You are on page 1of 231

SCHOOL OF ARCHITECTURE, BUILD AND DESIGN

BACHELOR OF QUANTITY SURVEYING


(HONOURS)

BLD 61203 STRUCTURE

STRUCTURAL ANALYSIS OF A RC
BUNGALOW

Name Student ID
YONG KANG SENG 0331857
YAP YUEN THONG 0326557
YONG MAY SIA 0327724
YONG SHI QI 0327539
YOONG AI TENG 0328347

Lecturer: Ms Ann See Peng


1
TABLE OF CONTENT

1. INTRODUCTION
1.1 Brief Description of Bungalow ----------------------------------------------- 3
1.2 Design Brief of Bungalow ---------------------------------------------------- 5
1.3 Relevant Floor Plan ------------------------------------------------------------ 7

2. BEAM ANALYSIS
2.1 Yap Yuen Thong --------------------------------------------------------------- 15
2.2 Yong Kang Seng -------------------------------------------------------------- 43
2.3 Yong May Sia ------------------------------------------------------------------ 72
2.4 Yong Shi Qi -------------------------------------------------------------------- 110
2.5 Yoong Ai Teng ----------------------------------------------------------------- 148

3. COLUMN ANALYSIS
3.1 Yap Yuen Thong ---------------------------------------------------------------- 173
3.2 Yong Kang Seng --------------------------------------------------------------- 183
3.3 Yong May Sia ------------------------------------------------------------------ 195
3.4 Yong Shi Qi -------------------------------------------------------------------- 207
3.5 Yoong Ai Teng ----------------------------------------------------------------- 217

4.0 CONCLUSION -------------------------------------------------------------------- 230

2
BRIEF DESCRIPTION OF BUNGALOW

The proposed one storey bungalow has an estimated total built up area of 244 square
meters. This bungalow is built to satisfy the needs of a family.

The interior space in this bungalow includes the basic area for a house which includes a
master bedroom, 2 bedrooms or guest rooms, 1 master bathroom and 2 bathrooms, a walk-
in closet connected to the master bedroom, spacious kitchen, dining area, living room,
laundry, maid room, storage room.

Besides, this bungalow also includes extra facilities such as a recreation room, music room
and also a gym room.

The structure of this bungalow is same as a typical residential house which consists of the
components of columns and beams which function to support its own weight and the
weight of the bungalow.

This structural proposal which includes the beam and column analysis is done to ensure
the bungalow structural integrity and the safety of its inhabitants. This is a basic procedure
of designing the building structure before it can be executed and implemented.

3
LOCATION OF BUNGALOW

The bungalow is located at Subang Jaya, connection to major highways and easy access
to Federal Highway and New Klang Valley Highway make traveling easier, thus
expanding its catchment area. It’s a majority for housing area, public transport such as
LRT station surrounded in CGC -Glenmarie, which provide resident in the area easy
access to any other area. Also, Kelana Business Centre located around, strongly provide
investment value for the property.

Address: Jalan Merinyu U1/71 [GPS: 3.091963, 101.586872]

LOCATION PLAN

SITE PLAN

4
DESIGN BRIEF

DEAD LOAD OF STRUCTURE (constant)

Basic Materials

Concrete Grade 35 Clay bricks High tensile steel bars


Density: 24kN/m3 Density: 19kN/m3 Strength: 460N/mm2

Floor Finishes

Spaces Type of finishes Load

Living Glazed tiles 0.17kN/m2


Dining Glazed tiles 0.17kN/m2

Kitchen Glazed tiles 0.17kN/m2

Recreation Glazed tiles 0.17kN/m2

Study room Glazed tiles 0.17kN/m2

Bathrooms Glazed tiles 0.17kN/m2

Corridor Glazed tiles 0.17kN/m2

Laundry Glazed tiles 0.17kN/m2

Bedrooms Timber flooring 0.15kN/m2


Walk in closet Timber flooring 0.15kN/m2

Maid room Timber flooring 0.15kN/m2

Gym room Vinyl tiles 0.05kN/m2


Music room Vinyl tiles 0.05kN/m2

* Dead load factor = 1.4


5
DESIGN BRIEF

LIVE LOAD OF EACH ROOM (according UBBL)

* Live load factor = 1.6


SPACES LIVE LOAD per meter square area (kN/m2)
Living 2.0
Dining 2.0
Kitchen 3.0
Recreation 2.0

Study room 2.5


Bathrooms 2.0

Corridor 2.0
Laundry 3.0
Bedrooms 1.5
Walk in closet 1.5
Maid room 2.0

Gym room 5.0


Music room 4.0
Flat roof 0.5

6
RELEVENT FLOOR PLAN ARCHITECTURE DRAWING

Laundry

Dining/ Bath
Kitchen

Store Bath
Recreation
room
Bath
Music
room Guest Guest Bath
room room
Gym room
Living area
Walk in
Master closet
Study
bedroom Master
room
bath

GROUND FLOOR PLAN


Not to scale.

7
RELEVENT FLOOR PLAN ARCHITECTURE DRAWING

ROOF PLAN

8
RELEVENT FLOOR PLAN STRUCTURAL DRAWING

PAD FOOTING LAYOUT PLAN


Not to scale.

9
RELEVENT FLOOR PLAN STRUCTURAL DRAWING

200 THK.

200 THK.

GROUND FLOOR PLAN


All slab to be 150mm thick unless otherwise stated.

10
RELEVENT FLOOR PLAN STRUCTURAL DRAWING

ROOF PLAN
All slab to be 150mm thick unless otherwise stated.

11
BEAM
ANALYSIS
REPORT

12
13
STRUCTURAL PLAN
14
LOAD DISTRIBUTION PLAN
YAP YUEN THONG
0326557

15
BEAM 1: L/5-6

Structural Plan

Load Distribution Plan


DEAD LOAD (BEAM L/5-6) STRUCTURAL ANALYSIS

5 6
2.00 m
Beam self-weight
1.08 kN/m
= Beam size x Density of concrete
= (0.15 x 0.30)m² x 24 kN/m³
= 1.08 kN/m

Brickwall load 9.98 kN/m


= Wall thickness x Wall height x
Density of brick
= (0.15 x 3.50)m² x 19 kN/m³
= 9.98 kN/m
2.70 kN/m
Slab K-L/5-6 (trapezoidal form)
= (Thickness of slab x Density of concrete)
x (Lx/2)
= (0.15m x 24 kN/m³) x (1.5/2)m
= 2.70 kN/m 2.70 kN/m

Slab L-M/5-6 (trapezoidal form)


= (Thickness of slab x Density of concrete)
x (Lx/2)
= (0.15m x 24 kN/m³) x (1.5/2)m 0.13 kN/m
= 2.70 kN/m

Floor Finishes K-L/5-6 (trapezoidal


form)
= (Density of finishes) x (Lx/2) 0.04 kN/m
= 0.17 kN/m² x (1.5/2)m
= 0.13 kN/m

Floor Finishes L-M/5-6 (trapezoidal


form) 16.63 kN/m
= (Density of finishes) x (Lx/2)
= 0.05 kN/m² x (1.5/2)m
= 0.04 kN/m

Total Dead Load


= (1.08 + 9.98 + 2.70 + 2.70 + 0.13 + 0.04)
kN/m
= 16.63 kN/m

YAP YUEN THONG 0326557


LIVE LOAD (BEAM L/5-6) STRUCTURAL ANALYSIS

5 6
2.00 m

Slab K-L/5-6 (trapezoidal) 1.50 kN/m


= Live load (UBBL) x (Lx/2)
= 2.0 kN/m² x (1.5/2)m
= 1.50 kN/m

Slab L-M/5-6 (trapezoidal) 3.75 kN/m


= Live load (UBBL) x (Lx/2)
= 5.0 kN/m² x (1.5/2)m
= 3.75 kN/m
5.25 kN/m
Total Live Load
= (1.50 + 3.75) kN/m
= 5.25 kN/m

ULTIMATE LOAD (BEAM L/5-6)

31.68 kN/m
Ultimate Load
= 1.4(Dead Load) + 1.6(Live Load)
= 1.4(16.63) +1.6(5.25)
= (23.28 + 8.40) kN/m
= 31.68 kN/m

63.36 kN
To Point Load
= Ultimate Load x Length of Beam
= 31.68 kN/m x 2.00m
= 63.36 kN

YAP YUEN THONG 0326557


REACTION FORCE (BEAM L/5-6) STRUCTURAL ANALYSIS

5 6
2.00 m

ƩM5= 0 63.36 kN
63.36(1.0)-2.0R6= 0
R6= 63.36/2
= 31.68 kN

ƩFx = 0
R5 R6

ƩFy = 0
R5+R6-63.36= 0
R5= 63.36-31.68
R5= 31.68 kN

31.68
BENDING MOMENT (BEAM L/5-6)

Ratio
V:H
2 : 63.36 0
x : 31.68
31.68
x= x2 x
63.36
= 1.00m
31.68
Maximum
Bending Moment = Area (positive)
= 1/2 x 1.00m x 31.68 kN
= 15.84 kNm

Maximum
Bending Moment = Area (negative)
= 1/2 x 1.00m x 31.68 kN
= 15.84 kNm
MAXIMUM BENDING MOMENT

YAP YUEN THONG 0326557


BEAM 2: J/4-6

Structural Plan

Load Distribution Plan


DEAD LOAD (BEAM J/4-6) STRUCTURAL ANALYSIS

4 6
3.00 m
Beam self-weight
= Beam size x Density of concrete 1.08 kN/m
= (0.15 x 0.30)m² x 24 kN/m³
= 1.08 kN/m

Brickwall self-weight
= Wall thickness x Wall height x Density of 9.98 kN/m
brick
= (0.15m x 3.50)m² x 19 kN/m³
= 9.98 kN/m

Slab G-J/4-6 (triangle form) 3.60 kN/m


= (Thickness of slab x Density
of concrete) x (Lx/2) x (2/3)
= (0.15m x 24 kN/m³) x (3/2)m x (2/3)
= 3.60 kN/m
3.60 kN/m
Slab J-K/4-6 (trapezoidal form)
= (Thickness of slab x Density of
concrete) x (Lx/2)
= (0.15m x 24 kN/m³) x (2/2)m
= 3.60 kN/m
0.15 kN/m

Floor Finishes G-J/4-6


= (Thickness of slab x Density of
concrete) x (Lx/2) x (2/3)
= 0.15 kN/m² x (3/2)m x (2/3)
= 0.15 kN/m 0.17 kN/m

Floor Finishes J-K/4-6


= (Thickness of slab x Density of
concrete) x (Lx/2)
18.58 kN/m
= 0.17 kN/m² x (2/2)m
= 0.17 kN/m

Total Dead Load


= (1.08 + 9.98 + 3.60 + 3.60 + 0.15 + 0.17)
kN/m
= 18.58 kN/m

YAP YUEN THONG 0326557


LIVE LOAD (BEAM J/4-6) STRUCTURAL ANALYSIS

4 6
3.00 m
Slab G-J/4-6 (triangle form)
= Live load (UBBL) x (Lx/2) x (2/3) 1.50 kN/m
= 1.5 kN/m² x (3/2)m x (2/3)
= 1.50 kN/m

Slab J-K/4-6 (trapezoidal form)


2.00 kN/m
= Live load (UBBL) x (Lx/2)
= 2.0 kN/m² x (2/2)m
= 2.00 kN/m

Total Live Load


3.50 kN/m
= (1.50 + 2.00) kN/m
= 3.50 kN/m

ULTIMATE LOAD (BEAM J/4-6) 31.61 kN/m

Ultimate Load
= 1.4(Dead Load) + 1.6 (Live Load)
= 1.4(18.58) + 1.6(3.50)
= (26.01 + 5.60) kN/m
= 31.61 kN/m

To Point Load 94.83 kN


= Ultimate Load x Length of Beam
= 31.61 kN/m x 3.00m
= 94.83 kN

YAP YUEN THONG 0326557


REACTION FORCE (BEAM J/4-6) STRUCTURAL ANALYSIS

4 6
3.00 m
ƩM4= 0
94.83(1.50)-3R6= 0
R6= 142.25/3 94.83 kN
= 47.42 kN​

ƩFx = 0

ƩFy = 0
R4+R6-94.83= 0
R4 + 47.42= 94.83 R4 R6
R4= 47.41 kN

BENDING MOMENT (BEAM J/4-6)

Ratio
V:H
3 : 94.83
x = 47.41 47.41

47.41
x= x3
94.83 15.80
x = 1.50m

Maximum
Bending Moment = Area (positive)
= 1/2 x 1.50m x 47.41 kN x 15.81
= 35.56 kNm
Ratio
V:H
3 : 94.83
47.42
x = 47.41

47.41
x= x3
94.83
x = 1.50m

Maximum
Bending Moment = Area (negative)
MAXIMUM BENDING MOMENT
= 1/2 x 1.50 x 47.42
= 35.57 kNm

YAP YUEN THONG 0326557


BEAM 3: K-M/5
With Point load from beam L/5-6

Structural Plan

Load Distribution Plan


DEAD LOAD (BEAM K-M/5) STRUCTURAL ANALYSIS

K L M
1.50 m 1.50 m
Beam self-weight
= Beam size x Density of concrete 1.08 kN/m
= (0.15 x 0.30)m² x 24 kN/m³
= 1.08 kN/m

Brickwall load
9.98 kN/m
= Wall thickness x Wall height x Density of
brick
= (0.15 x 3.50m)² x 19 kN/m³
= 9.98 kN/m

4.50 kN/m
Slab K-M/3-5 (trapezoidal form)
= (Thickness of slab x Density of
concrete) x (Lx/2)
= (0.15m x 24 kN/m³) x (2.5/2)m
= 4.50 kN/m
1.80 kN/m
Slab K-L/5-6 (triangle form)
= (Thickness of slab x Density of
concrete) x (Lx/2) x (2/3)
= (0.15m x 24 kN/m³) x (1.5/2)m x (2/3)
= 1.80 kN/m 1.80 kN/m

Slab L-M/5-6 (triangle form)


= (Thickness of slab x Density of
concrete) x (Lx/2) x (2/3)
= (0.15m x 24 kN/m³) x (1.5/2)m x (2/3)
= 1.80 kN/m

YAP YUEN THONG 0326557


DEAD LOAD (BEAM K-M/5) STRUCTURAL ANALYSIS

K L M
1.50 m 1.50 m
Floor Finishes K-M/3-5
= (Density of finishes) x (Lx/2) 0.06 kN/m
= 0.05 kN/m² x (2.5/2)m
= 0.06 kN/m

Floor Finishes K-L/5-6


0.09 kN/m
= (Density of finishes) x (Lx/2) x (2/3)
= 0.17 kN/m² x (1.5/2)m x (2/3)
= 0.09 kN/m

Floor Finishes L-M/5-6 0.03 kN/m


= (Density of finishes) x (Lx/2) x (2/3)
= 0.05 kN/m² x (1.5/2)m x (2/3)
= 0.03 kN/m

Total Dead Load


17.51 kN/m
For K-L/5 7.47 kN/m
= (1.08 + 9.98 + 4.50 + 1.80 + 0.06 + 0.09)
kN/m
= 17.51 kN/m

For L-M/5
= (1.08 + 4.50 + 1.80 + 0.06 + 0.03) kN/m
= 7.47 kN/m

YAP YUEN THONG 0326557


LIVE LOAD (BEAM K-M/5) STRUCTURAL ANALYSIS

K L M
1.50 m 1.50 m
Slab K-M/3-5
= Live load (UBBL) x (Lx/2) 6.25 kN/m
= 5.0 kN/m² x (2.5/2)m
= 6.25 kN/m

Slab K-L/5-6
1.00 kN/m
= Live load (UBBL) x (Lx/2) x (2/3)
= 2.0 kN/m² x (1.5/2)m x (2/3)
= 1.00 kN/m

Slab L-M/5-6 2.50 kN/m


= Live load (UBBL) x (Lx/2) x (2/3)
= 5.0 kN/m² x (1.5/2)m x (2/3)
= 2.50 kN/m

Total Live Load


8.75 kN/m
For K-L/5
7.25 kN/m
= (6.25 + 1.00) kN/m
= 7.25 kN/m

For L-M/5
= (6.25 + 2.50) kN/m
= 8.75 kN/m

YAP YUEN THONG 0326557


ULTIMATE LOAD (BEAM K-M/5) STRUCTURAL ANALYSIS

K L M
Ultimate Load K-L/5 1.50 m 1.50 m
= 1.4(Dead Load) + 1.6 (Live Load)
= 1.4(17.51) + 1.6(7.25) 36.11 kN/m 24.46 kN/m
= (24.51 + 11.60) kN/m
= 36.11 kN/m

Ultimate Load L-M/5


= 1.4(Dead Load) + 1.6 (Live Load)
= 1.4(7.47) + 1.6 (8.75)
= 10.46 + 14.00 kN/m
= 24.46 kN/m 54.17 kN 36.69 kN

To Point Load
For K-L/5
= Ultimate Load x Length of Beam
= 36.11 kN/m x 1.50m
= 54.17 kN

For L-M/5
= Ultimate Load x Length of Beam
= 24.46 kN/m x 1.50m
= 36.69 kN FORCE (BEAM K-M/5)
REACTION

ƩMK= 0
54.17(0.75) + 31.68(1.50) +
36.69(2.25)- RM= 0
RM= 170.70/3
= 56.90 kN
54.17 kN 36.69 kN
ƩFx = 0 31.68 kN

ƩFy = 0
RK + RM - 54.17 - 31.68 - 36.69= 0
RK + 56.90= 122.54
RK= 65.64 kN
RK RM

YAP YUEN THONG 0326557


BENDING MOMENT (BEAM K-M/5) STRUCTURAL ANALYSIS

K L M
1.50 m 1.50 m
Maximum
Bending Moment = Area (positive) 65.64
65.64
= 1/2 x (65.64 + 11.47) kN x 1.50m
= 1/2 x 77.11 kN x 1.50m
= 57.83 kNm 29.53
29.53
11.47
11.47
Maximum
Bending Moment = Area (negative)
= 1/2 x (20.21 + 56.90) kN x 1.50m
= 1/2 x 77.11 kN x 1.50m
= 57.83 kNm -20.21
- 20.21

- 44.67
-44.67
- 56.90
-56.90

MAXIMUM BENDING MOMENT

YAP YUEN THONG 0326557


BEAM 4: I-K/4
With Point load from beam J/4-6

Structural Plan

Load Distribution Plan


DEAD LOAD (BEAM I-K/4) STRUCTURAL ANALYSIS

I J K
0.50 m 2.00 m
Beam self-weight
= Beam size x Density of concrete 1.08 kN/m
= (0.15 x 0.30)m² x 24 kN/m³
= 1.08 kN/m

Brickwall load
= Wall thickness x Wall height x Density of 9.98 kN/m
brick
= (0.15 x 3.50)m² x 19 kN/m³
= 9.98 kN/m

Slab G-J/4-6 (triangle form) 3.60 kN/m


= (Thickness of slab x Density
of concrete) x (Lx/2) x (2/3)
= (0.15m x 24 kN/m³) x (3/2)m x (2/3)
= 3.60 kN/m
3.00 kN/m
Slab I-K/2-4 (triangle form)
= (Thickness of slab x Density
of concrete) x (Lx/2) x (2/3)
= (0.15m x 24 kN/m³) x (2.5/2)m x (2/3)
= 3.00 kN/m 2.40 kN/m

Slab J-K/4-6 (triangle form)


= (Thickness of slab x Density
of concrete) x (Lx/2) x (2/3)
= (0.15m x 24 kN/m³) x (2/2)m x (2/3)
= 2.40 kN/m

YAP YUEN THONG 0326557


DEAD LOAD (BEAM I-K/4) STRUCTURAL ANALYSIS

I J K
0.50 m 2.00 m
Floor Finishes G-J/4-6
0.15 kN/m
= (Density of finishes) x (Lx/2) x (2/3)
= 0.15 kN/m² x (3/2)m x (2/3)
= 0.15 kN/m

Floor Finishes I-K/2-4 0.14 kN/m


= (Density of finishes) x (Lx/2) x (2/3)
= 0.17 kN/m² x (2.5/2)m x (2/3)
= 0.14 kN/m

Floor Finishes J-K/4-6 0.11 kN/m


= (Density of finishes) x (Lx/2) x (2/3)
= 0.17 kN/m² x (2/2)m x (2/3)
= 0.11 kN/m

Total Dead Load


For I-J/4 17.95 kN/m
= (1.08 + 9.98 + 3.60 + 3.00 + 0.15 + 0.14) 6.73 kN/m
kN/m
= 17.95 kN/m

For J-K/4
= (1.08 + 3.00 + 2.40 + 0.14 + 0.11) kN/m
= 6.73 kN/m

YAP YUEN THONG 0326557


LIVE LOAD (BEAM I-K/4) STRUCTURAL ANALYSIS

I J K
0.50 m 2.00 m
Slab G-J/4-6 (triangle form)
= Live load (UBBL) x (Lx/2) x (2/3) 1.50 kN/m
= 1.50 kN/m² x (3/2)m x (2/3)
= 1.50 kN/m

Slab I-K/2-4 (triangle form)


1.67 kN/m
= Live load (UBBL) x (Lx/2) x (2/3)
= 2.0 kN/m² x (2.5/2)m x (2/3)
= 1.67 kN/m

Floor Finishes J-K/4-6 (triangle form)


1.33 kN/m
= Live load (UBBL) x (Lx/2) x (2/3)
= 2.0 kN/m² x (2/2)m x (2/3)
= 1.33 kN/m

Total Live Load


For I-J/4 3.17 kN/m 3.00 kN/m
= (1.50 + 1.67) kN/m
= 3.17 kN/m

For J-K/4
= (1.67 + 1.33) kN/m
= 3.00 kN/m

YAP YUEN THONG 0326557


ULTIMATE LOAD (BEAM I-K/4) STRUCTURAL ANALYSIS

I J K
Ultimate Load I-J/4
0.50 m 2.00 m
= 1.4(Dead Load) + 1.6 (Live Load)
= 1.4(17.95) + 1.6(3.17)
= (25.13 + 5.07) kN/m
30.20 kN/m 14.22 kN/m
= 30.20 kN/m

Ultimate Load J-K/4


= 1.4(Dead Load) + 1.6 (Live Load)
= 1.4(6.73) + 1.6(3.00)
= (9.42 + 4.80) kN/m
= 14.22 kN/m
15.10 kN 28.44 kN

To Point Load I-J/4


= Ultimate Load x Length of Beam
= 30.20 kN/m x 0.50m
= 15.10 kN

To Point Load J-K/4


= Ultimate Load x Length of Beam
= 14.22 kN/m x 2.00m
= 28.44 kN
REACTION FORCE (BEAM I-K/4)

47.41 kN
ƩMI= 0
15.10(0.25) + 47.41(0.50) +
28.44(1.50) -2.5RK= 0 15.10 kN 28.44 kN
RK= 70.15/2.5
= 28.06 kN

ƩFx = 0

ƩFy = 0 RI RK
RI+RK-15.10-47.41-28.44= 0
RI + 28.06= 90.95
RI= 62.89 kN

YAP YUEN THONG 0326557


BENDING MOMENT (BEAM I-K/4) STRUCTURAL ANALYSIS

I J K
Ratio
0.50 m 2.00 m
V:H
2 : 28.44
x = 0.38

0.38 62.89
62.89
x= x2
28.44
47.79
47.79
x = 0.03m

0.38
0.38
Maximum Bending Moment
y
= Area (positive)
= [1/2 x (62.89 + 47.79) kN x 0.50m] +
[1/2 x 0.03m x 0.38 kN] x
= (27.67 + 0.01) kNm - 13.84
= 27.68 kNm -13.84

- 28.06
Ratio -28.06
V:H
2 : 28.44
x = 28.06

28.06
x= x2
28.44
x = 1.97m

MAXIMUM BENDING MOMENT

Maximum Bending Moment


= Area (negative)
= 1/2 x 1.97m x 28.06 kN
= 27.64 kNm

YAP YUEN THONG 0326557


BEAM 5: K/3-6
With Point load from beam G-K/4 and K-M/5

Structural Plan

Load Distribution Plan


DEAD LOAD (BEAM K/3-6) STRUCTURAL ANALYSIS

3 4 5 6
1.50 m 1.00 m 2.00 m
Beam self-weight
= Beam size x Density of concrete 1.08 kN/m
= (0.15 x 0.30)m² x 24 kN/m³
= 1.08 kN/m

