You are on page 1of 8

ARCHITECTS AWARENESS MAPPINGS:

PIII LEGISLATION & ACT MAPPING

PREPARED BY AR RIDHA RAZAK


ARCHITECT ACT1967
An Act to provide the registration of Architect, sole proprietors, By Ar Ridha Razak
ARCHITECT ACT partnership, body corporate providing Architectural consultancy
(117) services, interior designers and building draughtsman

INTERPRETATITION
PART I
PRELIMINARY Building Draughtsman (BD)
Architect (A) Interior Designer (ID) Foreign PAM
SEC 1-2 Inspector Of Works (IoW)
Graduate Architect (GA) Graduate Interior Designer(GID) Architect MIID
Architectural Consultancy Practice(ACP) Interior Design Consultancy Practice (IDCP) Architectural Technologist (AT)
Architectural consultancy service(ACS) Interior Design Consultancy Service (IDCS)
PART II
BOARD OF ARCHITECTS MALAYSIA
Sec 3-4
SEC 3 SEC 4
Establishment BOA (LAM) – 21 board member Function BOA (LAM)
A President, 10 Private, 1 BOE, 1BQSM, 1 BD, 1
ID, 1 IOW, 1 AT, registrar
PART III
REGISTRATION OF ARCHITECTS
Sec 5-14 SEC 5 SEC 6 SEC 7 SEC 7A SEC 7B SEC 8 SEC 10 SEC 10A SEC 12
REGISTER Appointment & Restriction On Architectural MDP ENTITLEMENT QUALIFICATION REGISTRATION APPLICATION
- entitle to submit
OF Duties Of Registrar Unregistered Consultancy Practice 10(1) Reg Grad FOREIGN
plans to authorities SEC 13
ARCHITECTS Person - SOLE PROP including Making Arch ARCHITECT
- PARTNERSHIP valuation of buildings 10(2) Architect CERTIFICATE
PART IV - BODY CORPORATE and structures ,
Submitting planning SEC 14
CANCELATION, REMOVAL,
approval, conversions, NOTIFICATION
REINSTATEMENT, ETC sub-divisions, CHANGE ADDRESS
Sec 15-18 amalgamation,
SEC 15A SEC 16 SEC 17 SEC 18
planning studies and
POWER TO INVESTIGATE & REMOVAL REINSTATEMENT CERT REGISTRATION TO
reports.
PART V APPOINT DISCIPLINARY BE RETURN
SPECIAL PROVISION RELATING TO COMMITTEE
BUILDING DRAUGHTMAN
SEC 19-27 RELATED SECTIONS

PART VA
SPECIAL PROVISION RELATING TO Restriction Register Registration Qualification IDCP Notification Cancellation Removal Reinstatement Certificate
INTERIOR DESIGNERS Change Address
SEC 27A-27J
BD 20 & 24 21 22 - - 23 25 26 26A 27
PART VB
ID 27A 27B 27C 27D(2) 27E 27F 27G 27H 27I 27J
SPECIAL PROVISION RELATING TO
INSPECTOR OF WORKS Grad - 27B 27C 27D(1) - 27F 27G 27H 27I 27J
SEC 27K-27S ID

PART VB IOW 27K 27L 27M 27N - 27O 27P 27Q 27R 27S
SPECIAL PROVISION RELATING TO
ARCHITECTURAL TECHNOLOGIST AT 27T 27U 27V 27W - 27X 27Y 27Z 27ZA 27ZB
SEC 27T – 27 ZB

PART VI
GENERAL SEC 28- APPEAL SEC 33 – SEC 34- SEC 34A-FAILURE TO COMPLY ORDER SEC 35 SEC 35A
SEC 28-39 SEC 29 APPEAL BOARD PENALTIES, OBTAINING GENERAL SEC 34B- POWER SEARCH/ SEIZURE RULES Authorization
SEC 30 – MEMBERS APPEAL BOARD REGISTRATION BY FALSE PENALTIES SEC 34C– LIST OF THINGS - Arch Rules 1996 by president
SEC 31- PROCEDURE APPEAL PRETENSE - SOMF 2010
SCHEDULES SEC 32 – PROCEDURE APPEAL BOARD
ARCHITECT RULES 1996

