Chainage (-----------)

Layer
No of Bottom Width of Top Width of
Waiting Thickness upto Avg.
Embankment Embankment Fill Embankment
Period Waiting Period, Settlement, (m)
Fill Layer layer, (m) Fill layer, (m)
(m)
1 3 30 2 22 0.6
Additional
Length of
Volume of
Embankment,
Earthwork,
(m)
(cum)
50 13.92