STAINLESS STEEL

Case study

AURORA WASTE TO
#3
ENERGY PLANT

Eight stainless steel tanks were


constructed as part of a new waste to
energy plant in Wollert, a Melbourne
suburb, which opened in 2017. The
first of its kind in Australia, the 1
MW biogas facility will divert 33,000
tonnes of organic waste per year
from traditional landfill, significantly
reducing the burden on local landfills.
2 3

In response to the Millennium Drought, Australian water


companies have been compelled to use more energy- Material
intensive solutions for providing water, such as desalination
and water recycling. When Yarra Valley Water extended the Selection
Aurora sewage treatment plant to include recycled water
provision, the energy costs increased. Renewable energy
Stainless steel was used to Austenitic stainless steel grade Type Type 316Ti (UNS S31635 / EN 1.4571)
sources such as wind or solar were not viable for smaller manufacture the pre-storage tanks, 304 (UNS S30400 / EN 1.4301), which contains about 17% chromium,
sized plants such as Aurora. However a waste-to-energy plant, digesters and storage tank. It is containing about 18% chromium and 2% molybdenum and 11% nickel.
strategically located close to the treatment facilities and to an ideal material for an anaerobic 8.2% nickel, was used for the pre- The lower part of the digesters
digestion plant because of the storage and storage tanks. are permanently submerged in the
local food manufacturing, was economically feasible on the corrosive environments created The most corrosive zone inside a digestate which is a less highly
basis of taking an asset off the grid and/or selling to another by decaying organic matter which digester is the splash or tidal zone corrosive environment, and hence
customer, in addition to exporting to the electrical grid[1]. contains hydrogen sulphide, chlorides above the digestate, where corrosive grade Type 304 was used.
and organic acids. Stainless steel substances may concentrate on the
does not require the application of tank walls during wetting and drying
any additional coating, which may cycles. Dirt on the walls may also lead
degrade when in contact with warm to the formation of crevices, which
The ReWaste waste-to-energy plant produce both heat and electricity comes from cafeterias and restaurants, water containing organic compounds can be initiation points for crevice
is based on the process of anaerobic (Figure 1). supplemented by fats and oils, over the years of service. In addition, corrosion. For this reason, the upper
digestion (AD), the breakdown of The Aurora facility consists of five brewery and dairy leftovers, fruit and stainless steel tanks have low part of the stainless steel digesters,
organic material (also known as pre-storage tanks, two digesters and vegetable waste. It generates enough maintenance requirements, can be which are partly in the splash zone
biomass) by naturally occurring a large storage tank. The process biogas to run the existing sewage installed quickly and typical end-of- and partly in the gas phase, were
micro-organisms in the absence of is heavily automated, and the pre- treatment plant and the recycled life recycling rates for building and made from the more highly alloyed
oxygen. The process produces biogas storage tanks have sufficient capacity water facility, with the surplus energy infrastructure applications are 92%. grade of austenitic stainless steel
which can subsequently be burned to to ensure that no manpower is (approximately 75%) being sold or
produce heat or fed into a combined needed overnight or at weekends. exported to the electrical grid.
heat and power (CHP) generator to The organic waste feedstock mostly This is the first stand-alone food
waste processing facility constructed
by a water utility in Australia.

Fig 1 - Typical anaerobic digestion plant process Fig 2 - Overall view of Aurora waste to energy plant
4 5

Fabrication
and
Design installation
The stainless steel tanks were
On arrival at the site, the waste is constructed on site by bolting together
diameter and 3.8m high). Two of the The waste is fed into the two stainless individual flat stainless steel sheets
stored in the five pre-storage tanks, tanks have stainless steel bases, and steel digesters, each with a capacity of
the largest of which is over 340m3 (1.25 – 1.5m x 2.5 - 3.0m).
the others have reinforced concrete 3573m3 (26.9m diameter and 6.30m The segment construction allowed
(9.2m diameter and 5.0m high). The bases. high) (Figure 3). The substrate is then
other four tanks are 88m3 (5.4m the parts to be easily transported.
buffered into a stainless steel storage Additionally, expensive and labour
tank of 4,530m3 (30.0m in diameter intensive scaffolding was not needed.
and 6.3m high). The bolted connections were sealed to
Stainless steel tanks have variable prevent leakage of gas or liquid.
wall thickness, with the thickness
increasing lower down the tank as The tanks were assembled from top
the internal pressure due to the Fig 6 - Tank being fabricated on site
to bottom. Ring stiffeners gave the
contents of the tank increases. The tank stability during installation. The
outer surface of the tank is smooth procedure begins with the top ring
and inner surface stepped. For the of the tank. Once the top ring was
digesters, the wall thickness varied complete, it was lifted up and the next
from about 1.5mm for the top ring to ring constructed beneath it. The tank
about 3. 5mm for the bottom ring. wall is secured with an anchoring
system onto the base and permanently
sealed. It usually takes about two
weeks to erect the shell of a stainless
steel tank (Figure 6 and 7).

Fig 3 - Stainless steel digesters, thermally insulated with rockwool and clad
with corrugated carbon steel at the Aurora waste-to-energy plant Fig 7 - Insulating cladding being installed on a tank

Construction commenced in October of 2015 and full operation commenced on 19 May 2017.
The photographs and information for this case study was kindly provided by Weltec Biopower.

Procurement Details
Client: Yarra Valley Water Authority
Manufacturer of AD plant: Weltec Biopower
Engineering, Procurement and Construction: Aquatec Maxcon

References
[1] Water Services Association of Australia. Next Gen Urban Water Case study 10 Aurora food to waste energy plant,
May 2017 https://www.wsaa.asn.au/sites/default/files/publication/download/Case%20study%2010%20Aurora%20food%20
Fig 4 - Interior of a stainless steel biodigester, showing the agitator mechanism Fig 5 - The pump system which feeds the to%20waste%20energy%20plant.pdf (Accessed 11 May 2017)
on the left hand side which combines the incoming material with the bacteria substrate into the biodigester in accordance
with the consistency and characteristics of [2] Stainless steel tanks for biogas production, P412, The Steel Construction Institute, 2016
the individual substrates
Nickel Institute

www.nickelinstitute.org
communications@nickelinstitute.org

Published 2017