Page 1 of 32

Name of Project : Construction of 01 (One) no.New Bridge of Important class in Turnkey basis at Kashiani-Gopalgonj Section. (Bridge No
CONTRACT PACKAGE: WD-6
Name of Client : Bangladesh Railway
Name of Consultants : ACE Consultants Ltd.
Name of contractor : TOMA Construction & Co. Ltd.

BAR BENDING SCHEDULE FOR ABUTMENT 01 and 02 AS PER ACTUAL


BAR DIA SPACING LENGTH COMPONENT (mm) LENGTH APPLIED NO. OF NO. OF
MEMBER Bar Mark BAR SHAPE
(mm) (mm) (mm) LENGTH BAR ELEMENT
a b c d e (mm)
ABUTMENT

1 16 200 a b 150 1677 1827 6850 36 2

2 16 200 a b c 1600 1827 150 3577 6850 36 2

3 20 150 a b c 150 6700 150 7000 1677 13 2


BACK WALL b
4 20 150 a c 150 6700 150 7000 2455 18 2

5 16 a b c 250 6700 250 7200 20 2


b
6 16 100 a 425 1225 1243 4543 6850 70 2
c
7 16 200 a b 400 11723 400 12523 6850 36 2
c
a b
8 16 200 c 400 11723 400 12523 6850 36 2

9 20 150 b 400 6700 400 7500 5858 41 2


a c c

STEM

_______________________ ______________________ _________________


Contractor Representative Consultant Representative BR Representative
Page 2 of 32
Name of Project : Construction of 01 (One) no.New Bridge of Important class in Turnkey basis at Kashiani-Gopalgonj Section. (Bridge No
CONTRACT PACKAGE: WD-6
Name of Client : Bangladesh Railway
Name of Consultants : ACE Consultants Ltd.
Name of contractor : TOMA Construction & Co. Ltd.
STEM 10 20 150 a b c 300 6700 300 7300 5858 41 2

11 20 125 a b 400 6700 400 7500 3715 31 2


c
c
12 20 125 b 300 6700 300 7300 3715 31 2
a c

a b
13 20 250 a 300 3712 300 4312 98800 397 2

_______________________ ______________________ _________________


Contractor Representative Consultant Representative BR Representative
Page 3 of 32
Name of Project : Construction of 01 (One) no.New Bridge of Important class in Turnkey basis at Kashiani-Gopalgonj Section. (Bridge No
CONTRACT PACKAGE: WD-6
Name of Client : Bangladesh Railway
Name of Consultants : ACE Consultants Ltd.
Name of contractor : TOMA Construction & Co. Ltd.
BAR DIA SPACING LENGTH COMPONENT (mm) LENGTH APPLIED NO. OF NO. OF
MEMBER Bar Mark BAR SHAPE
(mm) (mm) (mm) LENGTH BAR ELEMENT
a b c d e (mm)

b c
16 12 a 950 100 950 2000 4 4

a b c
17 20 150 645 100 645 1390 800 7 4

SEISMIC a b c
18 12 150 100 250 100 450 925 8 8
ARRESTER

a b c
19 16 150 545 550 545 1640 300 3 8

a b c
20 12 150 100 875 100 1075 300 3 8

RETURN WALL

21 20 150 a b c 150 15550 150 15850 3720 26 4

a b c
22 20 150 300 15550 300 16150 3720 26 4

23 20 150 a b c 150 15550 150 15850 3715 26 4

a b c
24 20 150 300 15550 300 16150 3715 26 4

_______________________
STEM ______________________ _________________
Contractor Representative Consultant Representative BR Representative
Page 4 of 32
Name of Project : Construction of 01 (One) no.New Bridge of Important class in Turnkey basis at Kashiani-Gopalgonj Section. (Bridge No
CONTRACT PACKAGE: WD-6
Name of Client : Bangladesh Railway
Name of Consultants : ACE Consultants Ltd.
Name of contractor : TOMA Construction & Co. Ltd.
25 20 150 a b c 150 15550 150 15850 3715 26 4
b
26 20 150 a c 300 15550 300 16150 3715 26 4
STEM a b
27 16 250 c 200 13175 400 13775 15700 64 4
a b
27a 25 c 200 13175 400 13775 24 2
b
27b 12 150 a 350 250 2400 9773 67 4

a b
28 16 200 c 200 13175 400 13775 15700 80 4
a b
28a 25 c 200 13175 400 13775 24 2
b
28b 12 150 a 350 250 2400 9773 67 4