ARCHITECT By Ar Ridha Razak


RULES 1996

PART I INTERPRETATITION
PRELIMINARY
RULE 1-2 REGISTRA SECRETARY
BOARD PRESIDENT

PART II COMMUNICATION PIC MONIES AUDIT COLLECTION FEE


ADMINISTRATION
RULE 3-16A RULE 11- BANK ACCOUNTS RULES 15- AUDIT RULE 16A - FEES
RULE 3- MEETINGS RULE 9 – REGISTRA
RULE 4- NOTICE MEETING RULE 10- SECRETARY RULE 12 – CHEQUES RULES 16 FINANCIAL
RULE 5- VOTES RULE 13- ACCOUNTS YEAR
RULE 6- PROXIES NOT ADMITTED RULE 14- EXPENSES OF THE
RULE 7 MINUTES BOARD
RULE 8 - COMMINTIES

PART III REGISTER CERT & RENEWAL PRE REQUISITE FOREIGNER


REGISTRATION
RULE 17-27 RULE 26- PRACTICAL RULE 27- QUALIFICATION OF
RULE 17- APPLICATION FOR RULE 21- CERTIFICATE
REGISTRATION RULE 22- APPLICATION RENEWAL EXPERIENCE A FOREIGN ARCHITECT
RULE 18- TIME LIMIT FOR BOA TO DECIDE RULE 24- REINSTATEMENT FEES
RULE 19 – APPLICANT TO BE NOTIFIED RULE 25- FEE FOR APPROVE AREAS
RULE 20 – REGISTRATION
PART IV
CODE OF CONDUCT AND CONDITION
OF ENGAGEMENT
RULE 28 - CODE OF CONDUCT RULE 29- CODE OF ENGAGEMENT
RULE 28-29
28(1) Architect 29(1) Architect
28(2) Graduate Architect 29(2) Building Draughtsman
28(3) Building Draughtsman 29 (3) Interior Designer
28(4) Interior Designer
28(5) Graduate Interior Designer
PART V 28(6) inspector of works
REGISTRATION OF ARCHITECTURAL 28(7) Architectural technologist
CONSULTANCY PRACTICE
RULE 30-32A
ARCHITECTURAL CONSULTANCY PRACTICE INTERIOR DESIGN CONSULTANCY PRACTICE
PART VA
REGISTRATION OF INTERIOR DESIGN
RULE 30- FORM RULE 31- CERTIFICATE RULE 32A- RULE 32B- APPLICATION & FEES RULE 32C- CERTIFICATE RULE 32E-
CONSULTANCY PRACTICE
APPLICATION & FEES RULE 32 RENEWAL REINSTATEMENT FEE RULE 32BA- REGISTRATION RULE 32D- RENEWAL REINSTATEMENT FEE
RULE 32B-32E
MIID

PART VI GENERAL
RULE 33-34
RULE 33 - REVOCATION RULE 34- SAVINGS
FEE CODE OF CONDUCT CODE OF ENGAGEMENT MEMORENDUM AGREEMENT
SCHEDULES

