Construction contract administration in Malaysia using DFD: A


conceptual model

Article  in  Industrial Management & Data Systems · September 2011


DOI: 10.1108/02635571111182782 · Source: DBLP

CITATIONS READS
20 2,273

3 authors:

Heap Yih Chong Balamuralithara Balakrishnan


Universiti Tunku Abdul Rahman Universiti Pendidikan Sultan Idris (UPSI)
9 PUBLICATIONS   106 CITATIONS    34 PUBLICATIONS   273 CITATIONS   

SEE PROFILE SEE PROFILE

Siong-Choy Chong
Finance Accreditation Agency
96 PUBLICATIONS   2,204 CITATIONS   

SEE PROFILE

Some of the authors of this publication are also working on these related projects:

Entrepreneurship View project

MY Teachers TryScience View project

All content following this page was uploaded by Siong-Choy Chong on 06 February 2015.

The user has requested enhancement of the downloaded file.


The current issue and full text archive of this journal is available at
www.emeraldinsight.com/0263-5577.htm

Construction
Construction contract contract
administration in Malaysia using administration
DFD: a conceptual model
1449
Heap Yih Chong and Balakrishnan Balamuralithara
Faculty of Engineering and Science, Universiti Tunku Abdul Rahman, Received 9 August 2010
Kuala Lumpur, Malaysia, and Revised 21 January 2011
Accepted 21 January 2011
Siong Choy Chong
Asian Institute of Finance, Kuala Lumpur, Malaysia

Abstract
Purpose – The purpose of this paper is to propose a conceptual model which is aimed at assisting
end-users, i.e. construction practitioners who are without a proper legal background for effective
administration of construction contracts, to enable them to make correct interpretations and decisions
in dealing with vast amount of legal information.
Design/methodology/approach – This study proposes the application of data warehouse
technology in the contract administration process of the construction industry. Upon identification
of a comprehensive list of problems associated with construction contracts based on the feedback from
12 reputed experts in the construction industry, a conceptual model is developed using a data flow
diagram.
Findings – The results show that data warehouse technology is feasible and practical to the
construction practitioners in the contract administration process.
Research limitations/implications – This research focuses only on the development of a
conceptual model and thus the practicability aspect of the model is a major concern. As such, the
resulting practical implications are limited and are constrained only to the construction industry in
Malaysia, raising the question of generalizability of the proposed model, as well as across different
industries and countries.
Practical implications – It is posited that the proposed conceptual model, when implemented,
would enable construction practitioners to administer construction contracts with better clarity
and accuracy, so that interpretation errors and disputes can be mitigated. This will facilitate the
development of harmonious working relationships.
Originality/value – The application of data warehouse technology in contract administration is
rather new in the construction industry. The conceptual model thus offers a more effective and proactive
approach in construction contract administration towards dispute resolution and/or prevention.
Keywords Malaysia, Construction industry, Contracts, Contract law, Decision support systems,
Contract administration, Data warehouse technology, Data flow diagram, Conceptual model
Paper type Conceptual paper