_______________________ ______________________ _________________


Contractor Representative Consultant Representative BR Representative
Page 5 of 32
Name of Project : Construction of 01 (One) no.New Bridge of Important class in Turnkey basis at Kashiani-Gopalgonj Section. (Bridge No
CONTRACT PACKAGE: WD-6
Name of Client : Bangladesh Railway
Name of Consultants : ACE Consultants Ltd.
Name of contractor : TOMA Construction & Co. Ltd.
BAR DIA SPACING LENGTH COMPONENT (mm) LENGTH APPLIED NO. OF NO. OF
MEMBER Bar Mark BAR SHAPE
(mm) (mm) (mm) LENGTH BAR ELEMENT
a b c d e (mm)
a b c
29 16 250 150 1034 150 1334 1800 9 4

30 16 200 a b c 150 1034 150 1334 1800 10 4

31 16 200 a b 150 1075 1225 1517 9 4


FLAG PORTION

32 20 150 a b 150 1075 1225 1517 12 4

b c
33 16 2021 550 2571 4 4

F1 12 125 a b c 600 865 75 1540 15700 127 2

b
F2 10 150 15550 440 15990 865 7 2
FOOTH PATH c
F3 10 150 a b 600 865 75 1540 15700 106 2
b
F4 10 150 15550 440 15990 865 7 2

ABUTMENT PILE CAP

34 32 90 a b c 1450 16800 1450 19700 13200 148 2

a b c
35 32 100 1450 13050 1450 15950 16950 171 4

PILE CAP

_______________________ ______________________ _________________


Contractor Representative Consultant Representative BR Representative
Page 6 of 32
Name of Project : Construction of 01 (One) no.New Bridge of Important class in Turnkey basis at Kashiani-Gopalgonj Section. (Bridge No
CONTRACT PACKAGE: WD-6
Name of Client : Bangladesh Railway
Name of Consultants : ACE Consultants Ltd.
Name of contractor : TOMA Construction & Co. Ltd.
36 32 90 a b c 1450 16800 1450 19700 13200 148 2
PILE CAP
37 32 100 a b c 1450 13050 1450 15950 16950 171 4

38 16 a b c 900 16800 900 18600 6 4

b
39 16 12450 450 12900 6 4

_______________________ ______________________ _________________


Contractor Representative Consultant Representative BR Representative
Page 7 of 32
Name of Project : Construction of 01 (One) no.New Bridge of Important class in Turnkey basis at Kashiani-Gopalgonj Section. (Bridge No
CONTRACT PACKAGE: WD-6
Name of Client : Bangladesh Railway
Name of Consultants : ACE Consultants Ltd.
Name of contractor : TOMA Construction & Co. Ltd.
LENGTH COMPONENT (mm)
BAR DIA SPACING LENGTH APPLIED NO. OF NO. OF
MEMBER Bar Mark BAR SHAPE
(mm) (mm) (mm) LENGTH BAR ELEMENT
a b c d e (mm)
COUNTERFORT
b
40 16 200 a 700 2650 6700 10650 55 2

41 16 200 a b 400 7675 8075 4550 24 4

a b
41a 25 c 400 13523.4 400 14323.36 6 2
C1
a b
42 32 c 450 13506 500 14456 18 2

b
43 32 c 10395 500 10895 18 2

b
44 32 c 7424 500 7924 9 2

a b
45 32 c 400 13523 500 14423 10 16

b
46 32 c 9802 500 10302 5 16

b
C2 47 32 c 6607 500 7107 5 16

48 16 250 a b 400 7675 8075 2600 12 32

_______________________ ______________________ _________________


Contractor Representative Consultant Representative BR Representative
Page 8 of 32
Name of Project : Construction of 01 (One) no.New Bridge of Important class in Turnkey basis at Kashiani-Gopalgonj Section. (Bridge No
CONTRACT PACKAGE: WD-6
Name C2
of Client : Bangladesh Railway
Name of Consultants : ACE Consultants Ltd.
Name of contractor : TOMA Construction & Co. Ltd.
b
49 16 200 a 500 1600 4200 10650 55 16

