ELECTRICAL

III.1 GENERATOR AND MAIN OUTPUT SYSTEM


III.1.b Main Output Connection for connection from Generator to the MV Switchgear/GCB complete
with support and structure, etc.
III.1.b.1 Generator Circuit Breaker
1. GCB Switchgear 11KV #1
Riser Cubicle #1 C/W Join Busbar & Join Accessories Handle
Rear Breaker, TUAS, Handle ES
2. GCB Switchgear 11KV #2
Riser Cubicle #2 C/W Join Busbar
3. VCB 1200A, 17.5 kV, 40 kA, for Generator #1
4. VCB 1200A, 17.5 kV, 40 kA, for Generator #2
5. VT Drawer C/W 11kV / 3 / 110V / 3 / 110V3 C / W Fuse
Class 0.5 50va(WYE);Class 3P 50VA(Open Delta)
6. MV Current Transformer 1000/ 1-1A
III.2 PLANT ELECTRICAL EQUIPMENT
III.2.a Medium Voltage switchgears complete with necessary control metering and protection and instrum
III.2.a.1 Line-1 12kV SWITCHGEAR
III.2.a.1.1 NO. 1 AUX. TR. MV SWITCHGEAR 12kV
III.2.a.1.2 NO. 1 OUTGOING MV SWITCHGEAR 12kV
III.2.a.1.3 NGR PANEL #1
III.2.a.2 Line-2 12kV SWITCHGEAR
III.2.a.2.1 NO. 1 AUX. TR. MV SWITCHGEAR 12kV
III.2.a.2.2 NO. 1 OUTGOING MV SWITCHGEAR 12kV
III.2.a.2.3 NGR PANEL #2

III.2.b Low Voltage switchgears complete with necessary control metering and protection and
instrumentation system.
III.2.b.1 400V PCC Panel - IP4x Withdrawable, Fully type test
III.2.b.1.1 No. 1 LV SWITCHBOARD
III.2.b.1.2 LV TIE SWITCHBOARD
INC MCC COMMON 1
INCOMING 1
Riser 1
OUT FOR INC MCC ESSENTIAL 1
BUS COUPLER
OUT FOR INC MCC ESSENTIAL 2
INC MCC COMMON 2
INCOMING 2
Riser 2
III.2.c Low Voltage Motor Control Centers complete with necessary control, metering and protection
and instrumentation
III.2.c.1 400V MCCsystem.
Panel - IP4x Withdrawable, Fully type test
III.2.c.1.1 No. 2 LV SWITCHBOARD
III.2.c.1.2 No. 3 LV SWITCHBOARD (Common/Emergency LV Switchboard)

III.2.d Uninterruptible AC power supply complete with necessary control, metering and protection and in
III.2.d.1 UPS for MCC 220VAC/220VAC, 10kVA, Back up time 3 Hours
DC Charger
Packing A
Packing B
Packing C
Packing D
UPS
UPS 1
UPS 2
By Pass
Rack Battery
AC Distribution Board
Rack Battery of UPS
Rack Battery of DC Charger
Busbar Intercell Connector Battery
III.2.e Black Start/Emergency Diesel Generator (EDG) complete with necessary control, metering and pro
III.2.e.1 Emergency Diesel Generator
EDG Genset PL650P Generating Set
III.2.f Batteries, battery chargers and DC distribution panels complete with necessary control, metering a
III.2.f.1 Battery Charger for MV Panel 220VAC/110VDC, 5kVA, Back up time 30 Minutes
BOX 1
BOX 2
BOX 3
BOX 4
BOX 5
BOX 6
BOX 7
BOX 8
BOX 9
BOX 10
III.2.g Cabling and wiring complete cable trays, conduits and fittings and underground ducts.
III.2.g.1 MV Cable 11kV
III.2.g.1.1 From Generator 1 to MV Switch Gear (GCB)

III.2.g.1.2 From Generator 2 to MV Switch Gear (GCB)

III.2.g.1.3 From Outgoing MV Switchgear to Auxiliary Trafo 1

III.2.g.1.4 From Outgoing MV Switchgear to Auxiliary Trafo 2


III.2.g.2 MV Cable 20kV
III.2.g.2.1 From Step Up Trafo 1 to Step Up Incoming Panel 1
III.2.g.2.2 From Step Up Trafo 2 to Step Up Incoming Panel 2
III.2.g.2.3 From Outgoing MV Switchgear to First Pole No.1
III.2.g.2.4 From Outgoing MV Switchgear to First Pole No.2
III.2.g.2.5 MV Termination Kit
CU/XLPE/CTS/PVC/SWA/PVC 3 x 120 mm² - 18/30 (36) kV
CU/XLPE/CTS/PVC/SWA/PVC 3 x 120 mm² - 18/30 (36) kV 11KV 8.7/15K
N2XSY (Cu/XLPE/CTS/PVC-FR) 1 x 120 mm2 - 8.7/15 (17.5) kV
III.2.g.3 LV Power Cable
III.2.g.3.1 From BSDG to BSDG ACB Panel (Common LV Switchgear)
III.2.g.3.2 From Common Feeder ACB #1 to Incoming LV Panel #3
III.2.g.3.3 From Common Feeder ACB #2 to Incoming LV Panel #3
III.2.g.3.4 From LV MCC to:
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.4 Control Cable
III.2.g.4.1 NYY 4x1.5mm2
III.2.g.4.2 NYY 12x1.5mm3
III.2.g.4.3 Ethernet UTP Cat 5E
III.2.g.4.4 Mod bus
III.2.g.4.5 Fiber Optic
III.2.g.5 MV Busduct
III.2.g.5.1 Bus Duct 1200 A, 15 kV, 31.5 kA 3 second, One 1/2” x 6 cu, 3P4W,
III.2.g.6 LV Busduct Enclosure Steel, Support Molded
III.2.g.6.1 Bus Duct 2000 A, 600 V, 65 kA 1 second, Two 1/2” x 4 cu, 3P4W,
III.2g.7 Termination toEnclosure Steel,
Distribution 20kVSupport
pole 1/2” GPO-3 sheet
III.2.g.7.1 Termination Kit

III.2.g.8 Lighting Cable


III.2.g.8.1 NYY 4+E-2,5mm2
III.2.g.8.2 NYY 2+E-4mm2
III.2.g.8.3 NYY 4+E-16mm2
III.2.g.8.4 NYY 4+E-95mm2
III.2.g.9 Grounding Link Cable
III.2.g.9.1 Grounding Grid cable
III.2.g.9.2 Neutral Distribution Transformer
III.2.g.9.3 Neutral Distribution Generator Transformer
III.2.g.9.4 Bonding Ladder
III.2.g.10 Cable ladder for Main Cable Support
III.2.g.10.1 Cable ladder 600mm, separator, joint plate, flexible earthing joint,
nuts andLadder
Straight bolts
1. W 600 H 127 L 3000 mm
2. W400 H127 L300
3. W200 H127 L300
Horizontal Elbow
1. W600 H127 R300
2. W400 H100 R300
3. W200 H100 R300
Horizontal Tee Equal
1. W1 600 W2 600 W3 600 H127 R300
2. W1 400 W2 400 W3 400 H127 R300
3. W1 200 W2 200 W3 200 H127 R300
Vertical Inside Riser
1. W600 H127 R300
2. W400 H127 R300
3. W200 H127 R300
Vertical Outside Riser
1. W600 H127 R300
2. W400 H100 R300
3. W200 H100 R300
4. Jointing c/w Bolts, Nuts and Washers 14 H127
5. Baut CB 3/8 + 3/4 + Washers Nut
6. Separator Ladder 600 x 127
7.Separator Ladder 400 x 127
8. Separator Ladder 200 x 127
9. Cover Ladder c/w hold down clamp / hold down clip 600 x 127
10. Cover Ladder c/w hold down clamp / hold down clip 400 x 127
11. Cover Ladder c/w hold down clamp / hold down clip 200 x 127
12. Hold down clamp W x H : 30 x 127 (mm)
13. M6 x 20 Bolt + Washer + Nut
III.2.g.10.2 Cable ladder 200mm, separator, joint plate, flexible earthing joint,
nuts and bolts
Straight Ladder
1. W200 H127 L300
Horizontal Elbow
1. W200 H127 R300
Horizontal Tee Equal
1.W1 200 W2 600 W3 600 H127 R300
Vertical Inside Riser
1. W200 H127 R300
III.2.g.11 Cable Conduit for Lighting & GPO
III.2.g.11.1 Cable conduit 1" c/w accesories
III.2.g.11.2 Cable conduit 3" c/w accesories
III.2.g.11.3 Cable Gland 22
III.2.g.11.4 Cable Gland M40
III.2.g.11.5 Cable Gland M65

III.2.h Grounding and lightning protection system complete.


III.2.h.1 Grounding
III.2.h.1.1 Grounding Rod
III.2.h.1.2 Accesories
III.2.h.1.3 Accessories for Grounding
III.2.h.1.4 Cadwelld Connection ( including equipment cadweld )
III.2.h.1.5 Cable :
III.2.h.1.5.
III.2.h.1.5.
III.2.h.2 Lightning Protection
III.2.h.2.1 Air Terminal Radar System
III.2.h.2.2 Pole for Air Terminal
III.2.h.2.3 Grounding Rod
III.2.h.2.4 PVC Pipe & Accesories
III.2.h.2.5 Accessories for Lighning ( Connector & Bracket )
III.2.h.2.6 Cadwelld Connection( including equipment cadweld )
III.2.h.2.7 Power cable :
III.2.h.2.7.
III.2.h.2.7.

III.2.i Cathodic protection system complete (If applicable)

III.2.j Lighting and small power installation complete


III.2.j.1 Lighting and small power installation
III.2.j.1.1 TL TCW 2x36W
III.2.j.1.2 TL TCW c/w 2x36W
III.2.j.1.3 Down Light LED 25W
III.2.j.1.4 TBS 3 x 36 LED
III.2.j.1.5 HPK 138 1 x 400W
III.2.j.1.6 Flood Light LED 250W
III.2.j.1.7 GPO 1 phase 10A
III.2.j.1.8 GPO 3 phase 63A
III.2.j.1.9 Emergency Lighting
III.2.j.1.10 Street Lighting 250W
III.2.j.1.11 Street Pole Lighting
III.2.j.1.12 Joint Box for Lighting
III.2.j.2 Main Distribution Board (MDB)
III.2.j.2.1 MDB, IP 4x
III.2.j.2.2 Lighting Panel - IP 65

III.2.k Communication systems complete.


III.2.k.1 Indoor IP Telphone
III.2.k.2 PABX System
III.2.k.3 Cabling System
III.2.k.4 PABX & SOUND SYSTEM
III.2.k.4.1 Speaker TOA (25 Watt)
III.2.k.4.2 Mixer Amplifier
III.2.k.4.3 Micropone
III.2.k.4.4 Cable Power

III.2.l Closed circuit TV system equipment complete.


III.2.l.1 CCTV PTZ
III.2.l.2 PC c/w Monitor 32"
III.2.l.3 Pen Tilt Switch
III.2.l.4 DVR Unit
III.2.l.5 Power Supply
III.2.l.6 Cabling System
III.2.l.7 Fire Extinguiser

III.2.m Power Plant Metering and Protection panels complete.

III.3 POWER TRANSFORMERS


III.3.a Generator transformer complete with surge arresters, current transformers, etc.
III.3.a.1 Step Up TR #2 11 / 20 KV, 11.5 MVA, ONAN / ONAF, ON LOAD TAP CHANGER YNd1
1. Main Transformer GT1
2. Radiator for Transformer
3. Fan Radiator @stacks c/w fan
4. Conservator
5. Cable box
6. Oil Drum

1. Main Transformer GT 2
2. Radiator for Transformer
3. Fan Radiator @stacks c/w fan
4. Conservator
5. Cable box
6. Oil Drum
III.3.b Unit/Station Transformer complete with surge arrester, current transformers etc.
III.3.b.1 No.1 Aux TR #2 11 / 0.4 KV, 1250 kVA, ONAN, OFF LOAD TAP CHANGER, YNd1

III.4 20 kV/70kV / 150kV SUBSTATION EQUIPMENT


III.4.b 20kV SWITCHGEAR
III.4.b.1 MV switchgear complete with circuit breakers, earthing switches, surge arresters,
instrument
III.4.b.1.1 transformers.
Line-1 20KV SWITCHGEAR
III.4.b.1.1.
III.4.b.1.1.
III.4.b.1.1.

III.4.b.1.2 Line-2 20KV SWITCHGEAR


III.4.b.1.2.
III.4.b.1.2.

