PROPOSED FILM PACKAGING INDUSTRIAL AND RESIDENTIAL DEVELOPMENT

ON PLOT No IJC 354 (OG). UTM(ZONE 31), OGUN STATE, NIGERIA, SOUTH AFRICA
FOR FLEX FILMS AFRICA PVT. LIMITED
ITEM DESCRIPTION UNIT Nos L B D QUANTITY
0 0 Sq.m/Cu.m
BLOCK 7 A, B AND C- GUARD BLOCK

BILL 1: PRELIMINARIES
GENERAL AND PRELIMINARIES
Item
1 CONTRACTOR'S PRELIMINARIES
Item
2 INSURANCES
3 ESTABLISHMENT OF SITE FACILITIES Item
4 MOBILISATION Item
5 DEMOBILISATION Item
6 TENDER FEE Item
7 HANDING OVER Item
All the above LS

Any other item(s), can be specified by the tenderer

NOTE: This is lump sum contract and no re-measurement to be done

PRELIMINARIES BILL 1
Page 1 BILL 1

BILL 2 EARTHWORKS
Excess soil shall be carted away.
1 EXCAVATION:
a FROM EXISTING NATURAL GROUND LEVEL UPTO FOUNDATION LEVEL
EXCAVATION FOR FOOTING – 1 m3 2 2.6 2.4 3.2 39.94
EXCAVATION FOR FOOTING – 2 m3 2 2.4 2.2 3.2 33.79
EXCAVATION FOR FOOTING – 3 m3 2 2.6 2.4 3.2 39.94
EXCAVATION FOR EXTERNAL TIE BEAM AND SOLID BLOCKWALL m3 29 1 3.2 92.80
EXCAVATION FOR GRADE SLAB m3 49.4 0.3 14.82
EXCAVATION FOR STRAP BEAM m3 3 6 1.3 3.2 74.88
TOTAL 296.16
2 BACKFILLING:
compaction not be less than 98% of MDD m3
3 SURPLUS SOIL TO BE CART AWAY FROM SITE FOR PLOT LEVELLING. m3
5 ANTI-TERMITE TREATMENT m2
Anti-termite treatment shall be carried out on soil prior to commencing any concrete work.
EARTHWORKS BILL 2
Page 3/BILL 2
BILL-3 CONCRETE WORKS
370kg/m3 with minimum cube crushing strength of 30N/mm2 after 28days.
370kg/m3 with minimum cube crushing strength of 30N/mm2 after 28days.
300kg/m3
To include curing and concrete third part test.
1 100mm THICK PCC 1 m3 2 2 1.8 0.1 0.72
100mm THICK PCC 2 m3 2 1.8 1.6 0.1 0.58
100mm THICK PCC 3 m3 2 2 1.8 0.1 0.72
100mm THICK PCC BELOW SOLID BLOCKWALL m3 29 0.6 0.1 1.74
100mm THICK PCC BELOW STRAP BEAM m3 15 0.7 0.1 1.05
TOTAL 4.81
2 RCC CONCRETE WITH FORMWORK AND REINFORCEMENT
a FOOTING, F1 m3 2 1.6 1.4 0.4 1.79
FOOTING, F2 m3 2 1.4 1.2 0.4 1.34
FOOTING, F3 m3 2 1.6 1.4 0.4 1.79
TOTAL 4.93
b PEDASTAL COLUMN m3 6 0.23 0.4 2.6 1.44
0.00
c STRAP BEAM m3 3 5 0.3 0.5 2.25
d TIE BEAM m3 29 0.23 0.4 2.67
e SUPERSTRUCTURE COLUMNS m3 6 0.23 0.4 3.35 1.85
f ROOF BEAM m3 29 0.23 0.5 3.34
g 100mm THICK GRADE SLAB, A 142 MESH SINGLE LAYER m 2
9.6 4.54 43.58
h 200mm THICK ROOF SLAB m3 9.6 4.54 0.2 8.72
0.00
h PARAPET WALL m 3
29 0.15 0.6 2.61

