40.24 - 321.90 - - - - - - - -
left-T25-150 c/c 1.00 37.000 1.050 1.050 - - - 1 7 7 0.050 - - - 37.00 - 3.24 40.24 - 281.66 - - - - - - - -
right-T25-150 c/c 1.00 37.000 1.050 1.050 - - - 1 7 7 0.050 - - - 37.00 - 3.24 40.24 - 281.66 - - - - - - - -
stirrups-T16-150 c/c 1.00 37.000 1.050 1.050 - - - 1 - 0.050 0.150 247 1 248 - 0.95 1.85 - 2.80 - - - - - - - - 693.47 -
stirrups-T25-150 c/c 1.00 37.000 1.050 1.050 - - - 1 - 0.050 0.150 247 1 248 - 0.95 1.85 - 2.80 - - - - - - - 693.47 - -

40.793 77.700 Total length in metre (M) - 1,207.13 - - - - - 693.47 693.47 -

(m3) (m2) Kg per metre 6.313 3.853 2.466 1.578 0.888 0.617 0.222 3.853 1.578 0.222
TOTAL
Total weights in kg. ( KG ) - 4,651.05 - - - - - 2,671.93 1,094.29 -

OTAL WEIGHT OF REINFORCEMENT (KG) 8,417.27

PREVIOUS DRAWING

Size of capping beam VRC. Formwork Diameter Main Bar Stirrups


Length Of Bar (Main Bar) Length Of Bar (Stirrups) Bar Reinforcement
No of Length Width Height factor Grade Main Bar Stirrups Bar No Total cover Spacing total add total
Bil Reference (m) (m) (m) 40 Girth Total H.T ( Y @ T ) (T @ R) Bar nos 1 a b c d Lappin Total 2a 2b 24d Total High Tensile Mild Steel
Beam
Add
(m3) (m) (m2) 32 25 20 16 12 10 6 25 16 6 (m) (m) column/ +42d T32 T25 T20 T16 T12 T10 T6 T10 T16 R6
beam (+)

1 Wall 1-900mm dia 1.00 37.000 1.050 1.050 1 40.793 2.100 77.700
top-4T20 1.00 37.000 1.050 1.050 - - - 1 4 4 0.050 - - - 37.00 - 2.59 39.59 - - 158.36 - - - - - - -
bottom-4T20 1.00 37.000 1.050 1.050 - - - 1 4 4 0.050 - - - 37.00 - 2.59 39.59 - - 158.36 - - - - - - -
left-3T12 1.00 37.000 1.050 1.050 - - - 1 3 3 0.050 - - - 37.00 - 1.55 38.55 - - - - 115.66 - - - - -
right-3T12 1.00 37.000 1.050 1.050 - - - 1 3 3 0.050 - - - 37.00 - 1.55 38.55 - - - - 115.66 - - - - -
stirrups-T10-150 c/c 1.00 37.000 1.050 1.050 - - - 1 - 0.050 0.150 247 1 248 - 0.95 1.85 - 2.80 - - - - - - - 693.47 - -
stirrups-T10-150 c/c 1.00 37.000 1.050 1.050 - - - 1 - 0.050 0.150 247 1 248 - 0.95 1.85 - 2.80 - - - - - - - 693.47 - -

40.793 77.700 Total length in metre (M) - - 316.72 - 231.32 - - 1,386.93 - -

(m3) (m2) Kg per metre 6.313 3.853 2.466 1.578 0.888 0.617 0.222 0.617 1.578 0.222
TOTAL
Total weights in kg. ( KG ) - - 781.03 - 205.42 - - 855.74 - -

OTAL WEIGHT OF REINFORCEMENT (KG) 1,842.19

Diff 0 0 6575.08 357% increase over previous version