Energy Questionnaire
The purpose of this questionnaire is to gather information about a facility ahead of time in order to
facilitate preparedness of our personnel when they come on site. This questionnaire will ensure that
the time on site is spent efficiently and the analysis thorough.
1 Contact Information
Name of Company
Address
Contact Name / Number of person in
Charge of the audit project
Name of Person(s) filling out the
Questionnaire
Regd. Off: #103, MS Paradise, Gangamma Temple Lane, 9th Cross, Kodihalli, Bangalore - 560008
eQube
4 Electricity Bill Split Up
Estimate the amount of power each of the energy consumers take up in your facility
Appliance Percentage
Air-conditioning ……..%
Lighting ……..%
Lifts ……..%
Computers / Servers …….%
Pumps …….%
Others …….%
Other Information
6 Transformer Details
Transformer Make Qty Size
…………...KVA 33KV/11KV
………… KVA 11KV/433V
Page 2 of 6
eQube
7 Air Conditioning Details
Is the full facility air-conditioned ? If not what is the Yes/ No. …………. Sqft
total sqft that is air-conditioned
Type of Air-conditioning (central, packed / splits, Centralized
unitary)
If Centralized, type (water-cooled, air-cooled) Water cooled & Air cooled
Hours of Usage per day 24hrs
Day time Usage ………….TR x …….Hrs
Night time Usage ………..TR x ……… Hrs
No. of AHUs …………Nos.
Capacity of AHUs ……….. TR x …….. Nos. …….. Hrs
……….. TR x ……… Nos……… Hrs
……….. TR x ……… Nos. …….. Hrs
……….. TR x ……… Nos. ………Hrs
Typical 12 Hour operation AHU In/ Out Temp ……..oC/ ……….oC
Typical 24 Hour operation AHU IN/ OUT Temp ……..oC / ………oC
Qty Capacity
….. No’s (Water cooled type) ………TR
….. No’s (Air cooled type) ……. TR
Chilled water in/ Out temp ……/ ……… oC
Condenser water in/ Out temp ……./ ………oC
Page 3 of 6
eQube
7.3 Chilled Water Pumping
Type of Pump (primary / Qty Flow Head Hours of Motor HP
secondary) Operation
Primary-Air cooled ……….Hrs ……… KW
Primary - Water cooled ……….Hrs ……… KW
Primary-Condenser water ……….Hrs ……… KW
Secondary Chilled water ……….Hrs ……..KW VFD
Pumps
8 Lighting Details
Please provide an estimate of the kind of lighting that is used in your facility. For instance, if there are
100 CFL (18w) lamps in the canteen used for about 10 hrs (average) per day, then the information
would be location = canteen, type of fixture = CFL, qty = 100, wattage (18w), hrs / day of usage = 10
Page 4 of 6
eQube
10 Computer / Server Details
Please provide an estimate of the computers / servers is used in facility with estimates of usage per day
Type of computer (laptop, Hrs / day Usage/ %
server, deskop, etc) Make Quantity Wattage loading
CRT Monitors
LCD Monitors
CPUs
Servers (Rating – KW)
Laptops
11 Heating Details
Boilers
Air Heaters
12 Air Compressors
Page 5 of 6
eQube
13 UPS Details
If there is a UPS, then please provide information about it.
% Loading List of devices
Battery Size and Number of powered by the UPS
UPS Size in KW Make Voltage (AH) batteries and wattage