SITE MEASUREMENT

Valuation for certificate no 9 period February - June 2007


Bill no 17 CONCRETE WORKS Sheet 4 of 9
Item Details/Calculations Qty to IPC
Stair Case
17.01 Clearance of the site around the jetty for preparation of repair works
0 2
Total quantity to previous month m
745 2
Total quantity this month m
745 2 2
Total to date m 745 m

17.08 Demolision of the broken staircase upto Beam 'A' and disposal of material.
6 3
Total quantity to previous month m
0 3
Total quantity this month m
6 3 3
Total to date m 6 m

Demolision of the R.C walls on one side of the staircase and at the end of the lowest landing and
17.09
disposal of material
Total quantity to previous month 10 m3
0 3
Total quantity this month m
Total to date 10 m3 10 m
3

17.10 wrot, shutters placed in position for reconstruction of staircase


Total quantity to previous month 27 m2
Total quantity this month 0 m2
Total to date 27 m2 27 m2

17.11 steel reinforcement tied in position for reconstruction of staircase


Total quantity to previous month 750 kg
Total quantity this month 0 kg
Total to date 750 kg 750 kg

17.12 Concrete class 30/20 to staircase


6 3
Total quantity to previous month m
0 3
Total quantity this month m
6 3 3
Total to date m 6 m

Fendering system
17.23 removal of 150x100x2.5m timber fenders Total no removed 4 no
4 no

Raked timber fenders


17.28 Removing spoiled timber fenders 300x300x7.5
Total quantity to previous month 7 no
Total quantity this month 0 no
Total to date 7 no 7 no

Livestock approach jetty


17.31A 100x50x10mm channel 190 m @ 10.42 kg/m weight = 1,979.80 kg 1,980 kg

17.31B 50x50x6mm angle 360 m @ 4.47 kg/m weight = 1,609.20 kg 1,609.20 kg

17.31C 50x50x10 channel 254 m @ 5.12 kg/m weight = 1,300.48 kg 1,300 kg

............................................................. .........................................................
Contractor's Representative Resident Engineer