COMPANY PROFILE

Table of Contents
EXECUTIVE SUMMARY .................................................................................................................................. 4
1. INTRODUCTION ..................................................................................................................................... 5
A. Mission Statement ............................................................................................................................ 6
B. QHSE Policy ....................................................................................................................................... 7
2. MANAGEMENT PROFILE ....................................................................................................................... 9
A. Corporate Governance...................................................................................................................... 9
B. Chief Executive .................................................................................................................................. 9
C. Director Operations ........................................................................................................................ 10
D. Director Civil projects...................................................................................................................... 11
E. Director Special Projects ................................................................................................................. 11
F. Working Team ................................................................................................................................. 12
3. OUR SERVICES ..................................................................................................................................... 15
A. Construction Services...................................................................................................................... 15
B. Ready Mix Concrete ........................................................................................................................ 16
C. On Site Batching .............................................................................................................................. 16
D. Equipment Rental ........................................................................................................................... 17
4. OUR VALUES........................................................................................................................................ 18
5. PROJECT MANAGEMENT..................................................................................................................... 19
6. PLANT & EQUIPMENT ......................................................................................................................... 21
7. PROJECTS ............................................................................................................................................ 23
A- Construction Projects ...................................................................................................................... 24
B- Project executed by staff ................................................................................................................ 39
i.) Mirani Dam ................................................................................................................................. 39
ii.) Satpara Dam ............................................................................................................................ 40
C - Ready Mix Concrete Notable Projects ............................................................................................... 41
i.) Layari Development Authority – Scheme 42 - Karachi ............................................................... 41
ii.) ISLAMABAD - Building Clusters ............................................................................................... 42
iii.) SINDH – Building Clusters ....................................................................................................... 43
iv.) Nokhar – 500 KVA Grid Station ............................................................................................... 43
v.) Metro Bus Service, Lahore ...................................................................................................... 44

INTEGRATED CONSTRUCTION SOLUTIONS (PVT) LIMITED Page 2


COMPANY PROFILE

V.) DHA City, Karachi .................................................................................................................... 44


C. Ready Mix Concrete Commercial Projects ...................................................................................... 45
8. HEALT & SAFETY POLICY ..................................................................................................................... 50
9. QUALITY CONTROL - CONCRETE ....................................................................................................... 52
10. Quality Assurance ........................................................................................................................... 59
9. COMPANY DOCUMENTS ..................................................................................................................... 60
A. Memorandum of Association ......................................................................................................... 60
B. Articles of Association ..................................................................................................................... 60
C. SECP Certificate ............................................................................................................................... 60
D. NTN Certificate ................................................................................................................................ 60

INTEGRATED CONSTRUCTION SOLUTIONS (PVT) LIMITED Page 3


COMPANY PROFILE

EXECUTIVE SUMMARY

Integrated Construction Solutions (Pvt.) Ltd. was incorporated with SEC Pakistan in 2008 with
mission to introduce cutting edge technology and best practices for total project management
solutions in construction industry.

Currently ICS has three wings:

1. Ready Mix Concrete; we are offering Ready Mix Concrete and our brand name is “C-
Mix”. C-Mix has presence in three major business hubs of country i.e. Karachi, Lahore
and Islamabad/Rawalpindi. C-Mix is can be delivered anywhere in Pakistan. Batching
Plant can be installed at the Construction site, if required.

is a professional construction services, , & equipment rental company, based in Lahore with
qualified engineers and industry

veterans in the top executive positions.

By virtue of their experience they understand the concerns of the industry and their priorities
and needs.

We are serving the clients in the field of engineering, planning with infrastructure, construction
side & ready mix concrete.

We are providing construction services as group of highly qualified professionals with extensive
field experience who are working at the different platforms in their respective fields of
engineering and architecture.

We are big shareholder of rental equipment for ready mix concrete & construction services.

We have the manpower and the equipment to deliver concrete in the required quantity while
meeting the highest quality standards. (Please refer to organizational chart and List of
Equipment)

We understand the importance of quality and take extensive steps to ensure that quality is
delivered every day, every time. (Please go through the Quality Assurance Section of Profile).

INTEGRATED CONSTRUCTION SOLUTIONS (PVT) LIMITED Page 4


COMPANY PROFILE

ICS is one of most Experienced Company in the “Ready Mix, Equipment Rental & Construction
Services” business and it has already supplied concrete, equipment rental & construction to
hundreds of clients (Refer to List of Projects.)

ICS is the best choice for your concrete, equipment rental, construction services & related
needs because ICS focuses and specializes in concrete, equipment rental, construction services
and offers all the auxiliary services in addition to the supply of concrete, equipment rental &
constructions services.

1. INTRODUCTION

ICS was created to fill the much needed gap of providing quality concrete, rental equipment &
construction services to contractors and developers throughout Pakistan.

In a short period of Three years, the company has made its name as a reliable partner in the
construction industry by its professional approach, commercially viable solutions with highest
quality standards.

To serve the clients better, we have expanded throughout Pakistan and now have offices from
Islamabad to Karachi.

INTEGRATED CONSTRUCTION SOLUTIONS (PVT) LIMITED Page 5


COMPANY PROFILE

During this period, we have also expanded in other products like pavers, Hollow and Solid
Blocks and Construction Materials. This is in line with our name that implies solution under one
roof.

I thank all stake holders for their continued support and customers for their trust in ICS.

A. Mission Statement

INTEGRATED CONSTRUCTION SOLUTIONS (PVT) LIMITED Page 6


COMPANY PROFILE

“To be the partner of choice for providing construction services , ready mix
concrete , equipment rental and concrete related products to all premier
construction companies and property developers in Pakistan. We will strive to
maintain the preferred relationship with our clients by providing best service
based on quality, timely delivery and exceptional customer service. “

B. QHSE Policy

“At ICS we are committed to provide “construction services, concrete, equipment rental &
related Solutions” to our clients and excel in all aspects of customer expectations through
operational efficiency cost and quality control while complying with environmental and health
& safety best practices”.

It’s the aim of ICS (Pvt.) Ltd. to achieve customer satisfaction by:

 Recognizing the QHSE is every one’s responsibility.

 Providing a framework for establishing and reviewing QHSE objective and targets.

 Developing and implementing management structure and procedures at all our work
places.

 Exercising the excellence level of integrity and respect in dealing with each other.

 Continually enhancing and improving our QHSE performance through definition of


operational standards, training and audits.

 Making top management, managers, supervisor accountable for QHSE management


efforts to elimination of causes that might lead to harm people, environment and
community.

 Participating in product and process improvement initiatives and risk assessment


leading to minimizing the probability of potential harm.

INTEGRATED CONSTRUCTION SOLUTIONS (PVT) LIMITED Page 7


COMPANY PROFILE

 Fully meeting all the commitments on time every time.