FIRST SCHEDULE SECOND SCHEDULE THIRD SCHEDULE FOURTH SCHEDULE


PART TWO – FEES FOR PART ONE- COC ARCHITECT PART ONE- COE ARCHITECT PART ONE-MOA ACP
REGISTRATION, RENEWAL & PART TWO- COC BUILDING DRAUGHTMAN PART TWO- COE BUILDING DRAUGHTMAN PART TWO- MOA IDCP
REINSTATEMENT PART THREE- COC INTERIOR DESIGNER PART THREE- COE INTERIOR DESIGNER PART THREE- MOA BD
ARCHITECT RULES : SCALE OF MINIMUM FEES 2010
SCALE OF MINIMUM By Ar Ridha Razak
FEES 2010
PART I
PRELIMINARY
RULE 1-5 RULE 1- CITATION & RULE 2- RULE 3- PAYMENT FEES RULE 4- COSTOF WORK RULE 5- Multiplier Time cost formula
a) Completed • Director, partner, sole prop (3.0)
COMMENCEMENT INTERPRETATION -Any ACP perform any of the
b) Tender not awarded • Employed Professional (2.4) Annual salary
No of
architectural services shall not
c) Tender Not received • Sub Professional (2.2) 1800
X working X Multiplier
charge less than the SOMF
• Admin Staff, Tech Staff (2.0) hours

SERVICE BASIC SERVICE SUPPLEMENTARY SERVICE ADDITIONAL SERVICE OTHERS


PART II
ARCHITECTURAL CONSULTANCY
PRACTICE RULE 6-Type of RULE 7- Phases of basic services RULE 13- Supplementary services RULE 14- Additional services RULE 22-
RULE 6-22 a) Ascertaining clients objective and brief RULE 15- Advisory services Appointment of
services RULE 8- Schematic design (SD) and advise
RULE 9-Design Development (DD) RULE 16- Survey and investigation services specialist consultant
b) Inspecting, advising negotiation for site
 BASIC RULE 10-Contract documentation (CD) c) Prepare and refine clients brief to
RULE 17- Planning and development services to work in
 SUPPLEMENTARY RULE 11-Contract implementation and arrive to agreed project brief RULE 18- Financial advisory services collaboration with
 ADDITIONAL management (CIMP) d) Prepare project outline, cost estimate RULE 19- Exceptional negotiation and Architectural
RULE 12- Final completion (FC) and prelim cash flow protracted involvement services consultancy practice
e) Prepare master plan RULE 20- Project management consultancy
f) Preparing S&P drawing services
g) Certify progress billing for S&P
h) Provide interior design services
RULE 21- Miscellaneous services
PART III i) Designing graphic and signage
SCALE OF MINIMUM FEES
RULE 23 - 29 FEES PAYMENT FEE WITHOLD

RULE 23-Fees for basic services- (Percentage) RULE 27- Payment of fees for basic services RULE 29- Withholding of
RULE 23 (3)- Computation fees for repetitive works
RULE 24- Fees for supplementary services ( Time cost/ payments
23(3)(a)(i) 23(3)(b) Phases Percentage % Accumulative
Percentage) (All fees due to ACP shall not be
Building other than Housing under same Schematic Design 15 15
reduced or withheld on account of
housing site RULE 25- Fees for additional services ( Time cost/ Design Development 30 45
any penalties, liquidated &
1 100% 1 100% Percentage) Contract Documentation 25 70 ascertained damages or any other
2-5 40% 2-10 75% RULE 26- Fees for appointment of specialist consultant to Contract Implementation and Management 25 95 sums withheld from payments by the
6-9 35% 11-30 50% work in collaboration with architectural consultancy Final Completion 5 100 client to the contractor or any party.
10 30% 31-60 40% practice RULE 28- Payments fees for supplementary and additional fees
61-100 30%
>101 20%
Category 1- Exceptional Category 2- Moderate Category 3- Simple