Brickwall load
= Wall thickness x Wall height x Density of 9.98 kN/m
brick
= (0.15 x 3.50)m² x 19 kN/m³
= 9.98 kN/m

Slab I-K/2-4 (trapezoidal form) 4.50 kN/m


= (Thickness of slab x Density of
concrete) x (Lx/2)
= (0.15m x 24 kN/m³) x (2.5/2)m
= 4.50 kN/m
3.60 kN/m
Slab J-K/4-6 (trapezoidal form)
= (Thickness of slab x Density
of concrete) x (Lx/2)
= (0.15m x 24 kN/m³) x (2/2)m
= 3.60 kN/m 3.00 kN/m

Slab K-M/3-5 (triangle form)


= (Thickness of slab x Density
of concrete) x (Lx/2) x (2/3)
= (0.15m x 24 kN/m³) x (2.5/2)m x (2/3) 2.70 kN/m
= 3.00 kN/m

Slab K-L/5-6 (trapezoidal form)


= (Thickness of slab x Density
of concrete) x (Lx/2)
= (0.15m x 24 kN/m³) x (1.5/2)m
= 2.70 kN/m

YAP YUEN THONG 0326557


DEAD LOAD (BEAM K/3-6) STRUCTURAL ANALYSIS

3 4 5 6
1.50 m 1.00 m 2.00 m
Floor Finishes I-K/2-4
= (Density of finishes) x (Lx/2) 0.21 kN/m
= 0.17 kN/m² x (2.5/2)m
= 0.21 kN/m

Floor Finishes J-K/4-6


0.17 kN/m
= (Density of finishes) x (Lx/2)
= 0.17 kN/m² x (2/2)m
= 0.17 kN/m

Floor Finishes K-M/3-5


= (Density of finishes) x (Lx/2) x (2/3) 0.04 kN/m
= 0.05 kN/m² x (2.5/2)m x (2/3)
= 0.04 kN/m

Floor Finishes K-L/5-6


= (Density of finishes) x (Lx/2)
= 0.17 kN/m² x (1.5/2)m 0.13 kN/m
= 0.13 kN/m

Total Dead Load


For K/3-4
= (1.08 + 9.98 + 4.50 + 3.00 + 0.21 + 0.04)
kN/m 18.81 kN/m 17.76 kN/m
= 18.81 kN/m 17.87 kN/m

For K/4-5
= (1.08 + 9.98 + 3.60 + 3.00 + 0.17 + 0.04)
kN/m
= 17.87 kN/m

For K/5-6
= (1.08 + 9.98 + 3.60 + 2.70 + 0.17 + 0.13)
kN/m
= 17.66 kN/m

YAP YUEN THONG 0326557


LIVE LOAD (BEAM K/3-6) STRUCTURAL ANALYSIS

3 4 5 6
1.50 m 1.00 m 2.00 m
Slab I-K/2-4 (trapezoidal form)
2.50 kN/m
= Live load (UBBL) x (Lx/2)
= 2.0 kN/m² x (2.5/2)m
= 2.50 kN/m

Slab J-K/4-6 (trapezoidal form) 2.00 kN/m


= Live load (UBBL) x (Lx/2)
= 2.0 kN/m² x (2/2)m
= 2.00 kN/m

Slab K-M/3-5 (triangle form) 4.17 kN/m


= Live load (UBBL) x (Lx/2) x (2/3)
= 5.0 kN/m² x (2.5/2)m x (2/3)
= 4.17 kN/m

Slab K-L/5-6 (trapezoidal form)


1.50 kN/m
= Live load (UBBL) x (Lx/2)
= 2.0 kN/m² x (1.5/2)m
= 1.50 kN/m

Total Live Load


For K/3-4 6.67 kN/m
= (2.50 + 4.17) kN/m
6.17 kN/m 3.50 kN/m
= 6.67 kN/m

For K/4-5
= (2.00 + 4.17) kN/m
= 6.17 kN/m

For K/5-6
= (2.00 + 1.50) kN/m
= 3.50 kN/m

YAP YUEN THONG 0326557


ULTIMATE LOAD (BEAM K/3-6) STRUCTURAL ANALYSIS

3 4 5 6
1.50 m 1.00 m 2.00 m
Ultimate Load K/3-4
= 1.4(Dead Load) + 1.6 (Live Load)
= 1.4(18.81) + 1.6(6.67)
= (26.33 + 10.67) kN/m 34.89 kN/m
= 37.00 kN/m 37.00 kN/m 30.32 kN/m

Ultimate Load K/4-5


= 1.4(Dead Load) + 1.6 (Live Load)
= 1.4(17.87) + 1.6(6.17)
= (25.02 + 9.87) kN/m
= 34.89 kN/m

Ultimate Load K/5-6


= 1.4(Dead Load) + 1.6 (Live Load)
= 1.4(17.66) + 1.6(3.50)
= (24.72 + 5.60) kN/m
= 30.32 kN/m

To Point Load
For K/3-4
= Ultimate Load x Length of Beam
= 37.00 kN/m x 1.50m 55.50 kN 60.64 kN
= 55.50 kN
34.89 kN
For K/4-5
= Ultimate Load x Length of Beam
= 34.89 kN/m x 1.00m
= 34.89 kN

For K/5-6
= Ultimate Load x Length of Beam
= 30.32 kN/m x 2.00m
= 60.64 kN

YAP YUEN THONG 0326557


REACTION FORCE (BEAM K/3-6) STRUCTURAL ANALYSIS

3 4 5 6
1.50 m 1.00 m 2.00 m
ƩM3= 0
55.50(0.75) + 28.06(1.50) +
34.89(2.00) + 65.64(2.50) + 55.50 kN 65.64 kN 60.64 kN
60.64(3.50) - 4.5R6= 0
R6= 529.84/4.5 34.89 kN
= 117.74kN
28.06 kN
ƩFx = 0

ƩFy = 0
R3+R4-55.50-28.06-34.89-
65.64-60.60= 0 R3 R6
R3+117.74= 244.73
R3= 126.99 kN

YAP YUEN THONG 0326557


REACTION FORCE (BEAM K/3-6) STRUCTURAL ANALYSIS

3 4 5 6
1.50 m 1.00 m 2.00 m

Maximum Bending Moment


= Area (positive)
= [1/2 x (126.99 + 71.49) kN x 1.50m]
+ [1/2 x (43.43 + 8.54) kN x 1.00m] 126.99
126.99
= (148.86 + 25.99) kNm 89.99
= 174.85 kNm 89.99
71.49
71.49
Maximum Bending Moment
= Area (negative) 43.43
= [1/2 x (57.10 + 117.74) kN x 2.00m] 8.54
= 174.84 kNm

- 57.10
-57.10
- 87.42
-87.42 - 117.74

MAXIMUM BENDING MOMENT

YAP YUEN THONG 0326557


YONG KANG SENG
0331857

43
BEAM 3/K-M

2.5m 2.5m

3.5m 3.5m

Structural Plan Load Distribution Plan


DEAD LOAD ANALYSIS

DEAD LOAD (BEAM K-M/3) K M


3.00m

Beam self weight 1.08 kN/m


= Beam size x Density of concrete
= (0.150 x 0.300)m² x 24kN/m³
Beam self weight
= 1.08kN/m
9.98 kN/m
Brick wall self weight
= Wall thickness x Wall height x Density of brick
= (3.500 x 0.150)m² x 19kN/m³ Brick wall weight
= 9.98kN/m

Floor Slab K-M/1-3 (triangle)


3.60 kN/m
= (Thickness of slab x Density of concrete) x (Lx/2)
x (2/3)
= (0.150 m x 24kN/m³) x (3.000/2) x (2/3)
Slab K-M/1-3
= 3.600kN/m

Floor Finishes K-M/1-3 (triangle)


0.17 kN/m
=Density of Floor Finishes x (Lx/2) x (2/3)
= 0.17kN/m2 x (3.000/2) x (2/3)
Floor Finishes K-
= 0.17kN/m
M/1-3
Floor Slab K-M/3-5
= (Thickness of slab x Density of concrete) x (Lx/2) ) 4.50kN/m

= (0.150 m x 24kN/m³) x (2.500/2)


= 4.500kN/m Slab K-M/3-5

Floor Finishes K-M/3-5


=Density of Floor Finishes x (Lx/2) 0.06 kN/m

= 0.05kN/m2 x (2.500/2)
Floor Finishes K-
= 0.06kN/m M/3-5

Total Dead Load


19.39kN/m
For Beam K-M/3
= 1.08+9.98+3.60+0.17+4.50+0.06 Total Dead Load
=19.39kN/m

YONG KANG SENG 0331857


STRUCTURAL ANALYSIS
LIVE LOAD ANALYSIS

LIVE LOAD (BEAM K-M/3)

Live load in Study area K-M/1-3


= 2.5kN/m
Live load in Gym Room area K-M/3-5
= 5.0 kN/m K M
3.00m
Live load on slab K-M1/3 (triangle)
= Live load (UBBL) x (Lx/2) x (2/3)
2.5 kN/m
= 2.5N/m² x (3.000/2)m x (2/3)
= 2.50kN/m
Slab K-M/1-3
Live load on slab K-M/3-5
= Live load (UBBL) x (Lx/2)
= 5.0kN/m² x (2.500/2)m 6.25 kN/m

= 6.25kN/m
Slab K-M/3-5

THE ULTIMATE LOAD (BEAM K-M/3)

Load factor that needs to be applied:


1.4 for dead load
1.6 for live load K M
THE ULTIMATE LOAD (BEAM 4/G-H) 3.00m
Ultimate dead load
= 19.39kN/m x 1.4
= 27.15kN/m
41.14 kN/m
Ultimate live load
= (6.25kN/m+ 2.50kN/m) x 1.6
Total
= 14kN/m Ultimate Load
Total ultimate load
= 27.15+14.00
= 41.14kN/m

YONG KANG SENG 0331857


STRUCTURAL ANALYSIS
REACTION FORCE (BEAM K-M/3) STRUCTURAL ANALYSIS

Ʃ MK = 0
123.42 (1.5) – 3 RM = 0 K M
3.000m
RM = 185.13/3
= 61.71 kN

ƩFx = 0 41.14 kN/m x 3m=123.42kN/m

Ʃ 𝐹𝑦 = 0 RK RM
RK + RM - 123.42 = 0
61.71kN 61.71kN
RK + 61.71 = 123.42
RK = 61.71 kN

BENDING MOMENT
61.71
x 20.57

1 41.14
20.57
x 20.57
41.14 x 1
= 0.50m
𝑥
Maximum
bending moment = Area -20.57
(positive) =1/2 (61.71)(1+0.5)
= 46.28kNm
#
-61.71
Maximum
bending moment = Area
(negative) =1/2 (61.71)(1+0.5)
= 46.28kNm
#

MAXIMUM BENDING MOMENT

YONG KANG SENG 0331857

47
Beam L/5-6

1.50m 1.50m 1.50m 1.50m

2.0m 2.0m

Sturctural Plan Load Distribution Plan

48
DEAD LOAD ANALYSIS

DEAD LOAD (BEAM L/5-6) 5 6


2.00m
Beam self weight
= Beam size x Density of concrete 1.08 kN/m

= (0.150 x 0.300)m² x 24kN/m³


= 1.08kN/m Beam self weight

Brick wall self weight


9.98 kN/m
= Wall thickness x Wall height x Density of brick
= (3.500 x 0.150)m² x 19kN/m³
Brick wall weight
= 9.98kN/m

Floor Slab K-L/5-6


= (Thickness of slab x Density of concrete) x
2.70 kN/m
(Lx/2)
= (0.150 m x 24kN/m³) x (1.500/2)
Slab K-L/5-6
= 2.700kN/m

Floor Finishes K-L/5-6


=Density of Floor Finishes x (Lx/2)
0.13 kN/m
= 0.17kN/m2 x (1.500/2)
= 0.13kN/m Floor Finishes K-
L/5-6
Floor Slab L-M/5-6
= (Thickness of slab x Density of concrete) x
2.70kN/m
(Lx/2)
= (0.150 m x 24kN/m³) x (1.500/2)
Slab L-M/5-6
= 2.700kN/m

Floor Finishes L-M/5-6


=Density of Floor Finishes x (Lx/2) 0.04 kN/m

= 0.05kN/m2 x (1.500/2)
Floor Finishes L-
= 0.04kN/m M/5-6

Total Dead Load


16.63 kN/m
For Beam K-L/5
= 1.08+9.98+2.70+0.13+2.70+0.04
Total Dead Load
=16.63kN/m

YONG KANG SENG 0331857


STRUCTURAL ANALYSIS
LIVE LOAD ANALYSIS

LIVE LOAD (BEAM L/5-6)

Live load in Gym Room area = 5.0kN/m

Live load in Bath Room area = 2.0kN/m


5 6
Live load on slab K-L/5-6 2.00m

= Live load (UBBL) x (Lx/2)


1.5 kN/m
= 2.0N/m² x (1.500/2)m
= 1.50kN/m
Slab K-L/5-6

Live load on slab L-M/5-6


= Live load (UBBL) x (Lx/2) 3.75 kN/m
= 5.0N/m² x (1.500/2)m
= 3.75kN/m Slab L-M/5-6

Total Live Load


For Beam K-L/5
= 1.5+3.75 5.25 kN/m

=5.25kN/m
Total Live Load

THE ULTIMATE LOAD (BEAM L/5-6)

Load factor that needs to be applied:


1.4 for dead load
1.6
THEfor live loadLOAD (BEAM 4/G-H)
ULTIMATE

Ultimate dead load 5 6


2.00m
= 16.63kN/m x 1.4
= 23.28kN/m
Ultimate live load
=5.25kN/m x 1.6 31.68 kN/m
= 8.40kN/m
Total
Total ultimate load
Ultimate Load
= 23.28+8.40
=31.68kN/m

YONG KANG SENG 0331857


STRUCTURAL ANALYSIS
REACTION FORCE (BEAM L/5-6) STRUCTURAL ANALYSIS

Ʃ M5 = 0
63.36 (1.0) – 2R6 = 0 5 6
2.000m
R6 = 63.36/2
= 31.68 kN

ƩFx = 0 31.68 kN/m x 2m=63.36kN/m

Ʃ 𝐹𝑦 = 0 R5 R6
R5 + R6 - 63.36 = 0
31.68kN 31.68kN
R5 + 31.68 = 63.36
R5 = 31.68 kN

BENDING MOMENT
31.68

0
𝑥

Maximum
bending moment = Area -31.68
=1/2 (31.68)(1)
= 15.84 kNm
#

MAXIMUM BENDING MOMENT

YONG KANG SENG 0331857

51
BEAM 5/K-M
POINT LOADS IMPOSED ON THIS BEAM:
FROM BEAM L/5-6 = 31.68kN

1.5m 1.5m 1.5m 1.5m

2.0m 2.0m

2.5m 2.5m

Sturctural Plan
Load Distribution Plan
DEAD LOAD ANALYSIS

DEAD LOAD (BEAM K-L/5) K L M


1.50m 1.50m
Beam self weight
= Beam size x Density of concrete 1.08 kN/m

= (0.150 x 0.300)m² x 24kN/m³


= 1.08kN/m Beam self weight

Brick wall self weight


9.98 kN/m
= Wall thickness x Wall height x Density of brick
= (3.500 x 0.150)m² x 19kN/m³
Brick wall weight
= 9.98kN/m

Floor Slab K-L/3-5


= (Thickness of slab x Density of concrete) x
2.70 kN/m
(Lx/2) )
= (0.150 m x 24kN/m³) x (1.500/2)
Slab K-L/3-5
= 2.700kN/m

Floor Finishes K-L/3-5


=Density of Floor Finishes x (Lx/2)
0.04 kN/m
= 0.05kN/m2 x (1.500/2)
= 0.04kN/m Floor Finishes K-
L/3-5
Floor Slab K-L/5-6 (triangle)
= (Thickness of slab x Density of concrete) x
1.08 kN/m
(Lx/2) x (2/3)
= (0.150 m x 24kN/m³) x (1.500/2) x (2/3) Slab K-L/5-6
= 1.800kN/m

Floor Finishes K-L/5-6 (triangle)


0.09 kN/m
=Density of Floor Finishes x (Lx/2) x (2/3)
= 0.17kN/m2 x (1.500/2) x (2/3) Floor Finishes K-
L/5-6
= 0.09kN/m

Total Dead Load 15.69 kN/m


For Beam K-L/5
= 1.08+9.98+2.70+0.04+1.80+0.09
Total Dead Load
=15.69kN/m

YONG KANG SENG 0331857


STRUCTURAL ANALYSIS
LIVE LOAD ANALYSIS

LIVE LOAD (BEAM K-L/5)

Live load in Gym Room area = 5.0kN/m

Live load in Bath Room area = 2.0kN/m


K L M
1.50m 1.50m
Live load on slab K-L/3-5
= Live load (UBBL) x (Lx/2)
3.75 kN/m
= 5.0N/m² x (1.500/2)m
= 3.75kN/m Slab K-L/3-5

Live load on slab K-L/5-6 (triangle)


1.00 kN/m
= Live load (UBBL) x (Lx/2) x (2/3)
= 2.0N/m² x (1.500/2)m x (2/3)
Slab K-L/5-6
= 1.00kN/m

Total Live Load


4.75 kN/m
For Beam K-L/5
= 3.75+1.00
Total Live Load
=4.75kN/m

THE ULTIMATE LOAD (BEAM K-L/5)

Load factor that needs to be applied:


1.4 for dead load
1.6
THEfor live loadLOAD (BEAM 4/G-H)
ULTIMATE

Ultimate dead load K M


1.500m 1.500m
= 15.69kN/m x 1.4
= 21.97kN/m
Ultimate live load
=4.75kN/m x 1.6 29.57 kN/m
= 7.60kN/m
Total
Total ultimate load
Ultimate Load
= 21.97+7.60
= 29.57kN/m

YONG KANG SENG 0331857


STRUCTURAL ANALYSIS
DEAD LOAD ANALYSIS

DEAD LOAD (BEAM L-M/5)


K L M
Beam self weight 1.50m 1.50m
= Beam size x Density of concrete 1.08 kN/m
= (0.150 x 0.300)m² x 24kN/m³
= 1.08kN/m Beam self weight

Floor Slab L-M/3-5


= (Thickness of slab x Density of concrete) x
2.70 kN/m
(Lx/2) )
= (0.150 m x 24kN/m³) x (1.500/2)
= 2.700kN/m Slab L-M/3-5

Floor Finishes L-M/3-5


=Density of Floor Finishes x (Lx/2)
0.04 kN/m
= 0.05kN/m2 x (1.500/2)
= 0.04kN/m Floor Finishes L-
M/3-5
Floor Slab L-M/5-6 (triangle)
= (Thickness of slab x Density of concrete) x
(Lx/2) x (2/3) 1.80 kN/m

= (0.150 m x 24kN/m³) x (1.500/2) x (2/3)


= 1.800kN/m Slab L-M/5-6

Floor Finishes L-M/5-6 (triangle)


=Density of Floor Finishes x (Lx/2) x (2/3)
0.03 kN/m
= 0.05kN/m2 x (1.500/2) x (2/3)
= 0.03kN/m Floor Finishes L-
M/5-6

Total Dead Load


For Beam L-M/5 5.65 kN/m

= 1.08+2.70+0.04+1.80+0.03
=5.65kN/m Total Dead Load

YONG KANG SENG 0331857


STRUCTURAL ANALYSIS
LIVE LOAD ANALYSIS

LIVE LOAD (BEAM L-M/5)

Live load in Gym Room area = 5.0kN/m

Live load in Bath Room area = 2.0kN/m


K L M
1.50m 1.50m
Live load on slab L-M/3-5
= Live load (UBBL) x (Lx/2) 3.75 kN/m
= 5.0N/m² x (1.500/2)m
= 3.75kN/m Slab L-M/3-5

Live load on slab L-M/5-6 (triangle)


2.50 kN/m
= Live load (UBBL) x (Lx/2) x (2/3)
= 5.0N/m² x (1.500/2)m x (2/3)
Slab L-M/5-6
= 2.5kN/m

Total Live Load


6.25 kN/m
For Beam K-L/5
= 3.75+2.50
Total Live Load
=6.25kN/m

THE ULTIMATE LOAD (BEAM L-M/5)

Load factor that needs to be applied:


1.4 for dead load
1.6
THEfor live loadLOAD (BEAM 4/G-H)
ULTIMATE

Ultimate dead load K M


1.500m 1.500m
= 5.65kN/m x 1.4
= 7.91kN/m
Ultimate live load
=6.25kN/m x 1.6 17.91 kN/m
= 10.00kN/m
Total
Total ultimate load
Ultimate Load
= 7.91+10.00
=17.91kN/m

YONG KANG SENG 0331857


STRUCTURAL ANALYSIS
REACTION FORCE (BEAM K-M/5) STRUCTURAL ANALYSIS

K L M
Ʃ MK = 0 1.50 m 1.50 m
44.36 (0.75)+ 31.68 (1.50)+26.87
31.68kN
(2.25)- RM (3.00) = 0
29.57kN/m x 1.5m 17.91kN/m x 1.5m
RM = 141.25/3 =44.36kN =26.87kN
= 47.08 kN
ƩFx = 0

Ʃ 𝐹𝑦 = 0
RK + RM -44.36-31.68-26.87 = 0 RK 55.83kN RM 47.08kN
RK + 47.08 = 102.91
RK = 55.83 kN

55.83
BENDING MOMENT
26.26

Maximum 11.47
bending moment = Area
(positive) =1/2 (55.83 + 11.47)(1.50)
=50.48 kNm #
1.50 m

Maximum
bending moment = Area -20.21
(negative) =1/2 (20.21 + 47.08)(1.50) -38.12
=50.47 kNm -47.08
#

MAXIMUM BENDING MOMENT

YONG KANG SENG 0331857

57
Beam I-K/2

2.0m
2.0m

1.5m 1.5m

2.0m
2.0m

Sturctural Plan Load Distribution Plan

58
DEAD LOAD ANALYSIS

DEAD LOAD (BEAM I-K/2) I K


2.5 m

Beam self weight


1.08 kN/m
= Beam size x Density of concrete
= (0.150 x 0.300)m² x 24kN/m³
Beam self weight
= 1.08kN/m

Brick wall self weight


= Wall thickness x Wall height x Density of brick 9.98 kN/m

= (3.500 x 0.150)m² x 19kN/m³


Brick wall weight
= 9.98kN/m

Floor Slab I-K/2-4 (triangle)


= (Thickness of slab x Density of concrete) x (Lx/2) 3.00 kN/m
x (2/3)
= (0.150 m x 24kN/m³) x (2.500/2) x (2/3)
Slab I-K/2-4
= 3.00kN/m

Floor Finishes I-K/2-4 (triangle)


=Density of Floor Finishes x (Lx/2) x (2/3) 0.14 kN/m
= 0.17kN/m2 x (2.500/2) x (2/3)
Floor Finishes I-
= 0.14kN/m
K/2-4
Floor Slab I-K/1-2
= (Thickness of slab x Density of concrete) x (Lx/2) ) 3.60kN/m

= (0.150 m x 24kN/m³) x (2.000/2)


= 3.600kN/m Slab I-K/1-2

Floor Finishes I-K/1-2


=Density of Floor Finishes x (Lx/2) 0.17 kN/m

= 0.17kN/m2 x (2.000/2)
Floor Finishes I-
= 0.17kN/m K/1-2

Total Dead Load


17.97kN/m
For Beam K-M/3
= 1.08+9.98+3.00+0.14+3.60+0.17 Total Dead Load
=17.97kN/m

YONG KANG SENG 0331857


STRUCTURAL ANALYSIS
LIVE LOAD ANALYSIS

LIVE LOAD (BEAM I-K/2)

Live load in Corridor I-K/2-4


= 2.0kN/m
Live load in Gym Room area I-K/1-2
= 2.0 kN/m I K
2.5m
Live load on slab I-K/2-4 (triangle)
= Live load (UBBL) x (Lx/2) x (2/3)
1.67 kN/m
= 2.0N/m² x (2.500/2)m x (2/3)
= 1.67kN/m
Slab K-M/1-3