a b
32 c 400 13523 500 14423 5 4
50
a b
28 c 400 13523 500 14423 5 4

b
51 28 c 9802 500 10302 5 4
C3 b
52 28 c 6607 500 7107 5 4

53 16 250 a b 400 7675 8075 2600 12 8


b
54 16 200 a 500 1600 4200 10650 55 4

BAR BENDING SCHEDULE FOR PIER 01, 02 & 03 AS PER ACTUAL


LENGTH COMPONENT (mm)
BAR DIA SPACING LENGTH APPLIED NO. OF NO. OF
MEMBER Bar Mark BAR SHAPE
(mm) (mm) (mm) LENGTH BAR ELEMENT
a b c d e (mm)
PIER (P1,P2 & P3 )
b
55 20 100 a c 600 8400 600 9600 2100 22 3

b
56 20 100 a c 600 2000 600 3200 8500 86 3

_______________________ ______________________ _________________


Contractor Representative Consultant Representative BR Representative
Page 9 of 32
Name of Project : Construction of 01 (One) no.New Bridge of Important class in Turnkey basis at Kashiani-Gopalgonj Section. (Bridge No
CONTRACT PACKAGE: WD-6
Name of Client : Bangladesh Railway
Name of Consultants : ACE Consultants Ltd.
Name of contractor : TOMA Construction & Co. Ltd.
a b c
57 20 100 960 1500 960 3420 8500 86 3

a b c
58 20 100 960 7900 960 9820 2100 22 3
a
59 12 b 400 3143 400 3943 4 6
c
60 12 b 6400 6400 4 6
PIER CAP
61 20 150 a 1050 2000 12200 8500 58 3
b
b
61a 12 8400 8400 4 3

b c
62 20 150 a 645 250 645 1540 2100 15 6

b c
63 16 150 a 2000 250 2000 4250 670 6 6

64 20 150 b c 645 250 645 1540 1300 10 6


a

65 16 150 a b c 950 250 950 2150 670 6 6

LENGTH COMPONENT (mm)


BAR DIA SPACING LENGTH APPLIED NO. OF NO. OF
MEMBER Bar Mark BAR SHAPE
(mm) (mm) (mm) LENGTH BAR ELEMENT
a b c d e (mm)
a b
66 32 c 250 7950 500 8700 160 3

_______________________ ______________________ _________________


Contractor Representative Consultant Representative BR Representative
PIER COLUMN
Page 10 of 32
Name of Project : Construction of 01 (One) no.New Bridge of Important class in Turnkey basis at Kashiani-Gopalgonj Section. (Bridge No
CONTRACT PACKAGE: WD-6
Name of Client : Bangladesh Railway
Name of Consultants : ACE Consultants Ltd.
Name of contractor : TOMA Construction & Co. Ltd.
a b
67 20 250 2358 6400 17516 3900 17 3

67a 12 250 a b c 150 7850 150 8150 3900 17 15


PIER COLUMN
a
68 12 200 390 1450 3680 3900 21 36
b

a b
69 20 100 2358 6400 17516 3500 36 3

69a 12 100 a b c 150 7850 150 8150 3500 36 15

LENGTH COMPONENT (mm)


BAR DIA SPACING LENGTH APPLIED NO. OF NO. OF
MEMBER Bar Mark BAR SHAPE
(mm) (mm) (mm) LENGTH BAR ELEMENT
(mm)
a b c d e

PIER COLUMN 70 12 100 a 390 1450 3680 3500 36 36


b

71 32 160 a b c 1500 14050 1500 17050 13200 84 3

72 32 160 a b c 1500 14050 1500 17050 13200 84 6

a b c
73 32 160 1500 13050 1500 16050 14200 90 3
PILE CAP
b
74 32 160 1500 13050 1500 16050 14200 90 6

_______________________ ______________________ _________________


Contractor Representative Consultant Representative BR Representative
Page 11 of 32
Name of Project : Construction of 01 (One) no.New Bridge of Important class in Turnkey basis at Kashiani-Gopalgonj Section. (Bridge No
CONTRACT PACKAGE: WD-6
Name of Client : Bangladesh Railway
PILE CAP
Name of Consultants : ACE Consultants Ltd.
Name of contractor : TOMA Construction & Co. Ltd.
75 12 a b c 12450 440 12890 6 6

