You are on page 1of 11

  (Ş.Ş.

Ï )ÀĚ
‚ ŃĎþğ
√м ƒěĄİğĞĆ√Áğ
√À¼ ÂÓ
30503 :‫ﺳﺟﻝ ﺗﺟﺎﺭﻯ‬
‫ﻣﻧﻁﻘﺔ ﺣﺭﺓ ﺧﺎﺻﺔ‬
‫ ﻣﺩﻳﻧﺔ ﺍﻟﺳﺎﺩﺍﺕ – ﻣﺣﺎﻓﻅﺔ ﺍﻟﻣﻧﻭﻓﻳﺔ‬- ‫ﺍﻟﻣﻧﻁﻘﺔ ﺍﻟﺻﻧﺎﻋﻳﺔ ﺍﻟﺳﺎﺑﻌﺔ‬
‫ﺟﻣﻬﻭﺭﻳﺔ ﻣﺻﺭﺍﻟﻌﺭﺑﻳﺔ‬
+2(048) 2630132/33/34/35/36:‫ﻫﺎﺗﻑ‬

C.R.: 30503
Private Free Zone
ZAMIL STRUCTURAL STEEL CO. (S.A.E.) 7th Industrial Zone -Sadat City – Menoufia
(‫ﻡ‬.‫ﻡ‬.‫ﺷـــﺭﻛﺔ ﺍﻟﺯﺍﻣــﻝ ﻟﻠﻬﻳﺎﻛﻝ ﺍﻟﻔﻭﻻﺫﻳﺔ )ﺵ‬ Arab Republic of Egypt
Phone: +2(048) 2630132/33/34/35/36

M/S. HASSABO TRADING & TRANSPORT CO. LTD. Tele: +249(0)154885150


Fax: +249(0)153994229
KHARTOUM - SUDAN

Attention : Mr. Hassabo A. Elrahman – Chairman


Subject : Supply of Zamil Structural Pre-Engineered Building
Our Ref. : Quote No. D9-17-041 Rev. 00 – Dated 23-04-2017
Project : Warehouses
Location : ALBAGEIR - SUDAN

Thank you for giving Zamil Structural the opportunity to submit a proposal on this project.

This proposal is based on Zamil Structural’s standard design criteria and standard material
specifications. However, the overall dimensions and layout are in general accordance with your
inquiry.
An integral part of this proposal, are Zamil Structural’s:
 Standard Product Specifications (www.zamilsteel.com/peb/rd/Specs) and
 Standard Terms and Conditions of Sale (www.zamilsteel.com/peb/rd/Terms)
Kindly note that we have tried our utmost to ensure that this proposal meets all your project
requirements and specifications, however, in some cases we may have had to make some
assumptions, suggest certain deviations and/or exclude some items that you may have
requested. Therefore, we urge you to carefully review section 13 “Assumptions, Deviations &
Exclusions” of this proposal to understand the exact scope of our supply.

We look forward to doing business with you.

Sincerely yours,

Ayman Galal
Export Sales Manager
ZAMIL STRUCTURAL STEEL CO. (S.A.E.)

5-01114-999-00-00 :‫ﺭﻗﻡ ﺍﻟﻣــﻠﻑ ﺍﻟﺿـﺭﻳﺑﻲ‬ 315-753-684 : ‫ﺭﻗﻡ ﺍﻟﺑﻁــﺎﻗﺔ ﺍﻟﺿــﺭﻳﺑﻳﺔ‬

Area Offices
Cairo, Alexandria, Port Said, Assuit, Khartoum, Dar Es Salam, Addis Ababa, Johannesburg, Algiers, Casablanca, Dakar, Accra, Tripoli, Port
Harcourt, Dammam, Riyadh, Jeddah, Kuwait, Manama, Doha, Dubai, Abu Dhabi, Muscat, Sanaa, Baghdad, Amman, Chennai, Damascus
Lahore, Colombo, Dhaka, Prague, Athens, Istanbul, Bucharest, Warsaw, Madrid, Houston, Ho chi Minh, Hanoi, Haiphong, Bangkok, Kuala
Lumpur, Yangon, Manila, Phnom Penh, Tokyo, Shanghai, Qingdao, Guang Zhou, Jakarta, Batam, Singapore
PROPOSAL INDEX
SECTION 1 : BUILDING DESCRIPTION 01
1.1 Buildings: 01