 Communicate the QHSE policy to all the employees, and stake holders.

INTEGRATED CONSTRUCTION SOLUTIONS (PVT) LIMITED Page 8


COMPANY PROFILE

2. MANAGEMENT PROFILE

A. Corporate Governance

ICS’s management and Board of Directors have firm belief that corporate good governance and
high ethical standards are the key to the Company's long-term success. Accordingly, the Board
has adopted a number of policies and procedures that are intended to assist it and the
management to carry out their responsibilities effectively.

B. Chief Executive

Mr. Abdul Saboor Sheikh is the brain behind the entire operation of ICS. He has more than 10
years experience in running successful operations and has keen interest in taking current
company portfolio to new dimension. The company is going through a major re engineering
process in implementing ERP. I also appreciate my dedicated team members upon successful
completion of ISO 9001:2008 (QMS), ISO 14001:2004 (EMS) & ISO 18001:2007 (OHSAS).

INTEGRATED CONSTRUCTION SOLUTIONS (PVT) LIMITED Page 9


COMPANY PROFILE

C. Director Operations

He is a Mechanical Engineer from UET Lahore and holds an MBA degree from Punjab University
Lahore. He has over 25 years of Experience in mechanical and Construction equipment in
different organizations like Descon Engineering, Pakistan Army etc. Presently he is working as
Director Operations in ICS (Pvt.) Ltd.

He has worked on numerous Mega projects like Mirani Dam Project in Turbat Balochistan,
Satpara Dam Skardu, Mangla Dam Raising Project, Taunsa Barrage Rehabilitation Project
Taunsa, Islamabad Peshawar Motorway Peshawar Section and BHP Zamzama Gas Field Dadu.

He was engaged in the Procurement, shipment, transportation, operation & maintenance of


Equipment worth 50 million USD from Overseas in Descon and he was also involved in the
establishment of workshops in Kashmir. His valuable experience of sourcing, commissioning
and maintaining new and used construction machinery.

INTEGRATED CONSTRUCTION SOLUTIONS (PVT) LIMITED Page 10


COMPANY PROFILE

D. Director Civil projects

Mr. Mohammad Rauf is a civil Engineer from University of Engineering and Technology. He has
more than 25 years of experience of working in the construction industry. He has built many
buildings like HKB DHA Y Block, Extension of HKB Liberty, Century Tower – Kalma Chowk, Kayer
Centre, Valencia Tower, Madina Tower, a number of buildings in LUMS and dozens of other
projects including hospitals, schools and shopping malls.

Most of these buildings are being built with the modern construction techniques and comprise
of 12 + Floors. He has a thorough understanding of the local construction industry. His
extensive experience and contacts in the industry make him indispensable for us especially in
understanding the concerns of the industry and fulfilling their needs.

E. Director Special Projects

Mr. Attiq ur Rehman is a MFA Graphic Designing from University of Punjab. He has more than
28 years of experince of Interior Designing, Concept Construction Designing, Theme
Developemnt, Monument Designing and Creative & Innovative Construction Designing. He has
worked as PM Development at Kakul Academy, Consultant at Garrision 10 Div. & a lot of private
commercial projects etc.

INTEGRATED CONSTRUCTION SOLUTIONS (PVT) LIMITED Page 11


COMPANY PROFILE

F. Working Team

Name: Mr. Mohammad Rauf

Designation: Director
Qualification: BSc. Civil
Experience: Over 25 Years’ experience of working in the construction industry in
Pakistan. Specializing in construction of commercial buildings &
residential buildings etc.

Name: Mr. Salman Moid


Designation: Director Operations
Qualification: BSc. Mechanical Engineer & MBA
Experience: 25 years of Experience in mechanical and Construction equipment in
different organizations like Descon Engineering, Pakistan Army etc.
Presently he is working as Director Operations in ICS (Pvt.) Ltd.

Name: Mr. Attiq ur Rehman


Designation: Director Special Projects
Qualification: MFA Graphic Designing
Experience: 28 years of experince of Interior Designing, Concept Construction
Designing, Theme Developemnt, Monument Designing and Creative &
Innovative Construction Designing. Presently he is working as Director
Special Projects in ICS (Pvt.) Ltd.

Name: Mr. Souhail Khan

Designation: Manager Special Projects


Qualification: BSc. Mechanical Engineer
Experience: Professional engineer and has more than 20 years of experience in
project management, Business development and Quality assurance.

Name: Mr. Ilyas Gilani

Designation: Manager Operations & Maintenance


Qualification: Electrical Engineer
Experience: 20+ Years in operation & maintenance of Construction machinery and
Project Management. Has worked with IJM Concrete Products in
Islamabad and he has also worked with a number of construction
Companies abroad

INTEGRATED CONSTRUCTION SOLUTIONS (PVT) LIMITED Page 12


COMPANY PROFILE

INTEGRATED CONSTRUCTION SOLUTIONS (PVT) LIMITED Page 13


COMPANY PROFILE

INTEGRATED CONSTRUCTION SOLUTIONS (PVT) LIMITED Page 14


COMPANY PROFILE

3. OUR SERVICES

ICS always have a vision of the perfect lifestyle the perfect completion of each project.
At Integrated Construction Solutions, we make it our goal to turn that vision into reality. At
Integrated Construction Solutions, we are always looking for better ways to satisfy our buyers.
It’s the dedicated teamwork and total quality management approach that empowers us to build
all projects of distinction. Projects that will be valued and cherished for a lifetime to come.

A. Construction Services

ICS Construction specializes in design/build office buildings, warehouse distribution centers,


speculative warehouse buildings, healthcare & medical development and construction, retail
facilities, cold storage warehouses, commercial housing projects and light industrial projects for
end users, developers, entrepreneurs, and small businesses. Design-Build, is a method of
project delivery in which one entity forges a single contract with the owner to provide for
architectural/engineering design services and construction services. With design-build, the
owner is able to focus on scope, project needs, and timely decision-making, rather than on
coordination between the designer and builder

INTEGRATED CONSTRUCTION SOLUTIONS (PVT) LIMITED Page 15


COMPANY PROFILE

B. Ready Mix Concrete

ICS also specializes in Ready Mix Concrete and our brand name is C-Mix. Currently we are
offering "C-Mix" on commercial basis, in all the major cities of Pakistan, namely:

Karachi
Islamabad
Lahore
Rawalpindi

Needless to say that Pumping facility is also available through Mobile Concrete Trucks and
Stationary Concrete Pumps. Size of our concrete pumps range from 26 Mtr to 37 Mtr.
Stationary concrete pumps can serve buildings up to 250 Height.
We have supplied concrete to hundreds of projects so far.

C. On Site Batching

However where the customers can’t be served due to distance or where they demand exclusive
supply to their construction site then we can install the batch plant at site, along-with all the
relevant equipment like Wheel Loaders, Concrete Mixer Trucks and concrete pumps.

