A 27-Nov-2014 Issue for approval

REV. DATE DESCRIPTION DSGN CHKD APPD

OWNER : OWNER CONSULTANT :

VIETNAM OIL AND GAS GROUP (PVN) FICHTNER PV POWER PCC

EPC CONTRACTOR : EPC CONSTRACTOR'S CONSULTANT :

PETROVIETNAM CONSTRUCTION JOINT STOCK CORPORATION (PVC) WORLEYPARSONS

PROJECT :

THAI BINH 2 THERMAL POWER PLANT 2 x 600 MW

DRAWING/DOCUMENT TITLE:

METHOD STATEMENT FOR TOUCH UP PAINTING


SUB. CONTRACTOR ERECTION CONTRACTOR FUNCTION NAME SIGN DATE

DRWN Nam NT 26 Nov 2014

CHKD Hau ND 27 Nov 2014

LILAMA CORPORATION LILAMA 18 JSC APPD Tuan NA 27 Nov 2014

DOCUMENT NO.: TB2-LLM-00100-M-G1-PRO-0001 PAGE No: 5 SCALE: A4 REV.: A


Thai Binh 2 Thermal Power Plant Two(2) X 600MW
Method Statement for Touch up Painting REV. A

CONTENTS

1.0 PURPOSE

2.0 GENERAL

3.0 REFERENCE DOCUMENTS

4.0 RESPONSIBILITIES

5.0 PROCEDURE AND SEQUENCE

6.0 INSPECTION

7.0 ENVIRONMENT, HEALTH AND SAFETY (EHS)

2
Thai Binh 2 Thermal Power Plant Two(2) X 600MW
Method Statement for Touch up Painting REV. A

1.0 PURPOSE

The purpose of this Method Statement is to explain the procedure of the boiler steel structure
installation work for Thai Binh 2 Coal Fired Power Plant 2 x 600MW.

2.0 GENERAL

This method statement is applied to the above mentioned works. If there are any matters not
mentioned in this statement then that will follow international standard such as SSPC and national
and local codes.

3.0 REFERENCE DOCUMENTS


 Approved Contract Quality Plan

 Project EHSS Management Plan

 The Society for Protective Coatings Standards (SSPC)

4.0 RESPONSIBILITIES

4.1 Site Manager


Site Manager has the responsibilities for the application of this procedure and detail technical
aspects which is defined in this procedure.

4.2 Construction manager


Construction Manager is responsible for the execution of construction activities.

4.3 QA/QC manager


1) Verify the application of this procedure.
2) Wit necessary tests and inspection.
3) Verify the specification of supplied material to confirm if the delivered material is correct.

5.0 PROCEDURE AND SEQUENCE

5.1 Material
- Painting material will be supplied by PVC.

5.2 Procedure and sequence


The supplier shell provides touch-up paint with thinner at least 10% for site repair. The amount
of touch-up paint, 10% shell be determined by the design area and 40% of loss rate. Normally,
the design area will be 25m2 /1 ton steel structure.

Repairing damaged parts caused by burns, welds, scratches, or impact etc. during fabrication,
handling, storage, shipping, and erection shell be touched up as follow:

3
Thai Binh 2 Thermal Power Plant Two(2) X 600MW
Method Statement for Touch up Painting REV. A

- The surface preparation grade of damaged part depends on the area of damaged surface.
Normally, damaged surface shell be cleaned by power tool. When the areas needed to
repair are large, repair areas shell be treated by blast cleaning.

- The application method for the touch up painting is specified by brush or spray.

- Cleaned surface shell be touched up within 8 hours, if not the surface will be cleaned again.

- The intermediate coat (high build epoxy layer) shell be applied within 30 days from the
primer coat (Zinc phosphate layer) was applied. If not the primer coat will be removed and
applied again.

Min. dry film


Surface No. of
Item thickness Paint type Remark
preparation coat
(µm)

1st 75 Zinc photsphate

Boiler steel 2nd 115 High build epoxy


SSPC SP 2,3
structure
Polyurethane (RAL
3rd 60
5010)

Note:

The touch-up painting procedure above will be used for connection steel plate areas.

6.0 INSPECTION

The visual check will be applied for surface preparation and each coats finish.

7.0 ENVIRONMENT, HEALTH AND SAFETY (OSHA)

7.1 Responsibilities and Instructions


• PM/EHSS Officer shall ensure that all work is undertaken in accordance with the specified
work scope.
• Safety training should be conducted to all personnel assigned at site prior to commence any
work.
• All personnel should know the locations of fire extinguishers, communications, manual
alarms & ESD points.
• All personnel should be aware of assembly points, escape routes, emergency contact
numbers.
• Carry-out daily tool box and safety talks.

4
Thai Binh 2 Thermal Power Plant Two(2) X 600MW
Method Statement for Touch up Painting REV. A

• Personal Protective Equipment (PPE) shall be worn at all times.


• Good housekeeping shall be observed in work areas.
• Construction wastes shall be segregated and disposed to an approved dump yard area.
• Permit to work shall be obtained appropriately for the type of work and location.
• Adequate lighting equipment when working night time.
• Ensure all workers and equipment working overtime are properly accounted and obtained
permit/approval from LLM EHS Manager prior to carry-on works.
• Periodic refresher trainings, toll box talk and audit shall be conducted.

7.2 Safety (PPE)


• Safety Helmets (for all personnel present at site )
• Safety Shoes (for all personnel present at site )
• Gloves
• Safety Goggles
• 3M Mask
• Reflective Vest

7.3 First Aid Facilities


• First aid facility is always made available during working hours by a qualified first aiders.
• Ambulance car with Driver, Helper and stand by Nurse are available at site at all times.