SECTION 2 : APPLICABLE CODES 05


SECTION 3 : MATERIAL SPECIFICATIONS 06
SECTION 4 : STEEL WORK FINISH 07
4.1 PRIMARY STEEL 07
4.2 SECONDARY STEEL 07

SECTION 5 : STANDARD SUPPLIED ITEMS 07


SECTION 6 : SUPPLY DELIVERY PERIOD 07
SECTION 7 : DELIVERING, UNLOADING AND STORAGE AT JOB SITE 08
SECTION 8 : PROPOSAL VALIDITY 08
SECTION 9 : CHANGES / REVISIONS 09
SECTION 10 : SUPPLY PRICES 09
10.1 BUILDING & ACCESSORIES 09
SECTION 11: ALTERNATIVES 09

SECTION 12 : PAYMENT TERMS 10


SECTION 13 : ASSUMPTIONS, DEVIATIONS & EXCLUSIONS 10
SECTION 14 : GOVERNING LAW & DISPUTE RESOLUTION 10
SECTION 15 : CONTRACT FORM 11

ENCLOSURES
1. Proposal Drawings () 2. Product Brochure ( )
3. Standard Product Specifications ( ) 4. Standard Terms & Conditions of Sales ( )
5. Standard Panel Color Guide ( ) 6. Recommended L/C Opening Procedure ( )

Quote No. D9-17-041 Rev. 00 Date 23-04-2017 Page 2 of 11


Section 1 - Building Description
1.1 Building 01 Usage:Warehouse
Quantity of identical buildings is: 01
Areas: This building contains 1 area

1.1.1 Area 01

Building Parameters
1 Type CLEAR SPAN
2 Width (m) 25.000 out to out of steel lines
3 Number of Main Rigid Frames 07
4 Length (m) 80.000 out to out of steel lines
5 Eave Height (m) 7.000
6 Width Module (m) 1 @ 25.000
7 Roof Slope 1.00 : 10
8 Bay Spacing 1 @ 6.250 + 9 @ 7.500 + 1 @ 6.250
9 Type of End Frames Both: POST AND BEAM
10 Type of Bracing in Side Walls DIAGONAL
11 Type of Eave Both: EAVE GUTTERS & STEEL DOWNSPOUTS

Design Loads: (Refer to Section 2 “Applicable Codes” of this offer)


1 Design Dead Load (kN/m²) 0.12
2 Design Live Load (kN/m²) on Roof 0.58
3 Design Live Load (kN/m²) on Frame 0.58
4 Wind Speed (Km/H) 152.00
5 Wind Exposure Category C
6 Additional Collateral Load (kN/m²) 0.00
7 Ground Snow Load 0.00
8 Earthquake Zone NONE
9 Rain Fall (mm/h) 150.00
10 Temperature Plus (Deg) 0.00 Minus (Deg) 0.00
11 Primary Member Design Code AISC05 ASD
12 Secondary Member Design Code AISI 01

Open Wall Conditions


Partially Open For Block Walls by Others and Balance is Sheeted
1 Near Side Wall
80.000 x 3.000
Partially Open For Block Walls by Others and Balance is Sheeted
2 Far Side Wall
80.000 x 3.000
Partially Open For Block Walls by Others and Balance is Sheeted
3 Left End Wall
25.000 x 3.000
Partially Open For Block Walls by Others and Balance is Sheeted
4 Right End Wall
25.000 x 3.000

Quote No. D9-17-041 Rev. 00 Date 23-04-2017 Page 3 of 11


Roof and Wall (Sheeting + Insulation)
1 Roof Panel ZSP mm (nominal), Type-SS:S 0.50 Painted Zincalume, Color: Frost-White
2 Roof Insulation Insulation is included in the roof accessories portion of this building
3 Wall Panel ZSP mm (nominal), Type-SS:S 0.50 Painted Zincalume, Color: Frost-White
4 Wall Insulation Insulation is included in the wall accessories portion of this building

Roof Accessories

No. Description Quantity


1 50 mm FIBREGLASS insulation at roof. Density = 12 kg/m3. Face = WMSK Full Area
2 Skylights , Length: 3.600 m 16

Wall Accessories

No. Description Quantity


1 50 mm FIBREGLASS insulation at sheeted exterior walls. Density = 12 kg/m3. Face = WMSK Full Area
2 DOUBLE Sliding doors , Type: T1, Width: 4000 m, Height: 5000 m @ Near Side Wall 2
3 DOUBLE Sliding doors , Type: T1, Width: 4000 m, Height: 5000 m @ Left End Wall 1

REMARK:

** The color of Roof and Wall Sheeting is Royal Blue


** The color of Trims and doors headers will be either Frost white or Flame Red according to the availability

Quote No. D9-17-041 Rev. 00 Date 23-04-2017 Page 4 of 11


Section 2 - Applicable Design Codes
All buildings included in this proposal are designed in accordance with the following codes:
(Zamil Steel has the right to provide intermediate splices in structural members as needed)

Wind & Seismic loads applied on buildings and tolerances for fabrication and erection are in
accordance with:

Wind Loads will be in accordance with:


CA705 Min. design load for buildings and other structures ASCE7-05
Seismic Loads will be in accordance with:
2006 International Building Code
Load Combinations will be in accordance with:
CA705 Min. design load for buildings and other structures ASCE7-05

Hot rolled sections and built up sections are designed in accordance with:
The 13th Edition (2005) of the Manual of Steel Construction - ASD
By American Institute of Steel Construction, Inc. (AISC)
1 East Wacker Drive, Suite 700, Chicago, Illinois 60601-1802, USA

Cold formed members are designed in accordance with:


The 2001 Edition of Cold Formed Steel design Manual
By American Iron and Steel Institute (AISI)
1101 17th Street, NW, Washington, DC 20036 - 4700, USA

Welding and its inspection / testing for Steel Structure Fabrication will be in accordance with:
The latest Edition of Structural Welding Code - Steel (AWS D1.1: 2010)
By American Welding Society (AWS)
550 NW LeJeune Road, Miami, FL 33126, USA

Painting shall be in accordance with:


The 4th Edition of the SSPC Painting Manual Volume I
The 2005 Edition of the SSPC Painting Manual Volume II
By The Society for Protective Coatings (SSPC)
40 24th Street, 6th Floor, Pittsburgh, PA 15222, USA

Quote No. D9-17-041 Rev. 00 Date 23-04-2017 Page 5 of 11


Section 3 - Material Specifications
The following is the list of the material standards and specifications for which the building components have been designed:
Below are Zamil Steel’s standard material specifications that will be used in the project. Zamil Steel reserves the
right to make material substitutions and changes in specifications as and when deemed necessary.
No. Materials Specifications Minimum Strength
ASTM A 572M Grade 345 Type 1
1. Built-Up Members Fy = 34.5 kN/cm2
Or EN 10025 S355JR
Hot-Rolled Members
DIN 17100 & DIN 1025 (IPE 200)
 Beams & Columns Fy = 27.5 kN/cm2
Or ASTM A 572M Grade 345 Type 1
JIS G 3466 STKR 490
2.  Tubes Fy = 32.5 kN/cm2
Or EN 10210 -1 S355J2H
 Channels DIN 17100 & DIN 1026 Fy = 27.5 kN/cm2
Space Frames JIS G 3444 STK 500 Fy = 35.5 kN/cm2
 Pipes
Handrails ASTM A53 Fy = 20.5 kN/cm2
Cold Formed Secondary Members
3.  Black Steel EN10025 S355J2G3 Fy = 35.5 kN/cm2
 Galvanized Steel ASTM A 653M SS 340 Class 1 & EN10147 Fy = 35.0 kN/cm2
Sheeting & Liner Panels
4.  ZincAlume Steel ASTM A 792M Grade 345B, AZM 150 Fy = 34.5 kN/cm2
 Aluminum ASTM B 209M Alloy 3003 Temper H-26 Fy = 14.5 kN/cm2
Valley Gutters **
5.
 Galvanized Steel EN 10142 – EN 10143 Fy = 26.0 kN/cm2
Mezzanine Deck Panels
6.
 Galvanized Steel EN 10142 – EN 10143 Fy = 26.0 kN/cm2
X-Bracing Members
 Cables ASTM A 475 Extra High Strength Breaking Load = 119.7 kN
7. ASTM A 615M Grade 300 Fu = 50.0kN/cm2
 Rods
Or ASTM A 36M Fu = 40.0kN/cm2
 Angles DIN 17100 & DIN 1028 Fu = 41.0 to 54.0kN/cm2
ASTM A 36M or JIS-G3101 SS400 Fy = 25.0 kN/cm2
8. Anchor Bolts
Hot Dip Galvanized to ASTM A 153M Class C Fu = 40.0 kN/cm2
ASTM A 325M Class 8.8 Type 1
9. High Strength Bolts Hot Dip Galvanized to ASTM A 153M Class C Fu = 83.0 kN/cm2
[Or DIN 933 Class 8.8 Hot Dip Galvanized]
DIN 933 Class 4.6 / 4.8
10. Machine Bolts Fu = 40.0 kN/cm2
Electro Plated Yellow Chromate
Zamil Steel reserves the right to substitute partly or entirely some of the materials in case of material non-availability
or supply shortages.