Live load on slab I-K/1-2


= Live load (UBBL) x (Lx/2)
2.00 kN/m
= 2.0kN/m² x (2.000/2)m
= 2.00kN/m
Slab I-K/1-2

Total Live Load


For Beam I-K/2 3.67 kN/m
= 1.67+2.00
=3.67kN/m Total Live Load

THE ULTIMATE LOAD (BEAM I-K/2)

Load factor that needs to be applied:


1.4 for dead load
1.6 for live load I K
THE ULTIMATE LOAD (BEAM 4/G-H) 2.500m
Ultimate dead load
= 17.97kN/m x 1.4
= 25.16kN/m
Ultimate live load 31.03 kN/m
= 3.67 x 1.6
Total
= 5.87kN/m Ultimate Load
Total ultimate load
= 25.16+5.87
= 31.03kN/m

YONG KANG SENG 0331857


STRUCTURAL ANALYSIS
REACTION FORCE (BEAM I-K/2) STRUCTURAL ANALYSIS

Ʃ MI = 0
77.58 (1.25) – 2.50 RK = 0 I K
2.500m
RK = 96.98/2.50
=38.79 kN

ƩFx = 0 31.03kN/m x 2.5m=77.58kN

Ʃ 𝐹𝑦 = 0 RI RK
RI + RK -77.58 = 0
38.79kN 38.79kN
RI + 38.79 = 77.58
RI = 38.79N

BENDING MOMENT
38.79
𝑥 38.79
=
2.5 77.58
38.79 7.76
𝑥= x 2.5
77.58

= 1.25m
𝑥
Maximum
bending moment = Area
(positive) =1/2 (38.79)(1.25) -23.27
=24.24kNm
# -38.79
Maximum
bending moment = Area
(negative) =1/2 (38.79)(1.25)
=24.24kNm #

MAXIMUM BENDING MOMENT

YONG KANG SENG 0331857

61
BEAM K/1-3

1.5m

2.0m

Structural Plan Load Distribution Plan

62
DEAD LOAD ANALYSIS

DEAD LOAD (BEAM K/1-2) 1 2 3


2.0m 1.5 m

Beam self weight


1.08 kN/m
= Beam size x Density of concrete
= (0.150 x 0.300)m² x 24kN/m³
Beam self weight
= 1.08kN/m

Brick wall self weight


= Wall thickness x Wall height x Density of brick 9.98 kN/m

= (3.500 x 0.150)m² x 19kN/m³


Brick wall weight
= 9.98kN/m

Floor Slab I-K/1-2 (triangle)


= (Thickness of slab x Density of concrete) x (Lx/2)
2.40kN/m
x (2/3)
= (0.150 m x 24kN/m³) x (2.000/2) x (2/3)
Slab I-K/1-2
= 2.400kN/m

Floor Finishes I-K/1-2 (triangle)


0.11 kN/m
=Density of Floor Finishes x (Lx/2) x (2/3)
= 0.17kN/m2 x (2.000/2)x (2/3) Floor Finishes I-
K/1-2
= 0.11kN/m

Floor Slab K-M/1-3


5.40kN/m
= (Thickness of slab x Density of concrete) x (Lx/2)
= (0.150 m x 24kN/m³) x (3.000/2)
=5.400kN/m Slab K-M/1-3

Floor Finishes K-M/1-3


0.26 kN/m
=Density of Floor Finishes x (Lx/2)
= 0.17kN/m2 x (3.000/2) Floor Finishes K-
M/1-3
= 0.26kN/m

Total Dead Load


For Beam K/1-3 19.23kN/m

= 1.08+9.98+2.40+0.11+5.40+0.26 Total Dead Load


=19.23kN/m

YONG KANG SENG 0331857


STRUCTURAL ANALYSIS
DEAD LOAD ANALYSIS

LIVE LOAD (BEAM K/1-2) 3


1 2
2.0m 1.5 m

Live load on slab I-K/1-2 (triangle) 1.33 kN/m


= Live load (UBBL) x (Lx/2)x (2/3)
Slab I-K/1-2
= 2.0kN/m² x (2.000/2)m x (2/3)
=1.33kN/m

Live load on slab K-M1/3 3.75kN/m


= Live load (UBBL) x (Lx/2)
Slab K-M.1-3
= 2.5N/m² x (3.000/2)m
=3.75kN/m

Total Live Load 5.08kN/m


For Beam I-K/2
Total Live Load
=1.33+3.75
=5.08kN/m

THE ULTIMATE LOAD (BEAM K/1-2)

Load factor that needs to be applied:


1.4 for dead load
1.6 for live load
THE ULTIMATE LOAD (BEAM 4/G-H) 1 2 3
Ultimate dead load 2.0m 1.5 m
=19.23kN/m x 1.4
= 26.92kN/m 35.05 kN/m
Ultimate live load
=5.08 x 1.6 Total Ultimate
=8.13kN/m Load

Total ultimate load


= 26.92+8.13
= 35.05kN/m

YONG KANG SENG 0331857


STRUCTURAL ANALYSIS
DEAD LOAD ANALYSIS

DEAD LOAD (BEAM K/2-3) 1 2 3


2.0m 1.5 m

Beam self weight


1.08 kN/m
= Beam size x Density of concrete
= (0.150 x 0.300)m² x 24kN/m³
Beam self weight
= 1.08kN/m

Brick wall self weight


= Wall thickness x Wall height x Density of brick 9.98 kN/m

= (3.500 x 0.150)m² x 19kN/m³


Brick wall weight
= 9.98kN/m

Floor Slab I-K/2-4


= (Thickness of slab x Density of concrete) x (Lx/2) 4.50 kN/m
= (0.150 m x 24kN/m³) x (2.500/2)
= 4.50kN/m Slab I-K/2-4

Floor Finishes I-K/2-4


=Density of Floor Finishes x (Lx/2)
= 0.17kN/m2 x (2.500/2) 0.21 kN/m

= 0.21kN/m
Floor Finishes I-
K/2-4
Floor Slab K-M/1-3
= (Thickness of slab x Density of concrete) x (Lx/2)
5.40kN/m
= (0.150 m x 24kN/m³) x (3.000/2)
=5.400kN/m
Slab K-M/1-3
Floor Finishes K-M/1-3
=Density of Floor Finishes x (Lx/2)
0.26 kN/m
= 0.17kN/m2 x (3.000/2)
= 0.26kN/m Floor Finishes K-
M/1-3
Total Dead Load
For Beam K/1-3
21.43 kN/m
= 1.08+9.98+4.50+0.21+5.40+0.26
=21.43kN/m Total Dead Load

YONG KANG SENG 0331857


STRUCTURAL ANALYSIS
DEAD LOAD ANALYSIS

LIVE LOAD (BEAM K/2-3) 3


1 2
2.0m 1.5 m

Live load on slab I-K/2-4


2.50 kN/m
= Live load (UBBL) x (Lx/2) x (2/3)
= 2.0N/m² x (2.500/2)mx (2/3)
Slab I-K/2-4
= 2.50kN/m

Live load on slab K-M1/3


= Live load (UBBL) x (Lx/2) 3.75kN/m
= 2.5N/m² x (3.000/2)m
Slab K-M.1-3
=3.75kN/m

Total Live Load


6.25kN/m
For Beam I-K/2
= 2.50+3.75 Total Live Load
=6.25kN/m

THE ULTIMATE LOAD (BEAM K/2-3)

Load factor that needs to be applied:


1.4 for dead load
1.6 for live load
THE ULTIMATE LOAD (BEAM 4/G-H) 1 2 3
Ultimate dead load 2.0m 1.5 m
= 21.43kN/m x 1.4
= 30.00kN/m 40.00 kN/m
Ultimate live load
=6.25 x 1.6 Total Ultimate
= 10.00kN/m Load

Total ultimate load


=30.00+10.00
= 40.00kN/m

YONG KANG SENG 0331857


STRUCTURAL ANALYSIS
REACTION FORCE (BEAM K/1-3) STRUCTURAL ANALYSIS

1 2 3
Ʃ M1 = 0 2.00 m 1.50 m
70.10 (1.00)+ 38.79 (2.00)+60.00
(2.75)- R3 (3.50) = 0 38.79kN
35.05kN/m x 2.0m 40.00kN/m x 1.5m
R3 = 312.68/3.5 =70.10kN =60.00kN
= 89.34 kN
ƩFx = 0

Ʃ 𝐹𝑦 = 0
R1 + R3 -70.10-38.79-60.00 = 0 R1 79.55kN R3 89.34kN
R1 + 89.34 = 168.89
R1 = 79.55 kN

79.55
BENDING MOMENT 44.50

9.45
Maximum
bending moment = Area
(positive) =1/2 (79.55 + 9.45)(2)
=88.95 kNm #
2.00 m
Maximum
bending moment = Area
(negative) =1/2 (89.34 + 29.34)(1.50) -29.34
=89.01 kNm
#
-69.34
-89.34

MAXIMUM BENDING MOMENT

YONG KANG SENG 0331857

67
PRIMARY BEAM I-M/1
POINT LOADS IMPOSED ON THIS BEAM:
FROM BEAM I-K/2 =
FROM BEAM K/1-3 =

1.5m 1.5m

2.0m 2.0m

Sturctural Plan Load Distribution Plan


DEAD LOAD ANALYSIS

DEAD LOAD (BEAM I-M/1) I K M


2.5 m 3.0 m

Beam self weight


1.08 kN/m
= Beam size x Density of concrete
= (0.150 x 0.300)m² x 24kN/m³
Beam self weight
= 1.08kN/m
9.98 kN/m
Brick wall self weight
= Wall thickness x Wall height x Density of brick
= (3.500 x 0.150)m² x 19kN/m³ Brick wall weight
= 9.98kN/m

Floor Slab K-M/1-3 (triangle)


3.60 kN/m
= (Thickness of slab x Density of concrete) x (Lx/2)
x (2/3)
= (0.150 m x 24kN/m³) x (3.000/2) x (2/3)
Slab K-M/1-3
= 3.600kN/m

Floor Finishes K-M/1-3 (triangle)


0.17 kN/m
=Density of Floor Finishes x (Lx/2) x (2/3)
= 0.17kN/m2 x (3.000/2) x (2/3)
Floor Finishes K-
= 0.17kN/m
M/1-3
Floor Slab I-K/1-2
= (Thickness of slab x Density of concrete) x (Lx/2) ) 3.60kN/m

= (0.150 m x 24kN/m³) x (2.000/2)


= 3.600kN/m Slab I-K/1-2

Floor Finishes I-K/1-2


=Density of Floor Finishes x (Lx/2) 0.17 kN/m

= 0.17kN/m2 x (2.000/2)
Floor Finishes I-
= 0.17kN/m K/1-2

Total Dead Load


For Beam I-K/1
14.83kN/m 14.83kN/m
= 1.08+9.98+3.60+0.17
=14.83kN/m Total Dead Load
For Beam K-M/1
= 1.08+9.98+3.60+0.17
=14.83kN/m
YONG KANG SENG 0331857
STRUCTURAL ANALYSIS
LIVE LOAD ANALYSIS

LIVE LOAD (BEAM I-M/1)

Live load in Study area K-M/1-3


= 2.5kN/m
Live load in Master Bath area I-K/1-2
= 5.0 kN/m I K M
2.500m 3.000m
Live load on slab K-M1/3 (triangle)
= Live load (UBBL) x (Lx/2) x (2/3)
2.5 kN/m
= 2.5N/m² x (3.000/2)m x (2/3)
= 2.50kN/m
Slab K-M/1-3

Live load on slab I-k/1-2


= Live load (UBBL) x (Lx/2)
2.00 kN/m
= 2.0kN/m² x (2.000/2)m
= 2.00kN/m
Slab I-K/1-2

THE ULTIMATE LOAD (BEAM I-M/1)

Load factor that needs to be applied:


1.4 for dead load
1.6 for live load
THE ULTIMATE LOAD (BEAM 4/G-H) I K M
2.500m 3.000m
Ultimate dead load (Beam I-M/1)
= 15.44kN/m x 1.4
= 21.62kN/m 24.82 kN/m 25.62 kN/m
Ultimate live load (Beam I-K/1)
=2.00kN/m x 1.6 Total Ultimate
Load
=3.20kN/m
Ultimate live load (Beam K-M/1)
=2.50kN/m x 1.6
=4.00kN/m
Total ultimate load (Beam I-K/1)
= 21.62+3.20
=24.82kN/m
Total ultimate load (BeamK-M/1)
= 21.62+4.00
=25.62kN/m

YONG KANG SENG 0331857


STRUCTURAL ANALYSIS
REACTION FORCE (BEAM I-M/1) STRUCTURAL ANALYSIS

I K M
Ʃ MI = 0 2.50 m 3.0 m
62.05 (1.25)+ 79.55 (2.50)+76.86
(4.00)- RM (5.50) = 0 79.55kN
24.82kN/m x 2.5m 25.62kN/m x 3.00m
RM = 583.88/5.5 =62.05kN =76.86kN
= 106.16 kN
ƩFx = 0

Ʃ 𝐹𝑦 = 0
RI + RM -62.05-79.55-76.86 = 0 RI 51.64kN RM 166.82kN
RI + 106.16 = 218.46
RI = 112.3 kN

BENDING MOMENT 112.30


87.48
62.66
Maximum 50.25
bending moment = Area
(positive) =1/2 (112.30 + 50.25)(2.50)
=203.19kNm #

Maximum
bending moment =Area
(negative) =1/2 (29.30 + 106.16)(3)
=203.19kNm # -29.30

-54.92
-80.54
-106.16

MAXIMUM BENDING MOMENT

YONG KANG SENG 0331857

71
PRIMARY BEAM M/1-6
POINT LOADS IMPOSED ON THIS BEAM:
FROM BEAM K-M/5 =
FROM BEAM K-M/3 = 61.71kN

2.0m

2.5m

3.5m

Structural Plan
Load Distribution Plan

72
DEAD LOAD ANALYSIS

DEAD LOAD (BEAM M/1-6) 1 3 5 6


3.50m 2.50m 2.00m

Beam self weight


1.08 kN/m
= Beam size x Density of concrete
= (0.150 x 0.300)m² x 24kN/m³
Beam self weight
= 1.08kN/m

Brick wall self weight


9.98 kN/m
= Wall thickness x Wall height x Density of brick
= (3.500 x 0.150)m² x 19kN/m³ Brick wall weight
= 9.98kN/m

Floor Slab K-M/1-3 5.40 kN/m


= (Thickness of slab x Density of concrete) x (Lx/2)
= (0.150 m x 24kN/m³) x (3.000/2)
= 5.400kN/m Slab K-M/1-3

Floor Finishes K-M/1-3


0.21 kN/m
=Density of Floor Finishes x (Lx/2)
= 0.17kN/m2 x (3.000/2)
Floor Finishes K-
= 0.21kN/m
M/1-3
Floor Slab K-M/3-5 (triangle)
= (Thickness of slab x Density of concrete) x (Lx/2) 3.00kN/m

x (2/3)
= (0.150 m x 24kN/m³) x (2.500/2) x (2/3) Slab K-M/3-5
=3.00kN/m

Floor Finishes K-M/3-5 (triangle) 0.04 kN/m

=Density of Floor Finishes x (Lx/2) x (2/3)


Floor Finishes K-
= 0.05kN/m2 x (2.500/2) x (2/3) M/3-5
= 0.04kN/m

Floor Slab L-M/5-6


2.70kN/m
= (Thickness of slab x Density of concrete) x (Lx/2)
= (0.150 m x 24kN/m³) x (1.500/2)
Slab L-M/5-6
= 2.700kN/m

YONG KANG SENG 0331857


STRUCTURAL ANALYSIS
DEAD LOAD ANALYSIS

DEAD LOAD (BEAM M/1-6) 1 3 5 6


3.50m 2.50m 2.00m
Floor Finishes L-M/5-6
=Density of Floor Finishes x (Lx/2) 0.04 kN/m
= 0.05kN/m2 x (1.500/2)
Floor Finishes L-
= 0.04kN/m
M/5-6

Total Dead Load


For Beam M/1-3
= 1.08+9.98+5.40+0.21 16.67kN/m 14.10kN/m 13.80kN/m

=16.67kN/m
Total Dead Load
For Beam M/3-5
= 1.08+9.98+3.00+0.04
=14.10kN/m
For Beam M/5-6
= 1.08+9.98+2.70+0.04
=13.80kN/m

LIVE
LIVELOAD
LOAD(BEAM
(BEAMI-M/1)
M/1-6)

Live load in Study area K-M/1-3


= 2.5kN/m Live load on slab K-M1/3
Live load in Gym Room area K-M/3-5 = Live load (UBBL) x (Lx/2)
= 5.0 kN/m
= 2.5N/m² x (3.000/2)m
=3.75kN/m

1 3 5 6 Live load on slab K-M/3-5 (triangle)


3.50m 2.50m 2.00m
= Live load (UBBL) x (Lx/2) x (2/3)

3.75 kN/m = 5.0kN/m² x (2.500/2)m x (2/3)


4.17 kN/m 3.75 kN/m
= 4.17kN/m
live Load for
Beam M/1-6 Live load on slab L-M/5-6
= Live load (UBBL) x (Lx/2)
= 5.0N/m² x (1.500/2)m
= 3.75kN/m

YONG KANG SENG 0331857


STRUCTURAL ANALYSIS
DEAD LOAD ANALYSIS
THE ULTIMATE LOAD (BEAM M/1-6)

Load factor that needs to be applied:


1.4 for dead load
1.6 for live load

For Beam M1-3,


Ultimate dead load
=16.67kN/m x 1.4
= 23.34kN/m 1 3 5 6
Ultimate live load 3.50m 2.50m 2.00m

=3.75kN/m x 1.6
= 6.00kN/m 29.34 kN/m 26.41 kN/m 25.32 kN/m
Total ultimate load
Total
=23.34+6.00 Ultimate Load
= 29.34kN/m

For Beam M3-5,


Ultimate dead load
=14.10kN/m x 1.4
= 19.74kN/m
Ultimate live load
=4.17kN/m x 1.6
= 6.67kN/m
Total ultimate load
=19.74+6.67
= 26.41kN/m

For Beam M5-6,


Ultimate dead load
=13.80kN/m x 1.4
= 19.32kN/m
Ultimate live load
=3.75kN/m x 1.6
= 6.00kN/m
Total ultimate load
=19.32+6.00
= 25.32kN/m

YONG KANG SENG 0331857


STRUCTURAL ANALYSIS
REACTION FORCE (BEAM M/1-6) STRUCTURAL ANALYSIS

1 3 5 6
Ʃ M1 = 0 3.50 m 2.50 m 2.00 m
102.69 (1.75)+ 61.71 (3.50)+66.03
61.71kN 47.08kN
(4.75)+ 47.08(6.00)+50.64(7.00)+ R6
29.34kN/m x 3.5m
(8.00)= 0 =102.69kN 26.41kN/m x 2.5m 25.32kN/m x 2.0m
R6 = 1346.30/8.0 =66.03kN =50.64kN
= 168.29 kN
ƩFx = 0

Ʃ 𝐹𝑦 = 0
R1 + R6 -102.69-61.71-66.03-47.08- R1 159.86kN R6 168.29kN
50.64 = 0
R1 + 168.29 = 328.15
R1 = 159.86 kN
159.86
130.52
BENDING MOMENT 101.18
71.84
57.17
Maximum
bending moment = Area
(positive) =1/2 (159.86 + 57.17)(3.50)
=379.80 kNm
#
Maximum
bending moment = Area
-4.54
(negative) =[1/2 (4.54 + 70.57)(2.50)] +
[1/2 (117.65 + 168.29)(2.00) -30.95
-57.36
=93.89 + 285.94 -70.57
=379.83 kNm
# -117.65
-142.97
-168.29

MAXIMUM BENDING MOMENT

YONG KANG SENG 0331857

76
YONG MAY SIA
0327724

77
BEAM 1: G/4-6

78
DEAD LOAD (BEAM G/4-6) STRUCTURAL ANALYSIS

4 3.000m
6
Beam self-weight
= Beam size x Density of concrete 1.08 kN/m
= 0.150 x 0.300 x 24kN/m³
=1.08 kN/m

Brickwall load
= Wall thickness x Wall height x Density 9.98 kN/m
of brick
= 0.150 x 3.500 x 19kN/m³
= 9.98 kN/m

Slab E-G/4-6 (triangle)


= Thickness of slab x Density of concrete 3.60 kN/m
x (Lx/2) x (2/3)
= 0.150 x 24 kN/m³ x (3/2) x (2/3)
= 3.60 kN/m

Slab G-J/4-6 (triangle)


= Thickness of slab x Density of concrete 3.60 kN/m
x (Lx/2) x (2/3)
= 0.150 x 24 kN/m³ x (3/2) x (2/3)
= 3.60 kN/m

Floor Finishes G-J/4-6 (triangle)


0.15 kN/m
= Density of finishes x (Lx/2) x (2/3)
= 0.15 kN/m² x (3/2) x (2/3)
= 0.15 kN/m

Floor Finishes E-G/4-6 (triangle) 0.15 kN/m


= Density of finishes x (Lx/2) x (2/3)
= 0.15 kN/m² x (3/2) x (2/3)
= 0.15 kN/m

TOTAL DEAD LOAD 18.56 kN/m


= 1.08 + 9.98 + 3.6 + 3.6 + 0.15 + 0.15
= 18.56 kN/m

YONG MAY SIA 0327724


79
LIVE LOAD (BEAM G/4-6) STRUCTURAL ANALYSIS

Live load in Guest Bedroom 1


4 6
= 1.5 kN/m
Live load in Guest Bedroom 2 3.000m
= 1.5 kN/m

Slab E-G/4-6 (triangle) 1.50 kN/m


= Live load (UBBL) x (Lx/2) x (2/3)
= 1.5 kN/m² x (3/2) x (2/3)
= 1.50 kN/m

Slab G-J/4-6 (triangle)


= Live load (UBBL) x (Lx/2) x (2/3) 1.50 kN/m
= 1.5 kN/m² x (3/2) x (2/3)
= 1.50 kN/m

TOTAL LIVE LOAD


3.00 kN/m
= 1.50 + 1.50
= 3.00 kN/m

ULTIMATE LOAD (BEAM G/4-6)


30.78 kN/m
Ultimate Load
= 1.4(Dead Load) + 1.6 (Live Load)
= 1.4(18.56) + 1.6(3.00)
= 25.98 + 4.80
= 30.78 kN/m

92.34 kN

To Point Load
= Ultimate Load x Length
= 30.78 kN/m x 3.00
= 92.34 kN

YONG MAY SIA 0327724


80
REACTION FORCE ( BEAM G/4-6) STRUCTURAL ANALYSIS

4 6
Ʃ𝐹𝑥 = 0 3.000m

Ʃ𝑀4 =0 92.34 kN
0 = 92.34(1.50) - 3R6
3𝑅6 = 138.51
𝑅6 = 46.17 kN

Ʃ𝐹𝑦 =0
0 = 𝑅4 + 𝑅6 - 92.34
𝑅4 + 𝑅6 = 92.34
𝑅4 = 92.34 - 46.17 R4 R6
= 46.17 kN

BENDING MOMENT 46.17

Ratio
15.39
V:H
3 ∶ 92.34
𝑥 ∶ 46.17
46.17
𝑥= ×3
92.34 X
𝑥 = 1.50
-15.39
Bending Moment (positive)
= 1/2 x 46.17 x 1.50
= 34.63 kNm 46.17

Ratio
V:H
3 ∶ 92.34
𝑥 ∶ 46.17
46.17
𝑥= ×3
92.34 MAXIMUM BENDING MOMENT
𝑥 = 1.50

Bending Moment (negative)


= 1/2 (46.17) (1.50)
= 34.63 kNm

YONG MAY SIA 0327724


81
BEAM 2: E-I/4
With Point load from beam G/4-6

82
DEAD LOAD (BEAM E-I/4) STRUCTURAL ANALYSIS

E G I
3.000m 2.500m

Beam self-weight
1.08 kN/m
= Beam size x Density of concrete
= 0.150 x 0.300 x 24 kN/m³
= 1.08 kN/m

Brickwall load
= Wall thickness x Wall height x Density of 9.98 kN/m
brick
= 0.150 x 3.500 x 19 kN/m³
= 9.98 kN/m

Slab E-I/3-4 (trapezoidal)