76 12 a b c 900 13250 900 15050 6 6

LENGTH COMPONENT (mm)


BAR DIA SPACING LENGTH APPLIED NO. OF NO. OF
MEMBER Bar Mark BAR SHAPE
(mm) (mm) (mm) LENGTH BAR ELEMENT
a b c d e (mm)

TR1 16 100 a b c 150 2600 150 2900 5025 52 1

TR2 16 100 a b c 150 2600 150 2900 5025 52 1

TR3 16 100 a b c 150 4925 150 5225 2700 28 1

TR4 16 100 a b c 150 2150 150 2450 2700 28 1

TR5 16 100 a b c 150 2000 150 2300 3275 34 1


TROLLEY
REFUGE TR6 16 100 a b c 150 2000 150 2300 3275 34 1

TR7 25 125 a b c 150 3175 150 3475 2100 18 1

TR8 25 125 a b c 150 3175 150 3475 2100 18 1


a b
TR9 16 c 150 1310 300 1760 8 4

_______________________ ______________________ _________________


Contractor Representative Consultant Representative BR Representative
TROLLEY
REFUGE
Page 12 of 32
Name of Project : Construction of 01 (One) no.New Bridge of Important class in Turnkey basis at Kashiani-Gopalgonj Section. (Bridge No
CONTRACT PACKAGE: WD-6
Name of Client : Bangladesh Railway
Name of Consultants : ACE Consultants Ltd.
Name of contractor : TOMA Construction & Co. Ltd.
TR10 10 125 a 200 200 800 1310 12 4
b

_______________________ ______________________ _________________


Contractor Representative Consultant Representative BR Representative
Page 13 of 32
Name of Project : Construction of 01 (One) no.New Bridge of Important class in Turnkey basis at Kashiani-Gopalgonj Section. (Bridge No
CONTRACT PACKAGE: WD-6
Name of Client : Bangladesh Railway
Name of Consultants : ACE Consultants Ltd.
Name of contractor : TOMA Construction & Co. Ltd.
BAR BENDING SCHEDULE OF PILE FOR ABUTMENT 01 and 02 AS PER ACTUAL
LENGTH COMPONENT (mm)
BAR DIA SPACING LENGTH APPLIED NO. OF NO. OF
MEMBER Bar Mark BAR SHAPE
(mm) (mm) (mm) LENGTH BAR ELEMENT
a b c d e (mm)

ABUTMENT PILE

77 32 a b 400 11850 12250 40 20


b
78 32 12000 12000 20 20

79 12 50 4268 4268 21975 441 20

AB- 01 80 28 a b 1250 3200 3200 20 20

81 12 100 4293 4293 2625 28 20

Ring 20 2000 4192 4192 24900 14 20

Lapping b
12 440 440 167 20
Spiral

LENGTH COMPONENT (mm)


BAR DIA SPACING LENGTH APPLIED NO. OF NO. OF
MEMBER Bar Mark BAR SHAPE
(mm) (mm) (mm) LENGTH BAR ELEMENT
a b c d e (mm)

77 32 a b 400 11850 12250 40 20


b

_______________________ ______________________ _________________


ContractorAB-
Representative
02 Consultant Representative BR Representative
Page 14 of 32
Name of Project : Construction of 01 (One) no.New Bridge of Important class in Turnkey basis at Kashiani-Gopalgonj Section. (Bridge No
CONTRACT PACKAGE: WD-6
Name of Client : Bangladesh Railway
Name of Consultants : ACE Consultants Ltd.
Name of contractor : TOMA Construction & Co. Ltd.
b
78 32 12000 12000 20 20

79 12 50 4268 4268 21975 441 20

AB- 02 80 28 a b 1250 3200 3200 20 20

81 12 100 4293 4293 2625 28 20

Ring 20 2000 4192 4192 24900 14 20

Lapping b
12 440 440 167 20
Spiral

BAR BENDING SCHEDULE OF PILE FOR PIER 01, 02 & 03 AS PER ACTUAL
LENGTH COMPONENT (mm)
BAR DIA SPACING LENGTH APPLIED NO. OF NO. OF
MEMBER Bar Mark BAR SHAPE
(mm) (mm) (mm) LENGTH BAR ELEMENT
a b c d e (mm)
PIER PILE
83 32 a b 400 23925 24325 42 16