III.6 STUDIES FOR ELECTRICAL


III.6.1 The studies/calculation required to be performed as stipulated in Book II.
(Forward to schedule 1.1, VI.5)
CONTROL & INSTRUMENTATION
IV.1 Distributed digital control system and PLC control system complete with :
IV.1.1 DCS System
IV.1.2 Engineering & Supervision
IV.1.3 Panel Box inc. breaker, relay & terminal)
IV.1.4 Remote Terminal Unit (RTU)
IV.1.4.1 Power Supply, Noise Filter, CPU + Memory, D/I, D/O, A/I, A/O)

IV.2 The cubicle and accessories, I/O modules, include :


IV.2.1 Power Supply, Noise Filter, CPU + Memory, D/I, D/O, A/I, A/O)

IV.3 Power plant operation control desks,


IV.3.1 Operator Desk
IV.6 Instrument valve, include:
IV.6.1 Ball Valve
IV.6.2 Tube & Fitting
IV.6.3 Accessorries

IV.7 Field Instruments, include:


IV.7.3 Level Transmitter
IV.7.6 Temperature Gauge and Well
IV.7.7 Level Gauge

IV.10 Instrument Cable, Cable tray, Junction Box, Gland and accessories
IV.10.1 Instrument Cable
IV.10.1.1 REYY 2P x 1.5 mm2
IV.10.1.2 REYY 10 x 1.5 mm2
IV.10.1.3 NYY 2C x 1.5 mm2
IV.10.1.4 NYY 10Cx1.5mm2
IV.10.2 Cable Tray for Instrument
IV.10.2.1 Cable Tray 200mm c/w cover, separator, joint plate, flexible earthing joint, nuts and
IV.10.3 bolts
Cable Conduit
IV.10.3.1 Cable conduit 16 c/w accesories
IV.10.3.2 Cable Gland 16

IV.11 Instrument installation bulk material and accessories


IV.11.1 Supporting & Consumable Material

IV.12 STUDIES FOR INSTRUMENT & CONTROL


IV.12.1 The studies/calculation required to be performed as stipulated in Book II.
(Forward to schedule 1.1, VI.5)
IV.13 Additional Pengadaan Converter
IV.13.1 Converter Profibus to Modbus TCP/IP Modul ALP 121 Yokogawa
QTY Location

n for connection from Generator to the MV Switchgear/GCB complete


ure, etc.
rcuit Breaker unit 2 Power House
hgear 11KV #1 1
Riser Cubicle #1 C/W Join Busbar & Join Accessories Handle
Rear Breaker, TUAS, Handle ES
hgear 11KV #2 1
Riser Cubicle #2 C/W Join Busbar
A, 17.5 kV, 40 kA, for Generator #1 1
A, 17.5 kV, 40 kA, for Generator #2 1
C/W 11kV / 3 / 110V / 3 / 110V3 C / W Fuse 1
Class 0.5 50va(WYE);Class 3P 50VA(Open Delta)
nt Transformer 1000/ 1-1A 1

gears complete with necessary control metering and protection and instrumentation system.
SWITCHGEAR
NO. 1 AUX. TR. MV SWITCHGEAR 12kV Unit 1 Power House
NO. 1 OUTGOING MV SWITCHGEAR 12kV Unit 1 Power House
NGR PANEL #1 Unit 1 Power House
SWITCHGEAR
NO. 1 AUX. TR. MV SWITCHGEAR 12kV Unit 1 Power House
NO. 1 OUTGOING MV SWITCHGEAR 12kV Unit 1 Power House
NGR PANEL #2 Unit 1 Power House

s complete with necessary control metering and protection and


.
nel - IP4x Withdrawable, Fully type test
No. 1 LV SWITCHBOARD Unit 1 Power House
LV TIE SWITCHBOARD Unit 1 Power House
INC MCC COMMON 1
INCOMING 1

OUT FOR INC MCC ESSENTIAL 1


BUS COUPLER
OUT FOR INC MCC ESSENTIAL 2
INC MCC COMMON 2
INCOMING 2

trol Centers complete with necessary control, metering and protection


stem.
anel - IP4x Withdrawable, Fully type test
No. 2 LV SWITCHBOARD Unit 1 Power House
No. 3 LV SWITCHBOARD (Common/Emergency LV Switchboard) Unit 1 Power House

er supply complete with necessary control, metering and protection and instrumentation system.
220VAC/220VAC, 10kVA, Back up time 3 Hours unit 1 Power House
ution Board
ry of UPS
ry of DC Charger
ercell Connector Battery
Diesel Generator (EDG) complete with necessary control, metering and protection and instrumentation system.
iesel Generator Lot 1 Power House
et PL650P Generating Set
ers and DC distribution panels complete with necessary control, metering and protection and instrumentation system.
ger for MV Panel 220VAC/110VDC, 5kVA, Back up time 30 Minutes unit 1 Power House

plete cable trays, conduits and fittings and underground ducts.

From Generator 1 to MV Switch Gear (GCB) lot 1 Power House

From Generator 2 to MV Switch Gear (GCB) lot 1 Power House

From Outgoing MV Switchgear to Auxiliary Trafo 1 lot 1 Power House

From Outgoing MV Switchgear to Auxiliary Trafo 2 lot 1 Power House

From Step Up Trafo 1 to Step Up Incoming Panel 1 lot 1 Power House


From Step Up Trafo 2 to Step Up Incoming Panel 2 lot 1 Power House
From Outgoing MV Switchgear to First Pole No.1 lot 1 Power House
From Outgoing MV Switchgear to First Pole No.2 lot 1 Power House
MV Termination Kit lot 1 Power House
CU/XLPE/CTS/PVC/SWA/PVC 3 x 120 mm² - 18/30 (36) kV
CU/XLPE/CTS/PVC/SWA/PVC 3 x 120 mm² - 18/30 (36) kV 11KV 8.7/15KV
N2XSY (Cu/XLPE/CTS/PVC-FR) 1 x 120 mm2 - 8.7/15 (17.5) kV
From BSDG to BSDG ACB Panel (Common LV Switchgear) lot 1 Power House
From Common Feeder ACB #1 to Incoming LV Panel #3 lot 1 Power House
From Common Feeder ACB #2 to Incoming LV Panel #3 lot 1 Power House
From LV MCC to:
Radiator (15 kW x 4 feeder) #1 lot 1 1
Jacket Water Pre Heater with Pump #1 lot 1 1
Air Compressor A lot 1 1
Fire Fighting System (Pumps, etc) lot 1 1
LO Priming Pump lot 1 1
Air Dry Unit lot 1 1
Engine Side Ventilation fan 1A lot 1 1
Exhaust Ventilation fan on the roof 1 lot 1 1
Exhaust Gas Ventilation Fan 1 lot 1 1
FO Unloading Pump A lot 1 1
FO Transfer Pump Storage Tank to Purifier lot 1 1
FO Transfer Pump Storage Daily Tank to Engine lot 1 1
FO Transfer Pump Storage Daily Tank to Pilot Engine lot 1 1
FO Transfer Pump Storage Tank to Purifier lot 1 1
Sludge Pump lot 1 1
Dirty Oil Pump lot 1 1
FO Clean & Pilot Drain Pump lot 1 1
LO Transfer Pump Storage Tank to Purifier lot 1 1
LO Oil Transfer Pump to Oil Sumptank lot 1 1
LO Used Pump lot 1 1
Waste Oil Transfer Pump lot 1 1
LO Purifier Pump lot 1 1
Fresh Water Supplay HT/LT lot 1 1
LT Radiator Pump lot 1 1
HT Radiator Pump lot 1 1
Submersible Pump lot 1 1
Transfer Pump Treated Tank to Purifier lot 1 1
Waste Water Pump lot 1 1
Neutralization Pump lot 1 1
Turning Gear 1 lot 1 1
Fire Detection and alarm panel lot 1 1
Pit Pump for Engine Room A lot 1 1
Pit Pump for Pump House lot 1 1
Step Up Trafo Control Power 1 lot 1 1
Auxiliary power for 11 kV Switchgear lot 1 1
Auxiliary power for NGR panel 1 & 2 lot 1 1
Auxiliary power for DC 110V Battery Charger lot 1 1
Gen Side Ventilation Fan 1B lot 1 1
DO Purifier A lot 1 1
LO Purifier A lot 1 1
Pre Lubricating Pump 1 lot 1 1
Water Treatment Unit lot 1 1
Auxiliary power for control panels & PLC Panels lot 1 1
PCMS (Plant Control Monitoring System) lot 1 1
Building service power for air conditioning unit, etc lot 1 1
Motor Driven Fire Pump lot 1 1
Electrical Driven Fire Pump lot 1 1
Jockey Pump lot 1 1

NYY 4x1.5mm2 lot 1 1


NYY 12x1.5mm3 lot 1 1
Ethernet UTP Cat 5E lot 1 1
lot 1 1
Fiber Optic lot 1 1

Bus Duct 1200 A, 15 kV, 31.5 kA 3 second, One 1/2” x 6 cu, 3P4W, lot 1 1
Enclosure Steel, Support Molded
Bus Duct 2000 A, 600 V, 65 kA 1 second, Two 1/2” x 4 cu, 3P4W, lot 1 1
toEnclosure Steel,
Distribution 20kVSupport
pole 1/2” GPO-3 sheet
Termination Kit unit 2 2

NYY 4+E-2,5mm2 lot 1 1


NYY 2+E-4mm2 lot 1 1
NYY 4+E-16mm2 lot 1 1
NYY 4+E-95mm2 lot 1 1

Grounding Grid cable lot 1 1


Neutral Distribution Transformer lot 1 1
Neutral Distribution Generator Transformer lot 1 1
Bonding Ladder lot 1 1
for Main Cable Support
Cable ladder 600mm, separator, joint plate, flexible earthing joint, lot 1 1
nuts andLadder
Straight bolts
1. W 600 H 127 L 3000 mm pcs 7 power house
2. W400 H127 L300
3. W200 H127 L300
Horizontal Elbow
1. W600 H127 R300
2. W400 H100 R300
3. W200 H100 R300
Horizontal Tee Equal
1. W1 600 W2 600 W3 600 H127 R300 pcs 1 power house
2. W1 400 W2 400 W3 400 H127 R300
3. W1 200 W2 200 W3 200 H127 R300
Vertical Inside Riser
1. W600 H127 R300
2. W400 H127 R300
3. W200 H127 R300
Vertical Outside Riser
1. W600 H127 R300
2. W400 H100 R300
3. W200 H100 R300
4. Jointing c/w Bolts, Nuts and Washers 14 H127
5. Baut CB 3/8 + 3/4 + Washers Nut
6. Separator Ladder 600 x 127
7.Separator Ladder 400 x 127
8. Separator Ladder 200 x 127
9. Cover Ladder c/w hold down clamp / hold down clip 600 x 127
10. Cover Ladder c/w hold down clamp / hold down clip 400 x 127
11. Cover Ladder c/w hold down clamp / hold down clip 200 x 127
12. Hold down clamp W x H : 30 x 127 (mm)
13. M6 x 20 Bolt + Washer + Nut
Cable ladder 200mm, separator, joint plate, flexible earthing joint, lot 1 1
nuts and bolts
Straight Ladder
1. W200 H127 L300
Horizontal Elbow
1. W200 H127 R300
Horizontal Tee Equal
1.W1 200 W2 600 W3 600 H127 R300
Vertical Inside Riser
1. W200 H127 R300
it for Lighting & GPO
Cable conduit 1" c/w accesories lot 1 1
Cable conduit 3" c/w accesories lot 1 1
Cable Gland 22 lot 1 1
Cable Gland M40 lot 1 1
Cable Gland M65 lot 1 1

g protection system complete.

Grounding Rod lot 1 1


Accesories lot 1 1
Accessories for Grounding lot 1 1
Cadwelld Connection ( including equipment cadweld ) lot 1 1

Conductor BC 120mm2 lot 1 1


Termination cable Lot 1 1

Air Terminal Radar System lot 1 1


Pole for Air Terminal lot 1 1
Grounding Rod lot 1 1
PVC Pipe & Accesories Lot 1 1
Accessories for Lighning ( Connector & Bracket ) Lot 1 1
Cadwelld Connection( including equipment cadweld ) Lot 1 1
Power cable :
Down conductor NYA 1x120mm2 Lot 1 1
Termination cable Lot 1 1

tem complete (If applicable)

er installation complete
small power installation
TL TCW 2x36W Lot 1 1
TL TCW c/w 2x36W Lot 1 1
Down Light LED 25W Lot 1 1
TBS 3 x 36 LED Lot 1 1
HPK 138 1 x 400W Lot 1 1
Flood Light LED 250W Lot 1 1
GPO 1 phase 10A Lot 1 1
GPO 3 phase 63A Lot 1 1
Emergency Lighting Lot 1 1
Street Lighting 250W Lot 1 1
Street Pole Lighting Lot 1 1
Joint Box for Lighting Lot 1 1
ution Board (MDB)
MDB, IP 4x Lot 1 1
Lighting Panel - IP 65 Lot 1 1

s complete.
Lot 1 1
Lot 1 1
Lot 1 1

Speaker TOA (25 Watt) Lot 1 1


Mixer Amplifier Lot 1 1
Micropone Lot 1 1
Cable Power Lot 1 1

m equipment complete.
Lot 1 1
Lot 1 1
Lot 1 1
Lot 1 1
Lot 1 1
Lot 1 1
Lot 1 1

and Protection panels complete.

complete with surge arresters, current transformers, etc.


2 11 / 20 KV, 11.5 MVA, ONAN / ONAF, ON LOAD TAP CHANGER YNd1 unit 2 Transformer GT1
sformer GT1 1 Transformer GT1
or Transformer 3 Transformer GT1
or @stacks c/w fan 2 Transformer GT1
1 Transformer GT1
2 Transformer GT1
Liters 1900 Transformer GT1

sformer GT 2 1 Transformer GT2


or Transformer 3 Transformer GT2
or @stacks c/w fan 2 Transformer GT2
1 Transformer GT2
2 Transformer GT2
Liters 1900 Transformer GT2
er complete with surge arrester, current transformers etc.
#2 11 / 0.4 KV, 1250 kVA, ONAN, OFF LOAD TAP CHANGER, YNd1 unit 2 TR UAT

EQUIPMENT

ar complete with circuit breakers, earthing switches, surge arresters,


ransformers.
Line-1 20KV SWITCHGEAR
NO. 1 INCOMING MV SWITCHGEAR 20kV Unit 1 1
GRID OUTGOING MV SWITCHGEAR 20kV Unit 1 1
SUBSTATION 20KV SWITCHGEAR :
TIE MV SWITCHGEAR 20kV Unit 1 1
Line-2 20KV SWITCHGEAR
NO. 1 INCOMING MV SWITCHGEAR 20kV Unit 1 1
GRID OUTGOING MV SWITCHGEAR 20kV Unit 1 1

required to be performed as stipulated in Book II.