= Thickness of slab x Density of concrete x 2.70 kN/m
(Lx/2)
= 0.150 x 24 kN/m³ x (1.5/2)
= 2.70 kN/m

Slab E-G/4-6 (triangle)


= Thickness of slab x Density of concrete x 3.60 kN/m
(Lx/2) x (2/3)
= 0.150 x 24 kN/m³ x (3/2) x (2/3)
= 3.60 kN/m

Slab G-J/4-6 (triangle)


= Thickness of slab x Density of concrete x 3.60 kN/m
(Lx/2) x (2/3)
= 0.150 x 24 kN/m³ x (3/2) x (2/3)
= 3.60 kN/m

YONG MAY SIA 0327724


83
DEAD LOAD (BEAM E-I/4) STRUCTURAL ANALYSIS

E G I
3.000m 2.500m

Floor Finishes for E-I/3-4 (trapezoidal) 0.13 kN/m


= Density of finishes x (Lx/2)
= 0.17 kN/m² x (1.5/2)
= 0.13 kN/m

Floor Finishes for E-G/4-6 (triangle) 0.15 kN/m


= Density of finishes x (Lx/2) x (2/3)
= 0.15 kN/m² x (3/2) x (2/3)
= 0.15 kN/m

0.15 kN/m
Floor Finishes for G-J/4-6 (triangle)
= Density of finishes x (Lx/2) x (2/3)
= 0.15 kN/m² x (3/2) x (2/3)
= 0.15 kN/m

TOTAL DEAD LOAD E-G/4


17.64 kN/m 17.64 kN/m
= 1.08 + 9.98 + 2.70 + 3.60 + 0.13 + 0.15
= 17.64 kN/m

TOTAL DEAD LOAD G-I/4


= 1.08 + 9.98 + 2.70 + 3.60 + 0.13 + 0.15
= 17.64 kN/m

YONG MAY SIA 0327724


84
LIVE LOAD (BEAM E-I/4) STRUCTURAL ANALYSIS

Live load in Guest Bedroom 1 E 3.000m G I


2.500m
= 1.5 kN/m
Live load in Guest Bedroom 2
= 1.5 kN/m
Live load in Corridor = 2.0 kN/m

Slab E-I/3-4 1.50 kN/m


= Live load (UBBL) x (Lx/2)
= 2.0 kN/m² x (1.5/2)
= 1.50 kN/m

Slab E-G/4-6 (triangle) 1.50 kN/m


= Live load (UBBL) x (Lx/2) x (2/3)
= 1.5 kN/m² x (3/2) x (2/3)
= 1.50 kN/m

1.50 kN/m
Slab G-J/4-6 (triangle)
= Live load (UBBL) x (Lx/2) x (2/3)
= 1.5 kN/m² x (3/2) x (2/3)
= 1.50 kN/m

TOTAL LIVE LOAD E-G/4


= 1.50 + 1.50 3.00 kN/m 3.00 kN/m
= 3.00 kN/m

TOTAL LIVE LOAD G-I/4


= 1.50 + 1.50 kN/m
= 3.00 kN/m

YONG MAY SIA 0327724


85
ULTIMATE LOAD (BEAM BEAM E-I/4) STRUCTURAL ANALYSIS

E G I
3.000m 2.500m
Ultimate Load E-G/4
= 1.4(Dead Load) + 1.6 (Live Load) 29.50 kN/m 29.50 kN/m
= 1.4(17.64) + 1.6(3.00)
= 24.70 + 4.80
= 29.50 kN/m

Ultimate Load G-I/4


= 1.4(Dead Load) + 1.6 (Live Load)
= 1.4(17.64) + 1.6(3.00)
= 24.70 + 4.80
= 29.50 kN/m

88.50 kN
To Point Load E-G/4 73.75 kN
= Ultimate Load x Length
= 29.50 kN/m x 3.00
= 88.50 kN

To Point Load G-I/4


= Ultimate Load x Length
= 29.50 kN/m x 2.50
= 73.75 kN

YONG MAY SIA 0327724


86
REACTION FORCE (BEAM G/4-6) STRUCTURAL ANALYSIS

Ʃ𝐹𝑥 = 0 E 3.000m G 2.500m I


Ʃ𝑀𝐸 = 0
0 = 88.50(1.50) + 46.17(3.00) + 88.50 kN 73.75 kN
73.75(4.25) – 5.50 𝑅𝐼 46.17 kN
5.50𝑅𝐼 = 132.75 + 138.51 + 313.44
𝑅𝐼 = 584.73/5.5
= 106.31 kN

Ʃ𝐹𝑦 =0
0 = 𝑅𝐸 + 𝑅𝐼 - 88.50 – 46.17 – 73.75
RE RI
𝑅𝐸 + 𝑅𝐼 = 208.42
𝑅𝐸 = 208.42 – 106.31
= 102.11 kN
102.11
BENDING MOMENT 72.61
43.11

Maximum Bending Moment (positive) 13.61


= 1/2 (102.11 + 13.61)(3.00)
= 173. 58 kNm

Maximum Bending Moment (negative)


= 1/2 (32.56 + 106.31)(2.50)
= 173.59 kNm

-32.56
-62.06
-91.56
-106.31

MAXIMUM BENDING MOMENT

YONG MAY SIA 0327724


87
BEAM 3: E/3-5
With Point load from beam E-I/4

88
DEAD LOAD (BEAM E/3-5) STRUCTURAL ANALYSIS

3 4 5
1.500m 1.000m

Beam self-weight
= Beam size x Density of concrete 1.08 kN/m
= 0.150 x 0.300 x 24 kN/m³
= 1.08 kN/m

Brickwall load
= Wall thickness x Wall height x Density 9.98 kN/m
of brick
= 0.150 x 3.500 x 19 kN/m³
= 9.98 kN/m

Slab D-E/3-5 (trapezoidal)


= Thickness of slab x Density of concrete
x (Lx/2) 1.80 kN/m
= 0.150 x 24 kN/m³ x (1/2)
= 1.80 kN/m

Slab E-G/4-6 (triangle)


= Thickness of slab x Density of concrete 3.60 kN/m
x (Lx/2) x (2/3)
= 0.150 x 24 kN/m³ x (3/2) x (2/3)
= 3.60 kN/m

YONG MAY SIA 0327724


89
DEAD LOAD (BEAM E/3-5) STRUCTURAL ANALYSIS

3 4 5
1.500m 1.000m

Floor Finishes D-E/3-5 (trapezoidal)


= Density of finishes x (Lx/2) x (2/3) 0.09 kN/m
= 0.17 kN/m² x (1.5/2) x (2/3)
= 0.09 kN/m

Floor Finishes E-G/4-6 (triangle)


= Density of finishes x (Lx/2) x (2/3) 0.15 kN/m
= 0.15 kN/m² x (3/2) x (2/3)
= 0.15 kN/m

16.70 kN/m
TOTAL DEAD LOAD E/3-4
= 1.08 + 1.80 + 0.09 2.97 kN/m
= 2.97 kN/m

TOTAL DEAD LOAD E/4-5


= 1.08 + 9.98 + 1.80 + 3.60 + 0.09 + 0.15
= 16.70 kN/m

YONG MAY SIA 0327724


90
LIVE LOAD (BEAM E/3-5) STRUCTURAL ANALYSIS

3 4 5
1.500m 1.000m
Live load in Guest Bedroom 1
= 1.5 kN/m
Live load in Living Room = 2.0 kN/m

Slab D-E/3-5 (trapezoidal) 1.00 kN/m


= Live load (UBBL) x (Lx/2)
= 2.0 kN/m² x (1/2)
= 1.00 kN/m

Slab E-G/4-6 (triangle) 1.50 kN/m


= Live load (UBBL) x (Lx/2) x (2/3)
= 1.5 kN/m² x (3/2) x (2/3)
= 1.50 kN/m

TOTAL LIVE LOAD E/3-4


2.50 kN/m
= 1.00 kN/m 1.00 kN/m

TOTAL LIVE LOAD E/4-5


= 1.50+1.00
= 2.50 kN/m

ULTIMATE LOAD (BEAM E/3-5)

Ultimate Load E/3-4


= 1.4(Dead Load) + 1.6 (Live Load)
= 1.4(2.97) + 1.6(1.00) 27.38 kN/m
= 4.16 + 1.60
= 5.76 kN/m
5.76 kN/m
Ultimate Load E/4-5
= 1.4(Dead Load) + 1.6 (Live Load)
= 1.4(16.70) + 1.6(2.50)
= 23.38 + 4.00
= 27.38 kN/m

YONG MAY SIA 0327724


91
TO POINT LOAD STRUCTURAL ANALYSIS

3 4 5
To Point Load E/3-4 1.500m 1.000m
= Ultimate Load x Length
= 5.76 kN/m x 1.50
27.38 kN
= 8.64 kN
8.64 kN
To Point Load E/4-5
= Ultimate Load x Length
= 27.38 kN/m x 1.00
= 27.38 kN

REACTION FORCE (BEAM E/3-5)

Ʃ𝐹𝑥 = 0

Ʃ𝑀3 = 0
102.11 kN
0 = 8.64(0.75) + 102.11(1.50) +
27.38 kN
27.38(2.00) – 2.50 𝑅5
2.50𝑅5 = 6.48 + 153.17 + 54.76 8.64 kN
𝑅5 = 214.41/2.50
= 85.76 kN

Ʃ𝐹𝑦 =0
0 = 𝑅3 + 𝑅5 – 8.64 – 102.11 – 27.38
𝑅3 + 𝑅5 = 138.13
𝑅3 = 138.13 – 85.76
= 52.37 kN 𝑅3 𝑅5

YONG MAY SIA 0327724


92
BENDING MOMENT STRUCTURAL ANALYSIS

3 4 5
1.500m 1.000m

52.37
46.61
43.73
Maximum Bending Moment (positive)
= 1/2 (52.37 + 43.73)(1.50)
= 72.08 kNm

Maximum Bending Moment (negative)


= 1/2 (58.38 + 85.76) (1.00)
= 72.07 kNm
-58.38

-85.76

MAXIMUM BENDING MOMENT

YONG MAY SIA 0327724


93
BEAM 4: H/1-3

94
DEAD LOAD (BEAM H/1-3) STRUCTURAL ANALYSIS

1 3
3.500m
Beam self-weight
= Beam size x Density of concrete 1.08 kN/m
= 0.150 x 0.300 x 24 kN/m³
= 1.08 kN/m

Brickwall load
9.98 kN/m
= Wall thickness x Wall height x Density
of brick
= 0.150 x 3.500 x 19 kN/m³
= 9.98 kN/m

Slab D-H/1-3 (triangle) 4.20 kN/m


= Thickness of slab x Density of concrete
x (Lx/2) x (2/3)
= 0.150 x 24 kN/m³ x (3.5/2) x (2/3)
= 4.20 kN/m

Slab H-I/1-3
= Thickness of slab x Density of concrete 2.70 kN/m
x (Lx/2)
= 0.150 x 24 kN/m³ x (1.5/2)
= 2.70 kN/m

Floor Finishes D-H/1-3 (triangle)


0.18 kN/m
= Density of finishes x (Lx/2) x (2/3)
= 0.15 kN/m² x (3.5/2) x (2/3)
= 0.18 kN/m

Floor Finishes for H-I/1-3


= Density of finishes x (Lx/2) 0.11 kN/m
= 0.15 kN/m² x (1.5/2)
= 0.11 kN/m

18.25 kN/m
TOTAL DEAD LOAD
= 1.08 + 9.98 + 4.20 + 2.70 + 0.18 + 0.11
= 18.25 kN/m

YONG MAY SIA 0327724


95
LIVE LOAD (BEAM H/1-3) STRUCTURAL ANALYSIS

1 3
Live load in Master Bedroom 3.500m
= 1.5 kN/m
Live load in Walk-in Closet = 1.5 kN/m
1.75 kN/m
Slab D-H/1-3 (triangle)
= Live load (UBBL) x (Lx/2) x (2/3)
= 1.5 kN/m² x (3.5/2)m x (2/3)
= 1.75 kN/m
1.13 kN/m
Slab H-I/1-3
= Live load (UBBL) x (Lx/2)
= 1.5 kN/m² x (1.5/2)
= 1.13 kN/m
2.88 kN/m

TOTAL LIVE LOAD


= 1.75 + 1.13
= 2.88 kN/m

ULTIMATE LOAD (BEAM H/1-3)

Ultimate Load 30.16 kN/m


= 1.4(Dead Load) + 1.6 (Live Load)
= 1.4(18.25) + 1.6(2.88)
= 25.55 + 4.61
= 30.16 kN/m

105.56 kN/m

To Point Load
= Ultimate Load x Length
= 30.16 kN/m x 3.00
= 105.56 kN

YONG MAY SIA 0327724


96
REACTION FORCE (BEAM H/1-3) STRUCTURAL ANALYSIS

1 3
Ʃ𝐹𝑥 = 0 3.500m
Ʃ𝑀1 =0 105.56 kN
0 = 105.56(1.75) – 3.50 𝑅3
3.50𝑅3 = 184.73/3.50
𝑅3 = 52.78 kN

Ʃ𝐹𝑦 =0
0 = 𝑅1 + 𝑅3 – 105.56
𝑅1 + 𝑅3 = 105.56
𝑅1 = 105.56 – 52.78 R1 R3
= 52.78 kN

BENDING MOMENT 52.78

Ratio
V:H 22.62
3.5 ∶ 105.56
𝑦
𝑥 ∶ 52.78
52.78
𝑥= × 3.5
105.56 𝑥
𝑥 = 1.75
-7.54
Maximum Bending Moment (positive)
-37.70
= 1/2 (1.75)(52.78)
= 46.18 kNm -52.78
Ratio
V:H
3.5 ∶ 105.56
𝑦 ∶ 52.78
52.78
y= × 3.5
105.56
𝑦 = 1.75 MAXIMUM BENDING MOMENT

Maximum Bending Moment (negative)


= 1/2 (1.75)(52.78)
= 46.18 kNm

YONG MAY SIA 0327724


97
BEAM 5: D-I/3
With Point load from beam E/3-5 and H/1-3

98
DEAD LOAD (BEAM D-I/3) STRUCTURAL ANALYSIS

D E H I
1.000m 4.000m 1.500m
Beam self-weight
1.08 kN/m
= Beam size x Density of concrete
= 0.150 x 0.300 x 24 kN/m³
= 1.08 kN/m

Brickwall load
9.98 kN/m
= Wall thickness x Wall height x Density
of brick
= 0.150 x 3.500 x 19 kN/m³
= 9.98 kN/m

Slab D-H/1-3 (trapezoidal)


6.30 kN/m
= Thickness of slab x Density of concrete
x (Lx/2)
= 0.150 x 24 kN/m³ x (3.5/2)
= 6.30 kN/m

Slab E-I/3-4 2.70 kN/m


= Thickness of slab x Density of concrete
x (Lx/2)
= 0.150 x 24 kN/m³ x (1.5/2)
= 2.70 kN/m

YONG MAY SIA 0327724


99
DEAD LOAD (BEAM D-I/3) STRUCTURAL ANALYSIS

D E H I
1.000m 4.000m 1.500m
Floor Finishes D-H/1-3 (trapezoidal)
= Density of finishes x (Lx/2) 0.26 kN/m
= 0.15 kN/m² x (3.5/2)
= 0.26 kN/m

Floor Finishes E-I/3-4


= Density of finishes x (Lx/2)
0.13 kN/m
= 0.17 kN/m² x (1.5/2)
= 0.13 kN/m

TOTAL DEAD LOAD D-E/3


= 1.08 + 9.98 + 6.30 + 0.26
20.45 kN/m
= 17.62 kN/m 17.62 kN/m
13.89 kN/m

TOTAL DEAD LOAD E-H/3


= 1.08 + 9.98 + 6.30 + 2.70 + 0.26 + 0.13
= 20.45 kN/m

TOTAL DEAD LOAD H-I/3


= 1.08 + 9.98 + 2.70 + 0.13
= 13.89 kN/m

YONG MAY SIA 0327724


100
LIVE LOAD (BEAM D-I/3) STRUCTURAL ANALYSIS

D E H I
Live load in Master Bedroom
= 1.5 kN/m 1.000m 4.000m 1.500m
Live load in Corridor = 2.0kN/m

Slab D-H/1-3 (trapezoidal) 2.63 kN/m


= Live load (UBBL) x (Lx/2)
= 1.5 kN/m² x (3.5/2)m
= 2.63 kN/m​

Slab E-I/3-4 1.50 kN/m


= Live load (UBBL) x (Lx/2) x (2/3)​
= 2.0 kN/m² x (1.5/2)m
= 1.50 kN/m​

TOTAL LIVE LOAD D-E/3


= 2.63 kN/m 2.63 kN/m
4.13 kN/m
1.50 kN/m
TOTAL LIVE LOAD E-H/3
= 2.63+1.50
= 4.13 kN/m

TOTAL LIVE LOAD H-I/3


= 1.50 kN/m

ULTIMATE LOAD (BEAM D-I/3)


Ultimate Load D-E/3
= 1.4(Dead Load) + 1.6 (Live Load)
= 1.4(17.62) + 1.6(2.63)
= 24.67 + 4.21 35.24 kN/m
= 28.88 kN/m 28.88 kN/m 21.85 kN/m

Ultimate Load E-H/3


= 1.4(Dead Load) + 1.6 (Live Load)
= 1.4(20.45) + 1.6(4.13)
= 28.63 + 6.61
= 35.24 kN/m

Ultimate Load H-I/3


= 1.4(Dead Load) + 1.6 (Live Load)
= 1.4(13.89) + 1.6(1.50)
= 19.45 + 2.40
= 21.85 kN/m

YONG MAY SIA 0327724


101
TO POINT LOAD STRUCTURAL ANALYSIS

D E H I
To Point Load D-E/3
= Ultimate Load x Length 1.000m 4.000m 1.500m
= 28.88 kN/m x 1.00
= 28.88 kN
140.96 kN
To Point Load E-H/3
= Ultimate Load x Length 32.78 kN
28.88 kN
= 35.24 kN/m x 4.00
= 140.96 kN

To Point Load H-I/3


= Ultimate Load x Length
= 21.85 kN/m x 1.50
= 32.78 kN

REACTION FORCE (BEAM D-I/3)

Ʃ𝐹𝑥 = 0

Ʃ𝑀𝐷 = 0
0 = 28.88(0.50) + 52.37(1.00) + 140.96 kN
140.96(3.00) + 52.78(5.00) + 52.37 kN 52.78 kN
32.78(5.75) – 6.50 𝑅𝐼 32.78 kN
6.50𝑅𝐼 = 14.44 + 52.37 + 422.88 + 28.88 kN

263.90 + 188.49
𝑅𝐼 = 942.08/6.50
= 144.94 kN

Ʃ𝐹𝑦 = 0
0 = 𝑅𝐷 + 𝑅𝐼 – 28.88 – 52.37 –
140.96 – 52.78 – 32.78 RD​ RI
𝑅𝐷 + 𝑅𝐼 = 307.77
𝑅𝐷 = 307.77 – 144.94
= 162.83 kN

YONG MAY SIA 0327724


102
BENDING MOMENT STRUCTURAL ANALYSIS

D E H I
1.000m 4.000m 1.500m

Ratio
V:H 162.83
4 ∶ 140.96
𝑥 ∶ 81.58
81.58
𝑥= ×4 133.95
140.96
𝑥 = 2.31
Maximum Bending Moment (positive) 81.58
= [1/2 (162.83 + 133.95)(1.00)] + [1/2 46.34
(81.58)(2.31)] 11.10 𝑦
= 148.39 + 94.22
= 242.61 kNm 𝑥
-24.14
Ratio -59.38
V:H
4 ∶ 140.96 -112.16
𝑦 ∶ 59.38
59.38 -134.01
y= ×4
140.96
𝑦 = 1.69 -144.94
Maximum Bending Moment (negative)
= [1/2 (112.16 + 144.94)(1.50)] + [1/2
(59.38)(1.69)]
= 192.83 + 50.18
= 243.01 kNm

MAXIMUM BENDING MOMENT

YONG MAY SIA 0327724


103
BEAM 6: D/1-5
With Point load from beam D-I/3

104
DEAD LOAD (BEAM D/1-5) STRUCTURAL ANALYSIS

1 3 5
3.500m 2.500m

Beam self-weight
1.08 kN/m
= Beam size x Density of concrete
= 0.150 x 0.300 x 24 kN/m³
= 1.08 kN/m

Brickwall load 9.98 kN/m


= Wall thickness x Wall height x Density of
brick
= 0.150 x 3.500 x 19 kN/m³
= 9.98 kN/m

Slab A-D/1-5 (triangle) 9.60 kN/m


= Thickness of slab x Density of concrete
x (Lx/2) x (2/3)
= 0.200 x 24 kN/m³ x (6/2)x (2/3)
= 9.60 kN/m

Slab D-H/1-3 (triangle) 4.20 kN/m


= Thickness of slab x Density of concrete
x (Lx/2) x (2/3)
= 0.150 x 24 kN/m³ x (3.5/2) x (2/3)
= 4.20 kN/m

Slab D-E/3-5
= Thickness of slab x Density of concrete 1.80 kN/m
x (Lx/2)
= 0.150m x 24 kN/m³ x (1/2)
= 1.80 kN/m

YONG MAY SIA 0327724


105
DEAD LOAD (BEAM D/1-5) STRUCTURAL ANALYSIS

1 3 5
3.500m 2.500m

Floor Finishes A-D/1-5 (triangle)


0.34 kN/m
= Density of finishes x (Lx/2) x (2/3)
= 0.17 kN/m² x (6/2) x (2/3)
= 0.34 kN/m

Floor Finishes D-H/1-3 (triangle)


= Density of finishes x (Lx/2) x (2/3) 0.18 kN/m
= 0.15 kN/m² x (3.5/2) x (2/3)
= 0.18 kN/m

Floor Finishes D-E/3-5


= Density of finishes x (Lx/2) 0.09 kN/m
= 0.17 kN/m² x (1/2)
= 0.09 kN/m

TOTAL DEAD LOAD D/1-3


= 1.08 + 9.98 + 9.60 + 4.20 + 0.34 + 0.18 25.38 kN/m
= 25.38 kN/m 12.91 kN/m

TOTAL DEAD LOAD D/3-5


= 1.08 + 9.60 + 1.80 + 0.34 + 0.09
= 12.91 kN/m

YONG MAY SIA 0327724


106
LIVE LOAD (BEAM D/1-5) STRUCTURAL ANALYSIS

Live load in Living Room= 2.0 kN/m 1 3 5


Live load in Corridor = 2.0 kN/m 3.500m 2.500m
Live load in Master Bedroom
= 1.5 kN/m
4.00 kN/m
Slab A-D/1-5 (triangle)
= Live load (UBBL) x (Lx/2) x (2/3)​
= 2.0 kN/m² x (6/2) ​x (2/3)
= 4.00 kN/m​​

Slab D-H/1-3 (triangle) 1.75 kN/m


= Live load (UBBL) x (Lx/2) x (2/3)​​
= 1.5 kN/m² x (3.5/2)m x (2/3)
= 1.75 kN/m​​

Slab D-E/3-5 1.00 kN/m


= Live load (UBBL) x (Lx/2)
= 2.0 kN/m² x (1/2)
= 1.00 kN/m

TOTAL LIVE LOAD D/1-3 5.75 kN/m


= 4.00 + 1.75 5.00 kN/m
= 5.75 kN/m

TOTAL LIVE LOAD D/3-5


= 4.00 + 1.00
= 5.00 kN/m

YONG MAY SIA 0327724


107
ULTIMATE LOAD (BEAM D/1-5) STRUCTURAL ANALYSIS

1 3 5
Ultimate Load D/1-3 3.500m 2.500m
= 1.4(Dead Load) + 1.6(Live Load)
= 1.4(25.38) + 1.6(5.75)
44.73 kN/m
= 35.53 + 9.20
26.07 kN/m
= 44.73 kN/m

Ultimate Load D/3-5


= 1.4(Dead Load) + 1.6(Live Load)
= 1.4(12.91) + 1.6(5.00)
= 18.07 + 8.00
= 26.07 kN/m

To Point Load D/1-3


= Ultimate Load x Length
= 44.73 kN/m x 3.50 156.56 kN
= 156.56 kN 65.18 kN

To Point Load D/3-5


= Ultimate Load x Length
= 26.07 x 2.50
= 65.18 kN

REACTION FORCE (BEAM D/1-5)

