CRONOGRAMA DE AVANCE DE OBRA VALORIZADO (CAOV)

PROYECTO: PROYECTO VIAL

LOCALIDAD: JAEN
PLAZO DE EJECU128
VALOR REFERENS/. 7,067,163.05
FECHA: Dec-18

MESES
Metrad Precio
Item Descripción Und. Total (S/.) 01 02 03 04 05
o (S/.)
Monto (S/.) (%) Monto (S/.) (%) Monto (S/.) (%) Monto (S/.) (%) Monto (S/.) (%)
1 CALENADARIO VALORIZADO PROY.VIAL 5,207,931.50
1.01 OBRAS PRELIMINARES 5,149,350.00
01.01.01 MIVILIZACION Y DESMOVILIZACION EST 50.00 21,600.00 1,080,000.00 ### 50% 518,400.00 48% ### 2%
01.01.02 TRAZO Y REPLANTEO EST 50.00 48,987.00 2,449,350.00 ### 50% ### 48% ### 2%
01.01.03 INSTALACIONES PROVISIONALES EST 50.00 32,400.00 1,620,000.00 ### 50% 777,600.00 48% ### 2%
1.02 DEMOLICIONES Y MOV. TIERRAS 1,777.50
01.02.01 DEMOLICIONES VARIAS M2 50.00 15.08 754.00 754.00 100%
01.02.02 CORTE DE MATERIAL SUELTO PARA PAVIM. M3 50.00 4.27 213.50 213.50 100%
01.02.03 ELIMINACION DE EXCEDENTE D= 20 KM M3 50.00 16.20 810.00 810.00 100%
1.03 PAVIMENTOS 2,448.50
01.03.01 CONFORMACION DE SUBRASANTE M2 50.00 2.49 124.50 124.50 100%
01.03.02 SUB BASE GRANULAR e= 0.20M M2 50.00 13.24 662.00 662.00 100%
01.03.03 BASE GRANULAR e= 0.20M M2 50.00 14.24 712.00 712.00 100%
01.03.04 IMPRIMACION ASFALTICA M2 50.00 2.17 108.50 108.50 100%
01.03.05 CARPETA ASFALTICA EN CALIENTE e= 4CM M2 50.00 16.83 841.50 387.09 46% 454.41 54%
1.04 OBRAS DE ARTES 4,729.50
01.04.01 EXACAVACION DE MATERIAL SUELTO PARA
VEREDAS Y SARDINELES M3 50.00 25.48 1,274.00 1,274.00 100%
01.04.02 ELIMINACION DE EXCEDENTE D= 20 KM M3 50.00 16.20 810.00 810.00 100%
01.04.03 CONFORMACION DE SUBRASANTE PARA
VEREDAS M2 50.00 2.49 124.50 124.50 100%
01.04.04 BASE PARA VEREDAS e=0.10M M2 50.00 10.49 524.50 524.50 100%
01.04.05 VEREDA DE CONCRETO f´C =210 KG/CM2
e=4" M2 50.00 39.93 1,996.50 1,996.50 100%
1.05 SEÑALIZACION Y SEGURIDAD VIAL 49,626.00
01.05.01 PINTIRA ZONAL, DE SIMBOLOS Y LETRAS M2 50.00 22.52 1,126.00 1,126.00 100%
01.05.02 SEÑAL INFOMATIVOS M2 50.00 515.00 25,750.00 11,051.90 43% ### 52% 1,308.10 5%
01.05.03 SENAL PREVENTIVAS OCTOGONALES DE
75X75 CM Und. 50.00 455.00 22,750.00 9,764.30 43% ### 52%
Costo Directo ### ### 2,486,316.81 ### 11,072.40 11,830.00

Gastos Generales (10%CD) ### ### 248,631.68 ### 1,107.24 1,183.00


Utilidades (5%CD) ### ### 124,315.84 5,818.85 553.62 591.50

Sub Total ### ### ### ### ### ###

I.G.V. (18%ST) ### ### 514,667.58 ### 2,291.99 2,448.81

Valor Referencial(ST+IGV) ### ### ### ### ### ###

Avance Físico Mensual 49.56% 47.74% 2.23% 0.21% 0.23%

Avance Físico Acumulado 49.56% 97.30% 99.54% 99.75% 99.98%