PART IV 1. Abattoirs 1. Aquaria 21. Flats/ apartment 41. Prisons 1. Car ports
OTHER PAYMENTS 2. Airport terminal 2. Art galleries buildings 42. Recreational 2. Farm buildings
buildings 3. Assembly halls 22. Gymnasia building 3. School buildings
RULE 30 RULE 30-Reimbursable 3. Chancery buildings 4. Audio visual/ teleco 23. Hotels 43. Religious building (standard
expenses 4. Conservation works buildings 24. Housing estate 44. Research building government)
(Printing , telephone, fax, 5. Embassy buildings 5. Auditoria 25. Industrial building with 45. Restaurants 4. Simple industrial
postage, travelling, 6. Ferry terminal buildings 6. Banks 26. manufacturing and 46. Road transport type buildings
7. Hospitals 7. Bowling centres packaging terminal 5. Storage and
advertisement, specialist
8. Individual houses 8. Cafeteria and canteens 27. Kindergarten 47. School(private or warehouse
consultant fee, tax) 9. Legislative buildings 9. Cinema halls 28. Libraries no standard) buildings
10. Mausoleum 10. Civic centres 29. Marinas 48. Shop houses
PART VI GENERAL 11. Memorials 11. Club houses 30. Markets 49. Shopping
RULE 31- 32 12. Monuments 12. College buildings 31. Medical health clinics centres/complexe
13. Museums 13. Community centres 32. Mixed residential/ s
RULE 31- Revocation 14. Observatories 14. Concert halls and theatres commercial complex 50. Skating rink
15. Palaces 15. Convention halls & 33. Motels 51. Sports buildings
RULE 32- Transitional 16. Preservation works facilities 34. Nursing homes 52. Stadia
17. Renovation works 16. Court homes 35. Office buildings 53. Supermarket
SCHEDULES 17. Crematoria 36. Parking structures 54. Telephone
18. Departmental stores 37. Petrol filling & service exchange building
19. Exhibition/ exposition stations 55. University building
Classification of buildings 38. Police stations 56. Veterinary
building 20. Fire stations 39. Power stations buildings
40. Prefab structures
TYPICAL ARCHITECTURAL CONSULTANCY PRACTICE (ACP) BUSINESS PROCESS MAPPING

C.DESIGN D.CONTRACT E.CONTRACT F.FINAL


B. SCHEMATIC
DEVELOPMENT DOCUMENTATION IMPLEMENTATION & COMPLETION
A. INCEPTION DESIGN
MANAGEMENT

CORE PROCESS

START PRE DESIGN DEVELOP DESIGN TENDER CONSTRUCTION POST CONSTRUCTION

COMMENCEMENT

DRAWING, BQ & SPECS


A1-PROJECT ACQUISITION B1-PROJECT C1-DETAIL DESIGN D1-PREPERATION E1- PROJECT F1- COMPLIANCE TO
COMMUNICATION PROPOSAL TENDER DOCUMENTS PLANNING & SITE CCC
MOBILIZATION

DRAWING BQ & E2- CONFIRMATION OF PREPRATION FOR


R B2-GATHERING
SPECIFICATION MATERIAL AUTHORITY
E INFORMATION
RESOURCE INSPECTION
Q NO
MANAGEMENT CLIENTS D2 - REGISTRATION
U
APPROVAL POTENTIAL
I CONTRACT
R CONTRACTOR , NSC &
PREPERATION OF ADMINISTRATION NO
M SUPPLIER
DESIGN BRIEF YES RELEVANT
E E3-SITE SUPERVISION
INTERNAL AUTHORITY
N & SITE INSTRUCTION
DECISSION INSPECTION
T B3-PRELIMINARY D3- TENDER E4- SITE INSPECTION
SKETCH PROPOSAL C2-PREPERATION PROCEDURE AND TEST CONTROL
YES BUILDING PLAN
E5- ARCH EVENT YES
D4-TENDER CERTIFICATE ISSUANCE OF CCC
A2-BUSINESS B4-SCHEMATIC INVITATION
PROCUREMENT PROPOSAL E6- ARCH PAYMENT
C3- BOMBA CERTIFICATE
D5-TENDER
SUBMISSION
BASIC EVALUATION E7- DETERMINATION
F2- ASBUILT
OF CONTRACTOR
NO DRAWINGS
CLIENTS YES C4- BP
D6-TENDER AWARD E8- STATUTORY
SUPPLEMENTA APPROVAL SUBMISSION
OBLIGATION PREPERATION &
RY SUBMISSION OF
D7- CONTRACT ASBUILT
ADDITIONAL OBTAIN APPROVALS
DOCUMENTATION
INSPECTION
NO
YES
A3- APPOINTMENT B5-PLANNING C5-MANAGEMENT OF F3- DEFECT LIABILITY
OTHERS/ SUB- SUBMISSION & CHANGE (BP PERIOD
VERIFICATION
CONSULTANT APPROVAL AMENDMENT)
CONTROL OF NON ISSUANCE OF CMGD
A4- STANDARD CONFORMING
COMMUNICATION
NO
RECTIFICATION AND ISSUANCE
CORRECTION OF CPC
F4-FINAL ACCOUNT