Introduction
Construction stakeholders always use a standard form of contract to regulate their
contractual obligations and expectations during the contract administration process. It is Industrial Management & Data
during this process that a vast amount of contract provisions are referred to. However, Systems
Vol. 111 No. 9, 2011
contractual conflicts or disputes seem to be inevitable in the construction industry pp. 1449-1464
especially on issues concerning interpretation and understanding of construction q Emerald Group Publishing Limited
0263-5577
contracts (Broome and Hayes, 1997; Candlin et al., 2002). This is not difficult DOI 10.1108/02635571111182782
IMDS to understand as the construction industry is a dispute-prone industry due to its
111,9 fragmented and adversarial nature (Cheung and Yiu, 2007; Chong and Rosli, 2009).
In general, interpretation error and misunderstanding of construction contracts can be
traced to the illegibility of contract clauses (Broome and Hayes, 1997; Cutts, 2004; Styllis,
2005) and legalese or technical legal terms or jargons (Candlin et al., 2002; Cutts, 2004).
More often than not, these issues result in disagreements between the contracting parties
1450 on their contractual rights and responsibilities.
A considerable number of prior studies have explored the issues associated with
interpreting and/or understanding construction contracts and their impacts (Martin,
1993; Thomas et al., 1994; Broome and Hayes, 1997; Rameezdeen and Rajapakse, 2007).
Other empirical studies have described the use of language and characteristics in
legal documents (Henkin, 1988; Hill, 2001; Feinmann, 2003; Cutts, 2004). These studies
reported that the construction contractors often encounter difficulties in understanding
contract documents due to their non-legal background and the inherent legal jargons
and concluded that contractors should be well versed in the interpretation clauses
stated in the contracts. Notwithstanding the considerable number of research conducted,
means to resolve these issues have not been effectively and adequately provided. This is
evident from the conflicts reported in a Malaysian major daily about the occurrences of
collapsed ceilings and burst pipes either at newly built or existing government buildings
(New Straits Times, 2007).
Accordingly, the contractors are required to fulfill the obligations of a standard
contract form issued by the Malaysian Public Works Department (PWD) – the PWD
203 A (Revised 10/83) Form, which is the most popular and widely used form by the
Malaysian public sector agencies. The form was formulated in 1983 based on the
English 1931 RIBA standard form of contract which is also modeled after by many
Commonwealth countries. The form had been in use in Malaysia for more than 20 years
(Lim, 2004) until the latest revision (PWD – 203 A (Rev. 2007)) was launched in 2008. The
revised version, however, is still considered new and fresh to the construction industry
and many contractors are still familiar with the former version. Owing to its technicality
and legalese nature, many contractors misinterpreted the conditions of the contract and
did not understand the legal obligations outlined in the contract. As such, they failed to
appreciate the genuine contractual rights and obligations in a construction project which
have resulted in the untoward incidents occurred at the government buildings.
All these point to the imperative need of a detailed study on the lack of understanding,
particularly on the technical aspect of the language structure within the standard
contract form so as to serve as a basis to overcome the issues and challenges associated
with the form. In addition, it may also contribute to forms of similar construct used by
the Commonwealth countries. In so doing, this research aims to propose data warehouse
technology as an important and possibly practical measure in mitigating conflicts and
disputes arising from construction contracts. The introduction of such an approach
is considered new to the construction industry. Since data warehouse technology is an
analytical database that efficiently collects, organizes, and stores all relevant data in
support of management decision (Chau et al., 2002; Rujirayanyong and Shi, 2006), this
method is appropriate to be used for decision making especially when dealing with vast
amount of legal information in the construction contracts. While construction contracts
are considered as textual data in the data warehouse, this data are yet to be introduced
for business-decision making. This is a great challenge in research because the textual
data from construction contracts are not repetitive and is unstructured (Ho et al., 2009; Construction
Inmon and Valente, 2010). Therefore, a generic approach needs to be considered when contract
developing the data warehouse modeling (DWM) towards effective administration of
construction contracts. administration
The data flow diagram (DFD) method was selected to illuminate the process flow of
DWM in this study as the method focuses on object perspective (Luo and Tung, 1999)
with the primary reason to deliver a more clarified and accurate means of construction 1451
contract administration. Generic source of information can be sought in dealing with
the contractual issues instead of concentrating on a case-by-case basis. This method
also facilitates the process of retrieving, updating, and exchanging of information.
It thus provides useful information in better equipping the construction practitioners
to make more informed decisions to the contractual issues in contract administration
(Liu et al., 2007). In addition, it also assists contract drafters and experts to review and
clarify the clauses of the contract form in a way understandable to the parties. In other
words, it encourages a proactive approach in contract administration.
This paper is organized as follows. The next section reviews literature pertaining to
the construction contracts, followed by the description of data warehouse. The need for
data warehouse in contract administration is discussed next before the DFD method is
explained. As a result, a conceptual model is presented. The DWM and its features are
proposed and the results are discussed before concluding the paper.

Understanding construction contracts


Construction contracts are written agreements signed by the contracting parties, which
bind them, defining relationships and obligations in a particular project. Contract
administration, on the other hand, is a process of administrating a business or matter
that governed the contracting parties’ interests. In the construction industry, it revolves
around the pre-construction stage, construction stage, and post-construction stage.
Contract problems cannot be ignored as issues with the contract are a very common
reason for claims that cost the construction industry millions of dollars per year (Sturgill
and Vorster, 2006) due to unmet contractual obligations and expectations by the
contracting parties. In addition, poor understanding of construction contracts has also
led to construction disputes (Broome and Hayes, 1997; Hartman et al., 1997; Chong and
Rosli, 2010) which has the potential to mar the image of the construction industry even
for many years to come. Among the primary reasons attributed to these problems are
lack of clarity and use of legalese in the contract clauses. The use of formal and technical
language in legal documents upsets interpretation (Feinmann, 2003). As a matter of fact,
there may be more serious errors that go uncorrected because the interpretation
of the contract clause was not actually written or meant in the contract (Hill, 2001;
Thomas et al., 1994). This was exactly the case of the PWD 203 A standard contract
form. Contract clarity is therefore an undisputable necessity, whereby crystal clear
expression is a pre-requisite for all contractual agreements.
As an antidote to this perceived lack of clarity and legalese problems, the use of
‘‘Plain English’’ has established itself as a reform movement that focused on making
the language more accessible, particularly to non-lawyers (Candlin et al., 2002).
Undoubtedly, “Plain English” is a woolly term. Owing to this, researchers have proposed
several techniques and guidelines. Candlin et al. (2002), for instance, suggested
using strong verbs instead of weaker nouns to avoid nominalizations (e.g. the use
IMDS of “please explain” instead of “please provide an explanation”), and using active voice,
111,9 short sentences, familiar words, positive style, etc. Cutts (2004) underlines that using the
vertical list to break up complicated text, putting accurate punctuation in a “long”
sentence and shorten the sentence to an average of 15-20 words are important to ease
reading. Specifically, for construction contracts, Styllis (2005) suggests several
guidelines that can be applied towards its clarity such as:
1452 .
avoid too many cross-references between clauses;
.
use everyday words and grammar and only include legal terms where needed;
.
use verbs instead of noun phrases; and
.
use language of obligation correctly like “shall”, and use it only to express the
party’s obligation.