We run the operations seamlessly with the client. We work in close co-ordination with the
project manager, 24/7, while sharing the same priorities as that of our clients.

We can setup operations within 7 days or more (depending on the nature of job) of signing the
contract as at all times we have surplus equipment and trained staff at our disposal.

We have successfully completed a number of projects by installing batching plants at site. Refer
to Projects section for details.

INTEGRATED CONSTRUCTION SOLUTIONS (PVT) LIMITED Page 16


COMPANY PROFILE

D. Equipment Rental

We offer Concrete related equipment on rent, for one month or more. This equipment is manned and
maintained by us.

We offer the following equipment:

Concrete Mixer Trucks - 2.5-9 Cum

Wheel Loaders - Caterpillar and Other

Stationary Concrete Pumps - CIFA, SANY

Concrete Pump Trucks - Schwing, Zoomlion

Power Generators -

Water Chillers

Batching Plants - Stetter, Global Tech

Excavators

Dumpers

INTEGRATED CONSTRUCTION SOLUTIONS (PVT) LIMITED Page 17


COMPANY PROFILE

4. OUR VALUES

 Adaptability: We will be sensitive to the individual and diverse needs of our clients, and
committed to adapting our knowledge and experience to meet specific client
requirements.
 Confidentiality: We will honor the rights of our client’s intellect as developed in a highly
specialized and competitive market. We are steadfast in protecting all private
information.
 Courtesy and Respect: We recognize and admire the hard earned expertise of our
clients and we will show at all times our respect through a courteous and professional
relationship.
 Impartiality: We will endeavor at all times to utilize the best of our knowledge and
experience for any given challenge. The client’s preferences will always take the highest
possible priority.
 Innovation and Improvement: We will keep an open mind to accept new and
innovative methods of work. We are eager to utilize the newest developments in codes
and industry standards for the continuous improvement in catering to our client’s
needs.
 Integrity of Design: We faithfully apply sound engineering principles, tempered with
practical experience, to provide the highest attainable design quality for our clients.

INTEGRATED CONSTRUCTION SOLUTIONS (PVT) LIMITED Page 18


COMPANY PROFILE

5. PROJECT MANAGEMENT

ICS’s reputation among owners, developers, and tenants is a company offering top-
quality work, integrity and reliable performance. For optimal performance the ICS team has
focused on the development of a strong professional staff and sophisticated system of support.
Our quality associates along with our proven expertise in subcontractor management enable us
to execute each construction contract with the highest degree of performance.

We will control all elements most critical to a project's quality, schedule and cost. Our
commitment to quality extends to our subcontractors and suppliers. We have devised a system
for qualifying, selecting and managing subcontractors and suppliers to assure top performance
within the framework of competitive bidding.

To assure quality project delivery we:

1. Prequalify subcontractors and vendors.


2. Include specific requirements for safety and quality in our bid documents.
3. Inspect all materials upon receipt and continually monitor performance.

Construction activities are inherently unfriendly to the environment. To ensure that plans made
in the office are properly carried out in the field; ICS takes the added step of ensuring that our
management and field personnel are schooled in the proper means and methods to comply
with a project's stated environmental goals.

For faster completion time, better cost control and fewer problems. The depth of
management skill possessed by the ICS staff is perfectly suited to Construction Management.

INTEGRATED CONSTRUCTION SOLUTIONS (PVT) LIMITED Page 19


COMPANY PROFILE

ICS provides in depth consultation, recommendations and oversight of the entire


construction project, allowing the project owner to devote their time to their normal
responsibilities. The assistance delivered by ICS allows the owner to be informed of the
progress of their project, without being burdened by every facet of the construction. Project
owners who wish to delegate single source responsibility for their project should talk to us
about our Design/Build program.

Pre-Construction
The construction process consists of three distinct phases; Pre-Construction, Construction, and
Post Construction. We offer you a single source of responsibility for the entire project. This
allows you one person to go to for every question or issue associated with the project. The pre-
construction phase is one of the most important parts of the construction process. Without
proper planning preparation, we cannot ensure a successful project.

Construction
Once construction begins, we continue to make it easy for you to keep up with the construction
process. We keep you informed on a regular basis with progress photo books, weekly project
updates, and project coordination meetings as frequently as you desire.

Post construction
We will provide you with a complete set of record documents for the entire project. This will
allow you a quick reference for any of the components relating to maintenance or operation of
the facility. To deliver a major project on time and on budget while keeping costs and
administrative burdens to a minimum the ICS construction management team provides any or
all of the following services:
1. Design coordination and review
2. Value engineering and cost analysis
3. Constructability reviews and assessments
4. Construction planning, scheduling and contractor coordination