YES
ISSUANCE OF FINAL
CERTIFICATE
E9- PROJECT
HANDOVER

By Ar Ridha Razak
DEVELOPMENT RELATED ACTS
PART II
SUBMISSION PLAN FOR
NLC PART I PART II PART III PART IV APPROVAL
BYLAW 3-29
1965 PRELIMINARY STREET DRAIN BACKLANE
(56) SEC 1-3 SEC 4-48 SEC 50-69 SEC 65-69 PART III
SPACE, LIGHT
S.52 – LAND USE &VENTILATION
S. 124 -CONVERSION
S.124A -CONVERSION & SUBDIVISION BYLAW 30-47
S. 135-139 -SUBDIVISION
S.140-145 -PARTITION
S.146 -150 -AMALGAMATION
S. 195 - SURRENDER BL3 SUBMISSION OF PLANS FOR APPROVAL
S.203 & S.204A - SURRENDER & REALIENATION BL : 6,8,9,10,15,16, 29 ( SUBMISSION REQUIREMENT)
BL 5: THE SUPERVISION OF WORKS CARRIED BY PSP/SP
SDBA 1974 (133) LGA 1976 (171) BL 7: WITHDRAWAL OR CHANGE OF QUALIFIED PERSON
BL 19,20,21 ( TEMPORARY WORKS)
22. NOTICE COMMENCEMENT WORK (BORANG B)
BL 25 : G1-21 FORMS & CERTIFICATE OF COMPLETION
AND COMPLIANCE REQUIREMENTS
BL 25A: FORM F-CERTIFICATE OF COMPLETION AND
PART Xiii BY LAWS COMPLIANCE
BL 27(1): F1 FORM (PARTIAL CCC)
102 General Powers to Make By BL 27(2): FULL CCC AFTER PARTIAL COMPLETED
TCPA Law