Taking the above cues, this research incorporates the Plain English principles into the
DWM as part of the contract administration process in the construction industry.

Data warehouse and its relevance to contract administration


Data warehouse is recognized as a type of decision-support systems (DSS). It is
considered to be a relatively new database discipline. However, it has functions that
differ from those of a general database. The former is designed to respond to analysis
questions and make decisions, while the latter is merely to record or store data. Further,
data warehouse is a read-only database created by combining data from multiple
databases for purposes of analysis (Theodoratos and Sellis, 1999). The contents of a data
warehouse may be a reproduction of a part of some source data or the results of
preprocessed queries or both (Chau et al., 2002). This approach of data storage provides a
useful guide in making decisions.
Based on the justifications highlighted above, we have a strong reason to believe that
the application of data warehouse in the construction industry could ensure that the
end-users could access or retrieve the data for references and decision making at
the appropriate time during the contract administration period. This is in view of the
fact that the amount of information on construction contracts is increasing rapidly as
attributed to the complexities and contractual requirements of a project. Moreover,
judgments and jurisdictions from litigation cases create numerous legal views or
positions that affect the practice of contract administration. As such, organizations that
can effectively and efficiently manage this vast amount of data and use this information
would definitely be able to make better decisions in any contractual circumstances.
In practice, the data required by contract administration consists of contract
provisions, jurisdictions of legal cases, and literatures. While such data are voluminous
and very useful, end-users are poor in managing and appreciating it. Lack of
understanding of the data is a common problem in construction industry since most
of the end-users do not possess a legal background (Chong and Rosli, 2010). A data
warehouse stores summarized information instead of operational data. As such, it would
help to mitigate the problem when the data have been well-developed and organized.
It could perform data analysis, reporting, and query tools to help end-users sift through
tomes of data and extract valuable information from them (Gupta and Mumick, 2005).
The data warehouse technology thus motivates the need for a new breed of DSS in
contract administration.
In addition, the interface to and from the data warehouse must be able to operate in a Construction
batch mode. Operating in an online mode is an appealing option but it is not relevant to contract
this study. This is because the data warehouse technology requires full support or
sanction from the local authority and professional bodies in order to publish legal administration
information or contract provisions. This is also to prevent the conflict of interest. Hence,
the data warehouse proposed to be developed in this study is mainly for use by the
end-users within the construction organizations. 1453

Data flow diagram


The DFD is a graphical representation of the “flow” of data through the processes. DFD
uses four basic symbols to show entity, process, data flow, and data store to trace and
depict the movement of information (Luo and Tung, 1999). This is a different principle
compared to entity relationship diagram (ERD) based on the curtailing graphical
manifestations of the data model in the DFD (Millet, 1999). As illustrated in Table I, the
explanation of the DFD elements is based on the proposed conceptual process flow
model. The proposed model is derived from the discussion conducted with 12 reputed
experts using Delphi technique prior to the completion of the final conceptual model. The
experts were sought to verify the process flow and practicality of the conceptual model

DFD element and notations Explanation

Entity It was a data source or sink for the standard form of contract. The data
flow (contractual issue) moved out from the entity
DISPUTES

Process The process was an activity of the mitigation or prevention of


contractual disputes that involved in the model. It showed in bubble
0 shape. The process was stated a numbering to show the sequence and
level for the transformation of data
Mitigate/ prevent
contractual issues
systematically
and proactively

Data flow The arrow represented the information flow or movement either from
the process, entity or data store to another state. With a rule that the
Contractual issue flow must involve a process

Data store The data store was the data storage. It was retrieved to obtain the
necessary information regarding the project characteristics
D1 Project database Table I.
Explanation of DFD
elements and notations
IMDS specifically for the construction industry. Their feedback was taken into consideration
111,9 and this has contributed to the development of the final model.
The context diagram is the highest level of DFD which reveals an external picture
and overall function of an information system. The next level is Level-0 DFD which is
made up of a number of processes from the main activity in the diagram. This is followed
by Level-1 DFD, which decomposes from a parent process in the Level-0 DFD. The
1454 splitting of the diagrams presents better visualization of the model as shown Figure 1.