Quote No. D9-17-041 Rev. 00 Date 23-04-2017 Page 6 of 11


Section 4. Steel Work Finish
4.1 Primary Steel
 All primary steel members will be painted with two coats of total thickness 100 microns as below:

- One Coat of 40 microns thickness of Red oxide alkyd paint


- One Coat of 60 microns thickness of Zinc phosphate alkyd paint with Ral#7039

4.2 Secondary Steel


 All secondary steel members will be Pre-galvanized

Section 5 : Standard Supplied Items


The following are normally supplied unless mentioned otherwise:

1. Hot dip galvanized anchor bolts for rigid frames, end wall posts & framed wall openings
2. Eave gutters & downspouts on sidewalls or curved eaves at sidewalls with projection.
3. All necessary flashing & trims
4. Foam closures
5. Bead mastic for panel end-lap
6. Connection bolts
7. Sheeting fasteners

Section 6 : Supply Delivery Period


6.1 Our current Delivery Period is 8 weeks from the latest date of receipt and acceptance of the following in Cairo –
Arab Republic of Egypt:
 Signed contract (Any change must be noted and initialed by both parties)
 Down payment
 Final change order
 Acceptable letter of credit/Final accepted L/C amendment, incase the balance payment is by Letter of Credit
 Signed final "Approved as Noted" or Approved as Is’ Approval Drawings

6.2 Please allow a minimum of 3 weeks for Approval Drawings submittal, if the aproval drawings are required by
customer.

6.3 Customer must return approval drawings to Zamil Structural Head Office within 2 weeks of receipt. Any delay in the
return of the approval drawings back to Zamil Structural may result in a change to our delivery commitment.

6.4 Incase the approval drawings aren’t essential, the technical offer incorporated with this contract must be thoroughly
checked by customer or his technical staff along with the preliminary proposal drawings (if any). Signing the contract, in
this case, will entitle Zamil Structural to proceed with engineering/fabrication works on this project without the need to
any further confirmation from customer or his technical staff.

Quote No. D9-17-041 Rev. 00 Date 23-04-2017 Page 7 of 11


Section 7: Delivering, Unloading and Storage at Project Site
7.1 The customer, or his contractor is responsible for unloading the delivered Zamil Structural materials at the project site..

7.2 All expenses incurred inside the country of import, including but not limited to customs duties, taxes, clearance fees
and demurrage charges due to delays in returning the containers to the shipping lines, is the responsibility of the buyer.

7.3 Materials should be thoroughly checked after unloading. Zamil Structural should be notified in writing of any
shortages or damages within four weeks from the delivery date.

7.4 Care, storage and protection of the materials at the site is the responsibility of the customer, or his contractor..

7.5 Red oxide and grey aluminum oxide primer paints are meant to protect the steel during transportation and for a short
storage period at site (not to exceed two weeks). Zamil Structural is not responsible for any signs of rust that might
appear on the steel due to improper storage or long storage periods at site.

7.6 Incase of C&F offer, this includes the freight charges from any Egyptian Port to the target Port only. It doesn't include
any of the below mentioned items which should by handled by the customer:-

* Clearance & handling charges at the target Port.


* Inland Transportation of the containers to and from the project site.
* Local taxes & customs duties if any.
* Insurance from port to project site.
* Erection price.

Section 8 : Proposal Validity


8.1 This proposal is valid for 07 days from the above noted date. Any extension of validity by Zamil Structural must be
in writing.

8.2 If the job (project) is not “Released for Production” within TWO months from the date of entering this order at
Zamil Structural Head Office, it will be subject to delivery change and price change in accordance with the
prevailing delivery schedules and prices at the end of the above noted period.

“Released for Production” means that the Approval Drawings have been returned by the buyer “Approved as
Noted” or “Approved as Is”, the agreed upon payment terms, as per Section 12, have been fulfilled by the buyer
and the job has been released for final engineering production and fabrication at Zamil Structural.

8.3 That portion of this order that is not released for production as per section 8.2 and not shipped within the maximum
committed delivery period in section 6.1 of this proposal will be subject to a price change in accordance with the
prevailing prices posted at the end of the above noted time period. However, if that portion is not shipped due to
reasons by Zamil Structural, no price implication will be applied

Section 9: Changes/Revisions
Any change and/or revision to the above stated scope of supply may lead to a variation in the price and the delivery
period. A change must not hold payment for work completed in the original contract.

