You are on page 1of 2

VERIFICATION COMMENT SHEET

Project DNV Project No:


ALPHA ECC-Dehydration skids package for Tien Hai Thai Binh project Rev. 0
Title: PP117954
Document No.: Rev Document Title:

See below

Prepared by: Sign: Verified by: Sign: Date: Comment Sheet no.:
2014-10-28 C-PP17954-001
Nguyen Dang Han
Huynh Quy Thuan

VERIFICATION COMMENTS Comment Status: OPEN

Criticality **)
Comment No.

Status *)

By
Description

KTA.TB-PAC03-M07-001 Rev.A Teg Contactor,Glycol Cooler & Feed Gas Heater PID
KTA.TB-PAC03-M07-002 Rev.A Cold & Rich Glycol Exchangers PID
KTA.TB-PAC03-M07-003 Rev.A Flash Drum & Filters PID
KTA.TB-PAC03-M07-004 Rev.A Surge Drum PID
KTA.TB-PAC03-M07-005 Rev.A Glycol Reboiler & Still Column PID
KTA.TB-PAC03-M07-006 Rev.A Glycol Circulation Pump PID
KTA.TB-PAC03-M07-007 Rev.A Overhead System PID
KTA.TB-PAC03-M07-008 Rev.A Water Reflux Pumps PID
The following basic data to be reflected on P&ID:
- Equipment short specifications
- Instrument tag no/PSV tag no.
1 N O Thuan
- PSV sizing Case
- Shutdown/Control Valve fail safe position
- Pressure/flow/tempearature/level trip set point

The following documentations to be provided for PID review:


- Basis of Design from owner.
2 N O Thuan
- Legends & Symbols for P&ID
- HAZOP & HAZOP close-out report

*) O = Open; C = Closed; CI = Closed if implemented in document.


**) NC =Non Conformance (Response required); N=Note (Response required);
A=Advice (No Response required). Page 1 of 2
Document1
*) O = Open; C = Closed; CI = Closed if implemented in document.
**) NC =Non Conformance (Response required); N=Note (Response required);
A=Advice (No Response required). Page 2 of 2
Document1

You might also like