132/11 kV GIS Grid Station at DHA Phase X-II (EME Sector)

Barbending Schedule (CAT-05)Ground Floor Slab


Ground Floor Slab Bottom Reinforcement (01 No)
No.
Sr. Slab Spread Bar Cut Spread
Bar Name Length Bend-1 Bend-2 Spacing of Weightage Weight in Kg Figure
No. No. Area # Length Length
Bars
Bed Rm (C-E)
1 1 Dbl Hook 1-3 3 4150 100 100 4350 - Below 1 0.000541 2.35335 100 4150 100

1-A 1 Bed Rm (C-E) 1-3 3 4150 0 100 4250 200 3360 17 0.000541 39.08725 100 4150 0

2 1 Bed Rm (1-3) C-E 3 3820 0 100 3920 200 3690 19 0.000541 40.29368 100 3820 0

3 2 Bed Rm (A-C) 2-4 3 3570 0 100 3670 200 4460 23 0.000541 45.66581 100 3570 0

4 2 Bed Rm (2-4) A-C 3 4920 0 100 5020 200 3110 17 0.000541 46.16894 100 4920 0

5 3 Kitchen (D-F) 3-5 3 3570 0 100 3670 200 2460 13 0.000541 25.81111 100 3570 0

6 3 Kitchen (3-5) D-F 3 2920 0 0 2920 200 2330 13 0.000541 20.53636 0 2920 0

14 3 Kitchen (3-5) D-F 3 3150 0 100 3250 200 780 4 0.000541 7.033 100 3150 0

7 4 Corridor (B-D) 3-5 3 3150 0 0 3150 200 2460 13 0.000541 22.15395 0 3150 0

8 4 Corridor (3-5) B-D 3 2920 0 100 3020 200 2690 14 0.000541 22.87348 100 2920 0

9 5 Bath (A-B) 4-5 3 2220 100 100 2420 200 1060 6 0.000541 7.85532 100 2220 100

10 5 Bath (4-5) A-B 3 1520 100 100 1720 200 1760 10 0.000541 9.3052 100 1520 100

11 6 Entry Lobby (C-F)


5-6 3 4700 300 100 5100 200 2060 11 0.000541 30.3501 100 4700 300

12 6 Entry Lobby (5-6)


C-F 3 2520 0 0 2520 200 4360 23 0.000541 31.35636 0 2520 0

13 7 Kitchen (D-F) 6-8 3 3570 0 100 3670 200 2460 13 0.000541 25.81111 100 3570 0

14 7 Kitchen (6-8) D-F 3 2920 0 0 2920 200 2330 13 0.000541 20.53636 0 2920 0

14-A 7 Kitchen (6-8) D-F 3 3150 100 0 3250 200 780 4 0.000541 7.033 0 3150 100

15 8 Corridor (B-D) 6-8 3 3150 0 0 3150 200 2460 13 0.000541 22.15395 0 3150 0

16 8 Corridor (6-8) (B-D) 3 2920 0 100 3020 200 2690 14 0.000541 22.87348 100 2920 0

17 9 Bath (A-B) 6-7 3 2220 100 100 2420 200 1060 6 0.000541 7.85532 100 2220 100

18 9 Bath (6-7) A-B 3 1520 100 100 1720 200 1760 10 0.000541 9.3052 100 1520 100
Bed Rm (C-E)
19-A 10 Dbl Hook 1-3 3 4150 100 100 4350 - Below 1 0.000541 2.35335 100 4150 100

19 10 Bed Rm (C-E) 8-10 3 4150 100 0 4250 200 3360 17 0.000541 39.08725 0 4150 100

20 10 Bed Rm (8-10) C-E 3 3820 100 0 3920 200 3690 19 0.000541 40.29368 0 3820 100

21 11 Bed Rm (A-C) 7-9 3 3570 0 100 3670 200 4460 23 0.000541 45.66581 100 3570 0

22 11 Bed Rm (7-9) A-C 3 4920 0 100 5020 200 3110 17 0.000541 46.16894 100 4920 0
Ground Floor Slab Top Reinforcement
23 At A 2-4 3 1010 0 100 1110 200 4460 23 0.000541 13.81173 100 1010 0

