You are on page 1of 1

A-1

Edition
Date
Approved
06/09/2018
Date
Drawing Chek
OG
06/09/2018
Date
RBT
Drawn

2
4/5

MATERIAL RECOVERY FACILTY MATERIAL RECOVERY FACILTY MATERIAL RECOVERY FACILTY

1 FLOOR PLAN 3 FRONT ELEVATION 4 TYPICAL SIDE ELEVATION


SCALE 1: 50 SCALE 1: 50 SCALE 1: 50

MATERIAL RECOVERY FACILTY

2 SECTION - 1
SCALE 1: 50

MATERIAL RECOVERY FACILITY MATERIAL RECOVERY FACILTY

AREA 10 SQ. M
3 TRUSS DETAIL
SCALE 1: 20

DAILY WASTE INPUT 250 KG / DAY

MAIN CONTRACTOR CONSULTANT SUBCONTRACTOR PROJECT: REVISIONS SHEET CONTENTS: SHEET NO.

BATCHING PLANT- MEKA AT SRP 1 OF 1


MRF FLOOR PLAN
CEBU-CORDOVA LINK MRF ELEVATIONS SCALE
TRUSS DETAIL AS SHOWN
EXPRESSWAY PROJECT A RT OG 06/09/2018 RELEASED FOR CONSTRUCTION DRAWING NO. TW-CLJV-DRA-456092 REV. NO.
DATE: 06/09/2018
REV. BY CHK DATE DESCRIPTION ISSUE FOR: CONSTRUCTION ORIGINAL IN : A1 A

You might also like