You are on page 1of 1

VESTIBULE

178

PHASE 1

ACC
120
WHEELCHAIR
PT. TLT. PHASE 2 PHASE 2 PHASE 2
ALCOVE 113 117 118 119
112
MECH.
111

PHASE 1
121

STAFF
LOUNGE
103
CONFRENCE MOTHERS ELEC COM
104 109 110

Refrigerator
PHASE 1
122

PHASE 2 PHASE 2 PHASE 2


114 115 116

ACC
STAFF TLT. PHASE 1
105 123
DICTATION
ACC 128
P TLT. MEDICATION
108 127
PHYSICANS
LOUNGE
102
PHASE 1
124
CLEAN
106
EXAM PHASE 2 PHASE 2
DIRTY 129 130 131
107

PHASE 1
125
ASC

NOT FOR CONSTRUCTION


WAITING
AREA
101

EQUIPEMENT
STORAGE
175

OR 1 OR 2
132 133

PHYSICAIAN
WORK AREA
174

RECEPTION/
CHECK IN
100
STORAGE/WORK SUB SUB
STAFF ROOM STERILE STERILE
WORK AREA 172 134 135
173
ACC
ACC

WAITING
AREA
179
OR 3 OR 4
ACC

ACC

SELF CHECK-IN 136 137


MEDICAL
RECORDS
STORAGE
171
MEN TLT WOMENTLT
169 170

EXAM IT
EXAM 152
168
167
FIRST FLOOR
EQUIPMENT
STORAGE
151 ACC ARCHITECTURAL
EXAM
MENS
SHOWER
CRNA
140
DECONTAMINATION
PLAN
EXAM 138
166 165 142
MANAGER Issues and Revisions:
153
MENS
LOCKER
ROOM
141
EXAM EXAM STORAGE
164 163 154
BULK
STORAGE
150

CLEAN WORKROOM
155 146
ACC
EXAM EXAM
162 161 WOMEN'S STERILIZER
145
SHOWER
SOILED 144
156
MATERIAL
PHYSICANS PHYSICANS BREAK
WORK WORK DOWN WOMEN'S
SPACE SPACE 149 LOCKER
160 158 BIOHAZARD ROOM CLEAN
157 143 SUPPLY
147

OXYGEN
159

HOUSE KP.
148

VESTIBULE Commission No:


177
Drawn by:

A
2
.
1
Checked by:

SHEET

1 FIRST FLOOR ARCHITECTURAL PLAN


A2.1 1/8" = 1'-0"

T
R
U
E
S
H
E
E
T
S
C
A
L
E
0
"

1
/
2
"

1
"
12/11/2018 1:53:04 PM
C:\Users\bicmada\Desktop\Studio\Working model project(Recovery).rvt

You might also like