INTEGRATED CONSTRUCTION SOLUTIONS (PVT) LIMITED Page 20


COMPANY PROFILE

6. PLANT & EQUIPMENT

Sr. No. Description Capacity Make Qty


1. Concrete Batching Plant 30 cum/hr 25 E – Global/Lenocean 6
2. Concrete Batching Plant 30 cum/hr CP30 Stetter 1

3. Concrete Batching Plant 60 Cum 50F Lenocean 3

4. Concrete Transit Mixers 3-9 cum Misc. Japanese 15

5. Mobile Concrete Pump 23 M – Boom 60 cum/hr Mitsubishi/Schwing 2

6. Mobile Concrete Pump 37 M – Boom 100 Cum/Hr Zoomlion 2

7. Excavators 0.4-6 cum Hitachi 01

8. Dumpers Trucks HINO, Nissan, Isuzu, 6

9. Stationary Concrete Pump 56/87 cum/hr CIFA 2

10. Stationary Concrete Pump 75 cum/hr SANY 1

11. Stationary Concrete Pump 75 cum/hr Schwing 1

12. Power Generator 100 KVA Perkins 6

13. Power Generator 185 KVA Nippon 3

14. Tractor Loader Messy Ferguson MF385 3

15. Loader 910 Komatsu 4

16. Chiller Plant 8000 Ltrs/Hr 2

INTEGRATED CONSTRUCTION SOLUTIONS (PVT) LIMITED Page 21


COMPANY PROFILE

17. Concrete Testing Equipment 4

18. Concrete Lift Machine Hoists 2

19. Steel Shuttering 7,000 Sft

20. Scaffolding Pipe 10,000Rft

21. Compactors 3

INTEGRATED CONSTRUCTION SOLUTIONS (PVT) LIMITED Page 22


COMPANY PROFILE

7. PROJECTS

A- Construction Projects

B- Projects Executed by Staff

C- Ready Mix Concrete Notable Projects

D- Commercial Projects

INTEGRATED CONSTRUCTION SOLUTIONS (PVT) LIMITED Page 23


COMPANY PROFILE

A- Construction Projects
Projects Executed by Integrated Construction Solutions

& Professional Builders JV

COMPLETED PROJECTS
S.No Description Completion

Booking Office Ali Tower,


10 2007
M.M.Alam road, Lahore

Pilling Work at Madina Centre,


11 2007
Township, Lahore

Booking Office Ali Trade Centre, M.M. Alam road,


12 2007
Lahore

13 Pilling Work at Ali Tower 2007

2009
14 Commercial Building Upper Mall Lahore

15 Blue Mall, M.M.Alam road, Lahore. 2009

16 Xinhua Mall, Lahore – Upto Forth Floor 2010

17 Madina Centre, Township, Lahore 2010

18 Commercial Building, Valencia Town, Lahore 2012

Construction of Commercial Plaza, EVACUEE TRUST


19 PROPERTY BOARD, GOVT.OF PAKISTAN on plot # 2012
244, Sector Y, Phase III DHA, Lahore

Development of EVACUEE TRUST PROPERTY


20 BOARD, GOVT.OF PAKISTAN on plot # 473,Sector 2012
XX Phase III DHA, Lahore

21 Commercial Building 28K, MM Alam Road, Lahore 2013

22 Nazir Avenue , MM Alam Road, Lahore 2013

23 Kayre Centre, Main Ferozpur road Lahore 2013

INTEGRATED CONSTRUCTION SOLUTIONS (PVT) LIMITED Page 24


COMPANY PROFILE

PROJECT IN HAND

S.No Description Starting Date


1 City MALL, Near Nespak Housing Colony, 2014
Lahore

2 Rupali Food Factory Manga Raiwind Road, 2015


Lahore (This Project is being exclusively
done by ICS)

INTEGRATED CONSTRUCTION SOLUTIONS (PVT) LIMITED Page 25


COMPANY PROFILE

BLUE MALL

Consultant: Baig Associates


Covered Area: 35,000/ Sft
Completion Year: 2009
Location: MM. Alam Road, Lahore

1. Civil Structure 2. Plumbing & Electrictation


3. Tile, Marble Work, Granite Work 4. Glass & Aluminum Work
5. Wood Works 6. False Ceiling
7. Steel Work 8. Paint & Polish
9. Wooden Cabinets

INTEGRATED CONSTRUCTION SOLUTIONS (PVT) LIMITED Page 26


COMPANY PROFILE

BOOKING OFFICE ALI TRADE CENTRE


TTTTTTTTTTTTTTTTTTTTTTTTTTTOWE
R

Consultant: Naisr’s Design


Covered Area: 5,000/ Sft
Completion Year: 2007
Location: M.M. AlamRoad, Lahore

1. Civil Structure 2. Plumbing & Electricstation


3. Tile, Marble Work, Granite Work 4. Glass & Aluminum Work
5. Wood Works 6. False Ceiling
7. Steel Work 8. Paint & Polish
9. Wooden Cabinets

INTEGRATED CONSTRUCTION SOLUTIONS (PVT) LIMITED Page 27


COMPANY PROFILE

OFFICE BUILDING -201

Consultant: Raees Faheem

Covered Area: 35,000/ Sft

Completion Year: 2009

Location:UpperMall,Lahore

INTEGRATED CONSTRUCTION SOLUTIONS (PVT) LIMITED Page 28


COMPANY PROFILE

VALENCIA TOWER

Consultant: Mass Consultant

Covered Area: 50,000/ Sft

Completion Year: 2008

Location: Valencia Town, Lahore

INTEGRATED CONSTRUCTION SOLUTIONS (PVT) LIMITED Page 29


COMPANY PROFILE

Piling Works of Ali Tower

INTEGRATED CONSTRUCTION SOLUTIONS (PVT) LIMITED Page 30


COMPANY PROFILE

Ali Tower

Consultant: Nasir’s Design

Covered Area: 280,000/ Sft

Location: MM.Alam Road, Lahore

INTEGRATED CONSTRUCTION SOLUTIONS (PVT) LIMITED Page 31


COMPANY PROFILE

Piling Works of MADINA CENTRE

INTEGRATED CONSTRUCTION SOLUTIONS (PVT) LIMITED Page 32


COMPANY PROFILE

MADINA CENTRE

Consultant:Uni Arch

Covered Area: 235,000/ Sft

Location: Madina Road, Township, Lahore

INTEGRATED CONSTRUCTION SOLUTIONS (PVT) LIMITED Page 33


COMPANY PROFILE

XINHUA MALL

Covered Area: 200,000/ Sft

Location: 24-B/2, Gulberg III, Lahore

INTEGRATED CONSTRUCTION SOLUTIONS (PVT) LIMITED Page 34


COMPANY PROFILE

NAZEER AVENUE

Completion Year: 2013

Location: 9C - MM ALAM Road, Lahore

INTEGRATED CONSTRUCTION SOLUTIONS (PVT) LIMITED Page 35


COMPANY PROFILE

COMMERCIAL BUILDUING

Completion Year: 2013

Location: 28k - MM ALAM Road, Lahore

INTEGRATED CONSTRUCTION SOLUTIONS (PVT) LIMITED Page 36


COMPANY PROFILE

CITY MALL

INTEGRATED CONSTRUCTION SOLUTIONS (PVT) LIMITED Page 37


COMPANY PROFILE

CITY MALL

Consultant: Mass Consultant

Completion Year: Under Construction

Location: Near Nespak Housing Society, Lahore

INTEGRATED CONSTRUCTION SOLUTIONS (PVT) LIMITED Page 38


COMPANY PROFILE

B- Project executed by staff


i.) Mirani Dam

Mirani Dam is located near Turbat in Balochistan. This Project was awarded to DESCON
ENGINEERING as an EPC Project. This is basically a water storage Dam with Canals on both left
& right bank. This Project was started in 2002 & finished in 2006.

Mr. Salman Moid was involved right from the start in designing the Equipment requirement, its
Procurement from Abroad & maintenance, material & spare parts requirement and upkeep
besides managing all the required staff. All own equipment including Earth Moving, Concreting,
Lifting, Crushing & Generation Equipment was involved which nearly totaled more than 200
pieces.
Concrete was heavily in structures, culvert, spillway and canals.

The specs of project are as under:

Name of Project Mirani Dam


Name of Client WAPDA
Contractor Descon Engineering
Project Value Rs 4.5 Billion
Start Date 2002
End Date 2006
Concrete of Project 350,000 Cubic Meters
Team Strength 1500 People
Equipment Batching Plant 4 Nos.
Mixer Trucks 15 Nos.
Mobile Concrete Pump 2 Nos.
Super Swinger Truck 1 No
Canal Lining Machine 1 No

The Project was successfully executed before time despite remote location, extreme weathers
& dust storms.

