Name of Project : Construction of 01 (One) no.New Bridge of Important class in Turnkey basis at Kashiani-Gopalgonj Section. (Bridge No
CONTRACT PACKAGE: WD-6
Name of Client : Bangladesh Railway
Name of Consultants : ACE Consultants Ltd.
Name of contractor : TOMA Construction & Co. Ltd.
STEM
a b
13 20 250 a 300 3712 300 4312 98800 397 2
b c
16 12 a 950 100 950 2000 4 4
a b c
17 20 150 645 100 645 1390 800 7 4
SEISMIC a b c
18 12 150 100 250 100 450 925 8 8
ARRESTER
a b c
19 16 150 545 550 545 1640 300 3 8
a b c
20 12 150 100 875 100 1075 300 3 8
RETURN WALL
a b c
22 20 150 300 15550 300 16150 3720 26 4
a b c
24 20 150 300 15550 300 16150 3715 26 4
_______________________
STEM ______________________ _________________
Contractor Representative Consultant Representative BR Representative
Page 4 of 32
Name of Project : Construction of 01 (One) no.New Bridge of Important class in Turnkey basis at Kashiani-Gopalgonj Section. (Bridge No
CONTRACT PACKAGE: WD-6
Name of Client : Bangladesh Railway
Name of Consultants : ACE Consultants Ltd.
Name of contractor : TOMA Construction & Co. Ltd.
25 20 150 a b c 150 15550 150 15850 3715 26 4
b
26 20 150 a c 300 15550 300 16150 3715 26 4
STEM a b
27 16 250 c 200 13175 400 13775 15700 64 4
a b
27a 25 c 200 13175 400 13775 24 2
b
27b 12 150 a 350 250 2400 9773 67 4
a b
28 16 200 c 200 13175 400 13775 15700 80 4
a b
28a 25 c 200 13175 400 13775 24 2
b
28b 12 150 a 350 250 2400 9773 67 4
b c
33 16 2021 550 2571 4 4
b
F2 10 150 15550 440 15990 865 7 2
FOOTH PATH c
F3 10 150 a b 600 865 75 1540 15700 106 2
b
F4 10 150 15550 440 15990 865 7 2
a b c
35 32 100 1450 13050 1450 15950 16950 171 4
PILE CAP
b
39 16 12450 450 12900 6 4
a b
41a 25 c 400 13523.4 400 14323.36 6 2
C1
a b
42 32 c 450 13506 500 14456 18 2
b
43 32 c 10395 500 10895 18 2
b
44 32 c 7424 500 7924 9 2
a b
45 32 c 400 13523 500 14423 10 16
b
46 32 c 9802 500 10302 5 16
b
C2 47 32 c 6607 500 7107 5 16
a b
32 c 400 13523 500 14423 5 4
50
a b
28 c 400 13523 500 14423 5 4
b
51 28 c 9802 500 10302 5 4
C3 b
52 28 c 6607 500 7107 5 4
b
56 20 100 a c 600 2000 600 3200 8500 86 3
a b c
58 20 100 960 7900 960 9820 2100 22 3
a
59 12 b 400 3143 400 3943 4 6
c
60 12 b 6400 6400 4 6
PIER CAP
61 20 150 a 1050 2000 12200 8500 58 3
b
b
61a 12 8400 8400 4 3
b c
62 20 150 a 645 250 645 1540 2100 15 6
b c
63 16 150 a 2000 250 2000 4250 670 6 6
a b
69 20 100 2358 6400 17516 3500 36 3
a b c
73 32 160 1500 13050 1500 16050 14200 90 3
PILE CAP
b
74 32 160 1500 13050 1500 16050 14200 90 6
ABUTMENT PILE
Lapping b
12 440 440 167 20
Spiral
Lapping b
12 440 440 167 20
Spiral
BAR BENDING SCHEDULE OF PILE FOR PIER 01, 02 & 03 AS PER ACTUAL
LENGTH COMPONENT (mm)
BAR DIA SPACING LENGTH APPLIED NO. OF NO. OF
MEMBER Bar Mark BAR SHAPE
(mm) (mm) (mm) LENGTH BAR ELEMENT
a b c d e (mm)
PIER PILE
83 32 a b 400 23925 24325 42 16
Lapping b
12 440 440 228 16
Spiral
b
90 32 12000 12000 21 16
95 32 b 12000 12000 21 16