1, VI.5)

and PLC control system complete with :


Lot 1 1
Lot 1 1
relay & terminal) Lot 1 1

y, Noise Filter, CPU + Memory, D/I, D/O, A/I, A/O) Lot 1 1

modules, include :
ter, CPU + Memory, D/I, D/O, A/I, A/O) Lot 1 1

Lot 1 1
Printer Desk
Terminal Cabinet
Power Cabinet
Lot 1 1
Lot 1 1
Lot 1 1

Lot 1 1
Lot 1 1
Lot 1 1

ction Box, Gland and accessories

Lot 1 1
Lot 1 1
Lot 1 1
Lot 1 1

00mm c/w cover, separator, joint plate, flexible earthing joint, nuts and Lot 1 1

t 16 c/w accesories Lot 1 1


Lot 1 1

rial and accessories


ble Material Lot 1 1

required to be performed as stipulated in Book II. Lot 1 1


1, VI.5)

Modbus TCP/IP Modul ALP 121 Yokogawa Lot 1 1


Status
Installed

Installed
ELECTRICAL
III.1 GENERATOR AND MAIN OUTPUT SYSTEM
III.1.b Main Output Connection for connection from Generator to the MV Switchgear/GCB compl
support and structure, etc.
III.1.b.1 Generator Circuit Breaker
1. GCB Switchgear 11KV #1
Riser Cubicle #1 C/W Join Busbar & Join Accessories Handle
Rear Breaker, TUAS, Handle ES
2. GCB Switchgear 11KV #2
Riser Cubicle #2 C/W Join Busbar
3. VCB 1200A, 17.5 kV, 40 kA, for Generator #1
4. VCB 1200A, 17.5 kV, 40 kA, for Generator #2
5. VT Drawer C/W 11kV / 3 / 110V / 3 / 110V3 C / W Fuse
Class 0.5 50va(WYE);Class 3P 50VA(Open Delta)
6. MV Current Transformer 1000/ 1-1A
III.2 PLANT ELECTRICAL EQUIPMENT
III.2.a Medium Voltage switchgears complete with necessary control metering and protection and
III.2.a.1 Line-1 12kV SWITCHGEAR
III.2.a.1.1 NO. 1 AUX. TR. MV SWITCHGEAR 12kV
III.2.a.1.2 NO. 1 OUTGOING MV SWITCHGEAR 12kV
III.2.a.1.3 NGR PANEL #1
III.2.a.2 Line-2 12kV SWITCHGEAR
III.2.a.2.1 NO. 1 AUX. TR. MV SWITCHGEAR 12kV
III.2.a.2.2 NO. 1 OUTGOING MV SWITCHGEAR 12kV
III.2.a.2.3 NGR PANEL #2

III.2.b Low Voltage switchgears complete with necessary control metering and protection and
instrumentation system.
III.2.b.1 400V PCC Panel - IP4x Withdrawable, Fully type test
III.2.b.1.1 No. 1 LV SWITCHBOARD
III.2.b.1.2 LV TIE SWITCHBOARD
INC MCC COMMON 1
INCOMING 1
Riser 1
OUT FOR INC MCC ESSENTIAL 1
BUS COUPLER
OUT FOR INC MCC ESSENTIAL 2
INC MCC COMMON 2
INCOMING 2
Riser 2
III.2.c Low Voltage Motor Control Centers complete with necessary control, metering and protecti
instrumentation
III.2.c.1 400V MCCsystem.
Panel - IP4x Withdrawable, Fully type test
III.2.c.1.1 No. 2 LV SWITCHBOARD
III.2.c.1.2 No. 3 LV SWITCHBOARD (Common/Emergency LV Switchboard)

III.2.d Uninterruptible AC power supply complete with necessary control, metering and protection
III.2.d.1 UPS for MCC 220VAC/220VAC, 10kVA, Back up time 3 Hours
DC Charger
Packing A
Packing B
Packing C
Packing D
UPS
UPS 1
UPS 2
By Pass
Rack Battery
AC Distribution Board
Rack Battery of UPS
Rack Battery of DC Charger
Busbar Intercell Connector Battery
III.2.e Black Start/Emergency Diesel Generator (EDG) complete with necessary control, metering
III.2.e.1 Emergency Diesel Generator
EDG Genset PL650P Generating Set
III.2.f Batteries, battery chargers and DC distribution panels complete with necessary control, me
III.2.f.1 Battery Charger for MV Panel 220VAC/110VDC, 5kVA, Back up time 30 Minutes
BOX 1
BOX 2
BOX 3
BOX 4
BOX 5
BOX 6
BOX 7
BOX 8
BOX 9
BOX 10
III.2.g Cabling and wiring complete cable trays, conduits and fittings and underground ducts.
III.2.g.1 MV Cable 11kV
III.2.g.1.1 From Generator 1 to MV Switch Gear (GCB)

III.2.g.1.2 From Generator 2 to MV Switch Gear (GCB)

III.2.g.1.3 From Outgoing MV Switchgear to Auxiliary Trafo 1

III.2.g.1.4 From Outgoing MV Switchgear to Auxiliary Trafo 2


III.2.g.2 MV Cable 20kV
III.2.g.2.1 From Step Up Trafo 1 to Step Up Incoming Panel 1
III.2.g.2.2 From Step Up Trafo 2 to Step Up Incoming Panel 2
III.2.g.2.3 From Outgoing MV Switchgear to First Pole No.1
III.2.g.2.4 From Outgoing MV Switchgear to First Pole No.2
III.2.g.2.5 MV Termination Kit
CU/XLPE/CTS/PVC/SWA/PVC 3 x 120 mm² - 18/30 (36) kV
CU/XLPE/CTS/PVC/SWA/PVC 3 x 120 mm² - 18/30 (36) kV 11KV
N2XSY (Cu/XLPE/CTS/PVC-FR) 1 x 120 mm2 - 8.7/15 (17.5) kV
III.2.g.3 LV Power Cable
III.2.g.3.1 From BSDG to BSDG ACB Panel (Common LV Switchgear)
III.2.g.3.2 From Common Feeder ACB #1 to Incoming LV Panel #3
III.2.g.3.3 From Common Feeder ACB #2 to Incoming LV Panel #3
III.2.g.3.4 From LV MCC to:
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.4 Control Cable
III.2.g.4.1 NYY 4x1.5mm2
III.2.g.4.2 NYY 12x1.5mm3
III.2.g.4.3 Ethernet UTP Cat 5E
III.2.g.4.4 Mod bus
III.2.g.4.5 Fiber Optic
III.2.g.5 MV Busduct
III.2.g.5.1 Bus Duct 1200 A, 15 kV, 31.5 kA 3 second, One 1/2” x 6 cu, 3P4W,
III.2.g.6 LV Busduct Steel, Support Molded
III.2.g.6.1 Bus Duct 2000 A, 600 V, 65 kA 1 second, Two 1/2” x 4 cu, 3P4W, En
III.2g.7 Termination toSteel, Support20kV
Distribution 1/2”pole
GPO-3 sheet
III.2.g.7.1 Termination Kit

III.2.g.7.2 Grounding Cable


III.2.g.7.3 Pipe Conduit 2"
III.2.g.8 Lighting Cable
III.2.g.8.1 NYY 4+E-2,5mm2
III.2.g.8.2 NYY 2+E-4mm2
III.2.g.8.3 NYY 4+E-16mm2
III.2.g.8.4 NYY 4+E-95mm2
III.2.g.9 Grounding Link Cable
III.2.g.9.1 Grounding Grid cable
III.2.g.9.2 Neutral Distribution Transformer
III.2.g.9.3 Neutral Distribution Generator Transformer
III.2.g.9.4 Bonding Ladder
III.2.g.10 Cable ladder for Main Cable Support
III.2.g.10.1 Cable ladder 600mm, separator, joint plate, flexible earthing joint
bolts
Straight Ladder
1.W 600 H 127 L 3000 mm mm
2. W400 H127 L300
3. W200 H127 L300
Horizontal Elbow
1. W600 H127 R300
2. W400 H100 R300
3. W200 H100 R300
Horizontal Tee Equal
1. W1 600 W2 600 W3 600 H127 R300
2. W1 400 W2 400 W3 400 H127 R300
3. W1 200 W2 200 W3 200 H127 R300
Vertical Inside Riser
1. W600 H127 R300
2. W400 H127 R300
3. W200 H127 R300
Vertical Outside Riser
1. W600 H127 R300
2. W400 H100 R300
3. W200 H100 R300
4. Jointing c/w Bolts, Nuts and Washers 14 H127
5. Baut CB 3/8 + 3/4 + Washers Nut
6. Separator Ladder 600 x 127
7.Separator Ladder 400 x 127
8. Separator Ladder 200 x 127
9. Cover Ladder c/w hold down clamp / hold down clip 600 x 127
10. Cover Ladder c/w hold down clamp / hold down clip 400 x 127
11. Cover Ladder c/w hold down clamp / hold down clip 200 x 127
12. Hold down clamp W x H : 30 x 127 (mm)
13. M6 x 20 Bolt + Washer + Nut
III.2.g.10.2 Cable ladder 200mm, separator, joint plate, flexible earthing join
bolts
Straight Ladder
1. W200 H127 L300
Horizontal Elbow
1. W200 H127 R300
Horizontal Tee Equal
1.W1 200 W2 600 W3 600 H127 R300
Vertical Inside Riser
1. W200 H127 R300
III.2.g.11 Cable Conduit for Lighting & GPO
III.2.g.11.1 Cable conduit 1" c/w accesories
III.2.g.11.2 Cable conduit 3" c/w accesories
III.2.g.11.3 Cable Gland 22
III.2.g.11.4 Cable Gland M40
III.2.g.11.5 Cable Gland M65

III.2.h Grounding and lightning protection system complete.


III.2.h.1 Grounding
III.2.h.1.1 Grounding Rod
III.2.h.1.2 Accesories
III.2.h.1.3 Accessories for Grounding
III.2.h.1.4 Cadwelld Connection ( including equipment cadweld )
III.2.h.1.5 Cable :
III.2.h.1.5.
III.2.h.1.5.
III.2.h.2 Lightning Protection
III.2.h.2.1 Air Terminal Radar System
III.2.h.2.2 Pole for Air Terminal
III.2.h.2.3 Grounding Rod
III.2.h.2.4 PVC Pipe & Accesories
III.2.h.2.5 Accessories for Lighning ( Connector & Bracket )
III.2.h.2.6 Cadwelld Connection( including equipment cadweld )
III.2.h.2.7 Power cable :
III.2.h.2.7.
III.2.h.2.7.

III.2.i Cathodic protection system complete (If applicable)

III.2.j Lighting and small power installation complete


III.2.j.1 Lighting and small power installation
III.2.j.1.1 TL TCW 2x36W
III.2.j.1.2 TL TCW c/w 2x36W
III.2.j.1.3 Down Light LED 25W
III.2.j.1.4 TBS 3 x 36 LED
III.2.j.1.5 HPK 138 1 x 400W
III.2.j.1.6 Flood Light LED 250W
III.2.j.1.7 GPO 1 phase 10A
III.2.j.1.8 GPO 3 phase 63A
III.2.j.1.9 Emergency Lighting
III.2.j.1.10 Street Lighting 250W
III.2.j.1.11 Street Pole Lighting
III.2.j.1.12 Joint Box for Lighting
III.2.j.2 Main Distribution Board (MDB)
III.2.j.2.1 MDB, IP 4x
III.2.j.2.2 Lighting Panel - IP 65

III.2.k Communication systems complete.


III.2.k.1 Indoor IP Telphone
III.2.k.2 PABX System
III.2.k.3 Cabling System
III.2.k.4 PABX & SOUND SYSTEM
III.2.k.4.1 Speaker TOA (25 Watt)
III.2.k.4.2 Mixer Amplifier
III.2.k.4.3 Micropone
III.2.k.4.4 Cable Power

III.2.l Closed circuit TV system equipment complete.


III.2.l.1 CCTV PTZ
III.2.l.2 PC c/w Monitor 32"
III.2.l.3 Pen Tilt Switch
III.2.l.4 DVR Unit
III.2.l.5 Power Supply
III.2.l.6 Cabling System
III.2.l.7 Fire Extinguiser

III.2.m Power Plant Metering and Protection panels complete.

III.3 POWER TRANSFORMERS


III.3.a Generator transformer complete with surge arresters, current transformers, etc.
III.3.a.1 Step Up TR #2 11 / 20 KV, 11.5 MVA, ONAN / ONAF, ON LOAD TAP CHANGER YNd
1. Main Transformer GT1
2. Radiator for Transformer
3. Fan Radiator @stacks c/w fan
4. Conservator
5. Cable box
6. Oil Drum

1. Main Transformer GT 2
2. Radiator for Transformer
3. Fan Radiator @stacks c/w fan
4. Conservator
5. Cable box
6. Oil Drum
III.3.b Unit/Station Transformer complete with surge arrester, current transformers etc.
III.3.b.1 No.1 Aux TR #2 11 / 0.4 KV, 1250 kVA, ONAN, OFF LOAD TAP CHANGER, YNd1

III.4 20 kV/70kV / 150kV SUBSTATION EQUIPMENT


III.4.b 20kV SWITCHGEAR
III.4.b.1 MV switchgear complete with circuit breakers, earthing switches, surge arresters
instrument
III.4.b.1.1 transformers.
Line-1 20KV SWITCHGEAR
III.4.b.1.1.
III.4.b.1.1.
III.4.b.1.1.

III.4.b.1.2 Line-2 20KV SWITCHGEAR


III.4.b.1.2.
III.4.b.1.2.

III.6 STUDIES FOR ELECTRICAL


III.6.1 The studies/calculation required to be performed as stipulated in Book II.
(Forward to schedule 1.1, VI.5)
CONTROL & INSTRUMENTATION
IV.1 Distributed digital control system and PLC control system complete with :
IV.1.1 DCS System
IV.1.2 Engineering & Supervision
IV.1.3 Panel Box inc. breaker, relay & terminal)
IV.1.4 Remote Terminal Unit (RTU)
IV.1.4.1 Power Supply, Noise Filter, CPU + Memory, D/I, D/O, A/I, A/O)
IV.2 The cubicle and accessories, I/O modules, include :
IV.2.1 Power Supply, Noise Filter, CPU + Memory, D/I, D/O, A/I, A/O)

IV.3 Power plant operation control desks,


IV.3.1 Operator Desk

IV.6 Instrument valve, include:


IV.6.1 Ball Valve
IV.6.2 Tube & Fitting
IV.6.3 Accessorries

IV.7 Field Instruments, include:


IV.7.3 Level Transmitter
IV.7.6 Temperature Gauge and Well
IV.7.7 Level Gauge

IV.10 Instrument Cable, Cable tray, Junction Box, Gland and accessories
IV.10.1 Instrument Cable
IV.10.1.1 REYY 2P x 1.5 mm2
IV.10.1.2 REYY 10 x 1.5 mm2
IV.10.1.3 NYY 2C x 1.5 mm2
IV.10.1.4 NYY 10Cx1.5mm2
IV.10.2 Cable Tray for Instrument
IV.10.2.1 Cable Tray 200mm c/w cover, separator, joint plate, flexible earthing joint, nuts a
IV.10.3 Cable Conduit
IV.10.3.1 Cable conduit 16 c/w accesories
IV.10.3.2 Cable Gland 16

IV.11 Instrument installation bulk material and accessories


IV.11.1 Supporting & Consumable Material

IV.12 STUDIES FOR INSTRUMENT & CONTROL


IV.12.1 The studies/calculation required to be performed as stipulated in Book II.
(Forward to schedule 1.1, VI.5)
IV.13 Additional Pengadaan Converter
IV.13.1 Converter Profibus to Modbus TCP/IP Modul ALP 121 Yokogawa
QTY Location

n for connection from Generator to the MV Switchgear/GCB complete with


etc.
rcuit Breaker unit 2 Power House
hgear 11KV #1 1
Riser Cubicle #1 C/W Join Busbar & Join Accessories Handle
Rear Breaker, TUAS, Handle ES
hgear 11KV #2 1
Riser Cubicle #2 C/W Join Busbar
A, 17.5 kV, 40 kA, for Generator #1 1
A, 17.5 kV, 40 kA, for Generator #2 1
C/W 11kV / 3 / 110V / 3 / 110V3 C / W Fuse 1
Class 0.5 50va(WYE);Class 3P 50VA(Open Delta)
nt Transformer 1000/ 1-1A 1

gears complete with necessary control metering and protection and instrumentation system.
SWITCHGEAR
NO. 1 AUX. TR. MV SWITCHGEAR 12kV Unit 1 Power House
NO. 1 OUTGOING MV SWITCHGEAR 12kV Unit 1 Power House
NGR PANEL #1 Unit 1 Power House
SWITCHGEAR
NO. 1 AUX. TR. MV SWITCHGEAR 12kV Unit 1 Power House
NO. 1 OUTGOING MV SWITCHGEAR 12kV Unit 1 Power House
NGR PANEL #2 Unit 1 Power House

s complete with necessary control metering and protection and


.
nel - IP4x Withdrawable, Fully type test
No. 1 LV SWITCHBOARD Unit 1 Power House
LV TIE SWITCHBOARD Unit 1 Power House
INC MCC COMMON 1
INCOMING 1

OUT FOR INC MCC ESSENTIAL 1


BUS COUPLER
OUT FOR INC MCC ESSENTIAL 2
INC MCC COMMON 2
INCOMING 2

trol Centers complete with necessary control, metering and protection and
. - IP4x Withdrawable, Fully type test
anel
No. 2 LV SWITCHBOARD Unit 1 Power House
No. 3 LV SWITCHBOARD (Common/Emergency LV Switchboard) Unit 1 Power House

er supply complete with necessary control, metering and protection and instrumentation system.
220VAC/220VAC, 10kVA, Back up time 3 Hours unit 1 Power House
ution Board
ry of UPS
ry of DC Charger
ercell Connector Battery
Diesel Generator (EDG) complete with necessary control, metering and protection and instrumentation system.
iesel Generator Lot 1 Power House
et PL650P Generating Set
ers and DC distribution panels complete with necessary control, metering and protection and instrumentation system.
ger for MV Panel 220VAC/110VDC, 5kVA, Back up time 30 Minutes unit 1 Power House

plete cable trays, conduits and fittings and underground ducts.