INTEGRATED CONSTRUCTION SOLUTIONS (PVT) LIMITED Page 39


COMPANY PROFILE

ii.) Satpara Dam

SATPARA Dam is located near Skardu city. It is the highest Dam built in the world at a height of more
than 8000 ft. This dam was built on Satpara lake which is fed from waters coming from Deosai plains.
From it the water is also fed to 2x25MW Power stations for Power Production, besides Agriculture use &
drinking water supply to Skardu City. This Project was awarded to DESCON ENGINEERING. This Project
was started in 2002 & finished in 2007.

Was involved right from the start in designing the Equipment requirement, its Procurement from
Abroad, transportation & maintenance, material & spare parts requirement and upkeep besides
managing all the required staff. All own equipment including Earth Moving, Concreting, Lifting, Crushing
& Generation Equipment was involved which nearly totaled more than 90 pieces.

Concrete was heavily in structures, culvert, spillway and canals, Conduits.

The specs of project are as under:

Name of Project Satpara Dam


Name of Client WAPDA
Contractor Descon Engineering
Project Value Rs 1.8 Billion
Start Date 2003
End Date 2007
Concrete of Project 150,000 Cubic Meters
Team Strength 700 People
Equipment Batching Plant 2 Nos.
Mixer Trucks 8 Nos.
Mobile Concrete Pump 2 Nos.

The Project was successfully executed before time despite remote location, extreme weathers & dust
storms.

INTEGRATED CONSTRUCTION SOLUTIONS (PVT) LIMITED Page 40


COMPANY PROFILE

C - Ready Mix Concrete Notable Projects

i.) Layari Development Authority – Scheme 42 - Karachi

This project was initiated to serve the needs of a number of contractors working for the
infrastructure development of LDA Scheme 42 area. Infrastructural work is going on which
includes the construction of Bridges, Cluverts, Water Drains – Made of Concrete

Name of Project Scheme 42

Name of Client Lyari Development Authority

Concrete of Project 150,000 Cubic Meters

Team Strength 25 People

Equipment Batching Plant 2 Nos.

Mixer Trucks 6 Nos.

Mobile Concrete Pump 1 Nos.

INTEGRATED CONSTRUCTION SOLUTIONS (PVT) LIMITED Page 41


COMPANY PROFILE

ii.) ISLAMABAD - Building Clusters

Initially we installed two plants to cater the needs of different contractors working on 12
buildings. Besides providing concrete at this project we deliver concrete on commercial basis to
a number of structures situated at different places including Embassy Area as well.

Name of Project Cluster of Classified Buildings

Name of Client -------

Volume of Concrete 90,000 Cubic Meters

Ready Mix Supplied By C-Mix (Integrated Construction Solutions Pvt. Ltd

Commercial Supply to Sundry Clients Yes

Team Strength 40 people

Equipment Required Batching Plant 1 Nos.

Concrete Mixer Trucks – 7 Nos.

Stationary Concrete Pump – 1 No.s

Mobile Concrete Pump – 1 No.s

INTEGRATED CONSTRUCTION SOLUTIONS (PVT) LIMITED Page 42


COMPANY PROFILE

iii.) SINDH – Building Clusters

ICS has installed two plants of 30Cum/hr each at Client’s site. Concrete was supplied to all kinds
of structures including Residential Buildings, Machine Foundations, Warehouses, Aircraft
hangers, Office buildings, Concrete Roads etc. (A total of 72 Buildings).

Concrete of Project 60,000 Cubic Meters

Team Strength 45 people

Equipment Required Batching Plant 1 Nos.

Concrete Mixer Trucks – 5 Nos

Stationary Concrete Pump – 1 No.s

Mobile Concrete Pump – 2 Nos

iv.) Nokhar – 500 KVA Grid Station

A 500 KVA grids station was being built in Gujranwala. Concrete was supplied for its residential
quarters, office buildings, Equipment foundations, concrete roads and other misc. structures.

Concrete of Project 30,000 Cubic Meters

Team Strength 30 People

Equipment Required Batching Plant 1 Nos

Concrete Mixer Trucks – 5 Nos.

Stationary Concrete Pump – 1 No.s

INTEGRATED CONSTRUCTION SOLUTIONS (PVT) LIMITED Page 43


COMPANY PROFILE

v.) Metro Bus Service, Lahore

We installed two plants to cater the needs of different contractors working on Metro Bus
Service Project, Lahore. We supplied the concrete at Underpasses, Flyovers, Pilings, NJ Barrier,
Drains, and Metro Bus Stations.

Team Strength 50 People

Equipment Required Batching Plant 2 Nos

Concrete Mixer Trucks – 10 Nos

Stationary Concrete Pump – 1 No.s

Mobile Concrete Pump – 2 No.s

V.) DHA City, Karachi

This is our on going project. We have installed two plants & serving a number of contractors
working for the infrastructure development of DHA City, Karachi. Infrastructural work is going
on which includes the construction of Bridges, Cluverts, Water Drains – Made of Concrete.

Team Strength 30 People

Concrete of Project 60,000 Cubic Meters

Equipment Required Batching Plant 2 Nos

Concrete Mixer Trucks – 8 Nos

Stationary Concrete Pump – 1 No.s

Mobile Concrete Pump – 1 No.s

INTEGRATED CONSTRUCTION SOLUTIONS (PVT) LIMITED Page 44


COMPANY PROFILE

C. Ready Mix Concrete Commercial Projects

Sr. # Project Name Location Project Description Client

Kenrock
Pearl Continental Lahore - Behind A hotel of 5 Storey with
1. Geotechnical
Darbar Hotel Lahore Fort structure Piles
Services

Lahore - MM Alam Professional


2. Country Tower A 7 Storey Building
Road Builders
A 12 Storey Building
Lahore - Maulana Professional
3. Madina Tower with a total covered area
Johar Ali Road Builders
of 225,000 Sft.
A 15 storey building with
Lahore -Ferozepur Professional
4. Kayre Center a total covered area of
Road Builders
150,000 Sft.
Pakistan Hockey Lahore -Gaddafi
5. Misc. Civil Structures. National Boring
Stadium Stadium
Special Concrete
Shaukat Khanum Lahore -Johar Shaukat Khanum
6. Building to limit
Hospital Town, Hospital
Radiation.
Lahore -Ferozepur
7. China Centre A 15 storey building Polygon Developers
Road
Muslim Comm. Bank
Shalimar
8. MCB – HQ J Lahore - Jail Road Provincial Head Quarter
Construction Coy
Building
Structures & Rigid
9. Ring Road Lahore NLC-ARM
Pavement
These buildings have a
total area of approixmately
Govt. Building Islamabad - Chak Different
10. 1.5 Million sft and total
Compound Shahzad concrete is around 50,000
Contractors
Cum
Different Building
11. Comsat University Islamabad Haji Noor Engineers
Blocks
12. Comsat University Islamabad Different Building Akbar Associates
PakChina Islamabad - Exhibition Halls & Other China state
13.
Friendship Centre ChandTara Road Building Structures Construction