84 12 50 4268 4268 21975 441 16


b
85 32 12000 12000 21 16

86 28 a b 1250 9575 9575 21 16


PIER-01

87 12 100 4293 4293 19775 199 16

_______________________ ______________________ _________________


Contractor Representative Consultant Representative BR Representative
Page 15 of 32
Name of Project : Construction of 01 (One) no.New Bridge of Important class in Turnkey basis at Kashiani-Gopalgonj Section. (Bridge No
CONTRACT PACKAGE: WD-6
Name of Client : Bangladesh Railway
PIER-01
Name of Consultants : ACE Consultants Ltd.
Name of contractor : TOMA Construction & Co. Ltd.
Ring 20 2000 4192 4192 41900 22 16

Lapping b
12 440 440 228 16
Spiral

88 32 a b 400 23925 24325 42 16

89 12 50 4268 4268 21975 441 16

b
90 32 12000 12000 21 16

PIER-02 91 28 a b 1250 11575 11575 21 16

92 12 100 4293 4293 21775 219 16

Ring 20 2000 4192 4192 43900 23 16


Lapping b
12 440 440 235 16
Spiral

_______________________ ______________________ _________________


Contractor Representative Consultant Representative BR Representative
Page 16 of 32
Name of Project : Construction of 01 (One) no.New Bridge of Important class in Turnkey basis at Kashiani-Gopalgonj Section. (Bridge No
CONTRACT PACKAGE: WD-6
Name of Client : Bangladesh Railway
Name of Consultants : ACE Consultants Ltd.
Name of contractor : TOMA Construction & Co. Ltd.
BAR BENDING SCHEDULE OF PILE FOR PIER 01, 02 & 03 AS PER ACTUAL
LENGTH COMPONENT (mm)
BAR DIA SPACING LENGTH APPLIED NO. OF NO. OF
MEMBER Bar Mark BAR SHAPE
(mm) (mm) (mm) LENGTH BAR ELEMENT
a b c d e (mm)

93 32 a b 400 23775 24175 42 16

94 12 50 4268 4268 21825 438 16

95 32 b 12000 12000 21 16

PIER-03 96 28 a b 1250 7575 7575 21 16

97 12 100 4293 4293 17775 179 16

Ring 20 2000 4192 4192 39900 21 16


Lapping b
12 440 440 220 16
Spiral

Total Rebar For Bridge -37 =


Add 5% of Total Rebar For Bridge -37

_______________________ ______________________ _________________


Contractor Representative Consultant Representative BR Representative
Page 17 of 32
rtant class in Turnkey basis at Kashiani-Gopalgonj Section. (Bridge No. 37)
T PACKAGE: WD-6

ABUTMENT 01 and 02 AS PER ACTUAL


TOTAL UNIT TOTAL
LENGTH WEIGHT WEIGHT
OF BAR (kg/m) (kg)
(m)

131.54 1.58 207.83

257.53 1.58 406.90

182.00 2.47 449.54

252.00 2.47 622.44

288.00 1.58 455.04

636.06 1.58 1004.97

901.66 1.58 1424.62

901.66 1.58 1424.62

615.00 2.47 1519.05

_______________________ ______________________ _________________


Contractor Representative Consultant Representative BR Representative
Page 18 of 32
rtant class in Turnkey basis at Kashiani-Gopalgonj Section. (Bridge No. 37)
T PACKAGE: WD-6

598.60 2.47 1478.54

465.00 2.47 1148.55

452.60 2.47 1117.92

3423.73 2.47 8456.61

_______________________ ______________________ _________________


Contractor Representative Consultant Representative BR Representative
Page 19 of 32
rtant class in Turnkey basis at Kashiani-Gopalgonj Section. (Bridge No. 37)
T PACKAGE: WD-6

TOTAL UNIT TOTAL


LENGTH WEIGHT WEIGHT
OF BAR (kg/m) (kg)
(m)

32.00 0.89 28.48

38.92 2.47 96.13

28.80 0.89 25.63

39.36 1.58 62.19

25.80 0.89 22.96

1648.40 2.47 4071.55

1679.60 2.47 4148.61

1648.40 2.47 4071.55

1679.60 2.47 4148.61

_______________________ ______________________ _________________


Contractor Representative Consultant Representative BR Representative
Page 20 of 32
rtant class in Turnkey basis at Kashiani-Gopalgonj Section. (Bridge No. 37)
T PACKAGE: WD-6