Ʃ𝐹𝑥 = 0

Ʃ𝑀1 = 0 162.83 kN
156.56 kN
0 = 156.56(1.75) + 162.83(3.50)
+ 65.18(4.75) – 6.00 𝑅5 65.18 kN
6.00𝑅5 = 273.98 + 569.91 + 309.61
𝑅5 = 1153.50/6.00
= 192.25 kN

Ʃ𝐹𝑦 = 0
0 = 𝑅1 + 𝑅5 – 156.56 – 162.83 –
65.18
𝑅1 + 𝑅5 = 384.57
𝑅1 = 384.57 – 192.25 R1 R5
= 192.32 kN

YONG MAY SIA 0327724


108
BENDING MOMENT STRUCTURAL ANALYSIS

1 3 5
3.500m 2.500m

192.32
147.59
102.86
Maximum Bending Moment (positive)
58.13
= 1/2 (192.32+35.76)(3.50)
= 399.14 kNm 35.76

Maximum Bending Moment (negative)


= 1/2 (127.07 + 192.25) (2.50)
= 399.15 kNm

-127.07
-153.14
-179.21
-192.25

MAXIMUM BENDING MOMENT

YONG MAY SIA 0327724


109
YONG SHI QI
0327539

110
BEAM 1: C/7-9

Structural Plan Load Distribution Plan

111
DEAD LOAD (BEAM C/7-9 ) STRUCTURAL ANALYSIS

7 9
2.00 m

Beam self weight 1.08kN/m


= Beam size x Density of concrete
= (0.15 x 0.30)m² x 24kN/m³
= 1.08kN/m

Brick wall self weight 9.98kN/m


= Wall thickness x Wall height x Density
of brick
= (0.15 x 3.50)m² x 19kN/m³
= 9.98kN/m

Floor Slab B-C / 7-9 (trapezoid) 2.70kN/m


= (Thickness of slab x Density of
concrete) x (Lx/2)
= (0.15 m x 24kN/m³) x (1.5/2)
= 2.70kN/m
2.40kN/m
Floor Slab C-E / 7-9 (triangle)
= (Thickness of slab x Density of
concrete) x (Lx/2) x (2/3)
= (0.15 m x 24kN/m³) x (2.0/2) x (2/3)
= 2.40kN/m
0.13kN/m
Floor Finishes B-C / 7-9 (trapezoid)
= (Density of finishes) x (Lx/2)
= (0.17kN/m²) x (1.5/2)
= 0.13kN/m

Floor Finishes C-E / 7-9 (triangle) 0.11kN/m


= (Density of finishes) x (Lx/2) x (2/3)
= (0.17kN/m²) x (2.0/2) x (2/3)
= 0.11kN/m

Total dead load 16.40kN/m

= 1.08 + 9.98 + 2.70 + 2.40 + 0.13 + 0.11


= 16.40kN/m

YONG SHI QI 0327539

112
LIVE LOAD (BEAM C/7-9 ) STRUCTURAL ANALYSIS

7 9
2.00 m

Live load in recreation area = 2.00kN/m


Live load in dining area = 2.00kN/m

Live load on slab B-C / 7-9 (trapezoid) 1.50kN/m


= Live load (UBBL) x (Lx/2)
= 2.00kN/m² x (1.50/2)m
= 1.50kN/m

Live load on slab C-E / 7-9 (triangle) 1.33kN/m


= Live load (UBBL) x (Lx/2) x (2/3)
= 2.00kN/m² x (2.00/2)m x (2/3)
= 1.33kN/m

Total live load 2.83kN/m


= 1.50 + 1.33
= 2.83kN/m

YONG SHI QI 0327539

113
ULTIMATE LOAD (BEAM C/7-9) STRUCTURAL ANALYSIS

7 9
2.00 m

Ultimate dead load


22.96kN/m
= 16.40kN/m x 1.4
= 22.96kN/m

Ultimate live load 4.53kN/m


= 2.83kN/m x 1.6
= 4.53kN/m

Total ultimate load 27.49kN/m


= 22.96 + 4.53
= 27.49kN/m

YONG SHI QI 0327539

114
REACTION FORCE ( BEAM C/7-9) STRUCTURAL ANALYSIS

Ʃ 𝑀7 = 0
27.49(2) – 2𝑅9 = 0 7 9
2.00m
𝑅9 = 54.98/2
= 27.49kN

ƩFx = 0 54.98kN

Ʃ 𝐹𝑦 = 0
𝑅7 + 𝑅9 - 54.98= 0 𝑅7 𝑅9
𝑅7 + 27.49 = 54.98 27.49kN 27.49kN
𝑅7 = 27.49kN

BENDING MOMENT
27.49
Maximum bending moment
= Area (Positive)
=1/2 (27.49)(1)
= 13.75kNm

0
Maximum bending moment
= Area (Negative)
=1/2 (27.49)(1)
= 13.75kNm #
-27.49

MAXIMUM BENDING MOMENT

YONG SHI QI 0327539

115
BEAM 2: B-E/9

Structural Plan Load Distribution Plan

116
DEAD LOAD (BEAM B-E/9) STRUCTURAL ANALYSIS

B C E
1.50 m 3.50 m
Beam self weight 1.08kN/m
= Beam size x Density of concrete
= (0.15 x 0.30)m² x 24kN/m³
= 1.08kN/m

Brick wall self weight 9.98kN/m


= Wall thickness x Wall height x Density
of brick
= (0.15 x 3.50)m² x 19kN/m³
= 9.98kN/m
1.80kN/m
Floor Slab B-C / 7-9 (triangle)
= (Thickness of slab x Density of
concrete) x (Lx/2) x (2/3)
= (0.15 m x 24kN/m³) x (1.50/2) x (2/3)
= 1.80kN/m
8.00kN/m
Floor Slab B-E / 9-14 (triangle)
= (Thickness of slab x Density of
concrete) x (Lx/2) x (2/3)
= (0.20 m x 24kN/m³) x (5.00/2) x (2/3)
= 8.00kN/m
0.09kN/m
Floor Finishes B-C / 7-9 (triangle)
= (Density of finishes) x (Lx/2) x (2/3)
= (0.17kN/m²) x (1.50/2) x (2/3)
= 0.09kN/m
0.28kN/m
Floor Finishes B-E / 9-14 (triangle)
= (Density of finishes) x (Lx/2) x (2/3)
= (0.17kN/m²) x (5.00/2) x (2/3)
= 0.28kN/m

Total dead load 21.23kN/m

= 1.08 + 9.98 + 1.80 + 8.00 + 0.09 + 0.28


= 21.23kN/m

YONG SHI QI 0327539

117
LIVE LOAD (BEAM B-E/9) STRUCTURAL ANALYSIS

B C
1.50 m

Live load in dining area= 3.00kN/m


Live load in recreation area= 2.00kN/m

Live load on slab B-C / 7-9 (triangle) 1.00kN/m


= Live load (UBBL) x (Lx/2)
= 2.00kN/m² x (1.50/2)m x (2/3)
= 1.00kN/m

Live load on slab B-E / 9-14 (triangle) 5.00kN/m


= Live load (UBBL) x (Lx/2) x (2/3)
= 3.00kN/m² x (5.00/2)m x (2/3)
= 5.00kN/m

Total live load 6.00kN/m


= 1.00 + 5.00
= 6.00kN/m

YONG SHI QI 0327539

118
ULTIMATE LOAD (BEAM B-E/9) STRUCTURAL ANALYSIS

B C
1.50 m

Beam (B-C)
Ultimate dead load
29.72kN/m
= 21.23kN/m x 1.4
= 29.72kN/m

Ultimate live load 9.60kN/m


= 6.00kN/m x 1.6
= 9.60kN/m

Total ultimate load 39.32kN/m


= 29.72 + 9.60
= 39.32kN/m

YONG SHI QI 0327539

119
DEAD LOAD (BEAM B-E/9 ) STRUCTURAL ANALYSIS

B C E
1.50 m 3.50 m

Beam self weight 1.08kN/m


= Beam size x Density of concrete
= (0.15 x 0.30)m² x 24kN/m³
= 1.08kN/m

Floor Slab C-E / 7-9 (trapezoidal)


= (Thickness of slab x Density of
3.60kN/m
concrete) x (Lx/2))
= (0.15 m x 24kN/m³) x (2.00/2)
= 3.60kN/m

Floor Slab B-E / 9-14 (triangle)


= (Thickness of slab x Density of 8.00kN/m
concrete) x (Lx/2) x (2/3)
= (0.20 m x 24kN/m³) x (5.00/2) x (2/3)
= 8.00kN/m

Floor Finishes C-E / 7-9 (trapezoidal)


= (Density of finishes) x (Lx/2) 0.17kN/m
= (0.17kN/m²) x (2.00/2)
= 0.17kN/m

Floor Finishes B-E / 9-14 (triangle)


= (Density of finishes) x (Lx/2) x (2/3)
0.28kN/m
= (0.17kN/m²) x (5.00/2) x (2/3)
= 0.28kN/m

Total dead load


= 1.08 + 3.60 + 8.00 + 0.17 + 0.28 13.13kN/m
= 13.13kN/m

YONG SHI QI 0327539

120
LIVE LOAD (BEAM B-E/9) STRUCTURAL ANALYSIS

C E
3.50 m

Live load in dining area= 3.00kN/m


Live load in dining area = 2.00kN/m

Live load on slab C-E / 7-9 (trapezoid) 1.50kN/m


= Live load (UBBL) x (Lx/2)
= 2.00kN/m² x (2.00/2)m
= 2.00kN/m

Live load on slab B-E / 9-14 (triangle) 1.33kN/m


= Live load (UBBL) x (Lx/2) x (2/3)
= 3.00kN/m² x (5.00/2)m x (2/3)
= 5.00N/m

Total live load 2.83kN/m


= 2.00 + 5.00
= 7.00kN/m

YONG SHI QI 0327539

121
ULTIMATE LOAD (BEAM B-E/9) STRUCTURAL ANALYSIS

C E
3.50 m

Beam (C-E)
Ultimate dead load
18.38kN/m
= 13.13kN/m x 1.4
= 18.38kN/m

Ultimate live load 11.20kN/m


= 7.00kN/m x 1.6
= 11.20N/m

Total ultimate load 29.58kN/m


= 18.38 + 11.20
= 29.58kN/m

YONG SHI QI 0327539

122
REACTION FORCE ( BEAM B-E/9) STRUCTURAL ANALYSIS

 ΣMB = 0 B C E
0=58.98(0.75)+27.49(1.50)+103.53(3.25)- 1.50 m 3.50 m
5RE
RE=(44.24 +41.24+336.47) / 5 27.49kN
RE= 84.39kN 39.32kN/m
29.58kN/m
ƩFx = 0
 ΣFʏ = 0
0 = RB + RE- 39.32(1.50) – 27.49 –
29.58(3.50) RE 84.39kN
RB 105.61kN
RB + RE = 58.98 +27.49 +103.53 =190
RB= 190- 84.39
= 105.61kN
105.61
BENDING MOMENT
66.29
𝑥 84.39
= 3.50 −
1 29.58 46.63
84.39 19.14
𝑥 = 3.50 − 2.85 m
29.58
1.50 m 𝑥
= 0.65m -10.44

-40.02

Maximum bending moment = Area (+) -69.60


=[1/2 x (105.61 + 46.63) x 1.50]
+[1/2 x 19.14 x 0.65) ]
= 120.40kNm # -84.39

Maximum bending moment = Area (-)


=1/2 x 84.39 x 2.85
=120.26kNm

MAXIMUM BENDING MOMENT

YONG SHI QI 0327539

123
BEAM 3: B-E/7

3.00m 3.00m

5.00m 5.00m

Structural Plan Load Distribution Plan

124
DEAD LOAD (BEAM B-E/7) STRUCTURAL ANALYSIS

B C E
1.50 m 3.50 m
Beam self weight 1.08kN/m
= Beam size x Density of concrete
= (0.15 x 0.30)m² x 24kN/m³
= 1.08kN/m

Brick wall self weight 9.98kN/m


= Wall thickness x Wall height x Density
of brick
= (0.15 x 3.50)m² x 19kN/m³
= 9.98kN/m

Floor Slab B-C / 7-9 (triangle) 1.80kN/m


= (Thickness of slab x Density of
concrete) x (Lx/2) x (2/3)
= (0.15 m x 24kN/m³) x (1.50/2) x (2/3)
= 1.80kN/m

Floor Slab B-E / 5-7 (trapezoidal) 5.40kN/m


= (Thickness of slab x Density of
concrete) x (Lx/2)
= (0.15 m x 24kN/m³) x (3.00/2)
= 5.40kN/m

Floor Finishes B-C / 7-9 (triangle) 0.09kN/m


= (Density of finishes) x (Lx/2) x (2/3)
= (0.17kN/m²) x (1.50/2) x (2/3)
= 0.09kN/m

Floor Finishes B-E / 5-7 (trapezoidal) 0.26kN/m


= (Density of finishes) x (Lx/2)
= (0.17kN/m²) x (3.00/2)
= 0.26kN/m

Total dead load 18.61kN/m

= 1.08 + 9.98 + 1.80 + 5.40 + 0.09 + 0.26


= 18.61kN/m

YONG SHI QI 0327539

125
LIVE LOAD (BEAM B-E/7) STRUCTURAL ANALYSIS

B C
1.50 m

Live load in dining area= 2.00kN/m


Live load in living area= 2.00kN/m

Live load on slab B-C / 7-9 (triangle) 1.00kN/m


= Live load (UBBL) x (Lx/2)
= 2.00kN/m² x (1.50/2)m x (2/3)
= 1.00kN/m

Live load on slab B-E / 5-7 (trapezoidal) 3.00kN/m


= Live load (UBBL) x (Lx/2)
= 2.00kN/m² x (3.00/2)m
= 3.00kN/m

Total live load 4.00kN/m


= 1.00 + 3.00
= 4.00kN/m

YONG SHI QI 0327539

126
ULTIMATE LOAD (BEAM B-E/7) STRUCTURAL ANALYSIS

B C
1.50 m

Beam (B-C/7)
Ultimate dead load
26.05kN/m
= 18.61kN/m x 1.4
= 26.05kN/m

Ultimate live load 6.40kN/m


= 4.00kN/m x 1.6
= 6.40kN/m

Total ultimate load 32.45kN/m


= 26.05 + 6.40
= 32.45kN/m

YONG SHI QI 0327539

127
DEAD LOAD (BEAM B-E/7) STRUCTURAL ANALYSIS

B C E
1.50 m 3.50 m

Beam self weight 1.08kN/m


= Beam size x Density of concrete
= (0.15 x 0.30)m² x 24kN/m³
= 1.08kN/m

Floor Slab C-E / 7-9 (trapezoidal)


= (Thickness of slab x Density of
3.60kN/m
concrete) x (Lx/2))
= (0.15 m x 24kN/m³) x (2.00/2)
= 3.60kN/m

Floor Slab B-E / 5-7 (trapezoidal)


= (Thickness of slab x Density of 5.40kN/m
concrete) x (Lx/2)
= (0.15 m x 24kN/m³) x (3.00/2)
= 5.40kN/m

Floor Finishes C-E / 7-9 (trapezoidal)


= (Density of finishes) x (Lx/2) 0.17kN/m
= (0.17kN/m²) x (2.00/2)
= 0.17kN/m

Floor Finishes B-E / 5-7 (trapezoidal)


= (Density of finishes) x (Lx/2)
0.26kN/m
= (0.17kN/m²) x (3.00/2)
= 0.26kN/m

Total dead load


= 1.08 + 3.60 + 5.40 + 0.17 + 0.26 10.51kN/m
= 10.51kN/m

YONG SHI QI 0327539

128
LIVE LOAD (BEAM B-E/7) STRUCTURAL ANALYSIS

C E
3.50 m

Live load in dining area= 2.00kN/m


Live load in living area = 2.00kN/m

Live load on slab C-E / 7-9 (trapezoid) 2.00kN/m


= Live load (UBBL) x (Lx/2)
= 2.00kN/m² x (2.00/2)m
= 2.00kN/m

Live load on slab B-E / 5-7 (trapezoidal) 3.00kN/m


= Live load (UBBL) x (Lx/2)
= 2.00kN/m² x (3.00/2)m
= 3.00N/m

Total live load 5.00kN/m


= 2.00 + 3.00
= 5.00kN/m

YONG SHI QI 0327539

129
ULTIMATE LOAD (BEAM B-E/7) STRUCTURAL ANALYSIS

C E
2.00 m

Beam (C-E)
Ultimate dead load
14.71kN/m
= 10.51kN/m x 1.4
= 14.71kN/m

Ultimate live load 8.00kN/m


= 5.00kN/m x 1.6
= 8.00N/m

Total ultimate load 22.71kN/m


= 14.71 + 8.00
= 22.71kN/m

YONG SHI QI 0327539

130
REACTION FORCE ( BEAM B-E/7) STRUCTURAL ANALYSIS

 ΣMB = 0 B C E
48.68(0.75)+27.49(1.50)+79.49(3.25)- 1.50 m 3.50 m
5RE
RE=(36.51+41.24+258.34) / 5
RE= 67.21kN 27.49kN
32.45kN/m
22.71kN/m
ƩFx = 0

 ΣFʏ = 0
0 = RB + RE - 32.45(1.50) – 27.49 –
22.71(3.50) RB 88.44kN RE
RB + RE = 48.68 +27.49 + 79.49
=155.66
RB= 155.66 – 67.22
88.44
= 88.44kN

55.99
BENDING MOMENT
39.76
1 22.71 12.27 2.96 m
=
x 12.28
12.28 𝑥
𝑥= -10.44
22.71 1.50 m
= 0.54m
-33.15

Maximum -55.86
bending moment = Area (Positive)
=[1/2 x (88.44 + 39.77) x 1.50]
+[1/2 x 12.28 x 0.54) ] -67.21
= 96.16+3.32
= 99.48kNm #

Maximum
bending moment = Area (Negative) MAXIMUM BENDING MOMENT
=[1/2 x 67.21 x 2.96]
= 99.47kNm #

YONG SHI QI 0327539

131
BEAM 4: B/5-10

1.50m 3.50m

3.00m

3.00m

Structural Plan

132
BEAM 4: B/5-10

5.00m

1.50m 3.50m

Load Distribution Plan

133
DEAD LOAD (BEAM A-B/7) STRUCTURAL ANALYSIS

A B
3.00 m
Beam self weight 1.08kN/m
= Beam size x Density of concrete
= (0.15 x 0.30)m² x 24kN/m³
= 1.08kN/m

Brick wall self weight 9.98kN/m


= Wall thickness x Wall height x Density
of brick
= (0.15 x 3.50)m² x 19kN/m³
= 9.98kN/m

Floor Slab A-B/ 7-10 (triangle) 3.60kN/m


= (Thickness of slab x Density of
concrete) x (Lx/2) x (2/3)
= (0.15 m x 24kN/m³) x (3.00/2) x (2/3)
= 3.60kN/m

Floor Slab A-B / 5-7 (triangle) 3.60kN/m


= (Thickness of slab x Density of
concrete) x (Lx/2) x (2/3)
= (0.15 m x 24kN/m³) x (3.00/2) x (2/3)
= 3.60kN/m

Floor Finishes Slab A-B/ 7-10 (triangle) 0.17kN/m


= (Density of finishes) x (Lx/2) x (2/3)
= (0.17kN/m²) x (3.00/2) x (2/3)
= 0.17kN/m

Floor Finishes B-E / 5-7 (triangle) 0.05kN/m


= (Density of finishes) x (Lx/2) x (2/3)
= (0.05kN/m²) x (3.00/2) x (2/3)
= 0.05kN/m

18.48kN/m
Total dead load
= 1.08 + 9.98 + 3.60 + 3.60 + 0.17 + 0.05
= 18.48kN/m

YONG SHI QI 0327539

134
LIVE LOAD (BEAM A-B/7) STRUCTURAL ANALYSIS

A B
3.00 m

Live load in recreation area= 2.00kN/m


Live load in music room= 4.00kN/m

Live load on slab A-B/ 7-10 (triangle) 2.00kN/m


= Live load (UBBL) x (Lx/2)
= 2.00kN/m² x (3.00/2)m x (2/3)
= 2.00kN/m

Live load on slab A-B / 5-7 (triangle) 4.00kN/m


= Live load (UBBL) x (Lx/2) x (2/3)
= 4.00kN/m² x (3.00/2)m x (2/3)
= 4.00kN/m

Total live load 6.00kN/m


= 2.00 + 4.00
= 6.00kN/m

YONG SHI QI 0327539

135
ULTIMATE LOAD (BEAM A-B/7) STRUCTURAL ANALYSIS

A B
3.00 m

Beam (A-B/7)
Ultimate dead load
25.87kN/m
= 18.48kN/m x 1.4
= 25.87kN/m

Ultimate live load 9.60kN/m


= 6.00kN/m x 1.6
= 9.60kN/m

Total ultimate load 35.47kN/m


= 25.87 + 9.60
= 35.47kN/m

YONG SHI QI 0327539

136
REACTION FORCE ( BEAM A-B/7) STRUCTURAL ANALYSIS

 ΣMA = 0
=35.47(3.00)(1.50)-3RB A B
3.000m
RB= 53.21kN

ƩFx = 0 106.41kN
 ΣFʏ = 0
0 = RB + RE- 35.47(3.00)
RA + RB = 106.41kN
𝑅𝐴 53.20kN 53.21kN 𝑅𝐵
RA= 106.41-53.21
= 53.20kN

BENDING MOMENT
53.20

17.73

Maximum bending moment


= Area (Positive)
=1/2 (53.20)(1.50)
= 39.90kNm # -17.14

Maximum bending moment = Area


(Negative) -53.21

=[1/2x 53.21 x 1.50]


= 39.91kNm

MAXIMUM BENDING MOMENT

YONG SHI QI 0327539

137
DEAD LOAD (BEAM B/5-10) STRUCTURAL ANALYSIS

9 10
1.00 m
Beam self weight 1.08kN/m
= Beam size x Density of concrete
= (0.15 x 0.30)m² x 24kN/m³
= 1.08kN/m

Brick wall self weight 9.98kN/m


= Wall thickness x Wall height x Density
of brick
= (0.15 x 3.50)m² x 19kN/m³
= 9.98kN/m

Floor Slab A-B/ 7-10 (triangle) 3.60kN/m


= (Thickness of slab x Density of
concrete) x (Lx/2) x (2/3)
= (0.15 m x 24kN/m³) x (3.00/2) x (2/3)
= 3.60kN/m

Floor Slab B-E / 9-14 (trapezoidal) 12.00kN/m


= (Thickness of slab x Density of
concrete) x (Lx/2)
= (0.20 m x 24kN/m³) x (5.00/2)
= 12.00kN/m

Floor Finishes A-B/ 7-10 (triangle) 0.17kN/m


= (Density of finishes) x (Lx/2) x (2/3)
= (0.17kN/m²) x (3.00/2) x (2/3)
= 0.17kN/m

Floor Finishes B-E / 9-14 (trapezoidal) 0.43kN/m


= (Density of finishes) x (Lx/2)
= (0.17kN/m²) x (5.00/2)
= 0.43kN/m

27.26kN/m
Total dead load
= 1.08 + 9.98 + 3.60 + 12.00 + 0.17 + 0.43
= 27.26kN/m

YONG SHI QI 0327539

138
LIVE LOAD (BEAM B/5-10) STRUCTURAL ANALYSIS

9 10
1.00 m

Live load in dining area= 3.00kN/m


Live load in recreation area = 2.00kN/m

Live load on slab A-B/ 7-10 (triangle) 2.00kN/m


= Live load (UBBL) x (Lx/2) x (2/3)
= 2.00kN/m² x (3.00/2)m x (2/3)
= 2.00kN/m

Live load on slab B-E / 9-14 (trapezoidal) 7.50kN/m


= Live load (UBBL) x (Lx/2)
= 3.00kN/m² x (5.00/2)m
= 7.50kN/m

Total live load 9.50kN/m


= 2.00 + 7.50
= 9.50kN/m

YONG SHI QI 0327539

139
ULTIMATE LOAD (BEAM B/5-10) STRUCTURAL ANALYSIS

9 10
1.00 m

Beam (B/9-10)
Ultimate dead load
38.16kN/m
= 27.26kN/m x 1.4
= 38.16kN/m

Ultimate live load 15.20kN/m


= 9.50kN/m x 1.6
= 15.20N/m

Total ultimate load 53.36kN/m


= 38.16 + 15.20
= 53.36kN/m

YONG SHI QI 0327539

140
DEAD LOAD (BEAM B/5-10) STRUCTURAL ANALYSIS

7 9
2.00 m
Beam self weight 1.08kN/m
= Beam size x Density of concrete
= (0.15 x 0.30)m² x 24kN/m³
= 1.08kN/m