Development of a conceptual model


A good system ought to be able to supply useful information and data for users to make
decisions or references (Peter, 2008; Teh et al., 2008). Taking the cue, the DWM consists
of two sub-models as to deliver its contents and features. The sub-models are shown in
Figure 2.
The first sub-model demonstrates how to produce a clarified, organized, and reliable
source of references regarding the contractual obligations and expectations. It discusses
the processes involved in content development. Leading court cases and involvement of
experts are important input in the DWM. Besides, the project characteristics, breakdown
of contractual issues, and contract provisions need to be clarified in order to deliver
indented messages. The focus of the model is on explaining the sequence and process
required.
The second sub-model describes the features required in the DWM. The DWM
consists of three main features such as keyword searching, sub-categories of disputes
(breakdown of issue), and a forum for comments or discussion. It is designed in a simple
way to ease searching and feedback by and from the end-users. Eventually, the system is
aimed at rendering self-examination and proactive approach in contract administration

Context Diagram

Level-0 DFD

1.0

2.0

3.0

Figure 1.
Splitting of DFD diagrams
DWM Development
Construction
contract
administration
Sub-Model on the contents Sub-Model on the features

1455
• Project characteristics - Project characteristics
• Breakdown of contractual issues - Keywords searching
• Contract provisions - Breakdown of sub-categories
• Leading court cases - Updating or storing (if any)
• Involvement of local experts - Exchange of information (forum
for comments)

Figure 2.
DWM development for
contract administration

towards dispute resolution or prevention, whereby the clarified references or guidelines


are referred to and retrieved by the end-users.
Consequently, both the sub-models are verified and supported by 12 experts
specialized in the construction contract administration. The experts consist of three
lawyers who specialized in construction litigation, three veteran quantity surveyors,
three licensed architects, and three professional engineers. The Delphi technique was
employed to collect the opinions and judgments of construction experts and
practitioners. According to Linstone and Turoff (1975), this technique is particularly
useful under four specific conditions identified in this study:
(1) when the problem does not lend itself to precise analytical techniques but can
benefit from subjective judgments such as the sub-models presented in this
study;
(2) the individuals needed to contribute to the examination of a broad or complex
problem have no history of adequate communication (anonymous) and may
represent diverse backgrounds with respect to experience and expertise in
construction litigation, quantity surveying, architecture, and civil engineering;
(3) more individuals, such as in the case of this study, are needed than can
effectively interact in a face-to-face exchange; and
(4) time and cost make frequent group meetings unfeasible.

The experts identified in this study are busy people which made it impossible for
them to work together in the same physical location (Mitchell and Larson, 1987). The
interaction takes place between the experts and the researchers who act as facilitators.
Taking the cue from Brooks (1979), the Delphi technique has eight steps which begin
with the identification of panel of experts. In this regards, the purposive sampling
technique, particularly the judgment sampling, was employed. This non-probability
sampling technique is adopted due to the fact that the experts are in the best position
IMDS to provide the information required based on the criteria set by the researchers
111,9 (Sekaran and Bougie, 2010). Specifically, the experts were chosen because they hold a
significant position in their respective professional body. Because of their reputations
in the construction industry, they have frequently appeared in local publications
(i.e. magazines and daily newspapers) where their expert opinions are sought. More
importantly, they have had substantial experience in dealing with the PWD 203 A form.
1456 The second step involved determining the willingness of the individuals to serve on
the panel. All the experts identified were contacted and explained the nature of this
study. The researchers were pleased that all the 12 experts identified earlier had
consented to the study. Appointments were made to meet the experts (step 3) where they
were presented with the sub-models as well as the issues involved in different stages of
the construction contract (see Table II for details). Their concerns and feedback were
analyzed (step 4), compiled and incorporated in the resulting sub-models (Figure 2) and
the issues highlighted in Table II. The compiled information were then sent to each of the
experts by e-mails for review (step 5) in which their responses were again analyzed in an
aggregate form (step 6). Steps 7 and 8 were not directly applicable to this study as the
experts who evaluated the compiled information based on their positions unanimously
agreed to the information presented. As a matter of fact, the experts commended
on the extent of comprehensiveness of the sub-models developed and the issues in the

Pre-contract award stage Construction or commencement of work Post-commencement stage


(seven areas) stage (23 areas) (nine areas)

1. Estimating and pricing 1. Accessing to site 1. Defect liability period


2. Design information 2. Compensation/loss and expenses 2. Defects
3. Insurances 3. Default on notice 3. Determination
4. Performance bond 4. Delay and extension of time 4. Dispute resolution
submission 5. Discrepancy and inconsistency of 5. Final account and
5. Site possession information certificate
6. Tender documentation and 6. Fluctuation of price 6. Liquidated damages
requirements 7. Interference/problem by 7. Outstanding claim and
7. Work program subcontractors and suppliers set off
8. Interference/problem by 8. Retention monies or fund
professionals
9. Interim payment 9. Unresolved variations
10. Partial possession
11. Period of honoring certificates
12. Postponement or suspension of work
13. Practical completion
14. Quality of workmanship
15. Set off by employer
16. Site and nature of work
17. Standard and quality of material
18. Statutory obligations
19. Supply difficulties
20. Testing and inspection
21. Valuation and measurement
Table II. (work done)
Contractual issues 22. Contractual variations
in the three work stages 23. Weather
different construction stages highlighted. As such, group norm is demonstrated, and Construction
more importantly, their involvement and the resulting output generated have largely contract
enhanced the validity of the preliminary model and subsequently the value of this
research. administration