From Generator 1 to MV Switch Gear (GCB) lot 1 Power House

From Generator 2 to MV Switch Gear (GCB) lot 1 Power House

From Outgoing MV Switchgear to Auxiliary Trafo 1 lot 1 Power House

From Outgoing MV Switchgear to Auxiliary Trafo 2 lot 1 Power House

From Step Up Trafo 1 to Step Up Incoming Panel 1 lot 1 Power House


From Step Up Trafo 2 to Step Up Incoming Panel 2 lot 1 Power House
From Outgoing MV Switchgear to First Pole No.1 lot 1 Power House
From Outgoing MV Switchgear to First Pole No.2 lot 1 Power House
MV Termination Kit lot 1 Power House
CU/XLPE/CTS/PVC/SWA/PVC 3 x 120 mm² - 18/30 (36) kV
CU/XLPE/CTS/PVC/SWA/PVC 3 x 120 mm² - 18/30 (36) kV 11KV 8.7/15KV
N2XSY (Cu/XLPE/CTS/PVC-FR) 1 x 120 mm2 - 8.7/15 (17.5) kV
From BSDG to BSDG ACB Panel (Common LV Switchgear) lot 1 Power House
From Common Feeder ACB #1 to Incoming LV Panel #3 lot 1 Power House
From Common Feeder ACB #2 to Incoming LV Panel #3 lot 1 Power House
From LV MCC to:
Radiator (15 kW x 4 feeder) #1 lot 1 1
Jacket Water Pre Heater with Pump #1 lot 1 1
Air Compressor A lot 1 1
Fire Fighting System (Pumps, etc) lot 1 1
LO Priming Pump lot 1 1
Air Dry Unit lot 1 1
Engine Side Ventilation fan 1A lot 1 1
Exhaust Ventilation fan on the roof 1 lot 1 1
Exhaust Gas Ventilation Fan 1 lot 1 1
FO Unloading Pump A lot 1 1
FO Transfer Pump Storage Tank to Purifier lot 1 1
FO Transfer Pump Storage Daily Tank to Engine lot 1 1
FO Transfer Pump Storage Daily Tank to Pilot Engine lot 1 1
FO Transfer Pump Storage Tank to Purifier lot 1 1
Sludge Pump lot 1 1
Dirty Oil Pump lot 1 1
FO Clean & Pilot Drain Pump lot 1 1
LO Transfer Pump Storage Tank to Purifier lot 1 1
LO Oil Transfer Pump to Oil Sumptank lot 1 1
LO Used Pump lot 1 1
Waste Oil Transfer Pump lot 1 1
LO Purifier Pump lot 1 1
Fresh Water Supplay HT/LT lot 1 1
LT Radiator Pump lot 1 1
HT Radiator Pump lot 1 1
Submersible Pump lot 1 1
Transfer Pump Treated Tank to Purifier lot 1 1
Waste Water Pump lot 1 1
Neutralization Pump lot 1 1
Turning Gear 1 lot 1 1
Fire Detection and alarm panel lot 1 1
Pit Pump for Engine Room A lot 1 1
Pit Pump for Pump House lot 1 1
Step Up Trafo Control Power 1 lot 1 1
Auxiliary power for 11 kV Switchgear lot 1 1
Auxiliary power for NGR panel 1 & 2 lot 1 1
Auxiliary power for DC 110V Battery Charger lot 1 1
Gen Side Ventilation Fan 1B lot 1 1
DO Purifier A lot 1 1
LO Purifier A lot 1 1
Pre Lubricating Pump 1 lot 1 1
Water Treatment Unit lot 1 1
Auxiliary power for control panels & PLC Panels lot 1 1
PCMS (Plant Control Monitoring System) lot 1 1
Building service power for air conditioning unit, etc lot 1 1
Motor Driven Fire Pump lot 1 1
Electrical Driven Fire Pump lot 1 1
Jockey Pump lot 1 1

NYY 4x1.5mm2 lot 1 1


NYY 12x1.5mm3 lot 1 1
Ethernet UTP Cat 5E lot 1 1
lot 1 1
Fiber Optic lot 1 1

Bus Duct 1200 A, 15 kV, 31.5 kA 3 second, One 1/2” x 6 cu, 3P4W, Enclosure lot 1 1
Steel, Support Molded
Bus Duct 2000 A, 600 V, 65 kA 1 second, Two 1/2” x 4 cu, 3P4W, Enclosure lot 1 1
toSteel, Support20kV
Distribution 1/2”pole
GPO-3 sheet
Termination Kit unit 2 2

Grounding Cable lot 1 1


Pipe Conduit 2" lot 1 1

NYY 4+E-2,5mm2 lot 1 1


NYY 2+E-4mm2 lot 1 1
NYY 4+E-16mm2 lot 1 1
NYY 4+E-95mm2 lot 1 1

Grounding Grid cable lot 1 1


Neutral Distribution Transformer lot 1 1
Neutral Distribution Generator Transformer lot 1 1
Bonding Ladder lot 1 1
for Main Cable Support
Cable ladder 600mm, separator, joint plate, flexible earthing joint, nuts and lot 1 1
bolts
Straight Ladder
1.W 600 H 127 L 3000 mm mm pcs 9 Power House
2. W400 H127 L300 pcs 4 Power House
3. W200 H127 L300
Horizontal Elbow
1. W600 H127 R300 pcs 3 Power House
2. W400 H100 R300
3. W200 H100 R300
Horizontal Tee Equal
1. W1 600 W2 600 W3 600 H127 R300 pcs 1 power house
2. W1 400 W2 400 W3 400 H127 R300
3. W1 200 W2 200 W3 200 H127 R300
Vertical Inside Riser
1. W600 H127 R300 pcs 4 Power house
2. W400 H127 R300
3. W200 H127 R300
Vertical Outside Riser
1. W600 H127 R300 pcs 4 Power house
2. W400 H100 R300
3. W200 H100 R300
4. Jointing c/w Bolts, Nuts and Washers 14 H127 pcs 100 Power House
5. Baut CB 3/8 + 3/4 + Washers Nut
6. Separator Ladder 600 x 127
7.Separator Ladder 400 x 127
8. Separator Ladder 200 x 127
9. Cover Ladder c/w hold down clamp / hold down clip 600 x 127
10. Cover Ladder c/w hold down clamp / hold down clip 400 x 127
11. Cover Ladder c/w hold down clamp / hold down clip 200 x 127
12. Hold down clamp W x H : 30 x 127 (mm)
13. M6 x 20 Bolt + Washer + Nut
Cable ladder 200mm, separator, joint plate, flexible earthing joint, nuts and lot 1 1
bolts
Straight Ladder
1. W200 H127 L300
Horizontal Elbow
1. W200 H127 R300
Horizontal Tee Equal
1.W1 200 W2 600 W3 600 H127 R300
Vertical Inside Riser
1. W200 H127 R300
it for Lighting & GPO
Cable conduit 1" c/w accesories lot 1 1
Cable conduit 3" c/w accesories lot 1 1
Cable Gland 22 lot 1 1
Cable Gland M40 lot 1 1
Cable Gland M65 lot 1 1

g protection system complete.

Grounding Rod lot 1 1


Accesories lot 1 1
Accessories for Grounding lot 1 1
Cadwelld Connection ( including equipment cadweld ) lot 1 1
Conductor BC 120mm2 lot 1 1
Termination cable Lot 1 1

Air Terminal Radar System lot 1 1


Pole for Air Terminal lot 1 1
Grounding Rod lot 1 1
PVC Pipe & Accesories Lot 1 1
Accessories for Lighning ( Connector & Bracket ) Lot 1 1
Cadwelld Connection( including equipment cadweld ) Lot 1 1
Power cable :
Down conductor NYA 1x120mm2 Lot 1 1
Termination cable Lot 1 1

tem complete (If applicable)

er installation complete
small power installation
TL TCW 2x36W Lot 1 1
TL TCW c/w 2x36W Lot 1 1
Down Light LED 25W Lot 1 1
TBS 3 x 36 LED Lot 1 1
HPK 138 1 x 400W Lot 1 1
Flood Light LED 250W Lot 1 1
GPO 1 phase 10A Lot 1 1
GPO 3 phase 63A Lot 1 1
Emergency Lighting Lot 1 1
Street Lighting 250W Lot 1 1
Street Pole Lighting Lot 1 1
Joint Box for Lighting Lot 1 1
ution Board (MDB)
MDB, IP 4x Lot 1 1
Lighting Panel - IP 65 Lot 1 1

s complete.
Lot 1 1
Lot 1 1
Lot 1 1

Speaker TOA (25 Watt) Lot 1 1


Mixer Amplifier Lot 1 1
Micropone Lot 1 1
Cable Power Lot 1 1

m equipment complete.
Lot 1 1
Lot 1 1
Lot 1 1
Lot 1 1
Lot 1 1
Lot 1 1
Lot 1 1

and Protection panels complete.

complete with surge arresters, current transformers, etc.


2 11 / 20 KV, 11.5 MVA, ONAN / ONAF, ON LOAD TAP CHANGER YNd1 unit 2 Transformer GT1
sformer GT1 1 Transformer GT1
or Transformer 3 Transformer GT1
or @stacks c/w fan 2 Transformer GT1
1 Transformer GT1
2 Transformer GT1
Liters 1900 Transformer GT1

sformer GT 2 1 Transformer GT2


or Transformer 3 Transformer GT2
or @stacks c/w fan 2 Transformer GT2
1 Transformer GT2
2 Transformer GT2
Liters 1900 Transformer GT2
er complete with surge arrester, current transformers etc.
#2 11 / 0.4 KV, 1250 kVA, ONAN, OFF LOAD TAP CHANGER, YNd1 unit 2 TR UAT

EQUIPMENT

ar complete with circuit breakers, earthing switches, surge arresters,


ransformers.
Line-1 20KV SWITCHGEAR
NO. 1 INCOMING MV SWITCHGEAR 20kV Unit 1 1
GRID OUTGOING MV SWITCHGEAR 20kV Unit 1 1
SUBSTATION 20KV SWITCHGEAR :
TIE MV SWITCHGEAR 20kV Unit 1 1
Line-2 20KV SWITCHGEAR
NO. 1 INCOMING MV SWITCHGEAR 20kV Unit 1 1
GRID OUTGOING MV SWITCHGEAR 20kV Unit 1 1

required to be performed as stipulated in Book II.


1, VI.5)

and PLC control system complete with :


Lot 1 1
Lot 1 1
relay & terminal) Lot 1 1

y, Noise Filter, CPU + Memory, D/I, D/O, A/I, A/O) Lot 1 1


modules, include :
ter, CPU + Memory, D/I, D/O, A/I, A/O) Lot 1 1

Lot 1 1
Printer Desk
Terminal Cabinet
Power Cabinet

Lot 1 1
Lot 1 1
Lot 1 1

Lot 1 1
Lot 1 1
Lot 1 1

ction Box, Gland and accessories

Lot 1 1
Lot 1 1
Lot 1 1
Lot 1 1

00mm c/w cover, separator, joint plate, flexible earthing joint, nuts and bolts Lot 1 1

t 16 c/w accesories Lot 1 1


Lot 1 1

rial and accessories


ble Material Lot 1 1

required to be performed as stipulated in Book II. Lot 1 1


1, VI.5)

Modbus TCP/IP Modul ALP 121 Yokogawa Lot 1 1


Status
Installed
Installed
Installed

Installed

Installed

Installed

Installed
ELECTRICAL Unit
III.2.g.10.1Cable ladder 600mm, separator, joint plate, flexible earthing joint, lot
nuts andLadder
Straight bolts
1.W 600 H 127 L 3000 mm mm pcs
2. W400 H127 L300 pcs
3. W200 H127 L300
Horizontal Elbow
1. W600 H127 R300 pcs
2. W400 H100 R300
3. W200 H100 R300
Horizontal Tee Equal
1. W1 600 W2 600 W3 600 H127 R300 pcs
2. W1 400 W2 400 W3 400 H127 R300
3. W1 200 W2 200 W3 200 H127 R300
Vertical Inside Riser
1. W600 H127 R300 pcs
2. W400 H127 R300
3. W200 H127 R300
Vertical Outside Riser
1. W600 H127 R300 pcs
2. W400 H100 R300
3. W200 H100 R300
4. Jointing c/w Bolts, Nuts and Washers 14 H127 pcs
5. Baut CB 3/8 + 3/4 + Washers Nut
6. Separator Ladder 600 x 127
7.Separator Ladder 400 x 127
8. Separator Ladder 200 x 127
9. Cover Ladder c/w hold down clamp / hold down clip 600 x 127
10. Cover Ladder c/w hold down clamp / hold down clip 400 x 127
11. Cover Ladder c/w hold down clamp / hold down clip 200 x 127
12. Hold down clamp W x H : 30 x 127 (mm)
13. M6 x 20 Bolt + Washer + Nut
III.2.g.10.2Cable ladder 200mm, separator, joint plate, flexible earthing joint, lot
nuts and bolts
Straight Ladder
1. W200 H127 L300
Horizontal Elbow
1. W200 H127 R300
Horizontal Tee Equal
1.W1 200 W2 600 W3 600 H127 R300
Vertical Inside Riser
1. W200 H127 R300
11/9/2018 11/10/2018 11/11/2018 11/12/2018 11/13/2018 11/14/2018 11/15/2018
Location QTY
1 1