1648.40 2.47 4071.55

1679.60 2.47 4148.61

3526.40 1.58 5571.71

661.20 3.85 2545.62

643.20 0.89 572.45

4408.00 1.58 6964.64

661.20 3.85 2545.62

643.20 0.89 572.45

_______________________ ______________________ _________________


Contractor Representative Consultant Representative BR Representative
Page 21 of 32
rtant class in Turnkey basis at Kashiani-Gopalgonj Section. (Bridge No. 37)
T PACKAGE: WD-6

TOTAL UNIT TOTAL


LENGTH WEIGHT WEIGHT
OF BAR (kg/m) (kg)
(m)
48.01 1.58 75.86

53.34 1.58 84.28

44.10 1.58 69.68

58.80 2.47 145.24

41.14 1.58 65.00

391.16 0.89 348.13

223.86 0.62 138.79

326.48 0.62 202.42

223.86 0.62 138.79

5831.20 6.32 36853.18

10909.80 6.32 68949.94

_______________________ ______________________ _________________


Contractor Representative Consultant Representative BR Representative
Page 22 of 32
rtant class in Turnkey basis at Kashiani-Gopalgonj Section. (Bridge No. 37)
T PACKAGE: WD-6

5831.20 6.32 36853.18

10909.80 6.32 68949.94

446.40 1.58 705.31

309.60 1.58 489.17

_______________________ ______________________ _________________


Contractor Representative Consultant Representative BR Representative
Page 23 of 32
rtant class in Turnkey basis at Kashiani-Gopalgonj Section. (Bridge No. 37)
T PACKAGE: WD-6

TOTAL UNIT TOTAL


LENGTH WEIGHT WEIGHT
OF BAR (kg/m) (kg)
(m)

737.00 1.58 1164.46

775.20 1.58 1224.82

171.88 3.85 661.74

520.40 6.32 3288.93

392.24 6.32 2478.96

142.64 6.32 901.48

2307.74 6.32 14584.92

824.17 6.32 5208.75

568.52 6.32 3593.05

3100.80 1.58 4899.26

_______________________ ______________________ _________________


Contractor Representative Consultant Representative BR Representative
Page 24 of 32
rtant class in Turnkey basis at Kashiani-Gopalgonj Section. (Bridge No. 37)
T PACKAGE: WD-6

3696.00 1.58 5839.68

288.47 6.32 1823.13

288.47 4.84 1396.19

206.04 4.84 997.23

142.13 4.84 687.91

775.20 1.58 1224.82

924.00 1.58 1459.92

Total = 328.89 Tonne


OR PIER 01, 02 & 03 AS PER ACTUAL
TOTAL UNIT TOTAL
LENGTH WEIGHT WEIGHT
OF BAR (kg/m) (kg)
(m)

633.60 2.47 1564.99

825.60 2.47 2039.23

_______________________ ______________________ _________________


Contractor Representative Consultant Representative BR Representative
Page 25 of 32
rtant class in Turnkey basis at Kashiani-Gopalgonj Section. (Bridge No. 37)
T PACKAGE: WD-6

882.36 2.47 2179.43

648.12 2.47 1600.86

94.63 0.89 84.22

153.60 0.89 136.70

2122.80 2.47 5243.32

100.80 0.89 89.71

138.60 2.47 342.34

153.00 1.58 241.74

92.40 2.47 228.23

77.40 1.58 122.29


TOTAL UNIT TOTAL
LENGTH WEIGHT WEIGHT
OF BAR (kg/m) (kg)
(m)

4176.00 6.32 26392.32

_______________________ ______________________ _________________


Contractor Representative Consultant Representative BR Representative
Page 26 of 32
rtant class in Turnkey basis at Kashiani-Gopalgonj Section. (Bridge No. 37)
T PACKAGE: WD-6

893.32 2.47 2206.50

2078.25 0.89 1849.64

2782.08 0.89 2476.05

1891.73 2.47 4672.57

4401.00 0.89 3916.89

TOTAL UNIT TOTAL


LENGTH WEIGHT WEIGHT
OF BAR (kg/m) (kg)
(m)

