300 300
150 150
155
45
Ground Level
200
200
100
100
50
700
700
500
500
N10 at 200 mm intervals N10 at 200 mm intervals
400
400
Sl 81 or trench mesh Sl 81 or trench mesh
20 Mpa concrete
100
300 300
SECTION VIEW
Scale: 1:10
300
150
155
300 mm
Ground Level
200
100 mm
100
50
700
Length of the N10 bar is 600 mm
500
Sl 81 or trench mesh
Width of the mesh is 600 mm and 20 Mpa concrete
100
First excavate out the 700mm x 300 mm trench (area marked in light blue rectangle)and then excavate out the 300 mm x400 mm trench(area marked in dark blue rectangle) .
Then pour the concrete for the 300 mm x 400 mm trench with the N10 bar as shown in the drawing and for the 700mm x100 mm base with the trench mesh or SL 81 mesh in the middle as the first stage.
Finally, make formwork for the step shape wall and pour the concrete as the second stage. 300
Designed Project
D General Notes MUNICIPAL OFFICES Kanishka
CNR VINCENT & HIGH ST
ARARAT, 3377
####
C Drawn Kanishka
POSTAL ADDRESS Title
B - POST OFFICE BOX 246 Checked - ####
ARARAT, VICTORIA 3377
Date Project No Sheet No Sheet Size Rev.No
A 12-Jun-18
T: 03 5355 0200
Ararat Rural City F: 03 5355 0279
-
CAD file
#### 2 A1 ####
Rev. Description Date Drawn Checked Scale