Power House 9
Power House 4

Power House 3

power house 1

Power house 4

Power house 4

Power House 100

1 1
11/16/2018 11/17/2018 11/18/2018 11/19/2018 11/20/2018 11/21/2018 11/22/2018 11/23/2018
11/24/2018 11/25/2018 11/26/2018 11/27/2018 11/28/2018 11/29/2018 11/30/2018 12/1/2018
12/2/2018 12/3/2018 12/4/2018 12/5/2018 12/6/2018 12/7/2018
ELECTRICAL
III.1 GENERATOR AND MAIN OUTPUT SYSTEM
III.1.b Main Output Connection for connection from Generator to the MV Switchgear/GCB compl
with support and structure, etc.
III.1.b.1 Generator Circuit Breaker
1. GCB Switchgear 11KV #1
Riser Cubicle #1 C/W Join Busbar & Join Accessories Handle
Rear Breaker, TUAS, Handle ES
2. GCB Switchgear 11KV #2
Riser Cubicle #2 C/W Join Busbar
3. VCB 1200A, 17.5 kV, 40 kA, for Generator #1
4. VCB 1200A, 17.5 kV, 40 kA, for Generator #2
5. VT Drawer C/W 11kV / 3 / 110V / 3 / 110V3 C / W Fuse
Class 0.5 50va(WYE);Class 3P 50VA(Open Delta)
6. MV Current Transformer 1000/ 1-1A
III.2 PLANT ELECTRICAL EQUIPMENT
III.2.a Medium Voltage switchgears complete with necessary control metering and protection and
III.2.a.1 Line-1 12kV SWITCHGEAR
III.2.a.1.1 NO. 1 AUX. TR. MV SWITCHGEAR 12kV
III.2.a.1.2 NO. 1 OUTGOING MV SWITCHGEAR 12kV
III.2.a.1.3 NGR PANEL #1
III.2.a.2 Line-2 12kV SWITCHGEAR
III.2.a.2.1 NO. 1 AUX. TR. MV SWITCHGEAR 12kV
III.2.a.2.2 NO. 1 OUTGOING MV SWITCHGEAR 12kV
III.2.a.2.3 NGR PANEL #2

III.2.b Low Voltage switchgears complete with necessary control metering and protection and
instrumentation system.
III.2.b.1 400V PCC Panel - IP4x Withdrawable, Fully type test
III.2.b.1.1 No. 1 LV SWITCHBOARD
III.2.b.1.2 LV TIE SWITCHBOARD
INC MCC COMMON 1
INCOMING 1
Riser 1
OUT FOR INC MCC ESSENTIAL 1
BUS COUPLER
OUT FOR INC MCC ESSENTIAL 2
INC MCC COMMON 2
INCOMING 2
Riser 2
III.2.c Low Voltage Motor Control Centers complete with necessary control, metering and protecti
and instrumentation
III.2.c.1 400V MCCsystem.
Panel - IP4x Withdrawable, Fully type test
III.2.c.1.1 No. 2 LV SWITCHBOARD
III.2.c.1.2 No. 3 LV SWITCHBOARD (Common/Emergency LV Switchboard)

III.2.d Uninterruptible AC power supply complete with necessary control, metering and protection
III.2.d.1 UPS for MCC 220VAC/220VAC, 10kVA, Back up time 3 Hours
DC Charger
Packing A
Packing B
Packing C
Packing D
UPS
UPS 1
UPS 2
By Pass
Rack Battery
AC Distribution Board
Rack Battery of UPS
Rack Battery of DC Charger
Busbar Intercell Connector Battery
III.2.e Black Start/Emergency Diesel Generator (EDG) complete with necessary control, metering
III.2.e.1 Emergency Diesel Generator
EDG Genset PL650P Generating Set
III.2.f Batteries, battery chargers and DC distribution panels complete with necessary control, me
III.2.f.1 Battery Charger for MV Panel 220VAC/110VDC, 5kVA, Back up time 30 Minutes
BOX 1
BOX 2
BOX 3
BOX 4
BOX 5
BOX 6
BOX 7
BOX 8
BOX 9
BOX 10
III.2.g Cabling and wiring complete cable trays, conduits and fittings and underground ducts.
III.2.g.1 MV Cable 11kV
III.2.g.1.1 From Generator 1 to MV Switch Gear (GCB)

III.2.g.1.2 From Generator 2 to MV Switch Gear (GCB)

III.2.g.1.3 From Outgoing MV Switchgear to Auxiliary Trafo 1

III.2.g.1.4 From Outgoing MV Switchgear to Auxiliary Trafo 2


III.2.g.2 MV Cable 20kV
III.2.g.2.1 From Step Up Trafo 1 to Step Up Incoming Panel 1
III.2.g.2.2 From Step Up Trafo 2 to Step Up Incoming Panel 2
III.2.g.2.3 From Outgoing MV Switchgear to First Pole No.1
III.2.g.2.4 From Outgoing MV Switchgear to First Pole No.2
III.2.g.2.5 MV Termination Kit
CU/XLPE/CTS/PVC/SWA/PVC 3 x 120 mm² - 18/30 (36) kV
CU/XLPE/CTS/PVC/SWA/PVC 3 x 120 mm² - 18/30 (36) kV 11KV
N2XSY (Cu/XLPE/CTS/PVC-FR) 1 x 120 mm2 - 8.7/15 (17.5) kV
III.2.g.3 LV Power Cable
III.2.g.3.1 From BSDG to BSDG ACB Panel (Common LV Switchgear)
III.2.g.3.2 From Common Feeder ACB #1 to Incoming LV Panel #3
III.2.g.3.3 From Common Feeder ACB #2 to Incoming LV Panel #3
III.2.g.3.4 From LV MCC to:
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.4 Control Cable
III.2.g.4.1 NYY 4x1.5mm2
III.2.g.4.2 NYY 12x1.5mm3
III.2.g.4.3 Ethernet UTP Cat 5E
III.2.g.4.4 Mod bus
III.2.g.4.5 Fiber Optic
III.2.g.5 MV Busduct
III.2.g.5.1 Bus Duct 1200 A, 15 kV, 31.5 kA 3 second, One 1/2” x 6 cu, 3P4W,
III.2.g.6 LV Busduct Enclosure Steel, Support Molded
III.2.g.6.1 Bus Duct 2000 A, 600 V, 65 kA 1 second, Two 1/2” x 4 cu, 3P4W,
III.2g.7 Termination toEnclosure Steel,
Distribution 20kVSupport
pole 1/2” GPO-3 sheet
III.2.g.7.1 Termination Kit

III.2.g.7.2 Grounding Cable


III.2.g.7.3 Pipe Conduit 2"
III.2.g.8 Lighting Cable
III.2.g.8.1 NYY 4+E-2,5mm2
III.2.g.8.2 NYY 2+E-4mm2
III.2.g.8.3 NYY 4+E-16mm2
III.2.g.8.4 NYY 4+E-95mm2
III.2.g.9 Grounding Link Cable
III.2.g.9.1 Grounding Grid cable
III.2.g.9.2 Neutral Distribution Transformer
III.2.g.9.3 Neutral Distribution Generator Transformer
III.2.g.9.4 Bonding Ladder
III.2.g.10 Cable ladder for Main Cable Support
III.2.g.10.1 Cable ladder 600mm, separator, joint plate, flexible earthing joint
nuts andLadder
Straight bolts
1. W400 H127 L300
2. W200 H127 L300
Horizontal Elbow
1. W600 H127 R300
2. W400 H100 R300
3. W200 H100 R300
Horizontal Tee Equal
1. W1 600 W2 600 W3 600 H127 R300
2. W1 400 W2 400 W3 400 H127 R300
3. W1 200 W2 200 W3 200 H127 R300
Vertical Inside Riser
1. W600 H127 R300
2. W400 H127 R300
3. W200 H127 R300
Vertical Outside Riser
1. W600 H127 R300
2. W400 H100 R300
3. W200 H100 R300
4. Jointing c/w Bolts, Nuts and Washers 14 H127
5. Baut CB 3/8 + 3/4 + Washers Nut
6. Separator Ladder 600 x 127
7.Separator Ladder 400 x 127
8. Separator Ladder 200 x 127
9. Cover Ladder c/w hold down clamp / hold down clip 600 x 127
10. Cover Ladder c/w hold down clamp / hold down clip 400 x 127
11. Cover Ladder c/w hold down clamp / hold down clip 200 x 127
12. Hold down clamp W x H : 30 x 127 (mm)
13. M6 x 20 Bolt + Washer + Nut
III.2.g.10.2 Cable ladder 200mm, separator, joint plate, flexible earthing join
nuts and bolts
Straight Ladder
1. W200 H127 L300
Horizontal Elbow
1. W200 H127 R300
Horizontal Tee Equal
1.W1 200 W2 600 W3 600 H127 R300
Vertical Inside Riser
1. W200 H127 R300
III.2.g.11 Cable Conduit for Lighting & GPO
III.2.g.11.1 Cable conduit 1" c/w accesories
III.2.g.11.2 Cable conduit 3" c/w accesories
III.2.g.11.3 Cable Gland 22
III.2.g.11.4 Cable Gland M40
III.2.g.11.5 Cable Gland M65

III.2.h Grounding and lightning protection system complete.


III.2.h.1 Grounding
III.2.h.1.1 Grounding Rod
III.2.h.1.2 Accesories
III.2.h.1.3 Accessories for Grounding
III.2.h.1.4 Cadwelld Connection ( including equipment cadweld )
III.2.h.1.5 Cable :
III.2.h.1.5.
III.2.h.1.5.
III.2.h.2 Lightning Protection
III.2.h.2.1 Air Terminal Radar System
III.2.h.2.2 Pole for Air Terminal
III.2.h.2.3 Grounding Rod
III.2.h.2.4 PVC Pipe & Accesories
III.2.h.2.5 Accessories for Lighning ( Connector & Bracket )
III.2.h.2.6 Cadwelld Connection( including equipment cadweld )
III.2.h.2.7 Power cable :
III.2.h.2.7.
III.2.h.2.7.

III.2.i Cathodic protection system complete (If applicable)

III.2.j Lighting and small power installation complete


III.2.j.1 Lighting and small power installation
III.2.j.1.1 TL TCW 2x36W
III.2.j.1.2 TL TCW c/w 2x36W
III.2.j.1.3 Down Light LED 25W
III.2.j.1.4 TBS 3 x 36 LED
III.2.j.1.5 HPK 138 1 x 400W
III.2.j.1.6 Flood Light LED 250W
III.2.j.1.7 GPO 1 phase 10A
III.2.j.1.8 GPO 3 phase 63A
III.2.j.1.9 Emergency Lighting
III.2.j.1.10 Street Lighting 250W
III.2.j.1.11 Street Pole Lighting
III.2.j.1.12 Joint Box for Lighting
III.2.j.2 Main Distribution Board (MDB)
III.2.j.2.1 MDB, IP 4x
III.2.j.2.2 Lighting Panel - IP 65

III.2.k Communication systems complete.


III.2.k.1 Indoor IP Telphone
III.2.k.2 PABX System
III.2.k.3 Cabling System
III.2.k.4 PABX & SOUND SYSTEM
III.2.k.4.1 Speaker TOA (25 Watt)
III.2.k.4.2 Mixer Amplifier
III.2.k.4.3 Micropone
III.2.k.4.4 Cable Power

III.2.l Closed circuit TV system equipment complete.


III.2.l.1 CCTV PTZ
III.2.l.2 PC c/w Monitor 32"
III.2.l.3 Pen Tilt Switch
III.2.l.4 DVR Unit
III.2.l.5 Power Supply
III.2.l.6 Cabling System
III.2.l.7 Fire Extinguiser

III.2.m Power Plant Metering and Protection panels complete.

III.3 POWER TRANSFORMERS


III.3.a Generator transformer complete with surge arresters, current transformers, etc.
III.3.a.1 Step Up TR #2 11 / 20 KV, 11.5 MVA, ONAN / ONAF, ON LOAD TAP CHANGER YNd
1. Main Transformer GT1
2. Radiator for Transformer
3. Fan Radiator @stacks c/w fan
4. Conservator
5. Cable box
6. Oil Drum

1. Main Transformer GT 2
2. Radiator for Transformer
3. Fan Radiator @stacks c/w fan
4. Conservator
5. Cable box
6. Oil Drum
III.3.b Unit/Station Transformer complete with surge arrester, current transformers etc.
III.3.b.1 No.1 Aux TR #2 11 / 0.4 KV, 1250 kVA, ONAN, OFF LOAD TAP CHANGER, YNd1

III.4 20 kV/70kV / 150kV SUBSTATION EQUIPMENT


III.4.b 20kV SWITCHGEAR
III.4.b.1 MV switchgear complete with circuit breakers, earthing switches, surge arresters
instrument
III.4.b.1.1 transformers.
Line-1 20KV SWITCHGEAR
III.4.b.1.1.
III.4.b.1.1.
III.4.b.1.1.

III.4.b.1.2 Line-2 20KV SWITCHGEAR


III.4.b.1.2.
III.4.b.1.2.

