PSDP Project Name Approval Total Expenditure Throw- Allocation Proposed Adjustment
S# Status Cost Upto forward 2018-19 Allocation
June, 2018

AVIATION DIVISION
12 Installation of Weather Un- 1842.000 0.000 1842.000 29.000 0.000 -29.000
Surveillance Radar at Approved
Multan
13 Strengthening of Early Un- 12942.000 0.000 12942.000 100.000 0.000 -100.000
Warning System of Pakistan Approved
Meteorological Department

Total (Aviation): 14784.000 0.000 14784.000 129.000 0.000 -129.000


CABINET DIVISION
17 Infrastructure Development Un- 59.138 0.000 59.138 59.138 0.000 -59.138
& Provision of Security Approved
Lights at Newly Purchased
Eight (08) Acres of Land at
6 Aviation Squadron,
Islamabad Heliport

18 Tourism Master Plan AJK, Un- 50.000 0.000 50.000 50.000 0.000 -50.000
GB and Swat (Technical Approved
Study)
Total (Cabinet): 109.138 0.000 109.138 109.138 0.000 -109.138
CAPITAL ADMINISTRATION & DEVELOPMENT DIVISION
23 Conduction of Water from Un- 75929.920 0.000 75929.920 500.000 0.000 -500.000
Indus River System of Approved
Tarbella Dam for Islamabad
and Rawalpindi
(In Million Rupees)
PSDP Project Name Approval Total Expenditure Throw- Allocation Proposed Adjustment
S# Status Cost Upto forward 2018-19 Allocation
June, 2018
24 Providing / Replacement of Un- 295.760 0.000 295.760 295.760 0.000 -295.760
HVAC System Installed at Approved
Aiwan-e-Sadr, Islamabad

25 Providing / Replacement of Un- 158.009 0.000 158.009 158.009 0.000 -158.009


10 Nos. Lifts Installed at Approved
Aiwan-e-Sadr, Islamabad

32 Construction of Federal Un- 8206.823 0.000 8206.823 200.000 0.000 -200.000


Medical College, Islamabad Approved

33 Construction of Female Un- 222.062 0.000 222.062 50.000 0.000 -50.000


Doctor Hostel at PIMS, Approved
Islamabad
34 Construction of Nursing Un- 59.413 0.000 59.413 50.000 0.000 -50.000
Hostel at PIMS, Islamabad Approved

37 Establishment of Unit for Un- 295.316 0.000 295.316 295.316 0.000 -295.316
Shredding, Sterilization and Approved
Disposal of Medical Waste
at Shaheed Zulfiqar Ali
Bhutto Medical University /
Pakistan Institute of Medical
Sciences, Islamabad

38 Extension of Cardiac Centre Un- 100.000 0.000 100.000 25.000 0.000 -25.000
Extension Block at PIMS, Approved
Islamabad (Feasibility)
(In Million Rupees)
PSDP Project Name Approval Total Expenditure Throw- Allocation Proposed Adjustment
S# Status Cost Upto forward 2018-19 Allocation
June, 2018
39 Replacement/ Up-gradation Un- 725.000 0.000 725.000 594.111 0.000 -594.111
HVAC Plant Room Approved
Equipment & Allied Works
at PIMS, Islamabad

40 Strengthening of Intensive Un- 152.903 0.000 152.903 46.000 0.000 -46.000


Care Unit at FGPC, Approved
Islamabad
42 Up-Gradation of Un- 49.950 0.000 49.950 49.950 0.000 -49.950
Department of Nephrology Approved
at PIMS, Islamabad

44 Up-Gradation of Un- 386.017 0.000 386.017 100.000 0.000 -100.000


Gastroenterology Approved
Department/Replacement of
Equipment for Advance
Liver and GI Diseases
PIMS, Islamabad

46 Up-Gradation of Radiology Un- 364.500 0.000 364.500 110.000 0.000 -110.000


Department at FGPC Approved
(PGMI), Islamabad
55 Construction of Boundary Un- 59.943 0.000 59.943 20.000 0.000 -20.000
Wall of Islamabad Model Approved
College for Girls,
I-14/3, Islamabad
56 Construction of Building of Un- 47.183 0.000 47.183 20.000 0.000 -20.000
Islamabad Model School for Approved
Girls (I-V), No 1, Tarlai ,
Islamabad
(In Million Rupees)
PSDP Project Name Approval Total Expenditure Throw- Allocation Proposed Adjustment
S# Status Cost Upto forward 2018-19 Allocation
June, 2018
57 Construction of Building of Un- 58.351 0.000 58.351 15.000 0.000 -15.000
Islamabad Model School for Approved
Girls (I-VIII), Bain Nullah,
Islamabad
58 Establishment of Islamabad Un- 466.214 0.000 466.214 200.000 0.000 -200.000
Model College for Boys, G- Approved
13/2, Islamabad

59 Establishment of Islamabad Un- 250.222 0.000 250.222 50.000 0.000 -50.000


Model College for Boys, Approved
Margalla Town, Islamabad

60 Establishment of Islamabad Un- 166.082 0.000 166.082 50.000 0.000 -50.000


Model College for Boys, Approved
Pakistan Town, Islamabad

61 Establishment of Islamabad Un- 315.272 0.000 315.272 80.000 0.000 -80.000


Model College for Girls Approved
(IMCs) G-13/1, Islamabad.

62 Establishment of Islamabad Un- 460.515 0.000 460.515 200.000 0.000 -200.000


Model College for Girls, G- Approved
14/4, Islamabad

64 Establishment of Islamabad Un- 343.441 0.000 343.441 90.000 0.000 -90.000


Model School for College, Approved
G-15, Islamabad
(In Million Rupees)
PSDP Project Name Approval Total Expenditure Throw- Allocation Proposed Adjustment
S# Status Cost Upto forward 2018-19 Allocation
June, 2018
67 Up-Gradation of Un- 59.500 0.000 59.500 10.000 0.000 -10.000
Government Polytechnic Approved
Institute for Women, H-8/1,
Islamabad

68 Up-Gradation of Islamabad Un- 175.872 0.000 175.872 50.000 0.000 -50.000


Model College for Girls, Approved
Bhara Kahu, Islamabad

Total (CAD): 89348.268 0.000 89348.268 3259.146 0.000 -3259.146


CLIMATE CHANGE DIVISION
76 Climate Resilient Urban Un- 56.825 0.000 56.825 20.000 0.000 -20.000
Human Settlements Unit Approved
77 Establishment of Pakistan Un- 40.000 0.000 40.000 16.000 0.000 -16.000
WASH Strategic Planning & Approved
Coordination Cell
(Facilitating Achievements
of SDG 6.1 and 6.2)

Total (Climate): 96.825 0.000 96.825 36.000 0.000 -36.000


COMMERCE DIVISION
79 Expo Centre, Islamabad Un- 2500.000 0.000 2500.000 50.000 0.000 -50.000
Approved
81 Establishment of Pakistan Un- 3722.113 0.000 3722.113 100.000 0.000 -100.000
Institute of Fashion & Approved
Design (PIFD), Sub-campus
at Karachi
(In Million Rupees)
PSDP Project Name Approval Total Expenditure Throw- Allocation Proposed Adjustment
S# Status Cost Upto forward 2018-19 Allocation
June, 2018
82 Provision of Students and Un- 200.000 0.000 200.000 100.000 0.000 -100.000
Faculty Hostels and Approved
Transport Facilities for
Pakistan Institute of Fashion
& Design (PIFD), Lahore

83 Remodeling and Expansion Un- 4000.000 0.000 4000.000 500.000 0.000 -500.000
of Karachi Expo Centre Approved
(50% through PSDP, 50%
by MoC)

Total (Commerce): 10422.113 0.000 10422.113 750.000 0.000 -750.000


COMMUNICATIONS DIVISION (Other Than NHA)
91 Construction of Buildings at Un- 345.164 0.000 345.164 183.644 0.000 -183.644
NH&MP Training College, Approved
Sheikhupura
92 Construction of NH&MP Un- 1196.324 0.000 1196.324 300.000 0.000 -300.000
Buildings / Offices on Approved
Acquired Lands (Phase-I)
Total (Other than NHA): 1541.488 0.000 1541.488 483.644 0.000 -483.644
COMMUNICATIONS DIVISION (NHA)
102 Construction of Bajour Un- 10000.000 0.000 10000.000 600.000 0.000 -600.000
(Khar) - Jandola - Zhob Link Approved
Road (205 km)
137 Bella Awaran-Hoshab Road Un- 20000.000 0.000 20000.000 10.000 0.000 -10.000
Approved
140 Construction of Additional Un- 33170.000 0.000 33170.000 110.000 0.000 -110.000
Carriage way Shikarpur- Approved
Rajanpur Section of N55
CAREC Corridor (ADB)
(In Million Rupees)
PSDP Project Name Approval Total Expenditure Throw- Allocation Proposed Adjustment
S# Status Cost Upto forward 2018-19 Allocation
June, 2018
141 Construction of Additional Un- 11891.000 0.000 11891.000 10.000 0.000 -10.000
Lane, Widening and Approved
Improvement of Fawara
Chowk, Intersections in
Abbottabad (N-35)

142 Construction of approach Un- 6000.000 0.000 6000.000 5.000 0.000 -5.000
road to link LSM with Approved
Sambrial and Sailkot city
143 Construction of Babusar Un- 300.000 0.000 300.000 20.000 0.000 -20.000
Tunnel Feasibility study Approved
144 Construction of Dera Murad Un- 2500.000 0.000 2500.000 250.000 0.000 -250.000
Jamali Bypass Approved
147 Construction of Fly over at Un- 1500.000 0.000 1500.000 150.000 0.000 -150.000
the junction of N-5 and N-65 Approved
at Sukhur
150 Construction of Hub bypass Un- 6000.000 0.000 6000.000 510.000 0.000 -510.000
4-lane (16km) (IDB) Approved

154 Construction of Lakpass- Un- 12000.000 0.000 12000.000 110.000 0.000 -110.000
Noushki section (130) (IDB) Approved

155 Construction of Leepa Un- 6000.000 0.000 6000.000 10.000 0.000 -10.000
Valley Tunnel Approved
160 Construction of New Bridge Un- 10000.000 0.000 10000.000 10.000 0.000 -10.000
with approach roads Approved
between Sukkur - Rohri
Bridge over River Indus

161 Construction of Overhead Un- 1500.000 0.000 1500.000 5.000 0.000 -5.000
Bridge at Star Gate Jhelum Approved
km1431
(In Million Rupees)
PSDP Project Name Approval Total Expenditure Throw- Allocation Proposed Adjustment
S# Status Cost Upto forward 2018-19 Allocation
June, 2018
162 Construction of Psehwar- Un- 37450.000 0.000 37450.000 1000.000 0.000 -1000.000
Torkhum Section of Approved
Peshawar-Kabul Motorway
(WB)
164 Construction of Rajanpur- Un- 20000.000 0.000 20000.000 10.000 0.000 -10.000
DG Khan as a 4-lane Approved
Highway (IDB)
169 Construction of road from Un- 40000.000 0.000 40000.000 10.000 0.000 -10.000
Sambrial-Kharian Motorway Approved

170 Construction of road from Un- 8000.000 0.000 8000.000 50.000 0.000 -50.000
Sibi-Talli(20km) and Kohlu Approved
to Rakhni(80km)
173 Construction of Shahdad Un- 3000.000 0.000 3000.000 10.000 0.000 -10.000
Kot Bypass on M-8 Approved
174 Construction of Sharda- Un- 3000.000 0.000 3000.000 10.000 0.000 -10.000
Murinar-Jalkhad (SNJ) Approved
Road (36km)
175 Construction of Southern Un- 10000.000 0.000 10000.000 10.000 0.000 -10.000
bypass Peshawar Approved
179 Construction of Southern by Un- 12000.000 0.000 12000.000 10.000 0.000 -10.000
pass Hyderabad (ADB) Approved

180 Conversation of existing 2- Un- 13000.000 0.000 13000.000 20.000 0.000 -20.000
lane Karachi Northern Approved
bypass to 6-lane Highway
(AIIB)
183 Dualization of Kharian to Un- 57000.000 0.000 57000.000 20.000 0.000 -20.000
Rawalpindi Motor way Approved
(In Million Rupees)
PSDP Project Name Approval Total Expenditure Throw- Allocation Proposed Adjustment
S# Status Cost Upto forward 2018-19 Allocation
June, 2018
184 Dualization of Khuzdar - Un- 90500.000 0.000 90500.000 10.000 0.000 -10.000
Chaman Section of N-25 Approved
(408km) including rehab of
existing Khuzdar - Kalat
Section and Land
Acquisition CAREC

189 Kohala - Muzaffarabad 4 Un- 20000.000 0.000 20000.000 10.000 0.000 -10.000
Lane Dual Approved
Carriageway (40 KM) via
Lower Toppa
Chhijina

192 Mirpur - Mangla - Un- 142000.000 0.000 142000.000 5.000 0.000 -5.000
Muzaffarabad - Approved
Mansehra Road (CPEC)
193 Nokundi- Mashkhel- Un- 24000.000 0.000 24000.000 10.000 0.000 -10.000
Panjgoor (200KM) Approved
195 Rehab/Improvement of Un- 12000.000 0.000 12000.000 500.000 0.000 -500.000
Noshki - Dalbandin section Approved
(N-40) 165 km
196 Rehabilitation and Un- 27000.000 0.000 27000.000 20.000 0.000 -20.000
Improvement program of N- Approved
5 (ADB)
197 Rehabilitation of Bela- Un- 3500.000 0.000 3500.000 10.000 0.000 -10.000
kararo(47) Section Approved
198 Rehabilitation of Existing Un- 15000.000 0.000 15000.000 10.000 0.000 -10.000
Carriage way DI Khan- Approved
Saraigumbel Section(AIIB)

199 Rehabilitation of Existing Un- 8000.000 0.000 8000.000 10.000 0.000 -10.000
Carriage way Rajanpur- DG Approved
Khan Section (AIID)
(In Million Rupees)
PSDP Project Name Approval Total Expenditure Throw- Allocation Proposed Adjustment
S# Status Cost Upto forward 2018-19 Allocation
June, 2018
200 Rehabilitation of Existing Un- 14000.000 0.000 14000.000 10.000 0.000 -10.000
Carriage way Sehwan- approved
Ratodero (AIIB) (200km)
201 Rehabilitation of Jhelum Un- 500.000 0.000 500.000 10.000 0.000 -10.000
Bridges approved
202 Rehabilitation of KKH Un- 8150.000 0.000 8150.000 800.000 0.000 -800.000
between Thakot-Raikot approved
section including Tatapani
bypass (CPEC)
204 Safer Measures @ Sahiwal Un- 1500.000 0.000 1500.000 50.000 0.000 -50.000
Bypass approved
205 Sanan - Aab-e-Gum Un- 2300.000 0.000 2300.000 10.000 0.000 -10.000
connecting road between approved
Sibbi and District Kachhi (41
km) (50:50 basis)
206 Shandoor-Chitral Road Un- 25000.000 0.000 25000.000 50.000 0.000 -50.000
(CPEC) Approved
207 Sialkot Cantt to Jassar Un- 2000.000 0.000 2000.000 10.000 0.000 -10.000
Garrison Approved
208 Study of Land slides in Un- 200.000 0.000 200.000 50.000 0.000 -50.000
Gilgit- Khunjrab Section of approved
N-35
209 Sukkur - Hyderabad Section Un- 175000.000 0.000 175000.000 10.000 0.000 -10.000
(296 km) Approved
214 Widening & Improvement of Un- 5000.000 0.000 5000.000 10.000 0.000 -10.000
Noukundi-Taftan Section approved

215 Zhob to Kuchlak Road Un- 52750.000 0.000 52750.000 10.000 0.000 -10.000
including Land Acquisition Approved
CPEC
Total (NHA): 952711.000 0.000 952711.000 4555.000 0.000 -4555.000
DEFENCE DIVISION
(In Million Rupees)
PSDP Project Name Approval Total Expenditure Throw- Allocation Proposed Adjustment
S# Status Cost Upto forward 2018-19 Allocation
June, 2018
221 Development of I.T Un- 59.980 0.000 59.980 20.000 0.000 -20.000
Infrastructure for Approved
Implementation of E-Office
Application Suite

DEFENCE PRODUCTION DIVISION


225 Feasibility Study for Un- 80.000 0.000 80.000 80.000 0.000 -80.000
Enhancement, Up-gradation Approved
and Augmentation / BMR of
Production Facilities at PAC
Kamra

FEDERAL EDUCATION & PROFESSIONAL TRAINING DIVISION


236 Establishment of 400 Un- 4000.000 0.000 4000.000 600.000 0.000 -600.000
Vocational Training Approved
Institutes (VTIs) in the
Country (50:50 sharing with
the Provinces)

238 National Best Teacher Un- 542.490 0.000 542.490 50.000 0.000 -50.000
Awards Approved
239 National Teachers Training Un- 500.000 0.000 500.000 100.000 0.000 -100.000
Institute approved
241 Standardization of National Un- 1000.000 0.000 1000.000 250.000 0.000 -250.000
Examination System in the Approved
Country
244 Women Polytechnic Un- 50.000 0.000 50.000 25.000 0.000 -25.000
Institute Pasrur (50:50 Cost Approved
sharing)
Total (Federal Education): 6092.490 0.000 6092.490 1025.000 0.000 -1025.000
FINANCE DIVISION
(In Million Rupees)
PSDP Project Name Approval Total Expenditure Throw- Allocation Proposed Adjustment
S# Status Cost Upto forward 2018-19 Allocation
June, 2018
275 Clearing, Aligning & Un- 4217.891 0.000 4217.891 500.000 0.000 -500.000
Reconstruction of Sariab Approved
Road, Quetta
277 Construction of Federal Un- 656.756 0.000 656.756 200.000 0.000 -200.000
Audit Complex, Mauve Approved
Area, Sector G-8/1,
Islamabad
278 Construction of Fish Un- 5000.000 0.000 5000.000 100.000 0.000 -100.000
Harbour on West Bay approved
Gwadar with Boat Building
Facilities (CPEC)
279 Construction of National Un- 2189.577 0.000 2189.577 200.000 0.000 -200.000
Academy of Public Finance Approved
and Accountancy
281 Construction of Northern Un- 3875.000 0.000 3875.000 100.000 0.000 -100.000
Bypass including Fencing approved
77.5 KM (CPEC)
282 Development of Sui Town Un- 300.000 0.000 300.000 150.000 0.000 -150.000
Approved
283 Digitalization of Pakistan Un- 40.000 0.000 40.000 10.000 0.000 -10.000
Economic Survey approved
285 GDA Package Un- 500.000 0.000 500.000 100.000 0.000 -100.000
Approved
288 Improvement and Widening Un- 3000.000 0.000 3000.000 100.000 0.000 -100.000
of Road from N-50 in Zer Approved
Khaki to Sherani HQ 67 KM

289 Modernization and Up- Un- 2700.000 0.000 2700.000 350.000 0.000 -350.000
gradation of Pakistan Mint, Approved
Lahore (Phase-II)
291 Nawa Killi Flyover, Quetta Un- 1372.958 0.000 1372.958 345.000 0.000 -345.000
Approved
(In Million Rupees)
PSDP Project Name Approval Total Expenditure Throw- Allocation Proposed Adjustment
S# Status Cost Upto forward 2018-19 Allocation
June, 2018
292 The Construction of Road Un- 325.000 0.000 325.000 50.000 0.000 -50.000
from Union Council Dak Approved
Distt. Noshki to Tehsil
Chagai Distt. Chagai
293 Up-gradation of Existing 50 Un- 9968.230 0.000 9968.230 100.000 0.000 -100.000
Bed Hospital to 300 Beds, approved
Gwadar (CPEC)
Total (Finance): 34145.412 0.000 34145.412 2305.000 0.000 -2305.000
FOREIGN AFFAIRS DIVISION
295 Consultancy Services for Un- 268.000 0.000 268.000 100.000 0.000 -100.000
State Guest House and Approved
Conference Centre,
Islamabad (PC-II)
296 Construction of State Guest Un- 10000.000 0.000 10000.000 70.000 0.000 -70.000
House and Conference Approved
Centre, Islamabad

297 Renovation of ISSI Building Un- 29.774 0.000 29.774 29.774 0.000 -29.774
Including Procurement & Approved
Installation of Lift / Elevator,
Islamabad

Total (Foreign Affairs): 10297.774 0.000 10297.774 199.774 0.000 -199.774


HIGHER EDUCATION COMMISSION
315 Establishment of Stem Cell Un- 400.000 0.000 400.000 70.000 0.000 -70.000
Centre for Animal Cardiac approved
Replacement Therapy
(SCCT), Sindh Agriculture
University, Tandojam
(In Million Rupees)
PSDP Project Name Approval Total Expenditure Throw- Allocation Proposed Adjustment
S# Status Cost Upto forward 2018-19 Allocation
June, 2018
391 Strengthening & Un- 600.000 0.000 600.000 60.000 0.000 -60.000
Development of Jinnah approved
Sindh Medical University,
Karachi
392 Strengthening of Center of Un- 350.000 0.000 350.000 55.000 0.000 -55.000
Excellence in Arts & Design approved
(CEAD), MUET Jamshoro

433 Construction of Un- 316.390 0.000 316.390 100.000 0.000 -100.000


Hostel/Sports Facilities at approved
Karakoram International
University (KIU)
434 Development of Academic Un- 750.000 0.000 750.000 40.000 0.000 -40.000
and Research Infrastructure approved
of University of Gwadar

435 Development of Campus Un- 154.435 0.000 154.435 30.887 0.000 -30.887
Management System approved
(CMS) with implementation
of Financial Management
System (FMS) and Human
Resource Management
System (HRMS) - HEC (E-
Campus)

436 Development of Main Un- 650.000 0.000 650.000 50.000 0.000 -50.000
Campus of Bacha Khan approved
University, Charsadda
(In Million Rupees)
PSDP Project Name Approval Total Expenditure Throw- Allocation Proposed Adjustment
S# Status Cost Upto forward 2018-19 Allocation
June, 2018
437 Development of Rawalpindi Un- 1534.160 0.000 1534.160 60.000 0.000 -60.000
Medical University (RMU), Approved
Rawalpindi

438 Development of University Un- 500.000 0.000 500.000 70.000 0.000 -70.000
of Sahiwal approved
439 Drug Addiction Preventive Un- 70.000 0.000 70.000 20.000 0.000 -20.000
Programme in Educational approved
Institutions (HEC)

440 Establishment of Agriculture Un- 500.000 0.000 500.000 70.000 0.000 -70.000
University, D.I Khan approved

441 Establishment of Baba Un- 650.000 0.000 650.000 50.000 0.000 -50.000
Gurunanak International approved
University at Nankana
Sahib (Cost Sharing with
Pakistan Evacuee Trust
Board)

442 Establishment of BUITEMS Un- 1554.234 0.000 1554.234 100.000 0.000 -100.000
sub campus at Qilla approved
Saifullaha, Muslim Bagh

443 Establishment of Center for Un- 600.000 0.000 600.000 50.000 0.000 -50.000
Inter Faith Harmony and approved
Cooperation of Civilization
at Kartarpur
444 Establishment of Center of Un- 400.000 0.000 400.000 40.000 0.000 -40.000
Water Resource in approved
Balochistan
(In Million Rupees)
PSDP Project Name Approval Total Expenditure Throw- Allocation Proposed Adjustment
S# Status Cost Upto forward 2018-19 Allocation
June, 2018
445 Establishment of Gandhara Un- 600.000 0.000 600.000 50.000 0.000 -50.000
University at Taxila (Cost approved
Sharing with Pakistan
Evacuee Trust Board)

446 Establishment of Institute of Un- 300.000 0.000 300.000 50.000 0.000 -50.000
Sufisim & Mysticism approved
447 Establishment of National Un- 350.000 0.000 350.000 50.000 0.000 -50.000
Center for Human Nutrition approved

448 Establishment of National Un- 1980.000 0.000 1980.000 80.000 0.000 -80.000
Institutes of Applied approved
Technologies and
Specialized Research
Centers to support CPEC
Initiatives

449 Establishment of National Un- 650.000 0.000 650.000 50.000 0.000 -50.000
University of Sports approved
450 Establishment of Pak-China Un- 1900.000 0.000 1900.000 80.000 0.000 -80.000
National Research Centre approved
on Earth Sciences at Quaid-
e-Azam University,
Islamabad (Chinese Share
100.0 million Yuan)

451 Establishment of PMU for Un- 464.804 0.000 464.804 50.000 0.000 -50.000
Implementation and approved
monitoring of PSDP
Initiatives at HEC and
capacity building of P&D
staff of public sector
universities
(In Million Rupees)
PSDP Project Name Approval Total Expenditure Throw- Allocation Proposed Adjustment
S# Status Cost Upto forward 2018-19 Allocation
June, 2018
452 Establishment of sub Un- 1000.000 0.000 1000.000 70.000 0.000 -70.000
campuses of Public Sector approved
Universities at District Level
(Phase-II)
453 Establishment of University Un- 650.000 0.000 650.000 60.000 0.000 -60.000
at Murree approved
454 Establishment of University Un- 500.000 0.000 500.000 50.000 0.000 -50.000
of Chitral approved
455 Establishment of University Un- 580.000 0.000 580.000 70.000 0.000 -70.000
of Khushab approved
456 Global Youth Leadership Un- 732.729 0.000 732.729 50.000 0.000 -50.000
internship programme approved
457 Infrastructure Development Un- 700.000 0.000 700.000 70.000 0.000 -70.000
at University of Science & approved
Technology, Bannu

458 Institute of Islamic Thought Un- 500.000 0.000 500.000 50.000 0.000 -50.000
and Understanding Approved

459 Karakuram International Un- 500.000 0.000 500.000 50.000 0.000 -50.000
University, Gilgit (Women Approved
Campus)
460 Livestock Sector Un- 2052.000 0.000 2052.000 70.000 0.000 -70.000
Development through approved
Capacity Building, Applied
Research and Technology
Transfer, University of
Veterinary & Animal
Sciences (UVAS)
(In Million Rupees)
PSDP Project Name Approval Total Expenditure Throw- Allocation Proposed Adjustment
S# Status Cost Upto forward 2018-19 Allocation
June, 2018
461 National Center for Un- 2000.000 0.000 2000.000 50.000 0.000 -50.000
Computitional Science and Approved
Engineering / Technology
Park UET Lahore Sub-
Campus

462 National Center for GIS and Un- 1000.000 0.000 1000.000 70.000 0.000 -70.000
Space Sciences Approved
463 National Center for Un- 1000.000 0.000 1000.000 70.000 0.000 -70.000
Nanotechnology Approved
464 Pakistan Academy of Social Un- 806.017 0.000 806.017 50.000 0.000 -50.000
Sciences approved
465 Pak-Russia Knowledge Un- 300.000 0.000 300.000 50.000 0.000 -50.000
Platform- HEC approved
466 Pak-UK Knowledge Un- 500.000 0.000 500.000 25.000 0.000 -25.000
Gateway- HEC approved
467 Prime Minister University Un- 777.593 0.000 777.593 100.000 0.000 -100.000
Olympics approved
468 Provision of Academic & Un- 2099.776 0.000 2099.776 100.000 0.000 -100.000
Research facilities, and approved
Girls Hostel at Quaid-e-
Azam University, Islamabad

469 Provision of accommodation Un- 7000.000 0.000 7000.000 200.000 0.000 -200.000
facilities for female students approved
in Public Sector Universities
(Umbrella Projects)

470 Provision of Transport Un- 500.000 0.000 500.000 50.000 0.000 -50.000
facilities to Female approved
Students of Public Sector
Universities ( Umbrella
Project)
(In Million Rupees)
PSDP Project Name Approval Total Expenditure Throw- Allocation Proposed Adjustment
S# Status Cost Upto forward 2018-19 Allocation
June, 2018
471 Shangla Campus of Un- 200.000 0.000 200.000 50.000 0.000 -50.000
University of Swat approved
472 Strengthening & Un- 500.000 0.000 500.000 70.000 0.000 -70.000
Development of Physical approved
and Technological
Infrastructure at the
University of Haripur

473 Training Programme for Un- 500.000 0.000 500.000 50.000 0.000 -50.000
Youth on New and approved
Emerging Technologies
(Artificial Intelligence Cyber
Security, Data Base, Cloud
Computing & Robotics)

475 Uplifting of Academic and Un- 1793.144 0.000 1793.144 80.000 0.000 -80.000
Infrastructure Facilities at approved
Hazara University,
Mansehra
Total (HEC): 41465.282 0.000 41465.282 2830.887 0.000 -2830.887
HOUSING & WORKS DIVISION
538 Oghi Tunnel Shortcut of Un- 200.000 0.000 200.000 100.000 0.000 -100.000
CPEC to Interchange Approved
Chattar Plane, Mansehra.
HUMAN RIGHTS DIVISION
545 Acquisition of Land and Un- 250.000 0.000 250.000 91.140 0.000 -91.140
Construction of Building for Approved
National Institute of Human
Rights, Islamabad
546 Construction of Working Un- 290.500 0.000 290.500 60.000 0.000 -60.000
Women Hostel, G-6/2 and Approved
G-7/3, Islamabad
(In Million Rupees)
PSDP Project Name Approval Total Expenditure Throw- Allocation Proposed Adjustment
S# Status Cost Upto forward 2018-19 Allocation
June, 2018
547 Institutional Strengthening Un- 58.500 0.000 58.500 47.360 0.000 -47.360
of Regional Directorates of Approved
Human Rights Lahore,
Karachi, Peshawar and
Quetta

Total (Human Rights): 599.000 0.000 599.000 198.500 0.000 -198.500


INDUSTRIES & PRODUCTION DIVISION
557 Dates Processing Plant at Un- 324.290 0.000 324.290 50.389 0.000 -50.389
Various Locations (Panjgur, Approved
Khairpur & Dhakki)

558 Development of National Un- 1152.090 0.000 1152.090 150.000 0.000 -150.000
Productivity Institutes in Approved
Pakistan
559 Industrial Designing & Un- 1280.000 0.000 1280.000 50.000 0.000 -50.000
Automation Centers Punjab, Approved
Khyber Pakhtunkhwa, Sindh
& Balochistan

560 Infrastructure Development Un- 5400.367 0.000 5400.367 50.000 0.000 -50.000
of Gwadar Export Approved
Processing Zone
561 Up-gradation of PMTF Un- 775.000 0.000 775.000 50.000 0.000 -50.000
Facilities and Design Approved
Centre, Karachi
Total (Industries): 8931.747 0.000 8931.747 350.389 0.000 -350.389
INFORMATION & BROADCASTING DIVISION
581 Establishment of Sautul Un- 138.689 0.000 138.689 40.000 0.000 -40.000
Quran FM Network Phase-II Approved
(In Million Rupees)
PSDP Project Name Approval Total Expenditure Throw- Allocation Proposed Adjustment
S# Status Cost Upto forward 2018-19 Allocation
June, 2018
582 Media Development/ Un- 30.000 0.000 30.000 15.000 0.000 -15.000
Implementation of Code of Approved
Conduct
583 PTV Parliamentarian Un- 331.000 0.000 331.000 331.000 0.000 -331.000
Channel Approved
584 PTV Terrestrial Digitalization Un- 2744.719 0.000 2744.719 34.000 0.000 -34.000
DTMB Demonstration Approved
Project through grant in aid

585 Rebroadcast Station, Kan Un- 111.376 0.000 111.376 111.376 0.000 -111.376
Mehterzai Balochistan Approved
586 Rebroadcast Station, Musa Un- 107.943 0.000 107.943 107.943 0.000 -107.943
Khel Balochistan Approved
587 Rebroadcast Station, Un- 112.318 0.000 112.318 112.318 0.000 -112.318
Muslim Bagh Balochistan Approved
589 Rebroadcast Station, Un- 107.554 0.000 107.554 26.000 0.000 -26.000
Shangla (Swat) (Khyber Approved
Pakhtunkhwa)
590 Rebroadcast Station, Un- 113.418 0.000 113.418 113.418 0.000 -113.418
Sherani Balochistan Approved
591 Replacement of Equipment Un- 156.035 0.000 156.035 30.000 0.000 -30.000
of Studio and Control Room Approved
of PTV Academy

592 Up-gradation of Monitoring Un- 196.728 0.000 196.728 12.400 0.000 -12.400
System up to 250 TV Approved
Channels
Total (I&B): 4149.780 0.000 4149.780 933.455 0.000 -933.455
INFORMATION TECHNOLOGY & TELECOM DIVISION
602 Establishment of QA Lab for Un- 58.650 0.000 58.650 29.325 0.000 -29.325
Software Products in PSEB Approved
(In Million Rupees)
PSDP Project Name Approval Total Expenditure Throw- Allocation Proposed Adjustment
S# Status Cost Upto forward 2018-19 Allocation
June, 2018
603 Expansion of Broadband Un- 740.000 0.000 740.000 100.000 0.000 -100.000
Internet Services (through Approved
MSAN Technology) in AJ&K
and Gilgit Baltistan
605 Implementation of PECA Un- 210.000 0.000 210.000 50.000 0.000 -50.000
2016 and S.R.O 904 (i) / Approved
2017 for DIRBS, AJK &
Gilgit Baltistan
606 Phase-II of Pak-China Un- 29000.000 0.000 29000.000 100.000 0.000 -100.000
Project for Establishment of Approved
Cross Border OFC Network
(Khunjrab-Gwadar-Karachi)
along CPEC Routes

607 Replacement of 15 Years Un- 59.000 0.000 59.000 25.000 0.000 -25.000
Old Redundant Outside Approved
Plant (OSP) in AJ&K
608 Replacement of 15 Years Un- 59.000 0.000 59.000 25.000 0.000 -25.000
Old Redundent Outside Approved
Plant (OSP) in Gilgit
Baltistan
Total (IT&TC): 30126.650 0.000 30126.650 329.325 0.000 -329.325
INTER PROVINCIAL COORDINATION DIVISION
619 Construction of 100 Un- 2500.000 0.000 2500.000 1000.000 0.000 -1000.000
Stadiums (50:50 Sharing Approved
with Provinces)
620 Construction of Football Un- 25.000 0.000 25.000 25.000 0.000 -25.000
Ground at Chaman Approved
621 Laying of Synthetic Hockey Un- 150.000 0.000 150.000 150.000 0.000 -150.000
Turf at PSC, Islamabad Approved
(In Million Rupees)
PSDP Project Name Approval Total Expenditure Throw- Allocation Proposed Adjustment
S# Status Cost Upto forward 2018-19 Allocation
June, 2018
622 Promotion of Sports Talent Un- 100.000 0.000 100.000 30.000 0.000 -30.000
and Regaining Pride Approved

623 Upgradation of Sports Un- 500.000 0.000 500.000 100.000 0.000 -100.000
Infrastructure (PSB) Approved
Total (IPC): 3275.000 0.000 3275.000 1305.000 0.000 -1305.000
INTERIOR DIVISION
665 Beautification of Islamabad Un- 350.000 0.000 350.000 150.000 0.000 -150.000
through Horticulture and Approved
Improvement of existing
parks and Play Grounds

670 Construction / Development Un- 954.935 0.000 954.935 250.000 0.000 -250.000
5th Pakistan Coast Guards Approved
Battalion Omara for CPEC.

