The work to be performed under this Contract consist of the furnishing of all
materials, labor, equipment, transportation, and other facilities necessary to
complete the project in accordance with these Specifications and Contract
Drawings.
The plan and specification shall be considered as cooperative on all labor and
materials; if one is not mentioned or indicated in the other or vice versa it shall
be done by the contractor as if those are duly mentioned in both.
3.0. FINISHINGS
3.1. Flooring – Porcelain Tile for kitchen, Ceramic Tile for Dining Area
3.3. Serving Window - Fixed Sliding Panel on Kiln Dried wooden frames
1. All electrical works shall be in strict compliance with the latest edition of
the Philippine National Electrical Code
Painting work for the various parts of the work shall be as follows:
1. Workmanship:
Finished surfaces shall be smooth, even and free from defects, and
shall show even coatings. Paints shall be applied to dry surfaces only
and no succeeding coat of paint shall be applied until the preceding
coat is thoroughly worked into all joints crevices, and open spaces,
there shall be a perceptible difference in the shades of successive
coats of paints
2. Color Scheme:
3. Preparation of Surfaces: