Project version Date: 16 Nov 2015

(To be used in project associated with the licenser) Time: 21:48:14


Licenser: SY Perunding; www.syp.com.my By : ONG MW
PILECAP REFERENCE:P10_C14 Airmas_Block E Page: 1
-------------------------------------------------------------------------------------

Column Vert Dim, Hyy = 1600 mm Pile X Y


Column Horz Dim, Hxx = 600 mm 1 -1350 1170
Column Serv Deadload,DL = 14403 KN 2 0 1170
Column Serv Liveload,LL = 1834 KN 3 1350 1170
Column Serv Windload,WL = 0 KN 4 -2025 0
Deadload factor , DLF = 1.40 5 -675 0
Liveload factor , LLF = 1.60 6 675 0
Windload factor , WLF = 0.00 7 2025 0
Concrete Grade, Fcu = 30.00 N/mm^2 8 -1350 -1170
Steel Type, Fy =460.00 N/mm^2 9 0 -1170
Concrete cover = 40 mm 10 1350 -1170
Pile size = 500 mm
Max Pile Working Load = 1750 KN
Safe Pile Spacing = 1000 mm
Edge Distance = 225 mm
Pile Penetration = 75 mm
No.of warning(pile spacing + pile load)= 0 + 0 = 0
Pile Cap last rotated angle = 0 deg. clock-wise

P1 P2 P3

Y1

3
P4 P5 P6 P7 2
X1 X 9
0

P8 P9 P10

5000

n
o
s

1
0

3 3
0 0 1
n n 9
o o 0
s s
0
2 2
5 5

Piles C.G. x = 0.00mm. y = 0.00mm REBAR along XX = 30 NO. of 25.00 mm dia, at 109.14mm c/c
P.CAP C.G. x = 0.00mm. y = 0.00mm REBAR along YY = 30 NO. of 25.00 mm dia, at 162.93mm c/c
Eccen. Ex1 = 0.00mm.Ey1= 0.00mm LOOP BAR = 6 NO. Y 10
(Coordinate wrt Col. Centre as origin) anchorage of pile rebar to pilecap to be provided for
steel/r.c pile