hi catalin

are you there ?


yes
ok.
now we see together some function about gantt centri and load diagram
well
to start to discuss about planning some things has to be defined
- Workcenter with flagged the checkbox for planning
- a specific shift
- a calendar for the workcenter where we are interested to work.
clear until now ?
yes
----
now we'll use always the same workcenter for example.
ok, we can use this CDL=1304
ok
Remember these 3 parameter :
1. Utilizzo = in which percentage i use my resources
2. Livello Carico Inf. and "Sup." are 2 informations for wanr to us when the loa
d is not appropriate
for example : for a specific day we have 30 hours of work available for
all resources
so if we have liv. min = 0.8
and liv max = 1.1
it means the if the load is >= 0.8 * 30 = 24 h
and the load is <= 1.1 * 30 = 33 h all is ok and we don't need any warni
ng
ok ?
clear catalin ?
yes...
do you know this message ?
yes.I notice when i try to insert a new CDL, may you ask to vasile what it means
?
now it seems ok, is for the queue time and wait time. but i think that we can al
so accept time = 0,
but not < 0
are you there catalin ?
yes
Antonio
im leasining
ok
now i saved the information
we have to remember :
code = 1304
machines : 5
shift code : 1
utilizzo : 0.9
liv.min = 0.8
liv. max = 1.1
at the moment we don't have activities at CDL 1304, so i'm expect that also in L
oad Diagrams we have no load.
we have all time available.
ok catalin ?
until now all is ok
now we assign some job to the cdl=1304

order = MC0008
we have to produce 350 pieces
and we have 5 hours for a single piece.
now we change this value and we set 0.1 hours for piece and also we put a setup
time of 12 hours.
so for complete 350 pieces we need 350*0.1 hours = 35 hours + 12 hours for setup
.
47 hours.
time indicator is correct, how you can see.
to reload the planning cache we can use this button : "Aggiorna Client"
Look at data Pianificata : we planned to work at it from 01/09/2004 to 04/09/200
4
now we check the order. the order is planned in another period.
No we decide to produce it and we want re-plan for the future.

we go to order list.

ATTENTION : THE STATUS EXE is wrong because probably it was changed the status b
y hand. ok ?
ok
me make rel or what type?
in this case (with tasks) he need to be "EMI" = emitted, ready to work
but no problem-
we press this button to replan
i think that there is some problem with data not aligned
do you have them on access db ?
we can look..
YOU HAVE TO GO
i can stay un
til you finish explaing this
perfect
i think that the problem is that workcenter 1203, 1401, 1405 don't manage the pl
anning.
1 sec. i show a problem here at a colleague
excuse me but we found a big bug for calendar management linked at shift managem
ent
so tomorrow i have to ask some change at vasile
no we can try again to re-schedule
now is ok but ofr some reason it is not refreshed automatically

now you can see that every job is re-scheduled


ok ?
ok
this is our job of order mc0008 (rescheduled)
now you can see that we have

time indicator doesn't works.


refresh is needed
also with refresh doesn't works
so we have 350 hours x 0.1 = 35 hours + 12 = 47 hours
this is not very nice
we shod have only 47 hours not 40+40
no, the problem is another one
because i have 8 hours x 5 machines for day and normally i use 1 machine for a s
ingle job so i expect to
see 6 days requested not 2.
I HAVE TO CHECK IT
catalin, for now it's ok. tomorrow we can continue.
in these hours i'm also verifying the algoritms of planning so i'll check it bet
ter.
ok, thanks for your availability
no problem
see you tomorrow
ok..goog bye
ciao