24 At A 7-9 3 1010 0 100 1110 200 4460 23 0.000541 13.81173 100 1010 0

25 At B 4-5 3 910 0 250 1160 200 1060 6 0.000541 3.76536 250 910 0

26 At B 6-7 3 910 0 250 1160 200 1060 6 0.000541 3.76536 250 910 0

27 At C 2-3 4 1980 0 0 1980 200 3310 18 0.000983 35.03412 0 1980 0

28 At C 3-4 4 3440 0 0 3440 200 1400 7 0.000983 23.67064 0 3440 0

29 At C 7-8 4 3440 0 0 3440 200 1400 7 0.000983 23.67064 0 3440 0

30 At C 8-9 4 1980 0 0 1980 200 3310 18 0.000983 35.03412 0 1980 0

31 At D 4-5 3 1730 0 0 1730 200 1080 5 0.000541 4.67965 0 1730 0

32 At D 6-7 3 1730 0 0 1730 200 1080 5 0.000541 4.67965 0 1730 0

33 At E 1-3 3 1160 0 100 1260 200 3360 18 0.000541 12.26988 100 1160 0

34 At E 8-10 3 1160 0 100 1260 200 3360 18 0.000541 12.26988 100 1160 0

35 At F 3-5 3 1010 0 100 1110 200 2460 13 0.000541 7.80663 100 1010 0

36 At F 5-6 3 1310 0 100 1410 200 2060 11 0.000541 8.39091 100 1310 0

37 At F 6-8 3 1010 0 100 1110 200 2460 13 0.000541 7.80663 100 1010 0

38 At beam B-1 5-6 3 1290 0 100 1390 150 2460 17 0.000541 12.78383 100 1290 0

39 At 1 C-E 3 1060 0 100 1160 200 3690 19 0.000541 11.92364 100 1060 0

40 At 2 A-C 3 1360 0 100 1460 200 3110 17 0.000541 13.42762 100 1360 0

41 At 3 C-E 3 1730 0 0 1730 125 3710 31 0.000541 29.01383 0 1730 0

42 At 3 E-F 3 860 0 100 960 175 1010 6 0.000541 3.11616 100 860 0

43 At 4 A-B 3 1360 0 250 1610 200 2010 11 0.000541 9.58111 250 1360 0

44 At 4 B-C 3 2690 0 100 2790 200 1700 9 0.000541 13.58451 100 2690 0

45 At 5 Beam-F 3 1430 0 0 1430 175 4390 25 0.000541 19.34075 0 1430 0

46 At 6 G-F 3 1430 0 0 1430 175 4390 25 0.000541 19.34075 0 1430 0

47 At 7 B-C 3 2690 0 100 2790 200 1700 9 0.000541 13.58451 100 2690 0

48 At 7 A-B 3 1360 0 250 1610 200 2010 11 0.000541 9.58111 250 1360 0

49 At 8 E-F 3 860 0 0 860 175 1010 6 0.000541 2.79156 0 860 0

50 At 8 C-E 3 1730 0 100 1830 125 3710 31 0.000541 30.69093 100 1730 0

51 At 9 A-C 3 1360 0 100 1460 200 3110 17 0.000541 13.42762 100 1360 0

52 At 10 C-E 3 1060 0 100 1160 200 3690 19 0.000541 11.92364 100 1060 0
Distribution Steel at top
- -
1 Bed room 1 - 3 - - - 2150 - - 24 0.000541 27.9156 2150

- -
2 Bed room 1 - 3 - - - 2800 - - 12 0.000541 18.1776 2800

- -
3 Bed room 2 - 3 - - - 2730 - - 12 0.000541 17.72316 2730

- -
4 Bed room 2 - 3 - - - 2700 - - 12 0.000541 17.5284 2700

- -
5 Kitchen - 3 - - - 2150 - - 12 0.000541 13.9578 2150

- -
6 Kitchen - 3 - - - 1800 - - 8 0.000541 7.7904 1800

- -
7 Entrance lobby- 3 - - - 2810 - - 8 0.000541 12.16168 2810

- -
8 Entrance lobby- 3 - - - 1600 - - 4 0.000541 3.4624 1600

- -
9 Corridor - 3 - - - 1930 - - 12 0.000541 12.52956 1930

- -
10 Corridor - 3 - - - 1800 - - 8 0.000541 7.7904 1800

Total 1203.5969 Kg