III.6 STUDIES FOR ELECTRICAL


III.6.1 The studies/calculation required to be performed as stipulated in Book II.
(Forward to schedule 1.1, VI.5)
CONTROL & INSTRUMENTATION
IV.1 Distributed digital control system and PLC control system complete with :
IV.1.1 DCS System
IV.1.2 Engineering & Supervision
IV.1.3 Panel Box inc. breaker, relay & terminal)
IV.1.4 Remote Terminal Unit (RTU)
IV.1.4.1 Power Supply, Noise Filter, CPU + Memory, D/I, D/O, A/I, A/O)
IV.2 The cubicle and accessories, I/O modules, include :
IV.2.1 Power Supply, Noise Filter, CPU + Memory, D/I, D/O, A/I, A/O)

IV.3 Power plant operation control desks,


IV.3.1 Operator Desk

IV.6 Instrument valve, include:


IV.6.1 Ball Valve
IV.6.2 Tube & Fitting
IV.6.3 Accessorries

IV.7 Field Instruments, include:


IV.7.3 Level Transmitter
IV.7.6 Temperature Gauge and Well
IV.7.7 Level Gauge

IV.10 Instrument Cable, Cable tray, Junction Box, Gland and accessories
IV.10.1 Instrument Cable
IV.10.1.1 REYY 2P x 1.5 mm2
IV.10.1.2 REYY 10 x 1.5 mm2
IV.10.1.3 NYY 2C x 1.5 mm2
IV.10.1.4 NYY 10Cx1.5mm2
IV.10.2 Cable Tray for Instrument
IV.10.2.1 Cable Tray 200mm c/w cover, separator, joint plate, flexible earthing joint, nuts a
IV.10.3 bolts
Cable Conduit
IV.10.3.1 Cable conduit 16 c/w accesories
IV.10.3.2 Cable Gland 16

IV.11 Instrument installation bulk material and accessories


IV.11.1 Supporting & Consumable Material

IV.12 STUDIES FOR INSTRUMENT & CONTROL


IV.12.1 The studies/calculation required to be performed as stipulated in Book II.
(Forward to schedule 1.1, VI.5)
IV.13 Additional Pengadaan Converter
IV.13.1 Converter Profibus to Modbus TCP/IP Modul ALP 121 Yokogawa
QTY Location

n for connection from Generator to the MV Switchgear/GCB complete


ure, etc.
rcuit Breaker unit 2 Power House
hgear 11KV #1 1
Riser Cubicle #1 C/W Join Busbar & Join Accessories Handle
Rear Breaker, TUAS, Handle ES
hgear 11KV #2 1
Riser Cubicle #2 C/W Join Busbar
A, 17.5 kV, 40 kA, for Generator #1 1
A, 17.5 kV, 40 kA, for Generator #2 1
C/W 11kV / 3 / 110V / 3 / 110V3 C / W Fuse 1
Class 0.5 50va(WYE);Class 3P 50VA(Open Delta)
nt Transformer 1000/ 1-1A 1

gears complete with necessary control metering and protection and instrumentation system.
SWITCHGEAR
NO. 1 AUX. TR. MV SWITCHGEAR 12kV Unit 1 Power House
NO. 1 OUTGOING MV SWITCHGEAR 12kV Unit 1 Power House
NGR PANEL #1 Unit 1 Power House
SWITCHGEAR
NO. 1 AUX. TR. MV SWITCHGEAR 12kV Unit 1 Power House
NO. 1 OUTGOING MV SWITCHGEAR 12kV Unit 1 Power House
NGR PANEL #2 Unit 1 Power House

s complete with necessary control metering and protection and


.
nel - IP4x Withdrawable, Fully type test
No. 1 LV SWITCHBOARD Unit 1 Power House
LV TIE SWITCHBOARD Unit 1 Power House
INC MCC COMMON 1
INCOMING 1

OUT FOR INC MCC ESSENTIAL 1


BUS COUPLER
OUT FOR INC MCC ESSENTIAL 2
INC MCC COMMON 2
INCOMING 2

trol Centers complete with necessary control, metering and protection


stem.
anel - IP4x Withdrawable, Fully type test
No. 2 LV SWITCHBOARD Unit 1 Power House
No. 3 LV SWITCHBOARD (Common/Emergency LV Switchboard) Unit 1 Power House

er supply complete with necessary control, metering and protection and instrumentation system.
220VAC/220VAC, 10kVA, Back up time 3 Hours unit 1 Power House
ution Board
ry of UPS
ry of DC Charger
ercell Connector Battery
Diesel Generator (EDG) complete with necessary control, metering and protection and instrumentation system.
iesel Generator Lot 1 Power House
et PL650P Generating Set
ers and DC distribution panels complete with necessary control, metering and protection and instrumentation system.
ger for MV Panel 220VAC/110VDC, 5kVA, Back up time 30 Minutes unit 1 Power House

plete cable trays, conduits and fittings and underground ducts.

From Generator 1 to MV Switch Gear (GCB) lot 1 Power House

From Generator 2 to MV Switch Gear (GCB) lot 1 Power House

From Outgoing MV Switchgear to Auxiliary Trafo 1 lot 1 Power House

From Outgoing MV Switchgear to Auxiliary Trafo 2 lot 1 Power House

From Step Up Trafo 1 to Step Up Incoming Panel 1 lot 1 Power House


From Step Up Trafo 2 to Step Up Incoming Panel 2 lot 1 Power House
From Outgoing MV Switchgear to First Pole No.1 lot 1 Power House
From Outgoing MV Switchgear to First Pole No.2 lot 1 Power House
MV Termination Kit lot 1 Power House
CU/XLPE/CTS/PVC/SWA/PVC 3 x 120 mm² - 18/30 (36) kV
CU/XLPE/CTS/PVC/SWA/PVC 3 x 120 mm² - 18/30 (36) kV 11KV 8.7/15KV
N2XSY (Cu/XLPE/CTS/PVC-FR) 1 x 120 mm2 - 8.7/15 (17.5) kV
From BSDG to BSDG ACB Panel (Common LV Switchgear) lot 1 Power House
From Common Feeder ACB #1 to Incoming LV Panel #3 lot 1 Power House
From Common Feeder ACB #2 to Incoming LV Panel #3 lot 1 Power House
From LV MCC to:
Radiator (15 kW x 4 feeder) #1 lot 1 1
Jacket Water Pre Heater with Pump #1 lot 1 1
Air Compressor A lot 1 1
Fire Fighting System (Pumps, etc) lot 1 1
LO Priming Pump lot 1 1
Air Dry Unit lot 1 1
Engine Side Ventilation fan 1A lot 1 1
Exhaust Ventilation fan on the roof 1 lot 1 1
Exhaust Gas Ventilation Fan 1 lot 1 1
FO Unloading Pump A lot 1 1
FO Transfer Pump Storage Tank to Purifier lot 1 1
FO Transfer Pump Storage Daily Tank to Engine lot 1 1
FO Transfer Pump Storage Daily Tank to Pilot Engine lot 1 1
FO Transfer Pump Storage Tank to Purifier lot 1 1
Sludge Pump lot 1 1
Dirty Oil Pump lot 1 1
FO Clean & Pilot Drain Pump lot 1 1
LO Transfer Pump Storage Tank to Purifier lot 1 1
LO Oil Transfer Pump to Oil Sumptank lot 1 1
LO Used Pump lot 1 1
Waste Oil Transfer Pump lot 1 1
LO Purifier Pump lot 1 1
Fresh Water Supplay HT/LT lot 1 1
LT Radiator Pump lot 1 1
HT Radiator Pump lot 1 1
Submersible Pump lot 1 1
Transfer Pump Treated Tank to Purifier lot 1 1
Waste Water Pump lot 1 1
Neutralization Pump lot 1 1
Turning Gear 1 lot 1 1
Fire Detection and alarm panel lot 1 1
Pit Pump for Engine Room A lot 1 1
Pit Pump for Pump House lot 1 1
Step Up Trafo Control Power 1 lot 1 1
Auxiliary power for 11 kV Switchgear lot 1 1
Auxiliary power for NGR panel 1 & 2 lot 1 1
Auxiliary power for DC 110V Battery Charger lot 1 1
Gen Side Ventilation Fan 1B lot 1 1
DO Purifier A lot 1 1
LO Purifier A lot 1 1
Pre Lubricating Pump 1 lot 1 1
Water Treatment Unit lot 1 1
Auxiliary power for control panels & PLC Panels lot 1 1
PCMS (Plant Control Monitoring System) lot 1 1
Building service power for air conditioning unit, etc lot 1 1
Motor Driven Fire Pump lot 1 1
Electrical Driven Fire Pump lot 1 1
Jockey Pump lot 1 1

NYY 4x1.5mm2 lot 1 1


NYY 12x1.5mm3 lot 1 1
Ethernet UTP Cat 5E lot 1 1
lot 1 1
Fiber Optic lot 1 1

Bus Duct 1200 A, 15 kV, 31.5 kA 3 second, One 1/2” x 6 cu, 3P4W, lot 1 1
Enclosure Steel, Support Molded
Bus Duct 2000 A, 600 V, 65 kA 1 second, Two 1/2” x 4 cu, 3P4W, lot 1 1
toEnclosure Steel,
Distribution 20kVSupport
pole 1/2” GPO-3 sheet
Termination Kit unit 2 2

Grounding Cable lot 1 1


Pipe Conduit 2" lot 1 1

NYY 4+E-2,5mm2 lot 1 1


NYY 2+E-4mm2 lot 1 1
NYY 4+E-16mm2 lot 1 1
NYY 4+E-95mm2 lot 1 1

Grounding Grid cable lot 1 1


Neutral Distribution Transformer lot 1 1
Neutral Distribution Generator Transformer lot 1 1
Bonding Ladder lot 1 1
for Main Cable Support
Cable ladder 600mm, separator, joint plate, flexible earthing joint, lot 1 1
nuts andLadder
Straight bolts
1. W400 H127 L300 pcs 7 power house
2. W200 H127 L300
Horizontal Elbow
1. W600 H127 R300
2. W400 H100 R300
3. W200 H100 R300
Horizontal Tee Equal
1. W1 600 W2 600 W3 600 H127 R300 pcs 1 power house
2. W1 400 W2 400 W3 400 H127 R300
3. W1 200 W2 200 W3 200 H127 R300
Vertical Inside Riser
1. W600 H127 R300
2. W400 H127 R300
3. W200 H127 R300
Vertical Outside Riser
1. W600 H127 R300
2. W400 H100 R300
3. W200 H100 R300
4. Jointing c/w Bolts, Nuts and Washers 14 H127
5. Baut CB 3/8 + 3/4 + Washers Nut
6. Separator Ladder 600 x 127
7.Separator Ladder 400 x 127
8. Separator Ladder 200 x 127
9. Cover Ladder c/w hold down clamp / hold down clip 600 x 127
10. Cover Ladder c/w hold down clamp / hold down clip 400 x 127
11. Cover Ladder c/w hold down clamp / hold down clip 200 x 127
12. Hold down clamp W x H : 30 x 127 (mm)
13. M6 x 20 Bolt + Washer + Nut
Cable ladder 200mm, separator, joint plate, flexible earthing joint, lot 1 1
nuts and bolts
Straight Ladder
1. W200 H127 L300
Horizontal Elbow
1. W200 H127 R300
Horizontal Tee Equal
1.W1 200 W2 600 W3 600 H127 R300
Vertical Inside Riser
1. W200 H127 R300
it for Lighting & GPO
Cable conduit 1" c/w accesories lot 1 1
Cable conduit 3" c/w accesories lot 1 1
Cable Gland 22 lot 1 1
Cable Gland M40 lot 1 1
Cable Gland M65 lot 1 1

g protection system complete.

Grounding Rod lot 1 1


Accesories lot 1 1
Accessories for Grounding lot 1 1
Cadwelld Connection ( including equipment cadweld ) lot 1 1

Conductor BC 120mm2 lot 1 1


Termination cable Lot 1 1

Air Terminal Radar System lot 1 1


Pole for Air Terminal lot 1 1
Grounding Rod lot 1 1
PVC Pipe & Accesories Lot 1 1
Accessories for Lighning ( Connector & Bracket ) Lot 1 1
Cadwelld Connection( including equipment cadweld ) Lot 1 1
Power cable :
Down conductor NYA 1x120mm2 Lot 1 1
Termination cable Lot 1 1

tem complete (If applicable)

er installation complete
small power installation
TL TCW 2x36W Lot 1 1
TL TCW c/w 2x36W Lot 1 1
Down Light LED 25W Lot 1 1
TBS 3 x 36 LED Lot 1 1
HPK 138 1 x 400W Lot 1 1
Flood Light LED 250W Lot 1 1
GPO 1 phase 10A Lot 1 1
GPO 3 phase 63A Lot 1 1
Emergency Lighting Lot 1 1
Street Lighting 250W Lot 1 1
Street Pole Lighting Lot 1 1
Joint Box for Lighting Lot 1 1
ution Board (MDB)
MDB, IP 4x Lot 1 1
Lighting Panel - IP 65 Lot 1 1

s complete.
Lot 1 1
Lot 1 1
Lot 1 1

Speaker TOA (25 Watt) Lot 1 1


Mixer Amplifier Lot 1 1
Micropone Lot 1 1
Cable Power Lot 1 1

m equipment complete.
Lot 1 1
Lot 1 1
Lot 1 1
Lot 1 1
Lot 1 1
Lot 1 1
Lot 1 1

and Protection panels complete.

complete with surge arresters, current transformers, etc.


2 11 / 20 KV, 11.5 MVA, ONAN / ONAF, ON LOAD TAP CHANGER YNd1 unit 2 Transformer GT1
sformer GT1 1 Transformer GT1
or Transformer 3 Transformer GT1
or @stacks c/w fan 2 Transformer GT1
1 Transformer GT1
2 Transformer GT1
Liters 1900 Transformer GT1

sformer GT 2 1 Transformer GT2


or Transformer 3 Transformer GT2
or @stacks c/w fan 2 Transformer GT2
1 Transformer GT2
2 Transformer GT2
Liters 1900 Transformer GT2
er complete with surge arrester, current transformers etc.
#2 11 / 0.4 KV, 1250 kVA, ONAN, OFF LOAD TAP CHANGER, YNd1 unit 2 TR UAT

EQUIPMENT

ar complete with circuit breakers, earthing switches, surge arresters,


ransformers.
Line-1 20KV SWITCHGEAR
NO. 1 INCOMING MV SWITCHGEAR 20kV Unit 1 1
GRID OUTGOING MV SWITCHGEAR 20kV Unit 1 1
SUBSTATION 20KV SWITCHGEAR :
TIE MV SWITCHGEAR 20kV Unit 1 1
Line-2 20KV SWITCHGEAR
NO. 1 INCOMING MV SWITCHGEAR 20kV Unit 1 1
GRID OUTGOING MV SWITCHGEAR 20kV Unit 1 1

required to be performed as stipulated in Book II.