Floor Slab A-B/ 7-10 (triangle) 3.60kN/m


= (Thickness of slab x Density of
concrete) x (Lx/2) x (2/3)
= (0.15 m x 24kN/m³) x (3.00/2) x (2/3)
= 3.60kN/m

Floor Slab B-C / 7-9 (triangle) 1.80kN/m


= (Thickness of slab x Density of
concrete) x (Lx/2) x (2/3)
= (0.15 m x 24kN/m³) x (1.50/2) x (2/3)
= 1.80kN/m

Floor Finishes Slab A-B/ 7-10 (triangle) 0.17kN/m


= (Density of finishes) x (Lx/2) x (2/3)
= (0.17kN/m²) x (3.00/2) x (2/3)
= 0.17kN/m

Floor Finishes B-C / 7-9 (triangle)


= (Density of finishes) x (Lx/2) x (2/3) 0.09kN/m
= (0.17kN/m²) x (1.50/2) x (2/3)
= 0.09kN/m

Total dead load


= 1.08 + 3.60 + 1.80 + 0.17 + 0.09
= 6.74kN/m

18.48 kN/m

YONG SHI QI 0327539

141
LIVE LOAD (BEAM B/5-10) STRUCTURAL ANALYSIS

7 9
2.00 m

Live load in recreation area = 2.00kN/m


Live load in recreation area = 2.00kN/m

Live load on slab A-B/ 7-10 (triangle) 2.00kN/m


= Live load (UBBL) x (Lx/2)
= 2.00kN/m² x (3.00/2)m x (2/3)
= 2.00kN/m

Live load on slab B-C / 7-9 (triangle) 1.00kN/m


= Live load (UBBL) x (Lx/2)
= 2.00kN/m² x (1.50/2)m x (2/3)
= 1.00kN/m

Total live load 3.00kN/m


= 2.00 + 1.00
= 3.00kN/m

YONG SHI QI 0327539

142
ULTIMATE LOAD (BEAM B/5-10) STRUCTURAL ANALYSIS

7 9
2.00 m

Beam (B/7-9)
Ultimate dead load
9.44kN/m
= 6.74kN/m x 1.4
= 9.44kN/m

Ultimate live load 4.80kN/m


= 3.00kN/m x 1.6
= 4.80kN/m

Total ultimate load 14.24kN/m


= 9.44 + 4.80
= 14.24kN/m

YONG SHI QI 0327539

143
DEAD LOAD (BEAM B/5-10) STRUCTURAL ANALYSIS

5 7
3.00 m
Beam self weight 1.08kN/m
= Beam size x Density of concrete
= (0.15 x 0.30)m² x 24kN/m³
= 1.08kN/m

Brick wall self weight 9.98kN/m


= Wall thickness x Wall height x Density
of brick
= (0.15 x 3.50)m² x 19kN/m³
= 9.98kN/m

Floor Slab B-E / 5-7 (triangle) 3.60kN/m


= (Thickness of slab x Density of
concrete) x (Lx/2) x (2/3)
= (0.15 m x 24kN/m³) x (3.00/2) x (2/3)
= 3.60kN/m

Floor Slab A-B / 5-7 (triangle) 3.60kN/m


= (Thickness of slab x Density of
concrete) x (Lx/2) x (2/3)
= (0.15 m x 24kN/m³) x (3.00/2) x (2/3)
= 3.60kN/m

Floor Finishes B-E / 5-7 (triangle) 0.17kN/m


= (Density of finishes) x (Lx/2) x (2/3)
= (0.17kN/m²) x (3.00/2) x (2/3)
= 0.17kN/m

Floor Finishes A-B / 5-7 (triangle) 0.05kN/m


= (Density of finishes) x (Lx/2) x (2/3)
= (0.05kN/m²) x (3.00/2) x (2/3)
= 0.05kN/m

18.48kN/m
Total dead load
= 1.08 + 9.98 + 3.60 + 3.60 + 0.17 + 0.05
= 18.48kN/m

YONG SHI QI 0327539

144
LIVE LOAD (BEAM B/5-10) STRUCTURAL ANALYSIS

5 7
3.00 m

Live load in music room = 4.00kN/m


Live load in recreation area = 2.00kN/m

Live load on slab B-E / 5-7 (triangle) 2.00kN/m


= Live load (UBBL) x (Lx/2) x (2/3)
= 2.00kN/m² x (3.00/2)m x (2/3)
= 2.00kN/m

Live load on slab A-B / 5-7 (triangle) 4.00kN/m


= Live load (UBBL) x (Lx/2) x (2/3)
= 4.00kN/m² x (3.00/2)m x (2/3)
= 4.00kN/m

Total live load 6.00kN/m


= 2.00 + 4.00
= 6.00kN/m

YONG SHI QI 0327539

145
ULTIMATE LOAD (BEAM B/5-10) STRUCTURAL ANALYSIS

5 7
3.00 m

Beam (B/5-7)
Ultimate dead load
25.87kN/m
= 18.48kN/m x 1.4
= 25.87kN/m

Ultimate live load 9.60kN/m


= 6.00kN/m x 1.6
= 9.60kN/m

Total ultimate load 35.47kN/m


= 25.87 + 9.60
= 35.47kN/m

YONG SHI QI 0327539

146
REACTION FORCE ( BEAM B/5-10) STRUCTURAL ANALYSIS

 ΣMB = 0 10 9 7 5
53.36(1.00)(0.50) – 141.65(3.00) – 1.00 m 2.00 m 3.00 m
14.24(2)(2) – 105.61(1.00) –
35.47(3.00)(4.50) - 6R5 105.61kN
141.65kN
R5=1093.05/6
R5= 182.18kN 53.36kN/m
14.24kN/m 35.47kN/m
ƩFx = 0
 ΣFʏ = 0
0 = R10 + R5 - 53.36(1.00) – 141.65 –
14.24(2) – 105.61 – 35.47(3.00)
R10 R5
R5 + R10 = 435.51
R10= 435.51 – 182.18
= 253.33kN
253.33
BENDING MOMENT
199.97
Maximum bending moment = Area
94.36
(Positive)
80.12
=[1/2 (253.33+199.97) x 1] + [1/2 65.88
(94.36+65.88) x 2]
= 226.65 + 160.24
= 386.89kNm
-75.77
Maximum bending moment = Area -111.24
(Negative)
-146.71
=[1/2 (75.77+182.18) x 3.0] -182.18
= 386.93kNm
#

MAXIMUM BENDING MOMENT

YONG SHI QI 0327539

147
YOONG AI TENG
0328347

148
BEAM 1: E-G/13

149
DEAD LOAD ( BEAM E-G/13) STRUCTURAL ANALYSIS

E 3.00m G

Beam self-weight
1.08 kN/m
= Beam size x Weight
= 0.15 x 0.30 x 24
= 1.08 kN/m

Brick wall load 9.98 kN/m


= Wall thickness x Height x Weight
= 0.15 x 3.5 x 19
= 9.98 kN/m

Slab E-G/13-14 (trapezoidal form) 2.70 kN/m


= Slab thickness x Density x Lx/2
= 0.15 x 24 x 1.5/2
= 2.70 kN/m

Slab E-G/12-13 (trapezoidal form) 3.60 kN/m


= Slab thickness x Density x Lx/2
= 0.15 x 24 x 2/2
= 3.60 kN/m

Floor Finishes for E-G/13-14


= Density x Lx/2 0.13 kN/m
= 0.17 x 1.5/2
= 0.13 kN/m

Floor Finishes for E-G/12-13


0.15 kN/m
= Density x Lx/2
= 0.15 x 2/2
= 0.15 kN/m

17.64 kN/m
TOTAL DEAD LOAD
= 1.08 + 9.98 + 2.70 + 3.60 + 0.13 + 0.15
= 17.64 kN/ m

YOONG AI TENG 0328347

150
LIVE LOAD ( BEAM E-G/13) STRUCTURAL ANALYSIS

E 3.00m G
Slab E-G/13-14(trapezoidal form)
= Live load (UBBL) x Lx/2 2.25 kN/m
= 3.0 x 1.5/2
= 2.25 kN/m

Slab E-G/12-13 (trapezoidal form)


= Live load (UBBL) x Lx/2
1.50 kN/m
= 1.5 x 2/2
= 1.50 kN/m

TOTAL LIVE LOAD 3.75 kN/m


= 2.25+1.50
= 3.75 kN/m

ULTIMATE LOAD( BEAM E-G/13)


30.70 kN/m
Ultimate Load
= 1.4Dead load + 1.6Live load
= 1.4 (17.64) + 1.6 (3.75)
= 30.70 kN/m

To point load 92.10 kN


= 30.7 x 3
= 92.10 kN

YOONG AI TENG 0328347

151
REACTION FORCE ( BEAM E-G/13) STRUCTURAL ANALYSIS

Ʃ 𝑀𝐸 = 0
92.10 (1.5) – 3𝑅𝐺 = 0 E G
3.00m
𝑅𝐺 = 138.15/3
= 46.05 kN

ƩFx = 0 92.10 kN

Ʃ 𝐹𝑦 =0
𝑅E + 𝑅 - 92.10 = 0
𝐺 𝑅E 𝑅𝐺
𝑅E + 46.05 = 92.10
𝑅E = 46.05 kN

BENDING MOMENT
46.05
𝑥 15.35
=
1 30.70
15.35
𝑥= x1 15.35
30.70

= 0.50m
𝑥

-15.35
Maximum
bending moment = Area
(positive) =1/2(46.05)(1+0.5) -46.05
= 34.54 kNm

Maximum #
bending moment = Area
(negative) =1/2(46.05)(1+0.5)
= 34.54 kNm

MAXIMUM BENDING MOMENT

YOONG AI TENG 0328347

152
BEAM 2: G/11-14
With Point load from beam E-G/12 & E-G/13

153
DEAD LOAD ( BEAM E-G/12) STRUCTURAL ANALYSIS

POINT LOAD BEAM


E 3.00m G

Beam self-weight
1.08 kN/m
= Beam size x Weight
= 0.15 x 0.30 x 24
= 1.08 kN/m

Brickwall load 9.98 kN/m


= Wall thickness x Height x Weight
= 0.15 x 3.5 x 19
= 9.98 kN/m

Slab E-G/12-13 (trapezoidal form) 3.60 kN/m


= Slab thickness x Density x Lx/2
= 0.15 x 24 x 2/2
= 3.60 kN/m

Slab E-G/11-12 (trapezoidal form) 3.60 kN/m


= Slab thickness x Density x Lx/2
= 0.15 x 24 x 2/2
= 3.60 kN/m

Floor Finishes for E-G/12-13


= Density x Lx/2 0.15 kN/m
= 0.15 x 2/2
= 0.15 kN/m

Floor Finishes for E-G/11-12


0.17 kN/m
= Density x Lx/2
= 0.17 x 2/2
= 0.17 kN/m

18.58 kN/m
TOTAL DEAD LOAD
= 1.08 + 9.98 + 3.60 + 3.60 + 0.15 + 0.17
= 18.58 kN/ m

YOONG AI TENG 0328347

154
LIVE LOAD ( BEAM E-G/12) STRUCTURAL ANALYSIS

E 3.00m G
Slab E-G/12-13(trapezoidal form)
1.50 kN/m
= Live load (UBBL) x Lx/2
= 1.5 x 2/2
= 1.5 kN/m

Slab E-G/11-12 (trapezoidal form)


2.00 kN/m
= Live load (UBBL) x Lx/2
= 2.0 x 2/2
= 2.00 kN/m

3.50 kN/m
TOTAL LIVE LOAD
= 1.50 + 2.00
= 3.50 kN/m

ULTIMATE LOAD( BEAM E-G/13)


31.61 kN/m
Ultimate Load
= 1.4Dead load + 1.6Live load
= 1.4 (18.58) + 1.6 (3.50)
= 31.61 kN/m

To point load 94.83 kN


= 31.61 x 3
= 94.83 kN

YOONG AI TENG 0328347

155
REACTION FORCE ( BEAM E-G/13) STRUCTURAL ANALYSIS

Ʃ 𝑀𝐸 = 0
94.83 (1.5) – 3𝑅𝐺 = 0 E G
3.00m
𝑅𝐺 = 142.25/3
= 47.42 kN

ƩFx = 0 94.83 kN

Ʃ 𝐹𝑦 =0
𝑅E + 𝑅 - 94.83 = 0
𝐺 𝑅E 𝑅𝐺
𝑅E + 47.42 = 94.83
𝑅E = 47.41 kN

BENDING MOMENT
47.41
𝑥 15.81
=
1 31.61
15.80
𝑥= x1 15.80
31.61

= 0.50m
𝑥

-15.81

Maximum
bending moment = Area -47.42
=1/2 (47.41)(1+0.5)
= 35.56 kNm
#

MAXIMUM BENDING MOMENT

YOONG AI TENG 0328347

156
DEAD LOAD ( BEAM G/11-14) STRUCTURAL ANALYSIS

11 12 13 14
2.00m 2.00m 1.50m
Beam self-weight
= Beam size x Weight 1.08 kN/m
= 0.15 x 0.30 x 24
= 1.08 kN/m

Brickwall load
9.98 kN/m
= Wall thickness x Height x Weight
= 0.15 x 3.5 x 19
= 9.98 kN/m

Slab E-G/11-12 (triangular form) 2.40 kN/m

= Slab thickness x Density x Lx/2 x 2/3


= 0.15 x 24 x 2/2 x 2/3
= 2.40 kN/m

2.40 kN/m
Slab E-G/12-13 (triangular form)
= Slab thickness x Density x Lx/2 x 2/3
= 0.15 x 24 x 2/2 x 2/3
= 2.40 kN/m

Slab E-G/13-14 (triangular form) 1.80 kN/m


= Slab thickness x Density x Lx/2 x 2/3
= 0.15 x 24 x 1.5/2 x 2/3
= 1.80 kN/m

Floor finishes for E-G/11-12 0.10 kN/m


= Density x Lx/2 x 2/3
= 0.15 x 2/2 x 2/3
= 0.10 kN/m

0.10 kN/m
Floor finishes for E-G/12-13
= Density x Lx/2 x 2/3
= 0.15 x 2/2 x 2/3
= 0.10 kN/m

YOONG AI TENG 0328347

157
DEAD LOAD ( BEAM G/11-14) STRUCTURAL ANALYSIS

11 12 13 14
2.00m 2.00m 1.50m

Floor finishes for E-G/13-14


= Density x Lx/2 x 2/3 0.09 kN/m
= 0.17 x 1.5/2 x 2/3
= 0.09 kN/m

TOTAL DEAD LOAD


For 11-12
= 1.08 + 9.98 + 2.40 + 0.10
= 13.56 kN/m

For 12-13
13.56 kN/m 13.56 kN/m 12.95 kN/m
= 1.08 + 9.98 + 2.40 + 0.10
= 13.56 kN/m

For 13-14
= 1.08 ++9.98+ 1.80 + 0.09
= 12.95kN/m

LIVE LOAD ( BEAM G/11-14)

1.33 kN/m
Slab E-G/11-12 (triangular form)
= Live load (UBBL) x Lx/2 x 2/3
= 2.0 x 2/2 x 2/3
= 1.33 kN/m

1.00 kN/m
Slab E-G/12-13 (triangular form)
= Live load (UBBL) x Lx/2 x 2/3
= 1.5 x 2/2 x 2/3
= 1.00 kN/m

Slab E-G/13-14 (triangular form) 1.50 kN/m


= Live load (UBBL) x Lx/2 x 2/3
= 3.0 x 2/2 x 2/3
= 1.50 kN/m

YOONG AI TENG 0328347

158
ULTIMATE LOAD( BEAM G/ 11-14) STRUCTURAL ANALYSIS

11 12 13 14
2.00m 2.00m 1.50m

Ultimate load
21.11 kN/m
For 11-12
= 1.4(13.56) + 1.6(1.33)
= 21.11 kN/m
20.58 kN/m
For 12-13
= 1.4(13.56) + 1.6(1.00)
= 20.58 kN/m

20.53 kN/m
For 13-14
= 1.4(12.95) +1.6( 1.5)
= 20.53 kN/m

To point load
For 11-12 42.22kN
= 21.11 x 2
= 42.22 kN

For 12-13 41.16 kN


= 20.58 x 2
= 41.16 kN

For 13-14
= 20.53 x 1.5 30.80 kN
= 30.80 kN

YOONG AI TENG 0328347

159
REACTION FORCE ( BEAM G/11-14) STRUCTURAL ANALYSIS

Ʃ 𝑀11 = 0 11 12 13 14
42.22(1)+47.71(2)+41.16(3)+ 2.00m 2.00m 1.50m
46.05(4)+30.80(4.75)–5.5 𝑅14 = 0
𝑅14 = 591.02/5.5
= 107.46 kN
42.22 kN 41.16 kN 30.80kN
ƩFx = 0 47.71 kN 46.05 kN

Ʃ 𝐹𝑦 = 0
𝑅11 + 𝑅14 -42.22-47.71-41.16
𝑅11 𝑅14
-46.05-30.80 = 0
𝑅11 + 183.35 = 207.64
𝑅11 = 100.18 kN

BENDING MOMENT
100.18

79.07
𝑥 10.55
=
1 20.58
59.96
10.55
𝑥= x1
20.58

= 0.51m 10.55

𝑥
Maximum -10.03
bending moment = Area -30.61
(positive) =1/2(100.18+10.55)(2)
+ ½(10.55)(0.51) -76.66
= 158.10 + 2.69
= 160.79kNm # -97.19

-107.46
Maximum
bending moment = Area
(negative) =1/2(1.49)(30.61) +
½(76.66+107.46)(1.5)
= 22.80 + 138.09 MAXIMUM BENDING MOMENT
= 160.89kNm

YOONG AI TENG 0328347

160
BEAM 3: E/11-14
With Point load from beam E-G/12 & E-G/13

161
DEAD LOAD ( BEAM 11-14/E) STRUCTURAL ANALYSIS

11 12 13 14
2.00m 2.00m 1.50m

Beam self-weight
= Beam size x Weight 1.08 kN/m
= 0.15 x 0.30 x 24
= 1.08 kN/m

Brickwall load 9.98 kN/m


= Wall thickness x Height x Weight
= 0.15 x 3.5 x 19
= 9.98 kN/m

12.00 kN/m
Slab B-E/9-14 (trapezoidal form)
= Slab thickness x Density x Lx/2
= 0.20 x 24 x 5.0/2
= 12.00 kN/m

Slab E-G/11-12 (triangular form)


2.40 kN/m
= Slab thickness x Density x Lx/2 x 2/3
= 0.15 x 24 x 2/2 x 2/3
= 2.40 kN/m

Slab E-G/12-13 (triangular form) 2.40 kN/m


= Slab thickness x Density x Lx/2 x 2/3
= 0.15 x 24 x 2/2 x 2/3
= 2.40 kN/m

Slab E-G/13-14 (triangular form)


= Slab thickness x Density x Lx/2 x 2/3 1.80 kN/m

= 0.15 x 24 x 1.5/2 x 2/3


= 1.80 kN/m

Floor finishes for B-E/9-14


0.43 kN/m
= Density x Lx/2
= 0.17 x 5/2
= 0.43 kN/m

YOONG AI TENG 0328347

162
DEAD LOAD ( BEAM 11-14/E) STRUCTURAL ANALYSIS

11 12 13 14
2.00m 2.00m 1.50m

Floor finishes for E-G/11-12


0.10 kN/m
= Density x Lx/2 x 2/3
= 0.15 x 2/2 x 2/3
= 0.10 kN/m

Floor finishes for E-G/12-13


0.10 kN/m
= Density x Lx/2 x 2/3
= 0.15 x 2/2 x 2/3
= 0.10 kN/m

Floor finishes for E-G/13-14


0.09 kN/m
= Density x Lx/2 x 2/3
= 0.17 x 1.5/2 x 2/3
= 0.09 kN/m

TOTAL DEAD LOAD


For 11-12
= 1.08 + 2.40 + 0.10+12+0.43
= 16.01 kN/m

For 12-13 16.01 kN/m 16.01 kN/m 25.38 kN/m


= 1.08 + 9.98 + 2.40 + 0.10+12+0.43
= 25.99 kN/m

For 13-14
= 1.08 ++9.98+ 1.80 + 0.09 + 12 + 0.43
= 25.38kN/m

YOONG AI TENG 0328347

163
LIVE LOAD ( BEAM E/11-14) STRUCTURAL ANALYSIS

11 12 13 14
2.00m 2.00m 1.50m

Slab B-E/9-14(trapezoidal form) 7.50 kN/m


= Live load (UBBL) x Lx/2
= 3.0 x 5/2
= 7.50 kN/m

Slab E-G/11-12 (triangular form)


1.33 kN/m
= Live load (UBBL) x Lx/2 x 2/3
= 2.0 x 2/2 x 2/3
= 1.33 kN/m

Slab E-G/12-13 (triangular form)


= Live load (UBBL) x Lx/2 x 2/3 1.00 kN/m
= 1.5 x 2/2 x 2/3
= 1.00 kN/m

Slab E-G/13-14 (triangular form)


= Live load (UBBL) x Lx/2 x 2/3 1.50 kN/m
= 3.0 x 2/2 x 2/3
= 1.50 kN/m

TOTAL LIVE LOAD


For 11-12
= 1.33 + 7.50
= 8.83 kN/m

For 12-13 8.83 kN/m 8.50 kN/m 9.00 kN/m


= 1.00 + 7.50
= 8.50 kN/m

For 13-14
= 1.50 + 7.50
= 9.00 kN/m

YOONG AI TENG 0328347

164
ULTIMATE LOAD( BEAM E/ 11-14) STRUCTURAL ANALYSIS

11 12 13 14
2.00m 2.00m 1.50m

Ultimate load
36.54 kN/m
For 11-12
= 1.4(16.01) + 1.6(8.83)
= 36.54 kN/m
49.99 kN/m
For 12-13
= 1.4(25.99) + 1.6(8.50)
= 49.99 kN/m

49.93 kN/m
For 13-14
= 1.4(25.38) + 1.6(9.00)
= 49.93 kN/m

To point load 73.08 kN


For 11-12
= 36.54 x 2
= 73.08 kN
99.98 kN
For 12-13
= 49.99 x 2
= 99.98 kN

For 13-14 74.90 kN


= 49.93 x 1.5
= 74.90 kN

YOONG AI TENG 0328347

165
REACTION FORCE ( BEAM E/11-14) STRUCTURAL ANALYSIS

Ʃ 𝑀11 = 0 11 12 13 14
73.08(1)+47.71(2)+99.98(3)+ 2.00m 2.00m 1.50m
46.05(4)+74.90(4.75)–5.5 𝑅14 = 0
𝑅14 = 1007.82/5.5
= 183.24 kN
73.08 kN 99.98 kN 74.90 kN
ƩFx = 0 47.71 kN 46.05 kN

Ʃ 𝐹𝑦 = 0
𝑅11 + 𝑅14 -73.08-47.71-99.98
𝑅11 𝑅14
-46.05-74.90 = 0
𝑅11 + 183.35 = 341.42
𝑅11 = 158.18 kN

BENDING MOMENT 158.18

121.64
𝑥 37.69
= 85.10
1 49.99
37.69
𝑥= x1
49.99
37.69
= 0.75m

𝑥
-12.30
Maximum
-62.29
bending moment = Area
(positive) =1/2(158.18+85.10)(2)
-108.34
+ ½(37.69)(0.75)
= 243.28 + 14.13 -158.27
= 257.41kNm #
Maximum -183.24
bending moment = Area
(negative) =1/2(1.25)(62.29) +
½(108.34+183.24)(1.5)
= 38.93 + 218.69
= 257.62kNm MAXIMUM BENDING MOMENT

