CAPITAL EXPENDITURE
NARRATIVE JUSTIFICATION
PLAN / BUDGET
: 2019
YEAR
DEPARTMENT /
: TECHNICAL/QC
LOCATION
PROJECT Purchase of 2 Air Condition PROJECT
70,000
DESCRIPTION : units (Window type) COST :
COST CENTER : 0371
PRIORITY : Absolutely Essential (AE)
Replacement of corroded and non-functioning units necessary
JUSTIFICATION : to maintain standard temperature in the QC instrument and
chemical stock rooms
SITUATION ANALYSIS:
Air condition units installed in Laboratory instrument and chemical stock rooms cannot be used
because they are already corroded beyond repair.
2. What is the immediate / long range consequence if the situation remains the
same?
3. What are the benefits (direct / indirect) to be derived from the project? What
happens to the items that will be replaced?
Replacement of the damaged air condition units will extend shelf-life and delay/prevent
deterioration of laboratory chemicals and prevent malfunctions on lab equipment.
Old equipment are severely corroded and shall be turned over to Mat/Engg as scrap.