Quote No. D9-17-041 Rev. 00 Date 23-04-2017 Page 8 of 11


Section 10: Supply Prices

10.1 Basic Option

Supply Prices, All Prices are in US - Dollars

Sr. Building No. QTY CFR PORTSUDAN

1 Building # 01 (25 x 80 ms) 01 72,000.00

Total 72,000.00

REMARK:

** This price is given based on this description in this Revision / Date


For any further change in future this price will change

Section 11: Supply Alternatives


None

Quote No. D9-17-041 Rev. 00 Date 23-04-2017 Page 9 of 11


Section 12: Payment Terms
. 12.1 Supply CFR PORTSUDAN PORT, Sea Shipment Mode
Down payment of 30% of the total contract value is to be paid upon signing this contract by direct telex transfer to Zamil
Structural Account mentioned in clause - 12.2. The balance payment is to be paid after completion fabrication and
readiness for shipping, herein under is the list of the shipping documents which will be forwarded to customer after
receiving the balance payment:

 Commercial invoice.
 Packing list.
 Bill of lading.
 Certificate of origin, in either English or Arabic.

Other terms:
a. Partial shipment must be allowed.
b. Transshipment must be allowed.

12.2 Bank Details


For the down payment, herein under are our Bank Details required for the telex transfer:

Bank Name : AL-WATANY BANK OF EGYPT


Address : DOKKI BRANCH
Account Name : ZAMIL STRUCTURAL STEEL CO. (S.A.E.)
Account Number : 0802220168910100
Swift Code : WABAEGCXDOK
Correspondent Bank : Chase Manhattan N.Y

Section 13 : Assumptions, Deviations & Exclusions


13.1 Both parties agreed that the price quoted in this quotation is based on a lump sum basis calculated according to the
building descriptions as well as the required loading and codes shown above and not as a re-measurable basis. Hence,
the project weight given at the quotation stage is only indicative and no claim will be entertained in case of a reduction
or addition in the building weight after the final design or the shipment. However, should there be any revision to the
scope of the work after signing of the contract which may result in an increase or decrease in the contract value, then it
is subject for a ‘contract change order’ as per Section 9 (amendment to the contract value) reciprocally agreed by
Zamil Structural & the customer.

Section 14 : Governing Law & Dispute Resolution


14.1 This Agreement shall be governed by, and construed in accordance with the Laws of the Arab Republic of Egypt.
14.2 Any dispute arising hereunder or from or in connection herewith shall be resolved amicably by discussion between
the parties hereto, failing which the parties shall submit the matter in dispute to be finally settled pursuant to the
Egyptian Arbitration Regulations. The arbitration shall take place in Cairo, Arab Republic of Egypt.

Quote No. D9-17-041 Rev. 00 Date 23-04-2017 Page 10 of 11


Section 15: Contract Form
THIS CONTRACT is entered into on:: : 23th April 2017

BETWEEN

M/S. HASSABO TRADING & TRANSPORT CO. LTD., KHARTOUM - SUDAN , ON THE ONE
HAND, located in Lebanon and represented by Mr. Hassabo A. Elrahman, duly authorized to enter into this contract.

AND

Zamil Structural Steel Co. (S.A.E), ON THE OTHER HAND, located in 7th Industrial Zone -Sadat City – Menoufia,
Arab Republic of Egypt, and represented by Mr. Ayman Galal, duly authorized to enter into this contract.

NOW THEREFORE the parties agree as follows:

CONTRACT SCOPE: The supply of Zamil Structural building as described in the contract documents.

CONTRACT DOCUMENTS: The following documents constitute the contract documents:


1. Zamil Structuraal’s Proposal No.D9-17-041 Rev.No.00 Dated 23-04-17 with agreed and initialed amendments (if any).
2. Zamil Structuraal’s Standard Terms & Conditions of Sale.
3. Zamil Structuraal’s Standard Product Specifications.

CONTRACT PRICE: 72,000.00

((ONLY SEVENTY-TWO THOUSAND US Dollars))

IN WITNESS HEREOF, the authorized parties hereto have executed this Contract.

HASSABO TRADING &


FOR : ZAMIL STRUCTURAL STEEL CO. (S.A.E) FOR : TRANSPORT CO. LTD.,
KHARTOUM - SUDAN

Name : Mr. Ayman Galal Name : Hassabo A. Elrahman

Title : Export Sales Manager Title : Chairman

Signature : Signature :

Date : 23 – 04 - 2017 Date :

Stamp : Stamp :

Quote No. D9-17-041 Rev. 00 Date 23-04-2017 Page 11 of 11