YOONG AI TENG 0328347

166
BEAM 4: B-G/14
With Point load from beam E/11-14

167
DEAD LOAD ( BEAM B-G/14) STRUCTURAL ANALYSIS

B E 3.00m
G
Beam self-weight 5.00m
= Beam size x Weight
1.08 kN/m
= 0.15 x 0.30 x 24
= 1.08 kN/m

Brickwall load
9.98 kN/m
= Wall thickness x Height x Weight
= 0.15 x 3.5 x 19
= 9.98 kN/m

Slab E-G/13-14 (trapezoidal form) 2.70 kN/m


= Slab thickness x Density x Lx/2
= 0.15 x 24 x 1.5/2
= 2.70 kN/m

Slab B-E/9-14 (triangular form) 8.00 kN/m


= Slab thickness x Density x Lx/2 x 2/3
= 0.2 x 24 x 5/2 x 2/3
= 8.00 kN/m

Floor Finishes for E-G/13-14


= Density x Lx/2 0.13 kN/m
= 0.17 x 1.5/2
= 0.13 kN/m

Floor Finishes for B-G/9-14


0.28 kN/m
= Density x Lx/2 x 2/3
= 0.17 x 5/2 x 2/3
= 0.28 kN/m

TOTAL DEAD LOAD


= For B-E/14 19.34 kN/m 13.89 kN/m
= 1.08+9.98+8.0+0.28
= 19.34 kN/m

= For E-G/14
= 1.08+9.98+2.70+0.13
= 13.89 kN/m
YOONG AI TENG 0328347

168
LIVE LOAD ( BEAM B-G/14) STRUCTURAL ANALYSIS

B E 3.00m
G
5.00m

Slab E-G/13-14(trapezoidal form) 2.25 kN/m


= Live load (UBBL) x Lx/2
= 3 x 1.5/2
= 2.25 kN/m
5.00 kN/m
Slab B-E/9-14 (triangular form)
= Live load (UBBL) x Lx/2 x 2/3
= 3.0 x 5/2 x 2/3
= 5.00 kN/m

ULTIMATE LOAD( BEAM B-G/14)


22.35 kN/m
Ultimate Load
For E-G
= 1.4Dead load + 1.6Live load
= 1.4 (13.39) + 1.6 (2.25)
= 22.35 kN/m
35.08 kN/m
For B-E
= 1.4Dead load + 1.6Live load
= 1.4 (19.34) + 1.6 (5.00)
= 35.08 kN/m

67.05 kN
To point load
For E-G
= 22.35 x 3
= 67.05 kN
175.40 kN
For B-E
= 35.08 x 5
= 175.40 kN

YOONG AI TENG 0328347

169
REACTION FORCE ( BEAM B-G/14) STRUCTURAL ANALYSIS

B E 3.00m
G
Ʃ 𝑀𝐵 = 0 5.00m
174.5(2.5) +183.24(5)
+ 67.05(6.5) – 8 𝑅𝐺 = 0
𝑅𝐺 = 790.53/8 175.40 kN
183.24 kN
= 223.82 kN 67.05 kN

ƩFx = 0

Ʃ 𝐹𝑦 = 0 𝑅𝐺
𝑅B
𝑅B + 𝑅𝐺 -175.4-183.24-67.05 = 0
𝑅B + 223.82 = 425.69
𝑅B = 201.87 kN

BENDING MOMENT 201.87


166.79
131.71
96.63
Maximum 61.55
bending moment = Area
(positive) =1/2 (201.87+26.47)(5) 26.47
= 570.85 kNm
#

Maximum
bending moment = Area -156.77
(negative) =1/2(156.77+223.82)(3)
= 570.89 kNm -179.10
-201.47
-223.82

MAXIMUM BENDING MOMENT

YOONG AI TENG 0328347

170
COLUMN
ANALYSIS
REPORT

171
172
YAP YUEN THONG
0326557

173
COLUMN AT A/1
COLUMN 1 (A/1) STRUCTURAL ANALYSIS

Ground Level

Concrete slab
= 4.8 kN/m² x (3.5 x 3.0)m²
= 50.4 kN

Beam self-weight
= 1.08 kN/m x (3.5 + 3.0)m
= 7.02 kN

Brickwall load
= 9.98 kN/m x (3.5 +3.0)m
= 64.87 kN

Column self-weight
= 0.54 kN/m x 1.0m
= 0.54 kN

Floor Finishes A-D/1-5


= 0.17 kN/m² x (3.5 x 3.0)m²
= 1.79 kN

Total Dead Load


= (50.40+7.02+64.87+0.54+1.79) kN/m
= 124.62 kN

Live Load 3.0m


= 2.0kN/m² x (3.5 x 3.0)m²
= 21.0 kN

Ultimate Load 3.5m


= 1.4(124.62) + 1.6(21.0)
= (174.47 + 33.6) kN
= 208.07 kN Column 1 Ground Level

YAP YUEN THONG 0326557

175
COLUMN 1 (A/1) STRUCTURAL ANALYSIS

Roof Level

Roof slab
= 4.8 kN/m² x (3.5 x 3.0)m²
= 50.4 kN

Beam self-weight
= 1.08 kN/m x (3.5 + 3.0)m
= 7.02 kN

Column self-weight
= 0.54 kN/m x 3.5m
= 1.89 kN

Total Dead Load


= (50.40+7.02+1.89) kN/m
= 59.31 kN

Live Load
= 0.5 kN/m² x (3.5 x 3.0)m²
= 5.25 kN

Ultimate Load
= 1.4(59.31) + 1.6(5.25)
= (83.03 + 8.4) kN
= 91.43 kN
3.0m

3.5m

Column 1 Roof Level

YAP YUEN THONG 0326557

176
COLUMN 1 (A/1) STRUCTURAL ANALYSIS

Total Load acting on Column A/10


= (91.43 + 208.07) kN
= 299.5 kN < 471.09 kN

It is below the column maximum load


bearing capacity.

Capacity of the column


Given, Fcu= 35N/mm²
Fy= 460N/mm²
Ac= 150mm x 150mm
= 315000mm²
Asc= Area of steel (4T12)

N= (0.4 x 35 x 22500) + (0.75 x 460 x


113.14)
= 315000 + 156094.56
= 471094.56 N
= 471.09 kN

Therefore, suggested column size is


150mm x 150mm with 4T12
reinforcement .

3.0m

3.5m

Column 1

YAP YUEN THONG 0326557

177
COLUMN AT G/11
COLUMN 2 (G/11) STRUCTURAL ANALYSIS

Ground Level

Concrete slab
= 3.6 kN/m² x [(0.75 + 2.00 + 2.25) x
1.5]m²
= 27.0 kN

Beam self-weight
= 1.08 kN/m x (0.75 + 2.00 + 2.25+ 1.5 m
1.5 + 1.5)m
= 8.64 kN

Brickwall load
5.0 m
= 9.98 kN/m x (0.75 + 2.00 + 2.25+
1.5 + 1.5)m
= 79.84 kN

Floor Finishes E-G/12-13


= 0.15 kN/m² x (1.5 x 0.75)m²
= 0.17 kN
Column 2 Ground Level
Floor Finishes E-G/11-12
= 0.17 kN/m² x (2.0 x 1.5)m²
= 0.51 kN

Floor Finishes F-G/8-11


= 0.17 kN/m² x (2.25 x 1.5)m²
= 0.57 kN

Total Dead Load


= (27.0+8.64+79.84+0.17+0.51+0.57)
kN/m
= 116.73 kN

YAP YUEN THONG 0326557

179
COLUMN 2 (G/11) STRUCTURAL ANALYSIS

Ground Level

Live Load
For E-G/12-13
= 1.5 kN/m² x (1.5 x 0.75)m²
= 1.69 kN

For E-G/11-12
= 2.0 kN/m² x (1.5 x 2.0)m² 1.5 m
= 6.0 kN

For F-G/8-11
= 2.0 kN/m² x (1.5 x 2.25)m²
5.0 m
= 6.75 kN

Total Live Load


= (1.69 + 6.0 + 6.75) kN
= 14.44 kN

Ultimate Load
= 1.4(116.73) + 1.6(14.44) Column 2 Ground Level
= (163.42 + 23.10) kN
= 186.52 kN

YAP YUEN THONG 0326557

180
COLUMN 2 (G/11) STRUCTURAL ANALYSIS

Roof Level

Roof slab
= 3.6 kN/m² x [(0.75 + 2.0 + 2.25) x
1.5]m²
= 27.0 kN

Beam self-weight
= 1.08 kN/m x (0.75 + 2.00 + 2.25 + 1.5 m
1.5 + 1.5)m
= 8.64 kN

Column self-weight
5.0 m
= 0.54 kN/m x 3.5m
= 1.89 kN

Total Dead Load


= (27.0 + 8.64 +1.89) kN/m
= 37.53 kN

Live Load Column 2 Roof Level


= 0.5 kN/m² x [(0.75 + 2.0 + 2.25)
x 1.5]m²
= 3.75 kN

Ultimate Load
= 1.4(37.53) + 1.6(3.75)
= (52.54 + 6.0) kN
= 58.54 kN

YAP YUEN THONG 0326557

181
COLUMN 2 (G/11) STRUCTURAL ANALYSIS

Total Load acting on Column G/


= (186.52 kN + 58.54 kN) kN
= 245.06 kN < 471.09 kN

It is below the column maximum load


bearing capacity.

Capacity of the column 1.5 m


Given, Fcu= 35N/mm²
Fy= 460N/mm²
Ac= 150mm x 150mm
= 315000mm² 5.0 m
Asc= Area of steel (4T12)

N= (0.4 x 35 x 22500) + (0.75 x 460 x


113.14)
= 315000 + 156094.56
= 471094.56 N
= 471.09 kN
Column 2

Therefore, suggested column size is


150mm x 150mm with 4T12
reinforcement .

YAP YUEN THONG 0326557

182
YONG KANG SENG
0331857

183
COLUMN AT M/1
DEAD LOAD ANALYSIS

DEAD LOAD (COLUMN M/1)

Ground Level
Slab K-M/1-3
=Density of Concrete x (Area of Slab)
=[(0.15 x 24kN/m) x (1.25x1.75)+ (0.15 x
24kN/m) x (1.50x4.00)]
=7.88kN + 21.60kN 4.00m

=29.48kN

Slab K-M/3-5
=Density of Concrete x (Area of Slab)
=(0.15 x 24kN/m) x (1.50x1.00)
=25.40kN

Floor Finishes K-M/1-3


=Density of Finishes x (Area of Slab)
=[0.17kN/m2 x (1.25 x 1.75) + 0.17kN/m2
x (1.50 x 4.00)]
=0.37kN + 1.02kN
2.75m
=1.39kN

Floor Finishes K-M/3-5


=Density of Finishes x (Area of Slab) Column 1 Ground Level
=[0.17kN/m2 x (1.25 x 1.75)
=0.08kN

Brick Wall self weight


=Wall thickness x Wall height x Density of
brick x Length of the brickwall
=[(0.15 x 3.50)m2 x 19kN/m3 x
(2.75+4.00+1.50)
=82.34kN

Beam self weight


=Density of concrete x length of the beam
=(24kN/m3 x 0.15 x 0.30) x (2.75
4.00+1.50)
=8.91kN

YONG KANG SENG 0331857


STRUCTURAL ANALYSIS
DEAD LOAD ANALYSIS

DEAD LOAD (COLUMN M/1)

Column self weight


=(Size of the column x Density of
concrete) x depth of column stump
=(0.15x 0.15 x 24kN/m3 x 1.00)
=0.54kN

Total Dead Load


=29.48+25.40+1.39+0.08+82.34+8.91+0.5
4
=128.14kN

LIVE LOAD (COLUMN M/6)

Live load on slab K-M/1-3


= Live load (UBBL) x (Area of slab) 2.75m
= 2.5kN/m² x (1.25 x 1.75) + 2.5kN/m² x
(1.50+4.00)
=5.47kN+15.00kN Column 1 Ground Level
=20.47kN

Live load on slab K-M/3-5


= Live load (UBBL) x (Area of slab)
= 5.0kN/m² x (1.50 x 1.00)
=7.5kN

Total Live Load


=20.47+7.50
=27.97

Ultimate Load at Ground Level


=Total Dead Load (1.4) + Total Live load
(1.6)
=128.14kN(1.4) + 27.97kN(1.6)
=179.40kN + 44.75kN
=224.15kN
YONG KANG SENG 0331857
STRUCTURAL ANALYSIS
DEAD LOAD ANALYSIS

DEAD LOAD (COLUMN M/1)

Roof Level
Slab K-M/1-3
=Density of Concrete x (Area of Slab)
=[(0.15 x 24kN/m) x (1.25x1.75)+ (0.15 x
24kN/m) x (1.50x4.00)]
=7.88kN + 21.60kN
=29.48kN

Slab K-M/3-5 4.00m


=Density of Concrete x (Area of Slab)
=(0.15 x 24kN/m) x (1.50x1.00)
=5.40kN

Beam self weight


2.75m
=Density of concrete x length of the beam
=(24kN/m3 x 0.15 x 0.30) x (2.75
4.00+1.50)
Column 1 Roof Level
=8.91kN

Column self weight


=(Size of the column x Density of
concrete) x Height of column
=(0.15x 0.15 x 24kN/m3 x 3.50)
=1.89kN

Total Dead Load


=29.48 + 5.40 + 8.91 + 1.89
=45.68kN

YONG KANG SENG 0331857


STRUCTURAL ANALYSIS
DEAD LOAD ANALYSIS

LIVE LOAD (COLUMN M/1)

Live load on slab K-M/1-3


= Live load (UBBL) x (Area of slab)
= 0.5kN/m² x (1.25 x 1.75) + 0.5kN/m² x
(1.50+4.00)
=1.09kN+3.00kN 4.00m
=4.09kN

Live load on slab K-M/3-5


= Live load (UBBL) x (Area of slab)
= 0.5kN/m² x (1.50 x 1.00)
2.75m
=0.75kN

Total Live Load


=4.09+0.75 Column 1 Roof Level
=4.84
Ultimate Load at Roof Level
=Total Dead Load (1.4) + Total Live load Total Load acting on Column M/1:
(1.6) =224.15kN + 71.69kN
=45.68kN(1.4) + 4.84kN(1.6) =295.84kN < 471.07kN
=63.95kN + 7.74kN
=71.69kN Capacity of the column:
Given,Fcu = 35N/mm2
Fy = 460N/mm2
Ac = 150mm x 150mm
=22500mm2
Asc = Area of steel (4T12)
N =(0.4 X 35 X 22500) + (0.75 X
DDDDDDD460 X 452.39)
DDDDD=471074.55 (471.07kN)
: It is below the column maximum load
bearing capacity, therefore suggested
column size is 150mm x 150mm with
4T12 Reinforcement.

YONG KANG SENG 0331857


STRUCTURAL ANALYSIS
COLUMN AT M/6
DEAD LOAD ANALYSIS

DEAD LOAD (COLUMN M/6)

Ground Level

Slab J-M/4-6
=Density of Concrete x (Area of Slab)
=[(0.15 x 24kN/m) x (4.00 X 2.75)+ (0.15 x
24kN/m) x (1.50x1.25)]
=39.60kN + 6.75kN
=46.35kN
4.00m
Floor Finishes K-L/5-6
=Density of Finishes x (Area of Slab)
=0.17kN/m2 x (1.50 X 2.00)
=0.51kN
4.00m
Floor Finishes L-M/5-6
=Density of Finishes x (Area of Slab)
=0.05kN/m2 x (1.50 X 2.00)
=0.15kN
Column 2 Ground Level
Floor Finishes J-K/4-6
=Density of Finishes x (Area of Slab)
=[0.17kN/m2 x (1.00 X 1.50) + 0.17kN/m2
x (0.75 x 1.25)
=0.26kN + 0.16kN
=0.42kN

Floor Finishes K-M / 3-5


=Density of Finishes x (Area of Slab)
=[0.05kN/m2 x (1.50 X 2.00) + 0.05kN/m2
x (1.50 X 0.75)
=0.15kN + 0.06kN
=0.21kN

YONG KANG SENG 0331857


STRUCTURAL ANALYSIS
DEAD LOAD ANALYSIS

DEAD LOAD (COLUMN M/6)

Brick Wall self weight


=Wall thickness x Wall height x Density of
brick x Length of the brickwall
=[(0.15 x 3.50)m2 x 19kN/m3 x
(4.00+4.00+2.75+2.00+3.00)
=157.19kN
4.00m

Beam self weight


=Density of concrete x length of the beam
=(24kN/m3 x 0.15 x 0.30) x
(4.00+4.00+2.75+2.00+3.00) 4.00m

=17.01kN

Column self weight


=(Size of the column x Density of
Column 2 Ground Level
concrete) x depth of column stump
=(0.15x 0.15 x 24kN/m3 x 1.00)
=0.54kN

Total Dead Load


=46.35+0.51+0.15+0.42+0.21+157.19+17.
01+0.54
=222.38kN

YONG KANG SENG 0331857


STRUCTURAL ANALYSIS
DEAD LOAD ANALYSIS

LIVE LOAD (COLUMN M/6)

Live load on slab L-M/3-6


= Live load (UBBL) x (Area of slab)
= 5.0kN/m² x (1.50 x 4.00)
=30.00kN

Live load on slab K-L/3-6 4.00m


= Live load (UBBL) x (Area of slab)
= 5.0kN/m² x (1.50 x 0.75) + 2.0kN/m² x
(1.50 x 2.00)
=5.63kN+6.00kN
4.00m
=11.63kN

Live load on slab J-K/4-6


= Live load (UBBL) x (Area of slab)
= 2.0kN/m² x (0.75 x 1.25) + 2.0kN/m² x
Column 2 Ground Level
(1.00 x 1.50)
=1.88kN+3.00kN
=4.88kN

Total Live Load


=30.00+11.63+88
=129.63kN

Ultimate Load at Ground Level


=Total Dead Load (1.4) + Total Live load
(1.6)
=222.38kN(1.4) + 129.63kN(1.6)
=311.33kN + 207.41kN
=518.74kN

YONG KANG SENG 0331857


STRUCTURAL ANALYSIS
DEAD LOAD ANALYSIS

DEAD LOAD (COLUMN M/6)

Roof Level

Slab J-M/4-6
=Density of Concrete x (Area of Slab)
=[(0.15 x 24kN/m) x (4.00 X 2.75)+ (0.15 x
24kN/m) x (1.50x1.25)]
=39.60kN + 6.75kN
4.00m
=46.35kN

Beam self weight


=Density of concrete x length of the beam
=(24kN/m3 x 0.15 x 0.30) x
4.00m
(4.00+4.00+2.75+2.00+3.00)
=17.01kN

Column self weight


=(Size of the column x Density of
concrete) x depth of column Column 2 Roof Level
=(0.15x 0.15 x 24kN/m3 x 3.50)
=1.89kN

Total Dead Load


=46.35+17.01+1.89
=65.25kN

LIVE LOAD (COLUMN M/6)

Live load on slab L-M/3-6


= Live load (UBBL) x (Area of slab)
= 0.50kN/m² x (1.50 x 4.00)
=3.00kN

YONG KANG SENG 0331857


STRUCTURAL ANALYSIS
DEAD LOAD ANALYSIS

LIVE LOAD (COLUMN M/6)

Live load on slab K-L/3-6


= Live load (UBBL) x (Area of slab)
= 0.50kN/m² x (1.50 x 0.75) + 0.50kN/m² x
(1.50 x 2.00) 4.00m
=0.56kN+1.5kN
=2.06kN

Live load on slab J-K/4-6


= Live load (UBBL) x (Area of slab)
4.00m
= 0.50kN/m² x (0.75 x 1.25) + 0.50kN/m² x
(1.00 x 1.50)
=0.47kN+0.75kN
=1.22kN

Total Live Load Column 2 Roof Level


=3.00+2.06+1.22
Total Load acting on Column M/1:
=6.28kN
=518.74kN + 101.40kN
=602.14kN < 731.20kN
Ultimate Load at Roof Level
=Total Dead Load (1.4) + Total Live load
Capacity of the column:
(1.6)
Given,Fcu = 35N/mm2
=65.258kN(1.4) + 6.28kN(1.6)
Fy = 460N/mm2
=91.35kN + 10.05kN
Ac = 150mm x 150mm
=101.40kN
=22500mm2
Asc = Area of steel (6T16)
N =(0.4 X 35 X 22500) + (0.75 X
DDDDDDD460 X 1206.37)
DDDDD=731197.65 (731.20kN)

: It is below the column maximum load


bearing capacity, therefore suggested
column size is 150mm x 150mm with
6T16 Reinforcement

YONG KANG SENG 0331857


STRUCTURAL ANALYSIS
YONG MAY SIA
0327724

195
COLUMN AT D/1
DEAD LOAD COLUMN (D/1) – ROOF LEVEL STRUCTURAL ANALYSIS

Roof Slab
= Density of Concrete x Volume of Slab
= 24 kN/m³ x 0.15 x 6.75 x 3.00
= 72.90 kN

Roof Beam Self Weight


= Density of Concrete x Volume of Beam
= 24 kN/m³ x 0.15 x 0.30 x (3.00 + 6.75)
= 24 kN/m³ x 0.15 x 0.30 x 9.75
= 10.53 kN

Column Self Weight


= Density of Concrete x Volume of Column
= 24 kN/m³ x 0.15 x 0.15 x 3.50
= 1.89 kN

TOTAL DEAD LOAD


= 72.90 + 10.53 + 1.89
= 85.32 kN

LIVE LOAD COLUMN (D/1) –


ROOF LEVEL

Roof Slab
= Live Load (UBBL) x Area of Slab
= 0.50 kN/m² x 6.75 x 3.00
= 10.13 kN

TOTAL LIVE LOAD


= 10.13 kN

ULTIMATE LOAD COLUMN (D/1) -


ROOF LEVEL

Ultimate Load
= 1.4(Dead Load) + 1.6(Live Load)
= 1.4(85.32) + 1.6(10.13)
= 119.45 + 16.21
= 135.66 kN

YONG MAY SIA 0327724


197
DEAD LOAD COLUMN (D/1) – GROUND LEVEL STRUCTURAL ANALYSIS

Beam Self Weight


= Density of Concrete x Volume of Beam
= 24 kN/m³ x 0.15 x 0.30 x (3.00 + 6.75)
= 24 kN/m³ x 0.15 x 0.30 x 9.75
= 10.53 kN

Brickwall Load
= Density of Brick x Wall Area x Length of
Wall
= 19 kN/m³ x 0.15 x 3.50 x (3.00 + 6.75)
= 19 kN/m³ x 0.15 x 3.50 x 9.75
= 97.26 kN

Column Self Weight


= Density of Concrete x Volume of Column
= 24 kN/m³ x 0.15 x 0.15 x 1.00
= 0.54 kN

Slab A-D/1-5
= Density of Concrete x Volume of Slab
= 24 kN/m³ x 0.20 x 3.50 x 3.00
= 50.40 kN

Slab D-H/1-3
= Density of Concrete x Volume of Slab
= 24 kN/m³ x 0.15 x 3.25 x 3.00
= 35.10 kN

Floor Finishes A-D/1-5


= Density of Finishes x Area of Slab
= 0.17 kN/m² x 3.50 x 3.00
= 1.79 kN

Floor Finishes D-H/1-3


= Density of Finishes x Area of Slab
= 0.15 kN/m² x 3.25 x 3.00
= 1.46 kN

TOTAL DEAD LOAD


= 10.53 + 97.26 + 0.54 + 50.40 + 35.10 +
1.79 + 1.46
= 197.08 kN

YONG MAY SIA 0327724


198
LIVE LOAD COLUMN (D/1) – GROUND LEVEL STRUCTURAL ANALYSIS

Slab A-D/1-5 (Living Room)


= Live Load (UBBL) x Area of Slab
= 2.0 kN/m² x 3.50 x 3.00
= 21.00 kN

Slab D-H/1-3 (Master Bedroom)


= Live Load (UBBL) x Area of Slab
= 1.5 kN/m² x 3.25 x 3.00
= 14.63 kN

TOTAL LIVE LOAD


= 21.00 + 14.63
= 35.63 kN
ULTIMATE LOAD COLUMN (D/1) –
GROUND LEVEL
Ultimate Load
= 1.4(Dead Load) + 1.6(Live Load)
= 1.4(197.08) + 1.6(35.63)
= 275.91 + 57.01
= 332.92 kN

TOTAL LOAD COLUMN (D/1)

Total Load
= Roof Level Ultimate Load + Ground
Level Ultimate Load
= 135.66 + 332.92
= 468.58 kN

CAPACITY OF COLUMN (D/1)

N = 0.4 (𝑓𝑐𝑢 ) (𝐴𝑐 ) + 0.75 (𝑓𝑦 ) (𝐴𝑠𝑐 )


= 0.4 (35) (150x150) + 0.75 (460) (4𝜋62 )
= 315000 + 156094.56
= 471094.56 N
= 471.09 kN

Total load is lower than the column


maximum load bearing capacity.
(468.58 kN < 471.09 kN)

Suggested column size is 150mm x


150mm with 4T12 reinforcement .