1976 PART V PART VI PART VII


(172) BUILDING MISCELLANEOUS BY-LAWS UBBL 1984 PART IV
TEMPORARY WORKS
SEC 70-90 SEC 91- 132 SEC 133 BYLAW 48-52

PART V
PART IV Salient points STRUCTURAL
PLANNING REQUIREMENT
BYLAW 53-80
CONTROL
SEC 70 SEC 70A SEC 70B SEC 70C SEC 70D SEC 71 SEC 80 SEC 82 SEC 85A
NOTICE NEW EARTHWORK ORDER TO REVOCATION OF INSPECTION OF PENALTY FAILURE MOVABLE HOARDING PERIIODIC
SEC 20A BUILDING REVIEW SAFETY PLAN BUILDING BUILDING/ SHED INSPECTION PART VI
DUTY TO EARTHWORK CONSTRUCTION
CONSULT REQUIREMENT
BYLAW 81-132
SEC 70 (2) SEC70(9A) SEC70(11A) SEC 70 (12) SEC 70(14) SEC 70(20-25)
SEC 21
PSP TO SUBMIT STRUCTURE RENOVATION MISUE OF DON’T SUBMIT RELATING TO
SUBMISSION OF
TO LA SUBMISSION BUILDING - 20 TIMES CCC AND PART VII
PLANNING
OFFENSE
FIRE REQUIREMENT
BYLAW 133- 224
Process OSC 3.0
SEC 21A LCP CONSIDERATION
SEC 21B LAYOUT PLAN FOR COMMENCEMENT INTERIM FINAL
SEC 21C QUALIFIED PERSON PRE CONSULTATION DEVELOPMENT INSPECTION INSPECTION DEPOSIT CCC PART VIII
OF WORK
FIRE ALARM,
DETECTION, FIRE
FIGHTING
Collation of information Submission to OSC for • Borang B Interim Final Inspection I Deposit CCC
from technical propose development Inspection PBAN, TNB & PBT/JKR
BYLAW 225-253
• PDC 6, MSIG to LA,
agencies Vol II TNB, Developer ,
Water, Electric, KM / BP/ Structure/ • Borang BOMBA, Permohonan Sambungan LAM
Telecomunications, Engineering/ JKJ103, PBAN, IWK, komunikasi.
Land Earthwork/ DOSH dan PART IX
• Sijil tanah
By Ar Ridha Razak Infrastructure/
Landscape • etc
JKR/PBT. Final Inspection II JPBM,
DOSH, APP (IWK/MAJAARI)
MISC
HOUSING DEVELOPERS ACT
PROCESS
HOUSING i. An Act to provide for the control & licensing of the KM BP Site Possession CCC & VP END

DEVELOPERS business housing development in West Malaysia


ii. To protect the interest of the buyer
ACT (118) Submit Sifus to Construction
Schedule G& I -
PTG & Submit DLP 24
Schedule Parcel 24 Month
Schedule H & J – Months
INTERPRETATION to COB for
PART I stratified sales 36 Month
PRELIMINARY
Give VP
Sec 1-4 Progress
Housing License Housing Housing Developer, Controller, Bank, Finance company, Apply Developer license,
billing of
accommodation Developer, Purchaser, Body of Deputy Stakeholder Open Accounts &
completion
, Housing Housing Development persons, Controller, Advertising Permit to
by stages
Local commence sales
Development Account
Authority,
CCC
PART II
WHAT
LICENSING OF HOUSING
1 15
DEVELOPERS
SeC 5-6B
HD CONTROL &
SEC 5
Developer to
LICENSING) REG 1989 3 LICENSE
apply license for
Housing ADVERTSING
5
Development PERMIT

11 S&P

G H I J

PART III
DUTIES OF LICENSE HOUSING CONDITION OBLIGATION MONIES CIRCUMSTANCES BOOK KEEPING
DEVELOPERS 1 1 3RD SCHEDULE
Sec 7-9 PROGRESS PAYMENT
SEC 6 SEC 7 SEC 7A SEC 8 SEC 9 Audit
Condition of Duties of License Account Arrangement
VP WITH STRATA TITLE
license Developer affecting License
PART IV
developer 3 3
REGISTRATION &
ENFORCEMENT 2 6
Sec 10-10e

HD ( HOUSING DUTY DEPOSIT WITHDRAWAL

PART V
DEVELOPMENT
POWERS OF MINISTERS ACCOUNT) REG 1991 S3. DUTIES OF S 4. DEPOSIT OF S 7. PURPOSE MONIES
Sec 11-16
DEVELOPER ALL MONIES BY IN HD. ACCOUNT MAY
RELATING TO PURCHASER BE WITHDRAWN
THE ACCOUNT
PART VI HD ( TRIBUNAL FOR S 4A. S 8. CONDITION FOR
TRIBUNAL FOR HOME BUYERS
SEC 16
HOMEBUYERS) REG S3A. DEPOSIT PURCHASER WITHDRAWAL OF
MADE BY FINANCIER TO MONIES
Sec 16A-16AL TRIBUNAL 2002 DEVELOPER PAY DIRECT TO
THE ACCOUNT S9. WITHDRAWAL OF
SURPLUS MONIES
PART VII
MISCELLANEOUS
HD (COMPOUNDING S 11. WITHDRAWAL OF
ALL MONIES IN HD
SEC 24 OFFENCE) REG. 2002
Sec 17-24
POWER TO MAKE RULES
By Ar Ridha Razak ACC.
STRATA TITLE & STRATA MANAGEMENT ACT
An act to facilitate the subdivision of building An Act to provide for the proper maintenance
STRATA and land into parcels and the disposition of and management of buildings and common STRATA
TITLE ACT titles and for purposes connected therewith property, and for related matters. MANAGEMENT
(318) ACT (757)
GLOSSARY
PART I
PRELIMINARY
Strata title Parcel / Accessory Common property Provisional Share units
Provisional title Parcel/ Land Parcel block / title Maintenance charges
PART I