1, VI.5)

and PLC control system complete with :


Lot 1 1
Lot 1 1
relay & terminal) Lot 1 1

y, Noise Filter, CPU + Memory, D/I, D/O, A/I, A/O) Lot 1 1


modules, include :
ter, CPU + Memory, D/I, D/O, A/I, A/O) Lot 1 1

Lot 1 1
Printer Desk
Terminal Cabinet
Power Cabinet

Lot 1 1
Lot 1 1
Lot 1 1

Lot 1 1
Lot 1 1
Lot 1 1

ction Box, Gland and accessories

Lot 1 1
Lot 1 1
Lot 1 1
Lot 1 1

00mm c/w cover, separator, joint plate, flexible earthing joint, nuts and Lot 1 1

t 16 c/w accesories Lot 1 1


Lot 1 1

rial and accessories


ble Material Lot 1 1

required to be performed as stipulated in Book II. Lot 1 1


1, VI.5)

Modbus TCP/IP Modul ALP 121 Yokogawa Lot 1 1


Status
ELECTRICAL
III.1 GENERATOR AND MAIN OUTPUT SYSTEM
III.1.b Main Output Connection for connection from Generator to the MV Switchgear/GCB compl
with support and structure, etc.
III.1.b.1 Generator Circuit Breaker
1. GCB Switchgear 11KV #1
Riser Cubicle #1 C/W Join Busbar & Join Accessories Handle
Rear Breaker, TUAS, Handle ES
2. GCB Switchgear 11KV #2
Riser Cubicle #2 C/W Join Busbar
3. VCB 1200A, 17.5 kV, 40 kA, for Generator #1
4. VCB 1200A, 17.5 kV, 40 kA, for Generator #2
5. VT Drawer C/W 11kV / 3 / 110V / 3 / 110V3 C / W Fuse
Class 0.5 50va(WYE);Class 3P 50VA(Open Delta)
6. MV Current Transformer 1000/ 1-1A
III.2 PLANT ELECTRICAL EQUIPMENT
III.2.a Medium Voltage switchgears complete with necessary control metering and protection and
III.2.a.1 Line-1 12kV SWITCHGEAR
III.2.a.1.1 NO. 1 AUX. TR. MV SWITCHGEAR 12kV
III.2.a.1.2 NO. 1 OUTGOING MV SWITCHGEAR 12kV
III.2.a.1.3 NGR PANEL #1
III.2.a.2 Line-2 12kV SWITCHGEAR
III.2.a.2.1 NO. 1 AUX. TR. MV SWITCHGEAR 12kV
III.2.a.2.2 NO. 1 OUTGOING MV SWITCHGEAR 12kV
III.2.a.2.3 NGR PANEL #2

III.2.b Low Voltage switchgears complete with necessary control metering and protection and
instrumentation system.
III.2.b.1 400V PCC Panel - IP4x Withdrawable, Fully type test
III.2.b.1.1 No. 1 LV SWITCHBOARD
III.2.b.1.2 LV TIE SWITCHBOARD
INC MCC COMMON 1
INCOMING 1
Riser 1
OUT FOR INC MCC ESSENTIAL 1
BUS COUPLER
OUT FOR INC MCC ESSENTIAL 2
INC MCC COMMON 2
INCOMING 2
Riser 2
III.2.c Low Voltage Motor Control Centers complete with necessary control, metering and protecti
and instrumentation
III.2.c.1 400V MCCsystem.
Panel - IP4x Withdrawable, Fully type test
III.2.c.1.1 No. 2 LV SWITCHBOARD
III.2.c.1.2 No. 3 LV SWITCHBOARD (Common/Emergency LV Switchboard)

III.2.d Uninterruptible AC power supply complete with necessary control, metering and protection
III.2.d.1 UPS for MCC 220VAC/220VAC, 10kVA, Back up time 3 Hours
DC Charger
Packing A
Packing B
Packing C
Packing D
UPS
UPS 1
UPS 2
By Pass
Rack Battery
AC Distribution Board
Rack Battery of UPS
Rack Battery of DC Charger
Busbar Intercell Connector Battery
III.2.e Black Start/Emergency Diesel Generator (EDG) complete with necessary control, metering
III.2.e.1 Emergency Diesel Generator
EDG Genset PL650P Generating Set
III.2.f Batteries, battery chargers and DC distribution panels complete with necessary control, me
III.2.f.1 Battery Charger for MV Panel 220VAC/110VDC, 5kVA, Back up time 30 Minutes
BOX 1
BOX 2
BOX 3
BOX 4
BOX 5
BOX 6
BOX 7
BOX 8
BOX 9
BOX 10
III.2.g Cabling and wiring complete cable trays, conduits and fittings and underground ducts.
III.2.g.1 MV Cable 11kV
III.2.g.1.1 From Generator 1 to MV Switch Gear (GCB)

III.2.g.1.2 From Generator 2 to MV Switch Gear (GCB)

III.2.g.1.3 From Outgoing MV Switchgear to Auxiliary Trafo 1

III.2.g.1.4 From Outgoing MV Switchgear to Auxiliary Trafo 2


III.2.g.2 MV Cable 20kV
III.2.g.2.1 From Step Up Trafo 1 to Step Up Incoming Panel 1
III.2.g.2.2 From Step Up Trafo 2 to Step Up Incoming Panel 2
III.2.g.2.3 From Outgoing MV Switchgear to First Pole No.1
III.2.g.2.4 From Outgoing MV Switchgear to First Pole No.2
III.2.g.2.5 MV Termination Kit
CU/XLPE/CTS/PVC/SWA/PVC 3 x 120 mm² - 18/30 (36) kV
CU/XLPE/CTS/PVC/SWA/PVC 3 x 120 mm² - 18/30 (36) kV 11KV
N2XSY (Cu/XLPE/CTS/PVC-FR) 1 x 120 mm2 - 8.7/15 (17.5) kV
III.2.g.3 LV Power Cable
III.2.g.3.1 From BSDG to BSDG ACB Panel (Common LV Switchgear)
III.2.g.3.2 From Common Feeder ACB #1 to Incoming LV Panel #3
III.2.g.3.3 From Common Feeder ACB #2 to Incoming LV Panel #3
III.2.g.3.4 From LV MCC to:
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.3.4.
III.2.g.4 Control Cable
III.2.g.4.1 NYY 4x1.5mm2
III.2.g.4.2 NYY 12x1.5mm3
III.2.g.4.3 Ethernet UTP Cat 5E
III.2.g.4.4 Mod bus
III.2.g.4.5 Fiber Optic
III.2.g.5 MV Busduct
III.2.g.5.1 Bus Duct 1200 A, 15 kV, 31.5 kA 3 second, One 1/2” x 6 cu, 3P4W,
III.2.g.6 LV Busduct Enclosure Steel, Support Molded
III.2.g.6.1 Bus Duct 2000 A, 600 V, 65 kA 1 second, Two 1/2” x 4 cu, 3P4W,
III.2g.7 Termination toEnclosure Steel,
Distribution 20kVSupport
pole 1/2” GPO-3 sheet
III.2.g.7.1 Termination Kit

III.2.g.7.2 Grounding Cable


III.2.g.7.3 Pipe Conduit 2"
III.2.g.8 Lighting Cable
III.2.g.8.1 NYY 4+E-2,5mm2
III.2.g.8.2 NYY 2+E-4mm2
III.2.g.8.3 NYY 4+E-16mm2
III.2.g.8.4 NYY 4+E-95mm2
III.2.g.9 Grounding Link Cable
III.2.g.9.1 Grounding Grid cable
III.2.g.9.2 Neutral Distribution Transformer
III.2.g.9.3 Neutral Distribution Generator Transformer
III.2.g.9.4 Bonding Ladder
III.2.g.10 Cable ladder for Main Cable Support
III.2.g.10.1 Cable ladder 600mm, separator, joint plate, flexible earthing joint
nuts andLadder
Straight bolts
1. W400 H127 L300
2. W200 H127 L300
Horizontal Elbow
1. W600 H127 R300
2. W400 H100 R300
3. W200 H100 R300
Horizontal Tee Equal
1. W1 600 W2 600 W3 600 H127 R300
2. W1 400 W2 400 W3 400 H127 R300
3. W1 200 W2 200 W3 200 H127 R300
Vertical Inside Riser
1. W600 H127 R300
2. W400 H127 R300
3. W200 H127 R300
Vertical Outside Riser
1. W600 H127 R300
2. W400 H100 R300
3. W200 H100 R300
4. Jointing c/w Bolts, Nuts and Washers 14 H127
5. Baut CB 3/8 + 3/4 + Washers Nut
6. Separator Ladder 600 x 127
7.Separator Ladder 400 x 127
8. Separator Ladder 200 x 127
9. Cover Ladder c/w hold down clamp / hold down clip 600 x 127
10. Cover Ladder c/w hold down clamp / hold down clip 400 x 127
11. Cover Ladder c/w hold down clamp / hold down clip 200 x 127
12. Hold down clamp W x H : 30 x 127 (mm)
13. M6 x 20 Bolt + Washer + Nut
III.2.g.10.2 Cable ladder 200mm, separator, joint plate, flexible earthing join
nuts and bolts
Straight Ladder
1. W200 H127 L300
Horizontal Elbow
1. W200 H127 R300
Horizontal Tee Equal
1.W1 200 W2 600 W3 600 H127 R300
Vertical Inside Riser
1. W200 H127 R300
III.2.g.11 Cable Conduit for Lighting & GPO
III.2.g.11.1 Cable conduit 1" c/w accesories
III.2.g.11.2 Cable conduit 3" c/w accesories
III.2.g.11.3 Cable Gland 22
III.2.g.11.4 Cable Gland M40
III.2.g.11.5 Cable Gland M65

III.2.h Grounding and lightning protection system complete.


III.2.h.1 Grounding
III.2.h.1.1 Grounding Rod
III.2.h.1.2 Accesories
III.2.h.1.3 Accessories for Grounding
III.2.h.1.4 Cadwelld Connection ( including equipment cadweld )
III.2.h.1.5 Cable :
III.2.h.1.5.
III.2.h.1.5.
III.2.h.2 Lightning Protection
III.2.h.2.1 Air Terminal Radar System
III.2.h.2.2 Pole for Air Terminal
III.2.h.2.3 Grounding Rod
III.2.h.2.4 PVC Pipe & Accesories
III.2.h.2.5 Accessories for Lighning ( Connector & Bracket )
III.2.h.2.6 Cadwelld Connection( including equipment cadweld )
III.2.h.2.7 Power cable :
III.2.h.2.7.
III.2.h.2.7.

III.2.i Cathodic protection system complete (If applicable)

III.2.j Lighting and small power installation complete


III.2.j.1 Lighting and small power installation
III.2.j.1.1 TL TCW 2x36W
III.2.j.1.2 TL TCW c/w 2x36W
III.2.j.1.3 Down Light LED 25W
III.2.j.1.4 TBS 3 x 36 LED
III.2.j.1.5 HPK 138 1 x 400W
III.2.j.1.6 Flood Light LED 250W
III.2.j.1.7 GPO 1 phase 10A
III.2.j.1.8 GPO 3 phase 63A
III.2.j.1.9 Emergency Lighting
III.2.j.1.10 Street Lighting 250W
III.2.j.1.11 Street Pole Lighting
III.2.j.1.12 Joint Box for Lighting
III.2.j.2 Main Distribution Board (MDB)
III.2.j.2.1 MDB, IP 4x
III.2.j.2.2 Lighting Panel - IP 65

III.2.k Communication systems complete.


III.2.k.1 Indoor IP Telphone
III.2.k.2 PABX System
III.2.k.3 Cabling System
III.2.k.4 PABX & SOUND SYSTEM
III.2.k.4.1 Speaker TOA (25 Watt)
III.2.k.4.2 Mixer Amplifier
III.2.k.4.3 Micropone
III.2.k.4.4 Cable Power

III.2.l Closed circuit TV system equipment complete.


III.2.l.1 CCTV PTZ
III.2.l.2 PC c/w Monitor 32"
III.2.l.3 Pen Tilt Switch
III.2.l.4 DVR Unit
III.2.l.5 Power Supply
III.2.l.6 Cabling System
III.2.l.7 Fire Extinguiser

III.2.m Power Plant Metering and Protection panels complete.

III.3 POWER TRANSFORMERS


III.3.a Generator transformer complete with surge arresters, current transformers, etc.
III.3.a.1 Step Up TR #2 11 / 20 KV, 11.5 MVA, ONAN / ONAF, ON LOAD TAP CHANGER YNd
1. Main Transformer GT1
2. Radiator for Transformer
3. Fan Radiator @stacks c/w fan
4. Conservator
5. Cable box
6. Oil Drum

1. Main Transformer GT 2
2. Radiator for Transformer
3. Fan Radiator @stacks c/w fan
4. Conservator
5. Cable box
6. Oil Drum
III.3.b Unit/Station Transformer complete with surge arrester, current transformers etc.
III.3.b.1 No.1 Aux TR #2 11 / 0.4 KV, 1250 kVA, ONAN, OFF LOAD TAP CHANGER, YNd1

III.4 20 kV/70kV / 150kV SUBSTATION EQUIPMENT


III.4.b 20kV SWITCHGEAR
III.4.b.1 MV switchgear complete with circuit breakers, earthing switches, surge arresters
instrument
III.4.b.1.1 transformers.
Line-1 20KV SWITCHGEAR
III.4.b.1.1.
III.4.b.1.1.
III.4.b.1.1.

III.4.b.1.2 Line-2 20KV SWITCHGEAR


III.4.b.1.2.
III.4.b.1.2.