INTEGRATED CONSTRUCTION SOLUTIONS (PVT) LIMITED Page 45


COMPANY PROFILE

Islamabad-Melody
14. Avari Hotel Stucture Piling Murshad Builders
Abpara
Islamabad-Blue
15. IOM/NDC Zoom Engineers
Area
Islamabad-Near
16. Land Multiplex Shopping Complex Daman Engineers
Avari
New Royal Thai Islamabad-
17. Building Structure Daman Engineers
Embassy Diplomatic Enclave
Islamabad-
18. UNHCR Security Walls Ali Brothers
Diplomatic Enclave
Islamabad-
19. Norway Embassy Security Walls Ali Brothers
Diplomatic Enclave
Rawalpindi -
20. Canyon View Banglows Emaar/BridgeStone
Rawat
Islamanad -
21. Bridge Structure Brigde Structure Taha Enterprises
Chattar Park
Anqara Park Islamabad - Rawal
22. Fountain Structure VIVA Consultants
Fountain Lake
E-11 Infra
Drains, Culverts, Brides,
23. Structure Islamabad - E-11 Ayub Brothers
Road side Structure etc
Development
Rawalpindi - Near
24. Seven Star MES Apartments Complex FABCON
GHQ
Lahore School of Lahore - Johar
25. School/College Building Interhome
Fashion Design Town

26. DHA - Global Haly Lahore DHA Piling Works DHA

Building &
US Embassy – Diplomatic Enclave infrastructure,
27. Epik (Pvt.) Ltd
Islamabad Islamabad Approximate 10,000
Cum Concrete.
Korang Bridge
Barha Kouh,
28. Barha Kouh, Bridge I CON Builders
Islamabad
Islamabad
Diplomatic Enclave
29. Poland Embassy Building & infrastructure Ali Brothers
Islamabad
Sewerage Line
Rehmat
30. Project, DESTO Lab Chattar, Islamabad Sewerage Line
Construction
Chattar, Islamabad

INTEGRATED CONSTRUCTION SOLUTIONS (PVT) LIMITED Page 46


COMPANY PROFILE

DESTO Piling Rockwell Corp.


31. Chattar, Islamabad Piling
Project Chattar (Pvt.) Ltd.
Blue Area, 10 Storey Shopping
32. Plaza, Islamabad Descent Builders
Islamabad Plaza
US Embassy
Diplomatic Enclave
33. Warehouse Warehouse Project Qavi Engineering
Islamabad
Project, Islamabad
Poultry Factory
34. Tarlai, Islamabad Poultry Factory Safeway Builders
Tarlai, Islamabad
Hotel Building
35. Abpara, Islamabad 12 Storey Hotel Building Ansar Brothers
Abpara, Islamabad
Buildings, Roads,
Shahbaz Airbase Infrastructure
36. Jacobabad Midjac (Pvt.) Ltd
Project, Jacobabad Approximate 50,000
cum concrete
Canadian High
Diplomatic Enclave
37. Commission, Building & infrastructure Zor Engineering
Islamabad
Islamabad
Security Walls for
Diplomatic Enclave Mustahkum
38. Diplomatic Area, Panels of Security Walls
Islamabad Construction
Islamabad
Gymnasium
39. Building - Islamabad Building Zarwa (Pvt.) Ltd
Islamabad Club
United Bakery,
Super Market F-6,
40. Super Market F-6, Building Nazar & Co
Islamabad
Islamabad
DESTO Lab Project
41. Chattar, Islamabad Building 3K Enterprises
Chattar, Islamabad
Security Wall,
42. World Bank, Islamabad Security Wall Build Fast
Islamabad
British Embassy, Diplomatic Enclave
43. Building Samra Enterprises
Islamabad Islamabad
German, Embassy, Diplomatic Enclave
44. Building Samra Enterprises
Islamabad Islamabad
Italy, Embassy, Diplomatic Enclave
45. Building Samra Enterprises
Islamabad Islamabad
UN Mogit, Diplomatic Enclave Kestral SPD (Pvt)
46. Building
Islamabad Islamabad Ltd.

INTEGRATED CONSTRUCTION SOLUTIONS (PVT) LIMITED Page 47


COMPANY PROFILE

NARC Project, Universal


47. Islamabad Building
Islamabad Corporation
House Building, F- Montage Design
48. F-7/1, Islamabad Building
7/1, Islamabad Build
Palai Dam, Village
Charsadda - Sarwar Constructors
49. Palai, Charsadda - Dam
Peshawar (Pvt.) Ltd.
Peshawar
Indus Medical
Tando Muhammad Nisar Khan &
50. College, Tando Buildings
Khan Company (Pvt.) Ltd.
Muhammad Khan
EFFLUENT
TREATMENT
51. KOTRI - SINDH Plant ARA (Pvt.) Ltd
PLANT, KOTRI -
SINDH
Atomic Energy
Fabcon Design &
Building, Boundry
52. DG Khan Boundry Wall Engineering (Pvt.)
Wall Project, DG
Ltd.
Khan
MTS Pedestrian
Underpass
53. Lahore Concrete Underpass Z.K Associates
Ferozepur Road
Ichra, Lahore
Disposal Station,
ASCON Engineers
54. Near Tokhar Niaz Lahore Disposal Station
(Pvt.) Ltd
Baig, Lahore
Drain Project,
55. Chunge Amersadu, Lahore Drain Dilshad & Co
Lahore
EOBI Building,
56. Lahore Building Kingcrete Builders
Garishahu, Lahore
RDF Processing
Unit For DG Izhar Construction
57. Lahore RDF Processing Unit
Cement Compant (Pvt) Ltd
Lakhodair, Lahore
TOWER 75, NEAR
Wasif ali &
58. KALMA COWK, Lahore Building
Associates
LAHORE
City School, DHA
59. Lahore Building Khokhar Brothers
Phase 6, Lahore
BMTC Site # 2
Building Structure, Midjac (Pvt.) Ltd,
60. Rawalpindi Building
near GHQ, Rawalpindi.
Rawalpindi

INTEGRATED CONSTRUCTION SOLUTIONS (PVT) LIMITED Page 48


COMPANY PROFILE

AFIP Site # 1
Midjac (Pvt.) Ltd,
61. Building Structure, Rawalpindi Building
Rawalpindi.
near GHQ
Dunya Television
62. Network Office Islamabad Building Dunya TV
Building, Islamabad
Hospital Building,
Mansoor Mazhar
63. Bahria Enclave, Islamabad Building
Associates
Islamabad
School Building,
Mansoor Mazhar
64. Bahria Enclave, Islamabad Building
Associates
Islamabad
Islamabad Medical
65. & Dental College, Islamabad Building IMDC, Islamabad
Islamabad
Baluchistan
66. Officers Flats, Islamabad Building Unitone Engineers
G -8/4, Islamabad
University of
Punjab Group of
67. Central Punjab – Lahore Building
Colleges, Lahore
Extension, Lahore
PC Hotel, Parking Izhar Construction
68. Lahore Parking Plaza
Plaza, Lahore (Pvt) Ltd
LGS Building DHA
69. Lahore Building Ashfaq & Co, Lahore
Phase 5, Lahore

INTEGRATED CONSTRUCTION SOLUTIONS (PVT) LIMITED Page 49


COMPANY PROFILE

8. HEALT & SAFETY POLICY

Safety and accident prevention is everyone’s responsibility. Each employee is expected to


follow all company rules and to perform their work in a safe manner. Each supervisor and
foreman is responsible for safety, implementing the Integrated Construction Solutions safety
program, and training employees in safe work procedures. The Project Manager has overall
responsibility for safety at each location. This company’s policy is to provide a safe and healthy
place of employment for every employee and to abide by regulations set forth by federal, state
and local governments.