671 Construction detention Un- 359.500 0.000 359.500 100.000 0.000 -100.000
Center, 2x 128 men Approved
Barracks, 2x Blocks of
Soldier Quarters at
Operational HQ in Wana FC
KP (South)

678 Construction of Un- 1388.055 0.000 1388.055 400.000 0.000 -400.000


Accommodation, Training Approved
and Administrative Blocks
and Barracks for the
Establishment of Rapid
Response Force for
Islamabad Capital Territory
Police Islamabad (Phase-II).
(In Million Rupees)
PSDP Project Name Approval Total Expenditure Throw- Allocation Proposed Adjustment
S# Status Cost Upto forward 2018-19 Allocation
June, 2018
679 Construction of Un- 133.305 0.000 133.305 133.305 0.000 -133.305
Administrative Camps in Approved
District Ghizar- GB Scouts,
Gilgit
683 Construction of FC Hospital Un- 1141.360 0.000 1141.360 450.000 0.000 -450.000
for Frontier Corps (South) Approved
Turbat HQ Frontier Corps
Balochistan (South)

684 Construction of FC Training Un- 465.450 0.000 465.450 232.725 0.000 -232.725
Center for FC (South) Approved
Khuzdar HQ Frontier Corps
Balochistan (South)

685 Construction of Frontier Un- 1961.273 0.000 1961.273 400.000 0.000 -400.000
Corps KP Hospital at Bara Approved
Road Peshawar
687 Construction of ICT Un- 879.000 0.000 879.000 400.000 0.000 -400.000
Administration Complex Approved
Phase-II
688 Construction of Un- 300.000 0.000 300.000 150.000 0.000 -150.000
Infrastructure for Sports and Approved
Revamping of Islamabad
Sports Board for the
Promotion of Sports &
Physical Education in ICT.

689 Construction of Judicial & Un- 537.800 0.000 537.800 150.000 0.000 -150.000
Administration Complex in Approved
Mauve Area, G-11/4,
Islamabad.
(In Million Rupees)
PSDP Project Name Approval Total Expenditure Throw- Allocation Proposed Adjustment
S# Status Cost Upto forward 2018-19 Allocation
June, 2018
690 Construction of Married Un- 226.172 0.000 226.172 113.086 0.000 -113.086
Accommodations for Approved
serving officers/troops of
HQ Pakistan Ranges
(Punjab) (24 x Cat-V, 16 x
Cat-IV House& 10 x Patient
Quarters & 9 x Married
Officer Quarters)

693 Construction of Officers' Un- 58.800 0.000 58.800 58.800 0.000 -58.800
(Offices / Residential Approved
Accommodation Turbat HQ
Frontier Corps Balochistan
(South)

696 Construction of Residential Un- 800.000 0.000 800.000 400.000 0.000 -400.000
Complex for Senior Officer Approved
of IOTA
699 Construction of Roads in Un- 1400.000 0.000 1400.000 400.000 0.000 -400.000
Rural Area of ICT, Approved
Islamabad.
705 Construction of Town Hall Un- 2500.000 0.000 2500.000 625.000 0.000 -625.000
MCI House and other Approved
related Infrastructure for
Metropolitan Corporation of
Islamabad.

707 Establishment of Anti Riot- Un- 8278.234 0.000 8278.234 1000.000 0.000 -1000.000
Force Consisting of 2388 Approved
Officers /Men and
Construction of
Accommodation for 2388
Officers/Men of ARF
(In Million Rupees)
PSDP Project Name Approval Total Expenditure Throw- Allocation Proposed Adjustment
S# Status Cost Upto forward 2018-19 Allocation
June, 2018
708 Establishment of Model Un- 1000.000 0.000 1000.000 200.000 0.000 -200.000
Police Station in ICT / Approved
Police Reforms (Phase-II)
714 Islamabad Bus Service Un- 2500.000 0.000 2500.000 500.000 0.000 -500.000
Project Approved
715 Islamabad Citizen Un- 150.000 0.000 150.000 50.000 0.000 -50.000
Facilitation and Automation Approved
of Services project

716 Islamabad Food Authority Un- 500.000 0.000 500.000 100.000 0.000 -100.000
Project Approved
717 Korang River & Rawal Lake Un- 2500.000 0.000 2500.000 400.000 0.000 -400.000
Water Treatment Plants Approved

719 Police Hospital, Islamabad Un- 2000.000 0.000 2000.000 1000.000 0.000 -1000.000
Approved
720 Project for Promotion of Un- 50.280 0.000 50.280 25.140 0.000 -25.140
Rain Water Harvesting Approved
Techniques in ICT
722 Purchase of Machinery & Un- 1000.000 0.000 1000.000 250.000 0.000 -250.000
equipment for Disaster Approved
Management System.
725 Street Pavement / Un- 1200.000 0.000 1200.000 500.000 0.000 -500.000
Sanitation in Rural Area of Approved
ICT, Islamabad.
726 Strengthening and Up- Un- 200.000 0.000 200.000 100.000 0.000 -100.000
gradation of Islamabad Approved
Zoo .
727 Strengthening of Frontier Un- 500.000 0.000 500.000 100.000 0.000 -100.000
Constabulary Approved
(In Million Rupees)
PSDP Project Name Approval Total Expenditure Throw- Allocation Proposed Adjustment
S# Status Cost Upto forward 2018-19 Allocation
June, 2018
728 Strengthening of Sewerage Un- 600.000 0.000 600.000 150.000 0.000 -150.000
Maintenance System of ICT Approved
through procurement of
Modern Machinery,
equipment and revamping
of old sewer line.

729 Strengthening of Union Un- 145.000 0.000 145.000 100.000 0.000 -100.000
Council by Construction of Approved
50 Union Council Offices
and related Infrastructure .

730 Sustainable Livelihood and Un- 57.200 0.000 57.200 28.776 0.000 -28.776
Food Security Through approved
Adoption of Agriculture
Technologies in ICT

731 Up-gradation / Improvement Un- 150.000 0.000 150.000 150.000 0.000 -150.000
of Mosques under Approved
Administration Auquaf
Deptt, ICT Islamabad.

732 Up-Gradation of Security Un- 63.785 0.000 63.785 63.785 0.000 -63.785
Infrastructure at 3 x Joint Approved
Check Posts at Wahga,
Ganda Singh Wala and
Sulemenki

734 Water Supply Scheme in Un- 600.000 0.000 600.000 250.000 0.000 -250.000
Rural Area of ICT, Approved
Islamabad.
(In Million Rupees)
PSDP Project Name Approval Total Expenditure Throw- Allocation Proposed Adjustment
S# Status Cost Upto forward 2018-19 Allocation
June, 2018
735 Water Supply System in Un- 530.000 0.000 530.000 150.000 0.000 -150.000
Forward Area of FC (South) Approved
D. I. Khan
Total (Interior): 35480.149 0.000 35480.149 9530.617 0.000 -9530.617
KASHMIR AFFAIRS & GILGIT BALTISTAN DIVISION
746 Improvement & Metalling of Un- 231.480 0.000 231.480 50.000 0.000 -50.000
Link Road Konkan Panjoor Approved
Gali (13 KM), District
Muzaffarabad

756 05 MW HPP Hassan Abad Un- 1580.000 0.000 1580.000 100.000 0.000 -100.000
Hunza Approved

761 Medical College Gilgit Un- 2700.000 0.000 2700.000 95.000 0.000 -95.000
Approved
763 Off Shore Development of Un- 500.000 0.000 500.000 100.000 0.000 -100.000
Attabad Lake at Hunza, Approved
District Hunza
Total (KA&GB): 5011.480 0.000 5011.480 345.000 0.000 -345.000
LAW & JUSTICE DIVISION
775 Construction of Camp Office Un- 161.017 0.000 161.017 29.811 0.000 -29.811
for Federal Shariat Court at Approved
Peshawar
776 Construction of Sessions Un- 400.000 0.000 400.000 75.000 0.000 -75.000
Division East of Islamabad Approved
High Court Islamabad

777 Construction of Supreme Un- 40.000 0.000 40.000 15.000 0.000 -15.000
Court of Pakistan Branch Approved
Registry Building at Karachi
(PC-II)
(In Million Rupees)
PSDP Project Name Approval Total Expenditure Throw- Allocation Proposed Adjustment
S# Status Cost Upto forward 2018-19 Allocation
June, 2018
778 Establishment of Planning Un- 40.000 0.000 40.000 10.000 0.000 -10.000
Monitoring & Evaluation Cell Approved
in Ministry of Law & Justice

779 Strengthening Federal Un- 39.600 0.000 39.600 10.000 0.000 -10.000
Insurance Ombudsman Approved
Secretariat
780 Acquisition of Land for Un- 100.000 0.000 100.000 25.000 0.000 -25.000
Construction of Federal Approved
Insurance Ombudsman
Secretariat at Karachi
Total (Law): 780.617 0.000 780.617 164.811 0.000 -164.811
MARITIME AFFAIRS DIVISION
791 Capital Dredging of Berthing Un- 2800.000 0.000 2800.000 100.000 0.000 -100.000
Areas & Channel for Approved
Additional Terminals
(CPEC)
792 Construction of Port Un- 60.000 0.000 60.000 60.000 0.000 -60.000
Boundary wall of KoFHA, Approved
Karachi, Sindh
793 Construction/ Renovation/ Un- 19.853 0.000 19.853 19.853 0.000 -19.853
rehabilitation of Seamen’s Approved
hostel at Keamari (PMA city
Campus)
796 Land Acquisition as per Un- 16000.000 0.000 16000.000 895.853 0.000 -895.853
Gwadar Port Master Plan Approved
797 Oil Storage construction at Un- 3500.000 0.000 3500.000 702.025 0.000 -702.025
oil installation area (OIA), Approved
Keamari, Karachi
(In Million Rupees)
PSDP Project Name Approval Total Expenditure Throw- Allocation Proposed Adjustment
S# Status Cost Upto forward 2018-19 Allocation
June, 2018
798 Rehabilitation of Admin Un- 59.566 0.000 59.566 59.566 0.000 -59.566
Block, Cadet Block/ Approved
Residence block,
Auditorium, Quarter deck,
officer Mess in Premises of
PMA