III.6 STUDIES FOR ELECTRICAL


III.6.1 The studies/calculation required to be performed as stipulated in Book II.
(Forward to schedule 1.1, VI.5)
CONTROL & INSTRUMENTATION
IV.1 Distributed digital control system and PLC control system complete with :
IV.1.1 DCS System
IV.1.2 Engineering & Supervision
IV.1.3 Panel Box inc. breaker, relay & terminal)
IV.1.4 Remote Terminal Unit (RTU)
IV.1.4.1 Power Supply, Noise Filter, CPU + Memory, D/I, D/O, A/I, A/O)
IV.2 The cubicle and accessories, I/O modules, include :
IV.2.1 Power Supply, Noise Filter, CPU + Memory, D/I, D/O, A/I, A/O)

IV.3 Power plant operation control desks,


IV.3.1 Operator Desk

IV.6 Instrument valve, include:


IV.6.1 Ball Valve
IV.6.2 Tube & Fitting
IV.6.3 Accessorries

IV.7 Field Instruments, include:


IV.7.3 Level Transmitter
IV.7.6 Temperature Gauge and Well
IV.7.7 Level Gauge

IV.10 Instrument Cable, Cable tray, Junction Box, Gland and accessories
IV.10.1 Instrument Cable
IV.10.1.1 REYY 2P x 1.5 mm2
IV.10.1.2 REYY 10 x 1.5 mm2
IV.10.1.3 NYY 2C x 1.5 mm2
IV.10.1.4 NYY 10Cx1.5mm2
IV.10.2 Cable Tray for Instrument
IV.10.2.1 Cable Tray 200mm c/w cover, separator, joint plate, flexible earthing joint, nuts a
IV.10.3 bolts
Cable Conduit
IV.10.3.1 Cable conduit 16 c/w accesories
IV.10.3.2 Cable Gland 16

IV.11 Instrument installation bulk material and accessories


IV.11.1 Supporting & Consumable Material

IV.12 STUDIES FOR INSTRUMENT & CONTROL


IV.12.1 The studies/calculation required to be performed as stipulated in Book II.
(Forward to schedule 1.1, VI.5)
IV.13 Additional Pengadaan Converter
IV.13.1 Converter Profibus to Modbus TCP/IP Modul ALP 121 Yokogawa
QTY Location

n for connection from Generator to the MV Switchgear/GCB complete


ure, etc.
rcuit Breaker unit 2 Power House
hgear 11KV #1 1
Riser Cubicle #1 C/W Join Busbar & Join Accessories Handle
Rear Breaker, TUAS, Handle ES
hgear 11KV #2 1
Riser Cubicle #2 C/W Join Busbar
A, 17.5 kV, 40 kA, for Generator #1 1
A, 17.5 kV, 40 kA, for Generator #2 1
C/W 11kV / 3 / 110V / 3 / 110V3 C / W Fuse 1
Class 0.5 50va(WYE);Class 3P 50VA(Open Delta)
nt Transformer 1000/ 1-1A 1

gears complete with necessary control metering and protection and instrumentation system.
SWITCHGEAR
NO. 1 AUX. TR. MV SWITCHGEAR 12kV Unit 1 Power House
NO. 1 OUTGOING MV SWITCHGEAR 12kV Unit 1 Power House
NGR PANEL #1 Unit 1 Power House
SWITCHGEAR
NO. 1 AUX. TR. MV SWITCHGEAR 12kV Unit 1 Power House
NO. 1 OUTGOING MV SWITCHGEAR 12kV Unit 1 Power House
NGR PANEL #2 Unit 1 Power House

s complete with necessary control metering and protection and


.
nel - IP4x Withdrawable, Fully type test
No. 1 LV SWITCHBOARD Unit 1 Power House
LV TIE SWITCHBOARD Unit 1 Power House
INC MCC COMMON 1
INCOMING 1

OUT FOR INC MCC ESSENTIAL 1


BUS COUPLER
OUT FOR INC MCC ESSENTIAL 2
INC MCC COMMON 2
INCOMING 2

trol Centers complete with necessary control, metering and protection


stem.
anel - IP4x Withdrawable, Fully type test
No. 2 LV SWITCHBOARD Unit 1 Power House
No. 3 LV SWITCHBOARD (Common/Emergency LV Switchboard) Unit 1 Power House

er supply complete with necessary control, metering and protection and instrumentation system.
220VAC/220VAC, 10kVA, Back up time 3 Hours unit 1 Power House
ution Board
ry of UPS
ry of DC Charger
ercell Connector Battery
Diesel Generator (EDG) complete with necessary control, metering and protection and instrumentation system.
iesel Generator Lot 1 Power House
et PL650P Generating Set
ers and DC distribution panels complete with necessary control, metering and protection and instrumentation system.
ger for MV Panel 220VAC/110VDC, 5kVA, Back up time 30 Minutes unit 1 Power House

plete cable trays, conduits and fittings and underground ducts.

From Generator 1 to MV Switch Gear (GCB) lot 1 Power House

From Generator 2 to MV Switch Gear (GCB) lot 1 Power House

From Outgoing MV Switchgear to Auxiliary Trafo 1 lot 1 Power House

From Outgoing MV Switchgear to Auxiliary Trafo 2 lot 1 Power House

From Step Up Trafo 1 to Step Up Incoming Panel 1 lot 1 Power House


From Step Up Trafo 2 to Step Up Incoming Panel 2 lot 1 Power House
From Outgoing MV Switchgear to First Pole No.1 lot 1 Power House
From Outgoing MV Switchgear to First Pole No.2 lot 1 Power House
MV Termination Kit lot 1 Power House
CU/XLPE/CTS/PVC/SWA/PVC 3 x 120 mm² - 18/30 (36) kV
CU/XLPE/CTS/PVC/SWA/PVC 3 x 120 mm² - 18/30 (36) kV 11KV 8.7/15KV
N2XSY (Cu/XLPE/CTS/PVC-FR) 1 x 120 mm2 - 8.7/15 (17.5) kV
From BSDG to BSDG ACB Panel (Common LV Switchgear) lot 1 Power House
From Common Feeder ACB #1 to Incoming LV Panel #3 lot 1 Power House
From Common Feeder ACB #2 to Incoming LV Panel #3 lot 1 Power House
From LV MCC to:
Radiator (15 kW x 4 feeder) #1 lot 1 1
Jacket Water Pre Heater with Pump #1 lot 1 1
Air Compressor A lot 1 1
Fire Fighting System (Pumps, etc) lot 1 1
LO Priming Pump lot 1 1
Air Dry Unit lot 1 1
Engine Side Ventilation fan 1A lot 1 1
Exhaust Ventilation fan on the roof 1 lot 1 1
Exhaust Gas Ventilation Fan 1 lot 1 1
FO Unloading Pump A lot 1 1
FO Transfer Pump Storage Tank to Purifier lot 1 1
FO Transfer Pump Storage Daily Tank to Engine lot 1 1
FO Transfer Pump Storage Daily Tank to Pilot Engine lot 1 1
FO Transfer Pump Storage Tank to Purifier lot 1 1
Sludge Pump lot 1 1
Dirty Oil Pump lot 1 1
FO Clean & Pilot Drain Pump lot 1 1
LO Transfer Pump Storage Tank to Purifier lot 1 1
LO Oil Transfer Pump to Oil Sumptank lot 1 1
LO Used Pump lot 1 1
Waste Oil Transfer Pump lot 1 1
LO Purifier Pump lot 1 1
Fresh Water Supplay HT/LT lot 1 1
LT Radiator Pump lot 1 1
HT Radiator Pump lot 1 1
Submersible Pump lot 1 1
Transfer Pump Treated Tank to Purifier lot 1 1
Waste Water Pump lot 1 1
Neutralization Pump lot 1 1
Turning Gear 1 lot 1 1
Fire Detection and alarm panel lot 1 1
Pit Pump for Engine Room A lot 1 1
Pit Pump for Pump House lot 1 1
Step Up Trafo Control Power 1 lot 1 1
Auxiliary power for 11 kV Switchgear lot 1 1
Auxiliary power for NGR panel 1 & 2 lot 1 1
Auxiliary power for DC 110V Battery Charger lot 1 1
Gen Side Ventilation Fan 1B lot 1 1
DO Purifier A lot 1 1
LO Purifier A lot 1 1
Pre Lubricating Pump 1 lot 1 1
Water Treatment Unit lot 1 1
Auxiliary power for control panels & PLC Panels lot 1 1
PCMS (Plant Control Monitoring System) lot 1 1
Building service power for air conditioning unit, etc lot 1 1
Motor Driven Fire Pump lot 1 1
Electrical Driven Fire Pump lot 1 1
Jockey Pump lot 1 1

NYY 4x1.5mm2 lot 1 1


NYY 12x1.5mm3 lot 1 1
Ethernet UTP Cat 5E lot 1 1
lot 1 1
Fiber Optic lot 1 1

Bus Duct 1200 A, 15 kV, 31.5 kA 3 second, One 1/2” x 6 cu, 3P4W, lot 1 1
Enclosure Steel, Support Molded
Bus Duct 2000 A, 600 V, 65 kA 1 second, Two 1/2” x 4 cu, 3P4W, lot 1 1
toEnclosure Steel,
Distribution 20kVSupport
pole 1/2” GPO-3 sheet
Termination Kit unit 2 2

Grounding Cable lot 1 1


Pipe Conduit 2" lot 1 1

NYY 4+E-2,5mm2 lot 1 1


NYY 2+E-4mm2 lot 1 1
NYY 4+E-16mm2 lot 1 1
NYY 4+E-95mm2 lot 1 1

Grounding Grid cable lot 1 1


Neutral Distribution Transformer lot 1 1
Neutral Distribution Generator Transformer lot 1 1
Bonding Ladder lot 1 1
for Main Cable Support
Cable ladder 600mm, separator, joint plate, flexible earthing joint, lot 1 1
nuts andLadder
Straight bolts
1. W400 H127 L300 pcs 7 power house
2. W200 H127 L300
Horizontal Elbow
1. W600 H127 R300
2. W400 H100 R300
3. W200 H100 R300
Horizontal Tee Equal
1. W1 600 W2 600 W3 600 H127 R300 pcs 1 power house
2. W1 400 W2 400 W3 400 H127 R300
3. W1 200 W2 200 W3 200 H127 R300
Vertical Inside Riser
1. W600 H127 R300
2. W400 H127 R300
3. W200 H127 R300
Vertical Outside Riser
1. W600 H127 R300
2. W400 H100 R300
3. W200 H100 R300
4. Jointing c/w Bolts, Nuts and Washers 14 H127
5. Baut CB 3/8 + 3/4 + Washers Nut
6. Separator Ladder 600 x 127
7.Separator Ladder 400 x 127
8. Separator Ladder 200 x 127
9. Cover Ladder c/w hold down clamp / hold down clip 600 x 127
10. Cover Ladder c/w hold down clamp / hold down clip 400 x 127
11. Cover Ladder c/w hold down clamp / hold down clip 200 x 127
12. Hold down clamp W x H : 30 x 127 (mm)
13. M6 x 20 Bolt + Washer + Nut
Cable ladder 200mm, separator, joint plate, flexible earthing joint, lot 1 1
nuts and bolts
Straight Ladder
1. W200 H127 L300
Horizontal Elbow
1. W200 H127 R300
Horizontal Tee Equal
1.W1 200 W2 600 W3 600 H127 R300
Vertical Inside Riser
1. W200 H127 R300
it for Lighting & GPO
Cable conduit 1" c/w accesories lot 1 1
Cable conduit 3" c/w accesories lot 1 1
Cable Gland 22 lot 1 1
Cable Gland M40 lot 1 1
Cable Gland M65 lot 1 1

g protection system complete.

Grounding Rod lot 1 1


Accesories lot 1 1
Accessories for Grounding lot 1 1
Cadwelld Connection ( including equipment cadweld ) lot 1 1

Conductor BC 120mm2 lot 1 1


Termination cable Lot 1 1

Air Terminal Radar System lot 1 1


Pole for Air Terminal lot 1 1
Grounding Rod lot 1 1
PVC Pipe & Accesories Lot 1 1
Accessories for Lighning ( Connector & Bracket ) Lot 1 1
Cadwelld Connection( including equipment cadweld ) Lot 1 1
Power cable :
Down conductor NYA 1x120mm2 Lot 1 1
Termination cable Lot 1 1

tem complete (If applicable)

er installation complete
small power installation
TL TCW 2x36W Lot 1 1
TL TCW c/w 2x36W Lot 1 1
Down Light LED 25W Lot 1 1
TBS 3 x 36 LED Lot 1 1
HPK 138 1 x 400W Lot 1 1
Flood Light LED 250W Lot 1 1
GPO 1 phase 10A Lot 1 1
GPO 3 phase 63A Lot 1 1
Emergency Lighting Lot 1 1
Street Lighting 250W Lot 1 1
Street Pole Lighting Lot 1 1
Joint Box for Lighting Lot 1 1
ution Board (MDB)
MDB, IP 4x Lot 1 1
Lighting Panel - IP 65 Lot 1 1

s complete.
Lot 1 1
Lot 1 1
Lot 1 1

Speaker TOA (25 Watt) Lot 1 1


Mixer Amplifier Lot 1 1
Micropone Lot 1 1
Cable Power Lot 1 1

m equipment complete.
Lot 1 1
Lot 1 1
Lot 1 1
Lot 1 1
Lot 1 1
Lot 1 1
Lot 1 1

and Protection panels complete.

complete with surge arresters, current transformers, etc.


2 11 / 20 KV, 11.5 MVA, ONAN / ONAF, ON LOAD TAP CHANGER YNd1 unit 2 Transformer GT1
sformer GT1 1 Transformer GT1
or Transformer 3 Transformer GT1
or @stacks c/w fan 2 Transformer GT1
1 Transformer GT1
2 Transformer GT1
Liters 1900 Transformer GT1

sformer GT 2 1 Transformer GT2


or Transformer 3 Transformer GT2
or @stacks c/w fan 2 Transformer GT2
1 Transformer GT2
2 Transformer GT2
Liters 1900 Transformer GT2
er complete with surge arrester, current transformers etc.
#2 11 / 0.4 KV, 1250 kVA, ONAN, OFF LOAD TAP CHANGER, YNd1 unit 2 TR UAT

EQUIPMENT

ar complete with circuit breakers, earthing switches, surge arresters,


ransformers.
Line-1 20KV SWITCHGEAR
NO. 1 INCOMING MV SWITCHGEAR 20kV Unit 1 1
GRID OUTGOING MV SWITCHGEAR 20kV Unit 1 1
SUBSTATION 20KV SWITCHGEAR :
TIE MV SWITCHGEAR 20kV Unit 1 1
Line-2 20KV SWITCHGEAR
NO. 1 INCOMING MV SWITCHGEAR 20kV Unit 1 1
GRID OUTGOING MV SWITCHGEAR 20kV Unit 1 1

required to be performed as stipulated in Book II.


1, VI.5)

and PLC control system complete with :


Lot 1 1
Lot 1 1
relay & terminal) Lot 1 1

y, Noise Filter, CPU + Memory, D/I, D/O, A/I, A/O) Lot 1 1


modules, include :
ter, CPU + Memory, D/I, D/O, A/I, A/O) Lot 1 1

Lot 1 1
Printer Desk
Terminal Cabinet
Power Cabinet

Lot 1 1
Lot 1 1
Lot 1 1

Lot 1 1
Lot 1 1
Lot 1 1

ction Box, Gland and accessories

Lot 1 1
Lot 1 1
Lot 1 1
Lot 1 1

00mm c/w cover, separator, joint plate, flexible earthing joint, nuts and Lot 1 1

t 16 c/w accesories Lot 1 1


Lot 1 1

rial and accessories


ble Material Lot 1 1

required to be performed as stipulated in Book II. Lot 1 1


1, VI.5)

Modbus TCP/IP Modul ALP 121 Yokogawa Lot 1 1