You are on page 1of 4

Page 1 of 4

EASTERN OVERSEAS. LLC. REPORT NO : EOS/PACK-7/FORM.NO.57

INSTALLATION CHECKLIST FOR POWER TRANSFORMER RFI NO :

DATE :

CONSTRUCTION OF(3 X20 MVA) NAMAAN PRIMARY S/S 33/11 KV AT


PROJECT BARKA IN SOUTH BATINAH GOVERNORATE

COMPANY MAZOON ELECTRICITY COMPANY SAOC


COMPANY’S
ENGINEER
CONTRACTOR EASTERN OVERSEAS LLC.

Location Vendor Drawing


No.
System Voltage Description
Unit No. Rating

1. Name Plate Details:

Manufacturer Phases Connection


symbol
Serial No. Frequency Hz Untanking
mass
MVA Diagram Drg. Total oil
No
Voltage Ratio Year of Mfr Total mass

Break insulation Type of cooling Heaviest


level package
with oil
A.C. Test Total weight. Heaviest
voltage. package
without oil
Vector Group Transportation %
Weight Impedance
at normal

Insulation Level

EOS/PACK-7/06.09.2011/FORM.NO.57
Page 2 of 4

EASTERN OVERSEAS. LLC. REPORT NO : EOS/PACK-7/FORM.NO.57

INSTALLATION CHECKLIST FOR POWER TRANSFORMER RFI NO :

DATE :

2. Receipt and storage checks:

S.N Description Result


O
Check visually for any damage to transformer components/assembled
unit
ii Check all accessories stored in clean area and protected from rain water,
mud etc

3. Foundation and placement check:

S.NO Description Result


Check foundation level correctness
ii Check foundation dimension
iii Check foundation pocket is clear from foreign
materials
iv Check foundation jack plate is in appropriate location

4. Assembly of Transformer:

S.No. Description Result


Check turret 1U1 has been fitted properly
ii Check turret 1V1 has been fitted properly
iii Check turret 1W1 has been fitted properly
iv Check Buchholz relay pipe fitted properly
v Check OLTC pipe fitted properly
vi Check air vent pipe fitted properly
Vii Check HV terminal has been erected and aligned properly
Viii Check LV terminal has been erected and aligned properly
ix Check LV Neutral terminal has been erected and aligned
properly
X Check LV cable box has been erected and aligned properly
Xii Check Buchholz relay has been erected and aligned properly
Xiii Check breather for main and OLTC Conservator has been
erected and aligned properly
EOS/PACK-7/06.09.2011/FORM.NO.57
Page 3 of 4

EASTERN OVERSEAS. LLC. REPORT NO : EOS/PACK-7/FORM.NO.57

INSTALLATION CHECKLIST FOR POWER TRANSFORMER RFI NO :

DATE :

xiv Check pressure relief device has been erected and aligned
properly
xv Check radiator with air vent and plug has been erected and
aligned properly
Xvi Check conservator has been erected and aligned properly
Xvii Check earthing done at both ends.
Xviii Check Breather pipe done
Xix Check all bolts and nuts tightened
Xx Ensure all items of transformer fixed
Xxi Ensure all openings ( Valves , Taps) are closed and covered

5. Post assembly and testing readiness checks:

S.No. Description Result

Check transformer oil level

iii Check tightness of bushing terminal connectors

Vii Check Buchholz pipe valves open

Viii Check all valves to atmosphere blanked

Ix Check radiator top and bottom valves open

X Check all gasket joints leak tight

xi Check MTJ / JTB properly sealed

6. Equipment as accepted : YES / NO

EOS/PACK-7/06.09.2011/FORM.NO.57
Page 4 of 4

EASTERN OVERSEAS. LLC. REPORT NO : EOS/PACK-7/FORM.NO.57

INSTALLATION CHECKLIST FOR POWER TRANSFORMER RFI NO :

DATE :

7. Remarks / Observation :

TITLE EOS
NAME
DESIGNATION
SIGNATURE
DATE

EOS/PACK-7/06.09.2011/FORM.NO.57