799 Repair of Jetty Structure & Un- 60.000 0.000 60.000 60.000 0.000 -60.000
Ports Installations of Approved
KoFHA, Karachi, Sindh
Total (Maritime): 22499.419 0.000 22499.419 1897.297 0.000 -1897.297
NARCOTICS CONTROL DIVISION
805 Acquisition of Land for ANF Un- 10.712 0.000 10.712 10.712 0.000 -10.712
Setup at Jiwani & Gwadar Approved

806 Acquisition of Land for Un- 20.080 0.000 20.080 20.080 0.000 -20.080
Construction of ANF RD Approved
Punjab Complex
807 Construction of Model Un- 220.000 0.000 220.000 20.000 0.000 -20.000
Addiction Treatment & Approved
Rehabilitation Centre
(MATRC), Islamabad
808 Khyber Area Development Un- 550.000 0.000 550.000 30.955 0.000 -30.955
Project (Phase-II) Approved

Total (Narcotics Control): 800.792 0.000 800.792 81.747 0.000 -81.747


NATIONAL FOOD SECURITY & RESEARCH DIVISION
826 Agriculture Information Un- 100.000 0.000 100.000 30.000 0.000 -30.000
Portal Approved
(In Million Rupees)
PSDP Project Name Approval Total Expenditure Throw- Allocation Proposed Adjustment
S# Status Cost Upto forward 2018-19 Allocation
June, 2018
827 Better Cotton Initiatives Un- 300.000 0.000 300.000 127.000 0.000 -127.000
(BCI) for Sustainable Cotton Approved
production in Pakistan

828 Commercialization of Tissue Un- 1255.000 0.000 1255.000 100.000 0.000 -100.000
Culture Technology in Approved
Pakistan
830 ECO Water Institute Un- 50.000 0.000 50.000 10.000 0.000 -10.000
Approved
831 Establishment of Service Un- 390.000 0.000 390.000 50.000 0.000 -50.000
Center for Fish Farming Approved
Clusters
832 Ensuring Supply of Good Un- 446.751 0.000 446.751 48.000 0.000 -48.000
Quality Milk in Islamabad Approved
833 National Residue Control Un- 25.000 0.000 25.000 25.000 0.000 -25.000
Plan for Aquaculture Approved
Products (Study)
834 Promoting Research for Un- 1448.035 0.000 1448.035 100.000 0.000 -100.000
Productivity Enhancement Approved
in Pulses
Total (NFS&R): 4014.786 0.000 4014.786 490.000 0.000 -490.000
NATIONAL HEALTH SERVICES, REGULATIONS & COORDINATION DIVISION
855 Childhood Disabilities: A Un- 25.750 0.000 25.750 25.750 0.000 -25.750
Population Based Survey Approved
857 Establishment of Un- 6.000 0.000 6.000 6.000 0.000 -6.000
Bioequivalence/Bio Approved
availability Centre, at
National Institute of Health
Islamabad (PC-II)
858 Establishment of National Un- 80.000 0.000 80.000 12.000 0.000 -12.000
Institutional Review Boards, Approved
Registry
(In Million Rupees)
PSDP Project Name Approval Total Expenditure Throw- Allocation Proposed Adjustment
S# Status Cost Upto forward 2018-19 Allocation
June, 2018
860 Facility Based Births: Un- 35.500 0.000 35.500 15.500 0.000 -15.500
Mortality and Postpartum Approved
Quality of Life
861 Maternal, Neonatal and Un- 544.884 0.000 544.884 104.000 0.000 -104.000
Child Health Programme approved
(MNCH) FATA
862 Mother & Child Non- Un- 545.000 0.000 545.000 81.750 0.000 -81.750
Communicable Diseases Approved
863 National Preventive Health Un- 2000.000 0.000 2000.000 200.000 0.000 -200.000
Program Approved
865 Pakistan Nutrition Un- 248.045 0.000 248.045 108.872 0.000 -108.872
Programme Approved
868 Program for Family Un- 660.123 0.000 660.123 282.500 0.000 -282.500
Planning & Primary Health approved
Care FATA
869 Program for Family Un- 59.750 0.000 59.750 59.750 0.000 -59.750
Planning & Primary Health approved
Care GB
870 Program for Prevention & Un- 549.515 0.000 549.515 20.520 0.000 -20.520
Control of Hepatitis, AJK Approved
871 Program for Prevention & Un- 59.750 0.000 59.750 17.100 0.000 -17.100
Control of Hepatitis, FATA Approved
872 Program for Prevention & Un- 59.750 0.000 59.750 19.000 0.000 -19.000
Control of Hepatitis, Gilgit Approved
Baltistan
873 Program for Prevention and Un- 76.943 0.000 76.943 8.818 0.000 -8.818
Control of Avian Pandemic approved
Influenza AJK
874 Program for Prevention and Un- 50.000 0.000 50.000 0.922 0.000 -0.922
Control of Avian Pandemic approved
Influenza FATA
(In Million Rupees)
PSDP Project Name Approval Total Expenditure Throw- Allocation Proposed Adjustment
S# Status Cost Upto forward 2018-19 Allocation
June, 2018
875 Program for Prevention and Un- 50.000 0.000 50.000 0.922 0.000 -0.922
Control of Avian Pandemic approved
Influenza GB
876 Programme for Prevention Un- 80.558 0.000 80.558 7.410 0.000 -7.410
and Control of Blindness Approved
AJK
877 Programme for Prevention Un- 47.544 0.000 47.544 6.175 0.000 -6.175
and Control of Blindness Approved
FATA
878 Programme for Prevention Un- 18.525 0.000 18.525 6.210 0.000 -6.210
and Control of Blindness Approved
GB
879 Roll Back Malaria Control Un- 141.443 0.000 141.443 24.508 0.000 -24.508
Programme AJK Approved
880 Roll Back Malaria Control Un- 50.000 0.000 50.000 3.100 0.000 -3.100
Programme FATA Approved
881 Roll Back Malaria Control Un- 50.000 0.000 50.000 3.100 0.000 -3.100
Programme GB Approved
882 Special Initiatives in Health Un- 11500.000 0.000 11500.000 11500.000 0.000 -11500.000
Approved
884 Strengthening of Technical Un- 335.723 0.000 335.723 160.566 0.000 -160.566
Capacity of M/o National Approved
Health Services,
Regulations & Coordination.

885 TB Control Programme AJK Un- 284.467 0.000 284.467 3.720 0.000 -3.720
Approved
886 TB Control Programme Un- 9.300 0.000 9.300 3.100 0.000 -3.100
FATA Approved
887 TB Control Programme GB Un- 9.300 0.000 9.300 3.100 0.000 -3.100
Approved
(In Million Rupees)
PSDP Project Name Approval Total Expenditure Throw- Allocation Proposed Adjustment
S# Status Cost Upto forward 2018-19 Allocation
June, 2018
888 Treatment of Poor Cancer Un- 210.217 0.000 210.217 58.821 0.000 -58.821
Patients of ICT, AJK & Gilgit Approved
Baltistan
889 Up-gadation of Durgs Un- 3.000 0.000 3.000 3.000 0.000 -3.000
Testing facilities in Drugs Approved
Control and Traditional
Medicines Division NIH,
Islamabad (PC-II)

890 Up-Gradation of Laboratory Un- 49.500 0.000 49.500 25.000 0.000 -25.000
Animal Facility at NIH, Approved
Islamabad
891 Up-Gradation of Stable at Un- 49.702 0.000 49.702 25.500 0.000 -25.500
NIH, Islamabad Approved
Total (NHSR&C): 17890.289 0.000 17890.289 12796.714 0.000 -12796.714
NATIONAL HISTORY & LITERARY HERITAGE DIVISION
898 Construction of Regional Un- 100.000 0.000 100.000 30.000 0.000 -30.000
Office of Pakistan Academy Approved
of Letters, Dadu

899 Construction of Regional Un- 100.000 0.000 100.000 30.000 0.000 -30.000
Office of Pakistan Academy Approved
of Letters, FATA

900 Construction of Regional Un- 100.000 0.000 100.000 30.000 0.000 -30.000
Office of Pakistan Academy Approved
of Letters, Gilgit
(In Million Rupees)
PSDP Project Name Approval Total Expenditure Throw- Allocation Proposed Adjustment
S# Status Cost Upto forward 2018-19 Allocation
June, 2018
901 Construction of Regional Un- 100.000 0.000 100.000 30.000 0.000 -30.000
Office of Pakistan Academy Approved
of Letters, Muzaffarabad