r ANTI-TERMITE TREATMENT m2 540.00


s 1000 G POLYTHENE SHEET m2 570.00
t COLD BITUMIN PAINT ON PCC m2 180.00
COLD BITUMIN PAINT ON FOOTING – 1 m2 2 2.4 2.2 10.56
COLD BITUMIN PAINT ON FOOTING – 2 m2 2 2.2 2 8.80
COLD BITUMIN PAINT ON FOOTING – 3 m2 2 2.4 2.2 10.56
COLD BITUMIN PAINT ON PEDASTAL COLUMN m2 6 1.26 2.6 19.66
COLD BITUMIN PAINT ON TIE BEAM m2 2 29.00 0.40 23.20
COLD BITUMIN PAINT ON SOLID BLOCKWALL m2 2 29.00 2.50 145.00
COLD BITUMIN PAINT ON STRAP BEAM m2 3 5.00 1.30 19.50
TOTAL 417.28
u DPC LAYER m2
v FLEXCELL SHEET 1 m2
FLEXCELL SHEET 2 m2
TOTAL
w ROOF WATERPROOFING 1 m2 9.60 4.54 43.58
ROOF WATERPROOFING 2 m2 29.00 0.20 5.80
TOTAL 49.38

BILL 4 STEEL STRUCTURE AND METAL WORKS


1 STAIRCASE HANDRAIL Item

METAL WORKS BILL 4


Page 4/B4
BILL 5 BLOCK WORK AND PARTITION
1 230MM THICK SOLID BLOCKWORK FOR SUBSTRUCTURE
Solid blockwork shall be provided all along below tie beam up to founding level. m2 29.00 2.50 72.50
2 HOLLOW BLOCKWORK
230MM THICK EXTERNAL HOLLOW BLOCKWORK FOR ELEVATION A m2 23.84
230MM THICK EXTERNAL HOLLOW BLOCKWORK FOR ELEVATION B m2 13.72
230MM THICK EXTERNAL HOLLOW BLOCKWORK FOR ELEVATION C m2 23.90
230MM THICK EXTERNAL HOLLOW BLOCKWORK FOR ELEVATION D m2 11.83
TOTAL 73.30
230MM THICK INTERNAL HOLLOW BLOCK m2 4.62 3.10 14.32
TOTAL
TOTAL

Any other item(s), can be specified by the tenderer

BLOCKWORK BILL 5
Page 5/B5
BILL 6 FINISHES
1 PLASTER
10mm shall be provided in plaster at the junction of RCC members and block walls.
a 20mm THICK EXTERNAL PLASTER m2 2 220.00 440.00
0.00
b 15mm THICK INTERNAL PLASTER m2 2 45.00 90.00
2 Painting
a EXTERNAL WALL – RUSH TYROLEAN PAINT m2
b INTERNAL PAINT – 5 COAT OF EMULSION PAINT ON WALLS m2
c INTERNAL PAINT – 5 COAT OF EMULSION PAINT ON CEILING m2
TOILET
3 FLOORING
a ACID PROOF TILES m2
b ANTI SLIP CERAMIC TILE – TOILET m2
c SMOOTH POWER FLOAT FINISH AND FLOOR HARDNER – VAMS m2
SMOOTH POWER FLOAT FINISH AND FLOOR HARDNER – POWER PLANT m2
SMOOTH POWER FLOAT FINISH AND FLOOR HARDNER – HT/LT PANEL m2
SMOOTH POWER FLOAT FINISH AND FLOOR HARDNER – FUEL TREATMENT m2
SMOOTH POWER FLOAT FINISH AND FLOOR HARDNER – STORE ROOM m2
SMOOTH POWER FLOAT FINISH AND FLOOR HARDNER – CONTROL ROOM m2
SMOOTH POWER FLOAT FINISH AND FLOOR HARDNER – TANK FARM m2
SMOOTH POWER FLOAT FINISH AND FLOOR HARDNER – RAMP m2
TOTAL m2
4 CEILING
a GRID
CONTROL ROOM m2
TOILET ROOM m2
TOTAL
5 SKIRTING
CERAMIC TILE m
Any other item(s), can be specified by the tenderer

FINISHES BILL 6
Page 6/B6
BILL 7 WATERPROOFING WORKS
1 1000 G POLYTHENE SHEET m2
substructure works.
2 COLD BITUMIN PAINT m2

All RCC works and substructure blockwork which comes directly in contact with soil shall
be waterproofed with two coats of cold bitumen paint Nitopruf 10 or equivalent.
3 DPC LAYER m2
230mm wide DPC above tie beam for all blockworks.
4 25MM THICK FLEXCELL SHEET BETWEEN TWO COLUMNS FOR EVERY 16M C/C. m2
Any other item(s), can be specified by the tenderer

THERMAL MOISTURE&PROTECTION BILL 7


Page 8/B7