Integrated Construction Solutions is sincerely interested in the safety and welfare of our
employees. Accident prevention is essential in maintaining an efficient operation.

It is our policy that our safety rules shall be strictly observed at all times. Although these rules
are to be considered very important, it is impossible to publish a rule that covers every
circumstance. If a rule that might cover a specific hazardous condition has been omitted, that
shall not be an excuse for disregard of common sense in the safe performance of your work.
The possession or consumption of alcohol, drugs or any other controlled substance is against
policy and violators are subject to immediate dismissal each employee is urged to cooperate
fully with this policy. Abuse or disregard of this policy is a violation and will be treated
accordingly. Remember, your help in preventing accidents and injuries benefits you and your
fellow employees----we should all strive for a record of zero accidents

Accident reporting and discussions:

An employee must report any accident or injury, regardless of how minor, to the Project
Manager. All inquiries concerning incident/accident/injury/property damage shall be referred
to the Project Manager. The employee will make no comments, provide no details, or express
any opinion as to the cause of the incident, who was at fault, responsibility for, or any intent of
the company regarding the incident. The Project Manager will investigate any personal injury
accident, property damage claim or vehicle accident associated with the job and will complete
an Accident Investigation Report. The purpose of this investigation is to assist in preventing this
type of mishap in the future. The employee will cooperate fully with the Project Manager in this
investigation.

INTEGRATED CONSTRUCTION SOLUTIONS (PVT) LIMITED Page 50


COMPANY PROFILE

Personal protective equipment:

 Hard Hats
All employees are required to wear a hard hat on every job site at all times.

 Eye Protection
All employees are required to wear safety glasses (with side-shields) on the job

Site at all times.

 Fall Protection
All employees exposed to falls over 6ft are required to be trained on and use proper fall
protection. On scaffolds, the trigger height is 10ft. For steel erection activities, the
trigger height is 15 feet.

 Hand Protection
All employees involved in operations exposing hands to cuts, chemicals, burns, etc. are
required to wear gloves.

 Rubber Boots
Employees involved in operations exposing the feet/legs to such hazards as Concrete
burns during placing uncured concrete are required to wear rubber boots in good
condition.

 Other
Specific jobs may cause the need for other personal protective equipment. When this
occurs, the employee is expected to utilize this equipment. It is the Project Manager
responsibility to see that equipment in use is appropriate and in good condition.

INTEGRATED CONSTRUCTION SOLUTIONS (PVT) LIMITED Page 51


COMPANY PROFILE

9. QUALITY CONTROL - CONCRETE

At ICS we understand that “QUALITY” is one of the most important considerations for the client.
We take extensive measures to assure that the quality of concrete meets or exceed the client’s
requirements every time.

We have achieved that by developing rigorous testing procedures for each stage of the
production process.

Customer Requirement Definition:

It is important that the requirements of the customers must be defined very clearly before we
can undertake the task of meeting customer requirements.

In the absence of designated applicable general specifications the purchaser is normally


requested to specify the following:

Designated size, or sizes, of coarse aggregate.

Slump, or slumps, desired at the point of delivery

Requirements for compressive strength as determined on samples taken from the


transportation unit at the point of discharge. The purchaser shall specify the
requirements in terms of the compressive strength of standard specimens cured under
standard laboratory conditions for moist curing. (Unless otherwise specified the age at
test shall be 28 days.)

Cement content in bags or Kilogram per cubic meter

Maximum allowable water content in gallons per

Water in litres per cubic metre of concrete, including surface moisture on the
aggregates, but excluding water of absorption.

If admixtures are required, the type, name, and dosage to be used

INTEGRATED CONSTRUCTION SOLUTIONS (PVT) LIMITED Page 52


COMPANY PROFILE

When the purchaser requires the manufacturer to assume responsibility for the selection of the
proportions for the concrete mixture with then the purchaser shall also specify the following:

Required compressive strength as determined on samples taken from the


transportation unit at the point of discharge.

The purchaser shall specify the requirements for strength in terms of tests of standard
specimens cured under standard laboratory conditions for moist curing (see Section 17).
Unless otherwise specified the age at test shall be 28 days.

At the request of the purchaser we furnish the Design Mix statement (if required by the
customer) to the purchaser, giving the dry masses of cement and saturated surface-dry masses
of fine and coarse aggregate and quantities, type, and name of admixture (if any) and of water
per cubic yard or cubic metre of concrete that will be used in the manufacture of each class of
concrete ordered by the purchaser.

For the purposes of future reference all such design mixes are assigned codes and numbers.
This helps in identification of concrete at the time of delivery.

Equipment:

Batching Plants

While selecting the equipment we ensure that the equipment is compliant with International
standards and is of good make and origin. Some of the considerations are as follows:

Bins with adequate separate compartments shall be provided in the batching plant for
fine and for each required size of coarse aggregate. Each bin compartment shall be
designed and operated so as to discharge efficiently and freely, with minimum
segregation, into the weighing hopper. Means of control shall be provided so that, as
the quantity desired in the weighing hopper is approached, the material shall be shut off
with precision. Weighing hoppers shall be constructed so as to eliminate accumulations
of tare materials and to discharge fully.

Indicating devices shall be in full view and near enough to be read accurately by the
operator while charging the hopper. The operator shall have convenient access to all
controls. Scales shall be considered accurate when at least one static load test within

INTEGRATED CONSTRUCTION SOLUTIONS (PVT) LIMITED Page 53


COMPANY PROFILE

each quarter of the scale capacity can be shown to be within 60.2 % of the total capacity
of the scale.

Adequate standard test weights shall be available for checking accuracy. All exposed
fulcrums, clevises, and similar working parts of scales shall be kept clean. Beam scales
shall be equipped with a balance indicator sensitive enough to show movement when a
weight equal to 0.1 % of the nominal capacity of the scale is placed in the batch hopper.
Pointer travel shall be a minimum of 5 % of the net-rated capacity of the largest weigh
beam for underweight and 4 % for overweight.