Contents of DWM
The context diagram of the first sub-model is shown in Figure 3. This level presents an 1457
overall picture of the process flow model and briefly illustrates how the clarified and
organized references or guidelines are produced. The activity numbering “0” is the only
process involved in the context diagram, i.e. mitigating or preventing contractual
issues systematically and proactively.
Subsequently, the Level-0 DFD is a child diagram from the context diagram as
shown in Figure 4. This model presents the most comprehensive data where it provides
detailed information on the process involved.
The first activity is to classify the project characteristics and contractual issues.
There are two types of information which flow into the project database. The first stores
the new or additional data from a new case, while the second is a database that contains
previous project particulars. This project database (D1) is vital as different project
characteristics would have different effects and implications on the contractual issues.
The project particulars could be classified as:
.
Type of project (building construction, road construction, etc.).
.
Contract or procurement system (lump sum contracts, cost reimbursement, etc.).
.
Procurement method (traditional, design and build, etc.).
. Standard form of contract (international or local contract form, e.g. joints
contract tribunal, new engineering contract, etc.).

The potential contractual issues can be categorised into three main stages as
shown in Table II. As such, the classified project particulars will be checked against
the three work stages, i.e. pre-contract stage, construction or commencement of work
stage and post-commencement stage to identify all issues related to the dispute.
Cross-reference may be needed between the three work stages in order to search for all
of the related issues. These work stages are derived from literature review and
organized in such a way to clarify the contractual activities the contracting parties are
involved in.
The second activity is to identify the relevant contract clauses related to the issue at
hand. The relevant contract provisions are identified from the contract form (D2). The
targeted issue is classified according to the project particulars under the first activity
of selecting the contract form. A reference will be made to the main clause and its

0
Mitigate/ Clarified
DISPUTES Contractual issue prevent references/guidelines
contractual END-USERS
issues Figure 3.
systematically Context diagram of
and contents of DWM
proactively
IMDS
111,9
DISPUTES

Contractual issue
New cases (if any)
1.0
1458
Classify the Feedback/data refinement (if any)
D1 Project database project
characteristics
Previous cases and
contractual
issue
Targeted issue

2.0
D2 Standard Form
Identify the Extra info (if any)
Contract clauses relevant
contract
clauses

Contract provisions
3.0
D3 Literature and court cases
Investigate
Background data and and organize
legal principles the provisions
in detail

Comprehensive details
4.0
D4 Plain English guidelines
Clarify the
content for
Clarity aspects the ease of
understanding

Drafted references/guidelines
5.0
Verify and
comment the
references by
mixture of
experts for
the consensus
Clarified references/guidelines

Figure 4. END-USERS
Level-0 DFD of contents
of DWM
sub-clauses of the contract relevant to the issue in addition to other related clauses Construction
in order to gain a wider view on the expressed contractual obligations and expectations. contract
All the related clauses will be combined and cross-referred. The principle of read and
interpret as a whole is applied to produce the contract provisions regarding the targeted administration
issue.
The third activity is related to enhancing the information on the contract provisions.
It is important to consider some background data and legal principles in order to achieve 1459
a comprehensive reference and details related to the contract provisions. In achieving
this, the latest leading court cases and literatures (D3) are the main sources for this
exercise. This is because court cases provide the common law principles and legal
positions for a particular issue, while literature sources help in organizing and
recognizing the characteristics of the issue from different perspectives. It is possible that
the content of each clause may be reverted to the second process if there is extra
information generated after investigating the literature and court cases.
The fourth activity involves the comprehensive details that must be clarified due to
the weak understanding and poor interpretation of the issues in the construction
industry. The use of Plain English (D4) of the clarity aspects is to be adopted to provide
a clear meaning of its content so that they are simple and easy to understand. The list
of the Plain English guidelines is shown in Table III. After the process of clarification,
draft references or guidelines will be produced.
The activity numbering 5.0 is the last process of the conceptual model. This process
is considered the most important because it is the centre of the quality system which
provides useful information and references to end-users. Therefore, Delphi method
approach is incorporated under this process to denote a consensus derived at from a
mixture of experts. Construction industry is unique and adversarial in nature and this
consensus is vital especially when dealing with contractual conflicts or disputes. After
the process of verification and commentary, the clarified references or guidelines will
serve as a useful reference to the construction practitioners for decision making. The
verification process by the experts does not confined only to the language structure but
also to the meaning and certain legal intents of the contents.