WHAT WHO WHEN HOW CONDITION PRELIMINARY


PART II
APPLICATION FOR SUBDIVISION
OF A BUILDING SEC 6 SEC 7 SEC 8 SEC 8 & 9 SEC 10 PART II
Sec 6-14A Prerequisite & Condition for
Building and Original proprietor Circumstances in which ADMINISTRATION OF THE ACT
land may be may apply for it is compulsory to apply Requirement to approval of
subdivided into subdivision of a for subdivision of a apply strata strata
parcels building or land building or land PART III
PART III DEALINGS IN BUILDING OR
REGISTRATION OF STRATA LAND INTENDED
TITLES FOR SUBDIVISION INTO
SEC 15 SEC 16 SEC 17 SEC 18 SEC 19 Sec 6 PARCELS
Sec15-19
Prep of strata Document of Opening book of Share Provisional Schedule of parcels to be
title Strata title strata title units Share units filed with the
PART IV Commissioner before sale
PROVISIONAL BLOCK: ISSUE OF of any parcel
STRATA TITLES UPON
COMPLETION OF BUILDING PART IV
Sec 20-23 STRATA MANAGEMENT
SEC 20 SEC 20A SEC 20B BEFORE EXISTENCE OF
APPLY FOR FOR BUILDING WITH KM
COMPLETE SUBMIT PROPOSE STRATA APPROVE BEFORE 1 JUNE 2015 MANAGEMENT CORPORATION
PROVISIONAL BLOCK TO PLAN TO OBTAIN CPSP SUBDIVISION TO PTG
PART V VP --------------> Strata title
G12 OR CCC FROM JUPEM VP-> JMB-> MC
SUBDIVIDED BUILDINGS:
PART V
DIVISION / AMALGAMATION
STRATA MANAGEMENT AFTER
OF PARCELS
EXISTENCE OF
Sec 24-33A SEC 24 SEC 36. MANAGEMENT CORPORATION
Subdivision / Share unit FOR BUILDING WITH DO
PART VI Amalgamation entitlements APPROVE AFTER 1 JUNE 2015
RIGHTS & OBLIGATIONS Strata title  VP PART VI
ATTACHING TO INDIVIDUAL VP -> MC MANAGING AGENT
PARCELS & PROVISIONAL NEW PROCESS (A1450)
BLOCKS KM BP Site Possession CCC & VP
SEC 34 SEC 36. PART VII
Sec 34-38 Rights of proprietor Share unit DEPOSIT AND RECOVERY OF
in his parcel and entitlements Submit Sifus Submit Propose CHARGES
Strata Plan to
PART VIII common property to PTG
JUPEM At G12 for
building
TERMINATION OF SUBDIVISION Submit Schedule PART VIIi
OF SUBDIVIDED BUILDING Parcel to COB
JUPEM confirm
CPSP in order INSURANCE
Sec 56-57
Obtain Permit
And commence sale
Submit to VP &
Land Office issuance PART IX
PART X
MISCELLANEOUS
By Ar Ridha Razak Strata
Title DISPUTES AND STRATA
MANAGEMENT TRIBUNAL

You might also like