YONG MAY SIA 0327724


199
COLUMN AT I/1
DEAD LOAD COLUMN (I/1) – ROOF LEVEL STRUCTURAL ANALYSIS

Roof Slab A
= Density of Concrete x Volume of Slab
= 24 kN/m³ x 0.15 x (1.75 + 1.50 + 1.25) x
2.50
= 24 kN/m³ x 0.15 x 4.50 x 2.50
= 40.50 kN

Roof Slab B
= Density of Concrete x Volume of Slab
= 24 kN/m³ x 0.15 x (1.25 + 0.25) x 1.75
= 24 kN/m³ x 0.15 x 1.50 x 1.75
= 9.45 kN

Roof Beam Self Weight


= Density of Concrete x Volume of Beam
= 24 kN/m³ x 0.15 x 0.30 x (2.50 + 2.50 +
1.25 + 1.75 + 1.75 + 1.50 + 1.25 + 1.25 +
0.25)
= 24 kN/m³ x 0.15 x 0.30 x 14
= 15.12 kN

Column Self Weight


= Density of Concrete x Volume of Column
= 24 kN/m³ x 0.15 x 0.15 x 3.50
= 1.89 kN

TOTAL DEAD LOAD


= 40.50 + 9.45 + 15.12 + 1.89
= 66.96 kN

YONG MAY SIA 0327724


201
LIVE LOAD COLUMN (I/1) – ROOF LEVEL STRUCTURAL ANALYSIS

Roof Slab A
= Live Load (UBBL) x Area of Slab
= 0.50 kN/m² x (1.75 + 1.50 + 1.25) x 2.50
= 0.50 kN/m² x 4.50 x 2.50
= 5.63 kN

Roof Slab B
= Live Load (UBBL) x Area of Slab
= 0.50 kN/m² x (1.25 + 0.25) x 1.75
= 0.50 kN/m² x 1.50 x 1.75
= 1.31 kN

TOTAL LIVE LOAD


= 5.63 + 1.31
= 6.94 kN

ULTIMATE LOAD COLUMN (I/1) -


ROOF LEVEL

Ultimate Load
= 1.4(Dead Load) + 1.6(Live Load)
= 1.4(66.96) + 1.6(6.94)
= 93.74 + 11.10
= 104.84 kN

YONG MAY SIA 0327724


202
DEAD LOAD COLUMN (I/1) – GROUND LEVEL STRUCTURAL ANALYSIS

Beam Self Weight


= Density of Concrete x Volume of Beam
= 24 kN/m³ x 0.15 x 0.30 x (2.50 + 2.50 +
1.25 + 1.75 + 6.00)
= 24 kN/m³ x 0.15 x 0.30 x 14.00
= 15.12 kN

Brickwall Load
= Density of Brick x Wall Area x Length of
Wall
= 19 kN/m³ x 0.15 x 3.50 x (2.50 + 2.50 +
1.25 + 1.75 + 6.00)
= 19 kN/m³ x 0.15 x 3.50 x 14.00
= 139.65 kN

Column Self Weight


= Density of Concrete x Volume of Column
= 24 kN/m³ x 0.15 x 0.15 x 1.00
= 0.54 kN

Slab D-H/1-3
= Density of Concrete x Volume of Slab
= 24 kN/m³ x 0.15 x 1.75 x 2.50
= 15.75 kN

Slab H-I/1-3
= Density of Concrete x Volume of Slab
= 24 kN/m³ x 0.15 x 1.50 x 2.50
= 13.50 kN

Slab I-K/1-2 (A)


= Density of Concrete x Volume of Slab
= 24 kN/m³ x 0.15 x 1.25 x 2.00
= 9.00 kN

Slab I-K/1-2 (B)


= Density of Concrete x Volume of Slab
= 24 kN/m³ x 0.15 x 1.25 x 1.75
= 7.88 kN

Slab I-K/2-4
= Density of Concrete x Volume of Slab
= 24 kN/m³ x 0.15 x 1.25 x 0.50
= 2.25 kN

YONG MAY SIA 0327724


203
DEAD LOAD COLUMN (I/1) – GROUND LEVEL STRUCTURAL ANALYSIS

Slab K-M/1-3
= Density of Concrete x Volume of Slab
= 24 kN/m³ x 0.15 x 0.25 x 1.75
= 1.58 kN

Floor Finishes D-H/1-3


= Density of Finishes x Area of Slab
= 0.15 kN/m² x 1.75 x 2.50
= 0.66 kN

Floor Finishes H-I/1-3


= Density of Finishes x Area of Slab
= 0.15 kN/m² x 1.50 x 2.50
= 0.56 kN

Floor Finishes I-K/1-2 (A)


= Density of Finishes x Area of Slab
= 0.17 kN/m² x 1.25 x 2.00
= 0.43 kN

Floor Finishes I-K/1-2 (B)


= Density of Finishes x Area of Slab
= 0.17 kN/m² x 1.25 x 1.75
= 0.37 kN

Floor Finishes I-K/2-4


= Density of Finishes x Area of Slab
= 0.17 kN/m² x 1.25 x 0.50
= 0.11 kN

Floor Finishes K-M/1-3


= Density of Finishes x Area of Slab
= 0.17 kN/m² x 0.25 x 1.75
= 0.07 kN

TOTAL DEAD LOAD


= 15.12 + 139.65 + 0.54 + 15.75 + 13.50 +
9.00 + 7.88 + 2.25 + 1.58 + 0.66 + 0.56 +
0.43 + 0.37 + 0.11 + 0.07
= 207.46 kN

YONG MAY SIA 0327724


204
LIVE LOAD COLUMN (I/1) – GROUND LEVEL STRUCTURAL ANALYSIS

Slab D-H/1-3
= Live Load (UBBL) x Area of Slab
= 1.5 kN/m² x 1.75 x 2.50
= 6.56 kN

Slab H-I/1-3
= Live Load (UBBL) x Area of Slab
= 1.5 kN/m² x 1.50 x 2.50
= 5.63 kN

Slab I-K/1-2 (A)


= Live Load (UBBL) x Area of Slab
= 2.0 kN/m² x 1.25 x 2.00
= 5.00 kN

Slab I-K/1-2 (B)


= Live Load (UBBL) x Area of Slab
= 2.0 kN/m² x 1.25 x 1.75
= 4.38 kN

Slab I-K/2-4
= Live Load (UBBL) x Area of Slab
= 2.0 kN/m² x 1.25 x 0.50
= 1.25 kN

Slab K-M/1-3
= Live Load (UBBL) x Area of Slab
= 2.5 kN/m² x 0.25 x 1.75
= 1.09 kN

TOTAL LIVE LOAD


= 6.56 + 5.63 + 5.00 + 4.38 + 1.25 + 1.09
= 23.91 kN
ULTIMATE LOAD COLUMN (I/1) –
GROUND LEVEL
Ultimate Load
= 1.4(Dead Load) + 1.6(Live Load)
= 1.4(207.46) + 1.6(23.91)
= 290.44 + 38.26
= 328.70 kN

YONG MAY SIA 0327724


205
TOTAL LOAD COLUMN (I/1) STRUCTURAL ANALYSIS

Total Load
= Roof Level Ultimate Load + Ground
Level Ultimate Load
= 104.84 + 328.70
= 433.54 kN

CAPACITY OF COLUMN (I/1)

N = 0.4 (𝑓𝑐𝑢 ) (𝐴𝑐 ) + 0.75 (𝑓𝑦 ) (𝐴𝑠𝑐 )


= 0.4 (35) (150x150) + 0.75 (460) (4𝜋62 )
= 315000 + 156094.56
= 471094.56 N
= 471.09 kN

Total load is lower than the column


maximum load bearing capacity.
(433.54 kN < 471.09 kN)

Suggested column size is 150mm x


150mm with 4T12 reinforcement .

YONG MAY SIA 0327724


206
YONG SHI QI
0327539

207
COLUMN AT A/10
COLUMN 1 (A/10) STRUCTURAL ANALYSIS

Roof Level

Dead Load
Roof slab
= Density of concrete x ( area of the slab )
= (0.15 x 24kN/m3) x (3.00 x 1.50)m
= 16.20kN

Roof beam self weight


= 2/ [Density of concrete x length of the
beam]
= 2/ [(24kN/m³ x 0.15 x 0.30) x
(1.50+1.50+3.00)m]
= 2/6.48
= 3.24kN

Column self weight


= [(Size of the column x Density of
concrete) x depth of column stump] Column 1 Ground Level
= 0.15m x 0.15m x 24kN/m3 x 3.50m
= 1.89kN

Live Load
= Live load on slab A-B/7-10
= Live load (UBBL) x area of slab
= 0.50 x 3.00m x 1.50m
= 2.25kN

Column 1 Roof Level

YONG SHI QI 0327539

209
COLUMN 1 (A/10) STRUCTURAL ANALYSIS

Ground Level

Dead Load
Concrete Slab
= Density of concrete x ( area of the slab )
= (0.15 x 24kN/m3) x (3.00 x 1.50)m
= 16.2kN

Beam self weight


= 2/ [Density of concrete x length of the
beam]
= 2/ [(24kN/m³ x 0.15 x 0.30) x
(1.50+1.50+3.00)m]
= 2/6.48
= 3.24kN

Brick wall self weight


= 2/ [Wall thickness x Wall height x
Density of brick x (Length of the beam)] Column 1 Ground Level
= [(0.15 x 3.50)m² x 19kN/m³
x (1.50+1.50+3.00)m]
= 2/59.88
= 29.94kN

Floor Finishes A-B /7 -10


= (Density of finishes x area of slab
= 0.17kN/m² x 3.00 x 1.50
= 0.77kN

Column self weight


= [(Size of the column x Density of
concrete) x depth of column stump]
= 0.15m x 0.15m x 24kN/m3 x 1.00m
= 0.54kN

Live Load
= Live load on slab A-B/7-10
= Live load (UBBL)
= 2.00kN/m² x 3.00m x 1.50m Column 1 Roof Level
= 9.00kN

YONG SHI QI 0327539

210
COLUMN 1 (A/10) STRUCTURAL ANALYSIS

Total Dead Load at Ground Level


= 16.20 + 3.24 + 29.94 + 0.54 + 0.77
= 50.69kN

Total Live Load at Ground Level


= 9.00kN

Ultimate Load at Ground Level


= 1.4(50.69) + 1.6(9.00)
= 85.37kN

Total Dead Load at Roof Level


= 16.20 + 3.24 + 1.89
= 21.33

Total Live Load at Roof Level


= 2.25kN

Ultimate Load at Ground Level Column 1 Ground Level


= 1.4(21.33) + 1.6(2.25)
= 33.46kN

Total load acting on Column A10 :


= 85.37kN + 33.46kN
= 118.83kN < 471.10kN
: It is below the column maximum load
bearing capacity.

Capacity of the column:


Given,Fcu = 35N/mm2
Fy = 460N/mm2
Ac = 150mm x 150mm
= 22500mm2
Asc = Area of steel (4T12)

N = (0.4 x 35 x 22500) +
(0.75 x 460 x 452.45)
= 471095.25
= 471.10kN Column 1 Roof Level
Suggested column size is 150mm x
150mm with 4T12 reinforcement .

YONG SHI QI 0327539

211
COLUMN AT B/10
COLUMN 2 (B/10) STRUCTURAL ANALYSIS

Roof Level

Dead Load
Concrete Slab
A: (0.15 x 24kN/m3) x (1.50 x 3.00)m
= 16.20kN

B: (0.15 x 24kN/m3) x (2.50 x 4.00)m


= 36.00kN

C: (0.15 x 24kN/m3) x (1.50 x 2.00)m


= 10.80kN

D: (0.15 x 24kN/m3) x (1.00 x 2.00)m


= 7.20kN

Beam self weight


: 2.50 x 1.08 = 2.70kN
: 2.00 x 1.08 = 2.16kN Column 2 Ground Level
: 3.00 x 1.08 = 3.24kN
: 2/ [(1.50 +2.50) x 1.08] = 2.16kN

Column self weight


= [(Size of the column x Density of
concrete) x depth of column stump]
= 0.15m x 0.15m x 24kN/m3 x 3.50m
= 1.89kN

Live Load
= Live load (UBBL)
A: 0.50kN/m² x 1.50m x 3.00m = 2.25kN
B: 0.50kN/m² x 2.50m x 4.00m = 5.00kN
C: 0.50kN/m² x 1.50m x 2.00m = 1.50kN
D: 0.50kN/m² x 1.00m x 2.00m = 1.00kN

Column 2 Roof Level

YONG SHI QI 0327539

213
COLUMN 2 (B/10) STRUCTURAL ANALYSIS

Ground Level

Dead Load
Concrete Slab
A: (0.15 x 24kN/m3) x (3.00 x 1.50)m
= 16.20kN

B: (0.20 x 24kN/m3) x (2.50 x 4.00)m


= 48.00kN
B
C: (0.15 x 24kN/m3) x (1.50 x 2.00)m
= 10.80kN
A CD
D: (0.15 x 24kN/m3) x (1.00 x 2.00)m
= 7.20kN

Beam self weight


: 2.50 x 1.08 = 2.70kN
: 2.00 x 1.08 = 2.16kN Column 2 Ground Level
: 3.00 x 1.08 = 3.24kN
: 2/ [(1.50 +2.50) x 1.08] = 2.16kN

Brick wall self weight


: 9.98kN/m2 x(1.50+2.00+1.00)= 44.91kN
: 2/ [9.98kN/m2 x (1.50+2.50)] = 19.96kN

Floor Finishes
= (Density of finishes x area of slab
A: 0.17kN/m² x 3.00 x 1.50 = 0.77kN
B: 0.17kN/m² x 2.50 x 4.00 = 1.70kN
C: 0.17kN/m² x 1.50 x 2.00 = 0.51kN
D: 0.17kN/m² x 1.00 x 2.00 = 0.34kN

Column 2 Roof Level

YONG SHI QI 0327539

214
COLUMN 2 (B/10) STRUCTURAL ANALYSIS

Ground Level (cont’d)

Dead Load
Column self weight
= [(Size of the column x Density of
concrete) x depth of column stump]
= 0.15m x 0.15m x 24kN/m3 x 1.00m
= 0.54kN

B
Live Load
= Live load (UBBL)
A: 2.00kN/m² x 3.00m x 1.50m = 9kN A CD
B: 3.00kN/m² x 2.50m x 4.00m = 30kN
C: 2.00kN/m² x 1.50m x 2.00m = 6kN
D: 2.00kN/m² x 1.00m x 2.00m = 4kN

Column 2 Ground Level

Column 2 Roof Level

YONG SHI QI 0327539

215
COLUMN 2 (B/10) STRUCTURAL ANALYSIS

Total Dead Load at Ground Level


= 16.20 + 48.00 + 10.80 + 7.20 + 2.70 +
2.16 + 3.24 + 2.16 + 44.91 + 19.96 + 0.77
+ 1.70 + 0.51 + 0.34 + 0.54
= 161.19kN
Total Live Load at Ground Level
= 9 + 30 + 6 + 4
= 49kN
Ultimate Load at Ground Level
= 1.4(161.19) + 1.6(49.00)
= 304.07kN
Total Dead Load at Roof Level
= 16.20 + 36.00 + 10.80 + 7.20 + 2.70 +
2.16 + 3.24 + 2.16 + 1.89
= 82.35kN
Total Live Load at Roof Level
= 2.25 + 5.00 + 1.50 + 1.00
Column 2 Ground Level
= 9.75kN

Ultimate Load at Ground Level


= 1.4(82.35) + 1.6(9.75)
= 130.89kN

Total load acting on Column A10 :


= 304.07kN + 130.89kN
= 434.96kN < 592.58kN
: It is below the column maximum load
bearing capacity.

Capacity of the column:


Given,Fcu = 35N/mm2
Fy = 460N/mm2
Ac = 150mm x 150mm
= 22500mm2
Asc = Area of steel (4T16)
N = (0.4 x 35 x 22500) + (0.75 x 460 x 804.57)
= 592576.65 ⇒ 592.58kN Column 2 Roof Level
Suggested column size is 150mm x
150mm with 4T16 reinforcement .

YONG SHI QI 0327539

216
YOONG AI TENG
0328347

217
COLUMN AT G/14
DEAD LOAD ( COLUMN G/14) STRUCTURAL ANALYSIS

ROOF LEVEL
Column self-weight
= Column self-weight x Height
= 0.54 x 3.5
= 1.89kN

Load from beam


= Self weight x Length
= 1.08 x (4+3+2.75+2.75)
= 13.50kN

Load from roof


= Slab self weight x Area
= 3.6 x (4 x 2.75)
= 39.6kN

TOTAL DEAD LOAD


AT ROOF LEVEL =54.99kN

YOONG AI TENG 0328347

219
DEAD LOAD ( COLUMN A/5) STRUCTURAL ANALYSIS

GROUND LEVEL

Column self-weight
= Column self-weight x Height
= 0.54 x 1.0
= 0.54kN

Load from beam


= Self weight x Length
= 1.08 x (4+3+2.75+2.75)
= 13.50kN

Brickwall load
= Self-weight x Length
= 9.98 x (4+3+2.75+2.75)
= 124.75 kN

Slab B-E/9-14
= Self-weight x Area
= 4.8 x (1 x 2.75)
= 13.20 kN

Slab E-G/12-14
= Self-weight x Area
= 3.6 x (3 x 2.75)
= 29.70 kN

YOONG AI TENG 0328347

220
DEAD LOAD ( COLUMN G/14) STRUCTURAL ANALYSIS

GROUND LEVEL (CON’T)

Floor finishes of B-E/9-14


= Density x Area
= 0.17 x (1 x 2.75)
= 0.48kN

Floor finishes of E-G/12-13


= Density x Area
= 0.15 x (3 x 1.25)
= 0.56kN

Floor finishes of E-G/13-14


= Density x Area
= 0.17 x (3 x 1.5)
= 2.04kN

TOTAL DEAD LOAD


AT GROUND LEVEL =183.50kN

TOTAL DEAD LOAD


= 54.99 + 183.50
= 238.49kN

YOONG AI TENG 0328347

221
LIVE LOAD ( COLUMN A/5) STRUCTURAL ANALYSIS

ROOF LEVEL
Roof slab
= UBBL x Area
= 0.5 x (4 x 2.75)
= 5.5kN

GROUND LEVEL
Slab B-E/9-14
= UBBL x Area
= 3 x (1 x 2.75)
= 8.25kN

Slab E-G/12-13
= UBBL x Area
= 1.5 x (3 x 1.25)
= 5.63kN

Slab E-G/13-14
= UBBL x Area
= 3 x (3 x 1.5)
= 13.50kN

TOTAL LIVE LOAD =32.88kN

YOONG AI TENG 0328347

222
ULTIMATE LOAD( COLUMN A/5) STRUCTURAL ANALYSIS

Ultimate Load
= 1.4Dead Load + 1.6Live Load
= 1.4(238.49) + 1.6(32.88)
= 386.49kN

CAPACITY ( COLUMN A/5)

Capacity
=0.4Fcu(Ac)+0.75Fy(Asc)
=0.4(35)(150x150) + 0.75(460)(4𝜋6²)
=315000 + 156094.56
=471094.56N
=471.09kN

Maximum load bearing capacity is


higher than total load on column
(471.09kN > 386.49kN), therefore
suggested column size is 150mm x
150mm with 4T12 reinforcement.

YOONG AI TENG 0328347

223
COLUMN AT D/4
DEAD LOAD ( COLUMN A/5) STRUCTURAL ANALYSIS

ROOF LEVEL
Column self-weight
= Column self-weight x Height
= 0.54 x 3.5
= 1.89kN

Load from beam


= Self weight x Length
= 1.08 x (4/2+4+3+6)
= 16.20kN

Load from roof


= Slab self weight x Area
= 3.6 x (4 x 6)
= 84kN

TOTAL DEAD LOAD


AT ROOF LEVEL =104.49kN

YOONG AI TENG 0328347

225
DEAD LOAD ( COLUMN A/5) STRUCTURAL ANALYSIS

GROUND LEVEL

Column self-weight
= Column self-weight x Height
= 0.54 x 1.0
= 0.54kN

Load from beam


= Self weight x Length
= 1.08 x (4/2+4+3+6)
= 16.20kN

Brickwall load
= Self-weight x Length
= 9.98 x (4/2+3+3+6)
= 139.72 kN

Slab A-B/5-7
= Self-weight x Area
= 3.6 x (3 x 3)
= 32.40 kN

Slab B-C/5-7
= Self-weight x Area
= 3.6 x (1 x 3)
= 10.80 kN

Slab A-C/1-5
= Self-weight x Area
= 4.8 x (4 x 3)
= 57.60 kN

YOONG AI TENG 0328347

226
DEAD LOAD ( COLUMN A/5) STRUCTURAL ANALYSIS

GROUND LEVEL (CON’T)

Floor finishes of A-B/5-7


= Density x Area
= 0.05 x (3 x 3)
= 0.45kN

Floor finishes of B-C/5-7


= Density x Area
= 0.17 x (1 x 3)
= 0.51kN

Floor finishes of A-C/1-5


= Density x Area
= 0.17 x (4 x 3)
= 2.04kN

TOTAL DEAD LOAD


AT GROUND LEVEL =260.26kN

TOTAL DEAD LOAD


= 104.49 + 260.26
= 365.05kN

YOONG AI TENG 0328347

227
LIVE LOAD ( COLUMN A/5) STRUCTURAL ANALYSIS

ROOF LEVEL
Roof slab
= UBBL x Area
= 0.5 x (4 x 6)
= 12kN

GROUND LEVEL
Slab A-B/5-7
= UBBL x Area
= 4 x (3 x 3)
= 36kN

Slab B-C/5-7
= UBBL x Area
= 2 x (1 x 3)
= 6kN

Slab A-C/1-5
= UBBL x Area
= 2 x (4 x 3)
= 24kN

TOTAL LIVE LOAD =78kN

YOONG AI TENG 0328347

228
ULTIMATE LOAD( COLUMN A/5) STRUCTURAL ANALYSIS

Ultimate Load
= 1.4Dead Load + 1.6Live Load
= 1.4(364.75) + 1.6(78)
= 635.45kN

CAPACITY ( COLUMN A/5)

Capacity
=0.4Fcu(Ac)+0.75Fy(Asc)
=0.4(35)(150x150) + 0.75(460)(6𝜋8²)
=315000 + 416252.16
=731252.16N
=731.25kN

Maximum load bearing capacity is


higher than total load on column
(731.25kN > 635.45kN), therefore
suggested column size is 150mm x
150mm with 6T16 reinforcement.

YOONG AI TENG 0328347

229
CONCLUSION

In a nutshell, we conclude that the proposed sizes and positioning of structural


point not only is sufficient enough to support both dead loads and live loads of the
bungalow according to the calculation we did on the load transfer of beams and columns
but also meeting the user’s living requirements. We learnt how to design a building
based on structural considerations and propose practical building structures through this
assignment.

From this assignment we know that if the structure is improperly fabricated or designed,
or the actual applied loads exceed the design specifications, the structure will fail to
perform its intended function which will caused serious consequences. The exercise not
only shows the importance of structural analysis but also allows us to know exactly on
the points where the members are actually vulnerable in order for us to think of a
solution. It is always better to have an extra measure of safety to ensure the structures are
able to withstand unpredicted events in the future or a sudden shock to certain member.
This assignment has bring exposure about the technicality and rationality about what and
how to build buildings in real life.

Last but not least, we truly appreciate the help of our lecturer for her patience and
dedication in teaching us these technical skills in this exercise and we hope that we can
get more opportunity in the future to get more hands-on knowledge.

230