No. Plain English usage and guidelines

1 Reduce the unnecessary words to keep it as short as possible if more than 20 words in a sentence
2 Put accurate punctuation in a “long” sentence
3 Shorten the sentence for ease of reading to average 15-20 words
4 Use positive style rather than negative style
5 Use illustrative examples or flow chart in treating procedures as processes
6 Avoid too many cross-references between clauses
7 Use verbs instead of noun phrases
8 Use the active voice instead of passive voice
9 Use everyday words and grammar and only include legal terms where it has to
10 Use vertical list to break up complicated text Table III.
11 Eliminate the repetition or redundancy of words Plain English usage
Use language of obligation correctly: avoid using “shall”, but still using it to express party’s and guidelines
12 obligation in standard form
IMDS Features of DWM and a theoretical working example
111,9 Figure 5 shows the main process in the development of DWM features. It serves to search
and refer to the clarified and organized references or guidelines by the construction
practitioners.
Level-0 DFD is shown in Figure 6. A contractual issue is extracted from the
construction disputes. The issue will be classified according to the project particulars.
1460 Project database (D1) is referred to in order to provide a list of choices for selection. The
choices are listed from the four main elements of the project, i.e. project type, contract
procurement system, procurement method, and standard form of contract. Then, the
specified particulars of the project will be sorted out.
The next activity is to target a main issue from the contractual issues database (D2).
All the contractual issues are stored in the three work stages of the database. The issue
can be retrieved by searching using keywords or by selecting the concerned issue from
the breakdown of issues. A targeted issue is then obtained. Subsequently, the targeted
issue will be further examined based on the characteristics of the issue to investigate
and seek the root cause of the main issue.
The last process is to select the references or guidelines for the root cause of the
dispute. The data warehouse database is set up to store all the clarified references or
guidelines elicited from the experts. The database performs two functions. Primarily,
it provides the consensus data by the experts based on the issue’s root causes. The next
function is to keep all the comments or discussion by the construction practitioners
regarding the particular issue or its sub-topics. It will serve as a forum of discussion for
the practitioners in exchanging and sharing information.

Discussion
This study proposes two sub-models using the DFD which to date is non-existent. They
were identified, verified and modified though a series of discussions and interviews with
12 reputed experts. The first sub-model describes how to build up the content of the
DWM, while the second explains how the clarified references or guidelines are to
be referred to by the construction practitioners through a system. These sub-models are
discussed separately in order to illuminate a better understanding on the DWM.
The first sub-model requires a detailed study to be carried out towards the standard
form applied in the construction contract administration. Next, it clarifies the language
structure within the Plain English concept. This concept is vital towards facilitating
understanding of the contents since the practitioners are not from the legal background.
After that, the clarified information is verified by the experts or experienced staff within
the construction organization. As such, it offers significant contribution of the data
warehouse towards information retrieval through keyword searching and breakdown of
issues faced in construction administration.

0
Sorted
Contractual issue Search and references/guidelines
DISPUTES refer to the END-USERS
Figure 5. clarified and
Context diagram organized Comments/discussion
references/
of features of DWM
guidelines
Construction
DISPUTES
contract
Contractual issue administration
1.0

D1 Project database Select the 1461


project
Choices of project particulars particulars

Specified particulars

2.0

D2 Contractual issues Search the


contractual
Three work stages - issues issue via
keywords or
issues
breakdown
Targeted issue

3.0
Sort and
examine for
the sub-
topics/root
cause from
the issue
Breakdown of the issue

4.0
D3 eDR database
Select the
reference/
Consensus data by the experts guidelines

Clarified references/guidelines
Figure 6.
Comments/discussion Level-0 DFD
END-USERS of features of DWM

Subsequently, a data warehouse on clarified information is developed based on


the second sub-model. Two significant approaches were highlighted in the model,
i.e. effective legal information retrieval using keyword searching and breakdown of
contractual issues. It would help the users to locate and derive the relevant information
from the clarified contents. Microsoft Access can be an initial option for the development
IMDS of data warehouse system because the software is cheaper but yet user-friendly. The
111,9 developed data warehouse system could be shared and used within the construction
organization, so that the information can be retrieved, exchanged and stored in the data
warehouse. However, it is equally important that the users also consider functionalities,
reliability, scalability, and other pertinent issues when choosing database products.
Certain limitations need to be considered in order to deliver a complete data warehouse
1462 system for contract administration, especially the legal system like codified or common
law of the respective countries. Nonetheless, the DWM renders a generic approach
towards contract administration. The impact of these two sub-models render an important
insight to transform the conventional practice of using a whole bunch of complicated
legal documents towards a more clarified and organized means from information
technology perspective. It will be very useful to serve as a template or reference for further
development of a more comprehensive conceptual model and its implementation.