902 Faiz Ahmad Faiz Cultural & Un- 600.000 0.000 600.000 250.000 0.000 -250.000
Arts Complex, Kala Qadir Approved

Total (NH&LH)): 1000.000 0.000 1000.000 370.000 0.000 -370.000


PAKISTAN ATOMIC ENERGY COMMISSION
931 ISL Mining Project kaleri Un- 2346.886 0.000 2346.886 100.000 0.000 -100.000
Approved
932 Kashmir Institute of Nuclear Un- 2000.000 0.000 2000.000 50.000 0.000 -50.000
Medicine Oncology and Approved
Radiotherapy (KINOR)

933 Pakistan Research Reactor- Un- 4000.000 0.000 4000.000 200.000 0.000 -200.000
3 (10MWth upgradeable to Approved
20 MWth)
934 Pre-project Studies and Un- 2669.590 0.000 2669.590 150.000 0.000 -150.000
Development for Nuclear Approved
Power Projects
935 Up-gradation of Diagnostic Un- 1375.000 0.000 1375.000 300.000 0.000 -300.000
& Therapeutic Facilities at Approved
BINO, Bahawalpur

936 Up-gradation of KIRAN, Un- 2000.000 0.000 2000.000 415.350 0.000 -415.350
Karachi Approved
937 Upgradation of NIBGE Un- 450.000 0.000 450.000 110.000 0.000 -110.000
Approved
Total (PAEC)): 14841.476 0.000 14841.476 1325.350 0.000 -1325.350
(In Million Rupees)
PSDP Project Name Approval Total Expenditure Throw- Allocation Proposed Adjustment
S# Status Cost Upto forward 2018-19 Allocation
June, 2018

PETROLEUM DIVISION
945 Expansion and Up- Un- 424.439 0.000 424.439 100.000 0.000 -100.000
gradation of Pakistan Approved
Petroleum Corehouse
(PETCORE) for its
Sustainable Operations to
Facilitate Oil & Gas
Exploration Research in
Pakistan

946 Geological Mapping of 50 Un- 58.788 0.000 58.788 10.000 0.000 -10.000
Toposheets out of 354 Approved
Unmapped Toposheets of
Outcrop Area of Balochistan
Province

947 Strengthening and Up- Un- 457.766 0.000 457.766 220.000 0.000 -220.000
gradation of Karachi Approved
Laboratories Complex
(KLC) at HDIP Operations
Office, Karachi

948 Up-gradation of Chemical Un- 380.000 0.000 380.000 100.000 0.000 -100.000
and Petrology-Mineralogy Approved
Labs at Geological Survey
of Pakistan Southern Zone
Karachi

949 Up-gradation of HDIP's POL Un- 437.470 0.000 437.470 50.000 0.000 -50.000
Testing Facilities at Approved
Islamabad, Lahore, Multan,
Peshawar, Quetta and ISO
Certification of Petroleum
Testing Laboratory at
Islamabad
(In Million Rupees)
PSDP Project Name Approval Total Expenditure Throw- Allocation Proposed Adjustment
S# Status Cost Upto forward 2018-19 Allocation
June, 2018
Total (Petroleum)): 1758.463 0.000 1758.463 480.000 0.000 -480.000
PLANNING, DEVELOPMENT & REFORM DIVISION
973 Capacity Building of Officers Un- 782.153 0.000 782.153 150.000 0.000 -150.000
of Economist Group Approved

974 Capacity Enhancement of Un- 250.000 0.000 250.000 50.000 0.000 -50.000
Mid and Senior Civil Approved
Servants
975 CPEC Institute, Gwadar Un- 1000.000 0.000 1000.000 300.000 0.000 -300.000
Approved
977 Nutrition Awareness and Un- 1200.000 0.000 1200.000 150.000 0.000 -150.000
Institutional Strengthening Approved
Programme
978 Pak-China Year of Friendly Un- 381.000 0.000 381.000 100.000 0.000 -100.000
Exchanges Programme Approved
(CPEC)
979 Pakistan Institute of Un- 3000.000 0.000 3000.000 500.000 0.000 -500.000
Development Economics, Approved
Islamabad - Construction of
New Campus
982 Pakistan Talent Bank Un- 300.000 0.000 300.000 100.000 0.000 -100.000
Approved
984 Startup Pakistan Venture Un- 2000.000 0.000 2000.000 1000.000 0.000 -1000.000
Approved
Total (PD&R): 8913.153 0.000 8913.153 2350.000 0.000 -2350.000
POSTAL SERVICES DIVISION
988 Construction of International Un- 79.039 0.000 79.039 40.000 0.000 -40.000
Mail Office at Gwadar Approved
(In Million Rupees)
PSDP Project Name Approval Total Expenditure Throw- Allocation Proposed Adjustment
S# Status Cost Upto forward 2018-19 Allocation
June, 2018
989 Construction of International Un- 189.035 0.000 189.035 50.000 0.000 -50.000
Standard Mail Facilitation Approved
Centre at Golra More,
Rawalpindi
990 Construction of International Un- 334.039 0.000 334.039 80.000 0.000 -80.000
Mail Office at Karachi Approved

991 Rebranding / Renovation of Un- 828.000 0.000 828.000 200.000 0.000 -200.000
485 Post Offices All over the Approved
Country
Total (Postal Services): 1430.113 0.000 1430.113 370.000 0.000 -370.000
RAILWAYS DIVISION
1021 Acquisition of Land for Un- 10711.000 0.000 10711.000 400.000 0.000 -400.000
Gwadar Connectivity Approved
1023 Feasibility Study (PC-II) for Un- 474.000 0.000 474.000 1.000 0.000 -1.000
Construction of New Rail Approved
Link from Havelian to Pak
China Border (682 K.M)
(CPEC)

1024 Procurement of Track Un- 6000.000 0.000 6000.000 300.000 0.000 -300.000
Machines Commensurating Approved
with Modern Practices
(Phase-1)

1025 Pakistan Railways Strategic Un- 60.000 0.000 60.000 15.000 0.000 -15.000
Plan (PRSP) Support Approved
Project at Ministry of
Railways and Pakistan
Railways
(In Million Rupees)
PSDP Project Name Approval Total Expenditure Throw- Allocation Proposed Adjustment
S# Status Cost Upto forward 2018-19 Allocation
June, 2018
1026 Procurement of Equipments Un- 800.000 0.000 800.000 200.000 0.000 -200.000
for Maintenance of Rolling Approved
Stock at Risalpur Loco
Factory

1027 Installation of Escalators Un- 900.000 0.000 900.000 225.000 0.000 -225.000
and Elevators / Lifts on Approved
Important Railway Stations

1028 Up-gradation of Un- 350.000 0.000 350.000 86.517 0.000 -86.517


Maintenance Facility (Steel Approved
Shop), Pakistan Railways

1029 Up-gradation of Pakistan Un- 380800.000 0.000 380800.000 5000.000 0.000 -5000.000
Railway's existing Mainline- Approved
1 (ML-I) and establishment
of Dry port near Havelian
(2018-22) Phase-1 (CPEC)

1030 Up-gradation of Relief Un- 1890.000 0.000 1890.000 472.500 0.000 -472.500
Trains including Rolling Approved
Stock & Equipment (160
Kph).
Total (Railways): 401985.000 0.000 401985.000 6700.017 0.000 -6700.017
REVENUE DIVISION
(In Million Rupees)
PSDP Project Name Approval Total Expenditure Throw- Allocation Proposed Adjustment
S# Status Cost Upto forward 2018-19 Allocation
June, 2018
1044 Construction of Customs Un- 250.000 0.000 250.000 75.000 0.000 -75.000
Complex at SOST- Approved
involving:
a) Sepoy Barracks
b) E-Facilitation Centre
c) Transit Accomodation
and Customs Forensic
Laboratory

1046 Construction of MCC and Un- 400.000 0.000 400.000 100.000 0.000 -100.000
Directorate of Transit Trade Approved
at Gilgit for CPEC Trade
Facilitation
1049 Construction of Office of Un- 400.000 0.000 400.000 100.000 0.000 -100.000
Intelligence & Investigation Approved
(IRS) Karachi

1050 Construction of Regional Un- 400.000 0.000 400.000 100.000 0.000 -100.000
Tax Office Sargodha Approved
1053 Construction of Zonal Office Un- 200.000 0.000 200.000 100.000 0.000 -100.000
and Transit Accommodation Approved
at Gwadar

1054 Establishment of Custom Un- 200.000 0.000 200.000 50.000 0.000 -50.000
House on Pak-Iran Border Approved
Point 250-GUBD Near
Gwadar
1056 Purchase of Additional Land Un- 58.000 0.000 58.000 30.000 0.000 -30.000
for FBR (HQ) at Islamabad Approved
(In Million Rupees)
PSDP Project Name Approval Total Expenditure Throw- Allocation Proposed Adjustment
S# Status Cost Upto forward 2018-19 Allocation
June, 2018
1058 Purchase of Land for Un- 400.000 0.000 400.000 100.000 0.000 -100.000
Customs Check Post and Approved
Trade Facilitation Centre
along CPEC Route