4769.28 0.89 4244.66

4296.60 6.32 27154.51

8593.20 6.32 54309.02

4333.50 6.32 27387.72

8667.00 6.32 54775.44

_______________________ ______________________ _________________


Contractor Representative Consultant Representative BR Representative
Page 27 of 32
rtant class in Turnkey basis at Kashiani-Gopalgonj Section. (Bridge No. 37)
T PACKAGE: WD-6

464.04 0.89 413.00

541.80 0.89 482.20


TOTAL UNIT TOTAL
LENGTH WEIGHT WEIGHT
OF BAR (kg/m) (kg)
(m)
150.80 1.58 238.26

150.80 1.58 238.26

146.30 1.58 231.15

68.60 1.58 108.39

78.20 1.58 123.56

78.20 1.58 123.56

62.55 3.85 240.82

62.55 3.85 240.82

56.32 1.58 88.99

_______________________ ______________________ _________________


Contractor Representative Consultant Representative BR Representative
Page 28 of 32
rtant class in Turnkey basis at Kashiani-Gopalgonj Section. (Bridge No. 37)
T PACKAGE: WD-6

38.40 0.62 23.81

Total = 225.81 Tonne

_______________________ ______________________ _________________


Contractor Representative Consultant Representative BR Representative
Page 29 of 32
rtant class in Turnkey basis at Kashiani-Gopalgonj Section. (Bridge No. 37)
T PACKAGE: WD-6

FOR ABUTMENT 01 and 02 AS PER ACTUAL


TOTAL UNIT TOTAL
LENGTH WEIGHT WEIGHT
OF BAR (kg/m) (kg)
(m)

9800.00 6.32 61936.00

4800.00 6.32 30336.00

37642.50 0.89 33501.83

1280.00 4.84 6195.20

2404.00 0.89 2139.56

1173.68 2.47 2898.99

1468.37 0.89 1306.85

TOTAL UNIT TOTAL


LENGTH WEIGHT WEIGHT
OF BAR (kg/m) (kg)
(m)

9800.00 6.32 61936.00

_______________________ ______________________ _________________


Contractor Representative Consultant Representative BR Representative
Page 30 of 32
rtant class in Turnkey basis at Kashiani-Gopalgonj Section. (Bridge No. 37)
T PACKAGE: WD-6

4800.00 6.32 30336.00

37642.50 0.89 33501.83

1280.00 4.84 6195.20

2404.00 0.89 2139.56

1173.68 2.47 2898.99

1468.37 0.89 1306.85

Total = 276.63 Tonne


E FOR PIER 01, 02 & 03 AS PER ACTUAL
TOTAL UNIT TOTAL
LENGTH WEIGHT WEIGHT
OF BAR (kg/m) (kg)
(m)

16346.40 6.32 103309.25

30114.00 0.89 26801.46

4032.00 6.32 25482.24

3217.20 4.84 15571.25

13668.46 0.89 12164.93

_______________________ ______________________ _________________


Contractor Representative Consultant Representative BR Representative
Page 31 of 32
rtant class in Turnkey basis at Kashiani-Gopalgonj Section. (Bridge No. 37)
T PACKAGE: WD-6

1475.48 2.47 3644.44

1605.36 0.89 1428.77

16346.40 6.32 103309.25

30114.00 0.89 26801.46

4032.00 6.32 25482.24

3889.20 4.84 18823.73

15042.17 0.89 13387.53

1542.55 2.47 3810.10

1655.73 0.89 1473.60

_______________________ ______________________ _________________


Contractor Representative Consultant Representative BR Representative
Page 32 of 32
rtant class in Turnkey basis at Kashiani-Gopalgonj Section. (Bridge No. 37)
T PACKAGE: WD-6

E FOR PIER 01, 02 & 03 AS PER ACTUAL


TOTAL UNIT TOTAL
LENGTH WEIGHT WEIGHT
OF BAR (kg/m) (kg)
(m)

16245.60 6.32 102672.19

29909.14 0.89 26619.13

4032.00 6.32 25482.24

2545.20 4.84 12318.77

12294.74 0.89 10942.32

1408.42 2.47 3478.80

1547.48 0.89 1377.26

Total = 564.38 Tonne

Total Rebar For Bridge -37 = 1395.71 Tonne


Add 5% of Total Rebar For Bridge -37 = 1465.50 Tonne

_______________________ ______________________ _________________


Contractor Representative Consultant Representative BR Representative