Conclusion and future research possibilities


The imperative need for contract clarity is justified in this study through
the development of a conceptual model using DWM in dealing specifically with the
contractual and legalese issues. The sub-models provide a useful reference or proactive
approach to the prevention or mitigation in contract administration not only in
Malaysia but potentially across the Commonwealth countries which use similar forms
derived from the English 1931 RIBA standard document forms. The DWM provides a
very useful and rigorous methodology for its system development in the construction
industry. Ultimately, the complete data warehouse system helps the users to make
more informed decisions regarding contractual circumstances in a construction project
and subsequently help to overcome all the contractual issues highlighted in this paper,
although sometimes total elimination may not be achievable.
The paper presents a conceptual model which is new and significant to the
construction industry as verified by the 12 experts. However, the model is yet to be
tested and that there is an absence of a working example to illustrate how the model
works. Together, with the Delphi technique used, the aspects of practicability and
generalizability remain a significant question unanswered. It is recommended that
pilot projects are undertaken so as to assess and validate the sub-models in addition to
identify, if at all, any issue that has not been considered by the researchers. As a start,
simple software like Microsoft Access could be applied to develop an intranet system
within a construction organization, or it could be further enhanced and developed under
internet or open access system by professional bodies or governmental departments for
the use of the entire construction industry. Such an industry-wide system could assist in
decision making and render a useful guide for users. The resulting findings can be used
as a basis to expand the research to other Commonwealth countries adopting the English
1931 RIBA standard document forms.
Although the sub-models developed have provided helpful guidelines for future
contract drafting, it is imperative for future research to take into account the experts’
involvement in verifying the final conceptual model so that a more comprehensive model
can be derived at. In addition, future research on the possible improvement measures on
the clauses to be taken into consideration by contract drafters and experts is warranted.
This study also does not purport to look at ERD due to its focus on developing a process
flow conceptual model rather than modeling the data (DeMarco, 1978) although both
ERD and DFD are clustered under the Structural Analysis and Design techniques. While Construction
the use of DFD is reinforced by its current development as reported in a recent study by contract
Jilani et al. (2008), a review on ERD may provide interesting insights.
As described earlier, an appreciation of what the construction contracts actually administration
meant to the stakeholders would help to avoid misunderstood scenarios or wrong
interpretations from fostering between the contracting parties, create harmonious
working relationships between the parties, and more importantly, ensure that we all 1463
work and live in safe environments.