1059 Purchase of land for FBR Un- 57.000 0.000 57.000 30.000 0.000 -30.000
Complex at Lasbela Approved
Industrial Estate
1060 Purchase of land for FBR Un- 100.000 0.000 100.000 25.000 0.000 -25.000
Hostel at Islamabad Approved
1062 Replacement of five lifts in Un- 54.000 0.000 54.000 25.000 0.000 -25.000
RTO Karachi Approved
Total (Revenue): 2519.000 0.000 2519.000 735.000 0.000 -735.000
SCIENCE & TECHNOLOGICAL RESEARCH DIVISION
1083 Accreditation of NUST Un- 56.650 0.000 56.650 7.437 0.000 -7.437
Laboratories in Accordance Approved
with ISO Standards

1084 National University of Un- 3000.000 0.000 3000.000 1500.000 0.000 -1500.000
Technology (NUTECH) Approved
1086 Establishment of Model Un- 500.000 0.000 500.000 200.000 0.000 -200.000
Science School Ghaziwal approved
1087 Establishment of PAK- Un- 913.230 0.000 913.230 30.505 0.000 -30.505
KOREA Testing Facility for Approved
Solar & Allied Equipment,
PCRET
1089 Rehabilitation of Karezes for Un- 59.770 0.000 59.770 10.000 0.000 -10.000
Sustainable Groundwater Approved
Management and Livelihood
Improvements in
Balochistan, PCRWR
(In Million Rupees)
PSDP Project Name Approval Total Expenditure Throw- Allocation Proposed Adjustment
S# Status Cost Upto forward 2018-19 Allocation
June, 2018
1090 Strengthening and Up Un- 59.542 0.000 59.542 10.000 0.000 -10.000
gradation of Research and Approved
Development Activities at
NUST
1091 Strengthening of Pakistan Un- 50.000 0.000 50.000 10.000 0.000 -10.000
National Accredation Approved
Council for Digital
Accredation
1093 Up gradation of Medicinal Un- 136.000 0.000 136.000 30.000 0.000 -30.000
Botanic Center as National Approved
Center for Herbal Medicine,
PCSIR Labs. Complex,
Peshawar

Total (S&T): 4775.192 0.000 4775.192 1797.942 0.000 -1797.942


STATES & FRONTIER REGIONS DIVISION
1107 Bosaq Hydropower Project Un- 5000.000 0.000 5000.000 500.000 0.000 -500.000
Bajaur Agency Approved
STATISTICS DIVISION
1109 Development of Computer Un- 217.000 0.000 217.000 45.000 0.000 -45.000
Assisted Personal Approved
Interviewing System for All
Surveys / Censuses of PBS

1110 GIS Automation and Un- 100.000 0.000 100.000 23.000 0.000 -23.000
Capacity Building PBS Approved
Offices
Total (Statistics): 317.000 0.000 317.000 68.000 0.000 -68.000
SU PAR C O
(In Million Rupees)
PSDP Project Name Approval Total Expenditure Throw- Allocation Proposed Adjustment
S# Status Cost Upto forward 2018-19 Allocation
June, 2018
1112 Establishment of Space Un- 665.619 0.000 665.619 200.000 0.000 -200.000
Applications Research Approved
Centre Gilgit-Baltistan
9SPARC-GB)

1113 Pakistan Multi-Mission Un- 27578.655 0.000 27578.655 1350.000 0.000 -1350.000
Satellite (PakSat-MMI), Approved
Lahore & Karachi

1114 Pakistan Space Center Un- 26913.047 0.000 26913.047 1000.000 0.000 -1000.000
(PSC), Islamabad, Lahore & Approved
Karachi (China)
Total (SUPARCO): 55157.321 0.000 55157.321 2550.000 0.000 -2550.000
TEXTILE INDUSTRY DIVISION
1117 Faisalabad Garment City Un- 889.000 0.000 889.000 50.000 0.000 -50.000
(Phase-II) Approved

1118 Standardization System or Un- 58.437 0.000 58.437 58.437 0.000 -58.437
the Production of High Approved
Quality Standardization
Clean Cotton
Total (Textile): 947.437 0.000 947.437 108.437 0.000 -108.437
POWER DIVISION
1166 132-KV T/Line from Golan Un- 3446.972 0.000 3446.972 200.000 0.000 -200.000
Gol Project & Grid Station Approved
for Provision of Electricity.
For Area Distt. Chitral (New
Electrification Works at
Different Valleys of District
Chitral)

1168 500-KV Lahore, North. Un- 15592.500 0.000 15592.500 100.000 0.000 -100.000
Approved
(In Million Rupees)
PSDP Project Name Approval Total Expenditure Throw- Allocation Proposed Adjustment
S# Status Cost Upto forward 2018-19 Allocation
June, 2018
1170 Construction of 132KV grid Un- 471.500 0.000 471.500 100.000 0.000 -100.000
station at Sunny & 132KV Approved
SDT Bhag –Sunny T/Line
(QESCO)
1171 Construction of 132-KV Un- 761.084 0.000 761.084 100.000 0.000 -100.000
Mashkay G/S with Allied Approved
132-KV Nal- Mashkay
T/Line.
1172 Construction of 33kV S/S Un- 84.430 0.000 84.430 84.430 0.000 -84.430
and 26 KM HT Line from Approved
132kV Grid Station Loralai
to Do-sarka District Loralai
(QESCO)

1175 Electrification of Different Un- 344.770 0.000 344.770 100.000 0.000 -100.000
Union Councils, Killa Approved
Abdullah
1176 Electrification of Various Un- 500.000 0.000 500.000 125.000 0.000 -125.000
Villages at District Nausharo Approved
Feroze
1177 Establishment of 132 KV Un- 1795.045 0.000 1795.045 300.000 0.000 -300.000
Grid System alongwith Approved
upgradation of existing 33
KV Grid System to 132 kV
in District Chitral

1178 Establishment of Program Un- 2112.000 0.000 2112.000 100.000 0.000 -100.000
Management office (PMO) Approved
in Ministry of Water and
Power for Energy Efficiency
Program
(In Million Rupees)
PSDP Project Name Approval Total Expenditure Throw- Allocation Proposed Adjustment
S# Status Cost Upto forward 2018-19 Allocation
June, 2018
1179 Evacuation of Power from Un- 72645.000 0.000 72645.000 200.000 0.000 -200.000
2160MW Dasu HPP Stage- approved
I.
1180 Evacuation of Power from Un- 5330.000 0.000 5330.000 100.000 0.000 -100.000
Tarbela 5th Extension. Approved
Total (Power): 103083.301 0.000 103083.301 1509.430 0.000 -1509.430
WATER RESOURCES DIVISION
1263 Burj Aziz Dam Un- 200.000 0.000 200.000 30.000 0.000 -30.000
approved
1264 Construction of Feeding Un- 15000.000 0.000 15000.000 100.000 0.000 -100.000
Canal to Manchar Lake to approved
Eradicate Contamination
1269 CRBC 1st lift cum Gravity Un- 119600.000 0.000 119600.000 100.000 0.000 -100.000
Project D.I. Khan approved
1270 Detail Engineering Design & Un- 305.271 0.000 305.271 30.000 0.000 -30.000
Tender Documents & PC-I approved
for Badin Zai Dam Project
District Zhob
1271 Detailed Engineering Un- 249.437 0.000 249.437 50.000 0.000 -50.000
Design & Tender approved
Documents for Tank Zam
Dam Project
1273 Extension of Pat feeder Un- 1500.000 0.000 1500.000 50.000 0.000 -50.000
Canal for utilization of Indus approved
Water in Balochistan
(Package-III)
1275 Flood Protection Marginal Un- 2081.550 0.000 2081.550 100.000 0.000 -100.000
Bund D. I Khan approved
1276 Land and Water Un- 496.275 0.000 496.275 50.000 0.000 -50.000
Monitoring/Evaluation of approved
Indus Plains by SMO
(In Million Rupees)
PSDP Project Name Approval Total Expenditure Throw- Allocation Proposed Adjustment
S# Status Cost Upto forward 2018-19 Allocation
June, 2018
1277 Lining of K.B Feeder Upper Un- 20000.000 0.000 20000.000 100.000 0.000 -100.000
Canal for Water Supply to approved
Karachi City
1278 National Flood Protection Un- 332246.000 0.000 332246.000 100.000 0.000 -100.000
Plan-IV approved
1280 Rehabilitation and Un- 16163.295 0.000 16163.295 100.000 0.000 -100.000
Modernization of Sukkur approved
Barrage (90% WB, 10%
federal)
1282 Strengthening the technical Un- 635.360 0.000 635.360 50.000 0.000 -50.000
capacity of office of PCIW approved

1283 Sukleji Dam Project Un- 313.077 0.000 313.077 50.000 0.000 -50.000
approved
1284 Winder Dam Un- 1695.770 0.000 1695.770 196.128 0.000 -196.128
approved
Total (Water): 510486.035 0.000 510486.035 1106.128 0.000 -1106.128
Grand Total: 2407126.970 0.000 2407126.970 64275.748 0.000 -64275.748
363
Un- Approved Projects

Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks

You might also like