Daily DWG/DOC List

PROJECT: RPLC_EPC(RPLC Project for EPC Phase)

Date: 1/10/2019
IN / Rvd./send Return
S/N CORRESPONDENCE No. TITLE / SUBJECT Pages Rev. Unit Disp. Doc Date Reference No. Drawing No.
OUT Date Required
Drawing
3006-498D-DC249101
1 CHW-S-09963-TL-16-12477 (UNIT 98D) SULFUR TANKS AREA EARTH DIKE & DRAINAGE PLAN & SECTION DETAILS (Rev.3) 3 3 98 CV OUT 2016-05-31 2016-05-31 Y
3006-498D-DC249102
3006-395A-DC2C9311
3006-395A-DC2C9321
3006-395A-DC2C9322
2 CHW-S-09963-TL-16-12478 (UNIT 95) LOCAL PIPE SUPPORT FDN (PSFM1/PSF1,2) PLAN & SECTION DETAILS (Rev.1) 6 1 95 CV OUT 2016-05-31 2016-05-31 Y 3006-395A-DC2C9323
3006-395A-DC2C9341
3006-395A-DC2C9342
3006-395A-DC2C9345

3006-178A-DC231109
3006-178A-DC231110
3006-178A-DC231111
3006-178A-DC231112
3 CHW-S-09963-TL-16-12479 Macotal Area Open Ditch & Joint Box Detail Drawings (Rev.2) (2of2) 10 2 84 CV OUT 2016-05-31 2016-05-31 Y
3006-178A-DC231113
3006-178A-DC231114
3006-178A-DC231115
3006-178A-DC231116

3006-178A-DC231101
3006-178A-DC231102
3006-178A-DC231103
3006-178A-DC231104
4 CHW-S-09963-TL-16-12480 Macotal Area Open Ditch & Joint Box Detail Drawings (Rev.2) (1of2) 9 2 78 CV OUT 2016-05-31 2016-05-31 Y
3006-178A-DC231105
3006-178A-DC231106
3006-178A-DC231107
3006-178A-DC231108

3006-284A-DC249101
3006-284A-DC249102
5 CHW-S-09963-TL-16-12481 Unit 84 Tank (D-8402 & 8414) Dike DWG (Rev.1) 5 1 84 CV OUT 2016-05-31 2016-05-31 Y 3006-284A-DC249103
3006-284A-DC249104
3006-284A-DC249105
3006-1741-DC234511
6 CHW-S-09963-TL-16-12482 U74-1/2 Movable Stand Steel Drawings (Rev.0) 2 0 74 CV OUT 2016-05-31 2016-05-31 Y
3006-1742-DC234511
7 CHW-S-09963-TL-16-12483 Lighting & Small Power Layout Cooling Water System Unit (Rev.2) 1 2 91 EL OUT 2016-05-31 2016-05-31 Y 3006-391B-DE2A8004
8 VONE-S-09962-TL-16-2513 AC UPS ONE LINE DIAGRAM - UNIT 04 (Rev.1) 1 1 04 EL OUT 2016-05-31 2016-05-31 Y 3006-404A-DE216011
9 VONE-S-09962-TL-16-2514 AC UPS ONE LINE DIAGRAM - UNIT 05, UNT 97B (Rev.1) 3 1 05 EL OUT 2016-05-31 2016-05-31 Y 3006-174A-DT2A2001
Outgoing Document