References
Brooks, K.W. (1979), “Delphi technique: expanding applications”, North Central Association
Quarterly, Vol. 53, pp. 377-85.
Broome, J.C. and Hayes, R.W. (1997), “A comparison of the clarity of traditional construction
contracts and of the new engineering contract”, International Journal of Project
Management, Vol. 15 No. 4, pp. 255-61.
Candlin, C.N., Bhatia, V.K. and Jensen, C.H. (2002), “Developing legal writing materials for
English second language learners: problems and perspectives”, Journal of English for
Specific Purposes, Vol. 21 No. 4, pp. 299-320.
Chau, K.W., Cao, Y., Anson, M. and Zhang, J. (2002), “Application of data warehouse and decision
support system in construction management”, Automation in Construction, Vol. 12 No. 2,
pp. 213-24.
Cheung, S.O. and Yiu, T.W. (2007), “A study of construction mediator tactics – part I: taxonomies
of dispute sources, mediator tactics and mediation outcomes”, Building and Environment,
Vol. 42 No. 2, pp. 752-61.
Chong, H.Y. and Rosli, M.Z. (2009), “The behavior of dispute resolution methods in Malaysian
construction industry”, The IEEE Proceedings of the 2009 International Conference on
Industrial Engineering and Engineering Management (IEEM), Hong Kong, pp. 643-7.
Chong, H.Y. and Rosli, M.Z. (2010), “A case study into the language structure of construction standard
form in Malaysia”, International Journal Project Management, Vol. 28 No. 6, pp. 601-8.
Cutts, M. (2004), Oxford Guide to Plain English, Oxford University Press, New York, NY.
DeMarco, T. (1978), Structural Analysis and System Specification, Yourdon Press, New York, NY.
Feinmann, J.M. (2003), 1001 Legal Words You Need to Know, Oxford University Press,
New York, NY.
Gupta, H. and Mumick, I.S. (2005), “Selection of views to materialize in a data warehouse”,
IEEE Transactions on Knowledge and Data Engineering, Vol. 17 No. 1, pp. 24-43.
Hartman, F., Snelgrove, P. and Ashrafi, R. (1997), “Effective wording to improve risk allocation in
lump sum contract”, Construction Engineering and Management, Vol. 123 No. 4, pp. 379-87.
Henkin, H. (1988), Drafting Engineering Contracts, Elsevier Applied Science Publishers,
New York, NY.
Hill, C.A. (2001), Why Contracts are Written in Legalese, Kent College of Law, Chicago, IL.
Ho, T.C., Hsu, S.F. and Oh, K.B. (2009), “Knowledge sharing: game and reasoned action
perspectives”, Industrial Management & Data Systems, Vol. 109 No. 9, pp. 1211-30.
Inmon, B. and Valente, G. (2010), “A peek into the future: the next wave of data warehousing”,
available at: http://tdwi.org/Articles/2010/02/03/Next-Wave-DW.aspx?Page¼1
Jilani, A.A.A., Nadeem, A., Kim, T.-H. and Cho, E.-S. (2008), “Formal representations of the data
flow diagram: a survey”, Proceedings of the International Conference on Advanced
IMDS Software Engineering and Its Applications (ASEA) 2008, Hainan Island, People’s Republic
of China, 13-15 December, IEEE Computer Society Press, Los Angeles, CA, pp. 153-8.
111,9 Lim, C.F. (2004), The Malaysian PWD Form of Construction Contract, Sweet & Maxwell Asia,
Selangor.
Linstone, H.A. and Turoff, M. (1975), The Delphi Method: Techniques and Applications,
Addison-Wesley, Reading, MA.
1464 Liu, J., Li, B., Lin, B. and Nguyen, V. (2007), “Key issues and challenges of risk management and
insurance in China’s construction industry: an empirical study”, Industrial Management &
Data Systems, Vol. 107 No. 3, pp. 382-96.
Luo, W.H. and Tung, Y. (1999), “A framework of selecting process modelling methods”,
Industrial Management & Data Systems, Vol. 99 No. 7, pp. 312-19.
Martin, E. (1993), “Importance of teaching construction contract specifications”, Professional
Issues in Engineering Education and Practice, Vol. 119 No. 2, pp. 147-52.
Millet, I. (1999), “Technical note – a proposal to simplify data flow diagrams”, IBM Systems
Journal, Vol. 38 No. 1, pp. 118-21.
Mitchell, T.R. and Larson, J.R. Jr (1987), People in Organizations: An Introduction to
Organizational Behavior, McGraw-Hill, New York, NY.
New Straits Times (2007), “PWD eyes ‘full of power to monitor projects’”, May 3, p. 6.
Peter, R.D. (2008), “A relationship approach to construction supply chains”, Industrial
Management & Data Systems, Vol. 108 No. 3, pp. 310-27.
Rameezdeen, R. and Rajapakse, C. (2007), “Contract interpretation: the impact of readability”,
Journal of Construction Management and Economics, Vol. 25 No. 7, pp. 729-37.
Rujirayanyong, T. and Shi, J.J. (2006), “A project-oriented data warehouse for construction”,
Automation in Construction, Vol. 15 No. 6, pp. 800-7.
Sekaran, U. and Bougie, R. (2010), Research Methods for Business: A Skill-Building Approach,
Wiley, Hoboken, NJ.
Sturgill, R.C. and Vorster, M.E. (2006), “Visually improving construction contract
administration”, Journal of the Transportation Research Board, Vol. 1946, pp. 12-21.
Styllis, S. (2005), Constructing Construction Contract: The Need for Clarity, Sutton Reed Business
Information, Sutton.
Teh, P.L., Ooi, K.B. and Yong, C.C. (2008), “Does TQM impact on role stressors? A conceptual
model”, Industrial Management & Data Systems, Vol. 108 No. 8, pp. 1029-44.
Theodoratos, D. and Sellis, T. (1999), “Design data warehouse”, Data & Knowledge Engineering,
Vol. 31 No. 3, pp. 279-301.
Thomas, H.R., Smith, G.R. and Mellot, R.E. (1994), “Interpretation of construction contracts”,
Journal of Construction Engineering and Management, Vol. 120 No. 2, pp. 321-36.

Further reading
Inmon, W.H. (2002), Building the Data Warehouse, Wiley, New York, NY.

Corresponding author
Siong Choy Chong can be contacted at: eddy.chong@aif.org.my

To purchase reprints of this article please e-mail: reprints@emeraldinsight.com


Or visit our web site for further details: www.emeraldinsight.com/reprints
This article has been cited by:

1. Xiangyu Wang, Heap-Yih Chong. 2015. Setting new trends of integrated Building Information Modelling
(BIM) for construction industry. Construction Innovation 15:1, 2-6. [Abstract] [Full Text] [PDF]
2. Heap Yih Chong, Rosli Mohamad Zin, Siong Choy Chong. 2013. Employing Data Warehousing
for Contract Administration: e-Dispute Resolution Prototype. Journal of Construction Engineering and
Management 139:6, 611-619. [CrossRef]
3. Heap-Yih Chong, Tick-Hwa Phuah. 2013. Incorporation of database approach into contractual issues:
Methodology and practical guide for organizations. Automation in Construction 31, 149-157. [CrossRef]
4. Yen‐Lin Kuo. 2013. Technology readiness as moderator for construction company performance. Industrial
Management & Data Systems 113:4, 558-572. [Abstract] [Full Text] [PDF]
5. Heap‐Yih Chong, Rosli Mohamad Zin. 2012. Selection of dispute resolution methods: factor analysis
approach. Engineering, Construction and Architectural Management 19:4, 428-443. [Abstract] [Full Text]
[PDF]