The device for the measurement of the added water shall be capable of delivering to the
batch the quantity required within the accuracy required. The device shall be so
arranged that the measurements will not be affected by variable pressures in the water
supply line. Measuring tanks shall be equipped with outside taps and valves to provide
for checking their calibration unless other means are provided for readily and accurately
determining the amount of water in the tank.

Concrete Trucks

Mixers and agitators are examined or their mass determined as frequently as necessary
to detect changes in condition due to accumulations of hardened concrete or mortar
and examined to detect wear of blades.

Equipment Calibration & Testing:

Periodic equipment testing and calibration ensure that the Design Mix is being complied
with strictly and without exception.

We not only have our own mechanism of testing and calibrating the quality control
equipment on regular basis but a third party calibration is also conducted periodically
for full confidence of client.

INTEGRATED CONSTRUCTION SOLUTIONS (PVT) LIMITED Page 54


COMPANY PROFILE

Material Selection

We undertake the testing procedure a fresh whenever we start production at a different


location even when there is no change in the source (i.e. quarry or supplier). We understand
that the quality of raw-material is instrumental in the determination of the final quality of
concrete. We take measures to ensure that:

OPC & SRC complies with Pakistan Standards (PSS 232-1983 & PSS 612-1989). Cement
shall conform to Specification C 150, Specification C 595, or Specification C 1157 (see
Note

Aggregates—Normal weight aggregates shall conform to Specification C 33. Lightweight


aggregates shall conform to Specification C 330 and heavyweight aggregates shall
conform to Specification C 637.

Water—Water shall conform to Specification C 1602.

Mineral Admixtures—Coal fly ash and raw or calcined natural pozzolan shall conform to
Specification C 618 as applicable.

Ground Granulated Blast-Furnace Slag—Ground granulated blast- furnace slag shall


conform to Specification C 989.

Chemical Admixtures—Chemical admixtures shall conform to either Specification C


494/C 494M or C 1017

Procurement:

We maintain rigorous quality controls at the time of procurement of raw materials to ensure
that they are in consistency with the approved samples. Periodic testing continues throughout
the lifecycle of the project.

Material storage:

We take extensive steps to ensure that material is stored in the right conditions so that the
material quality is the same as at the time of purchase.

Temperature Controls:

At ICS, our professionals fully understand the implications of temperature changes on concrete
quality. Standards as per ASTM and BS like sprinkling of aggregates, reducing water
temperature, incorporation of measured ice in concrete are adopted to control temperature.

INTEGRATED CONSTRUCTION SOLUTIONS (PVT) LIMITED Page 55


COMPANY PROFILE

Production & Delivery.

Approved design mixes (as per customer requirements) are used for Production.

Temperature, slump and water cement ratio etc. are monitored before the trucks are loaded.

It is ensure that the controlled amount of water or ad-mixture (in extreme conditions) is added
once the concrete has been poured in the Concrete Truck.

Delivery time of concrete is controlled as per identified limits.

Slump test and temperature tests are conducted before the concrete is poured on the site,
from the truck.

Delivery Slip

Delivery slip is issued with each truck at the time of dispatch from Concrete Pump. Delivery slip
further helps to ensure the compliance of customer requirements. It includes fields like:

Batch plant number & Name

Serial number of ticket

Date

Truck number

Name of purchaser

Specific designation of job (name and location)

Specific class or designation of the concrete in

Conformance with that employed in job specifications,

Amount of concrete in cubic yards (or cubic meters),

Time loaded or of first mixing of cement and

Aggregates, and

Time of arrival at site

Time of completion of pour - at site

Slump Test Result

Temperature Test
INTEGRATED CONSTRUCTION SOLUTIONS (PVT) LIMITED Page 56
COMPANY PROFILE

Water added by receiver of concrete and his initials.

Signature or initials of producer’s representative.

Signature of Recepient's representative.

Testing:

9 set of cylinders are cast at the time of pour.

Cylinder Samples are extracted from the relevant portion of truck only.

Cylinders are properly stored and safely transported.

Cylinders are kept in the prescribed conditions before crushing.

They are crushed on 7 & 28 days.

Mean strength is taken as an indicator of the strength.

Members of our dedicated quality control team are present at each site to ensure that quality
concrete is produced and delivered every time, every day.

Other testing measures like “Smith Hammer” and visual inspection of concrete after the pour
also helps us to monitor quality.

INTEGRATED CONSTRUCTION SOLUTIONS (PVT) LIMITED Page 57


COMPANY PROFILE

Reference Documents:
A-ASTM Documents:

C 31/C 31M Practice for Making and Curing Concrete Test

Specimens in the Field

C 33 Specification for Concrete Aggregates

C 39/C 39M Test Method for Compressive Strength of Cylindrical Concrete Specimens

C 138/C 138M Test Method for Density (Unit Weight), Yield, and Air Content (Gravimetric) of
Concrete

C 150 Specification for Portland Cement

C 172 Practice for Sampling Freshly Mixed Concrete

C 173/C 173M Test Method for Air Content of Freshly Mixed Concrete

C 191 Test Method for Time of Setting of Hydraulic Cement

C 494/C 494M Specification for Chemical Admixtures for Concrete

C 637 Specification for Aggregates for Radiation-Shielding Concrete

C 989 Specification for Ground Granulated Blast-Furnace Slag for Use in Concrete

C 1017/C 1017M Specification for Chemical Admixture for Use in Producing Flowing Concrete

C 1064/C 1064M Test Method for Temperature of Freshly Mixed Portland-Cement Concrete

C 1077 Practice for Laboratories Testing Concrete and Concrete Aggregates for Use in
Construction and Criteria for Laboratory Evaluation

D 512 Test Methods for Chloride Ion in Water

D 516 Test Method for Sulfate Ion in Water

B- ACI Documents: 3

301 Standard Specifications for Structural Concrete

305R Hot Weather Concreting

306R Cold Weather Concreting

318 Building Code Requirements for Structural Concrete

INTEGRATED CONSTRUCTION SOLUTIONS (PVT) LIMITED Page 58


COMPANY PROFILE

10. Quality Assurance

Producing the best quality concrete is the main focus of ICS and is evident from the procedures
adopted at different sites. Company is also aware of the fact that quality assurance at the head
office level is also extremely important and due to this awareness, ICS is going towards the
accusation of ISO9001, 14000 and 18001 systems and will be acquiring these certificates in next
three months.

INTEGRATED CONSTRUCTION SOLUTIONS (PVT) LIMITED Page 59


COMPANY PROFILE

9. COMPANY DOCUMENTS

A. Memorandum of Association
B. Articles of Association
C. SECP Certificate
D. NTN Certificate