You are on page 1of 8

ARCHITECTURAL WORK

VOLUME DAN HARGA LUMP SUM


(Termasuk Bahan, Peralatan, Upah Dan Pemasangan)

NO URAIAN PEKERJAAN Volume Satuan


Harga Satuan Subtotal Biaya
(Rp) (Rp)

PEKERJAAN ARSITEK
1 Bangunan Kantor -
1.1 Pasangan & Plesteran Dinding -
1.1.1 Lantai Dasar -
a) Pasangan Dinding Bata 1 Pc : 5 Pasir 588.30 M² -
b) Plester Dinding Bata 1 Pc : 5 Pasir 1,139.25 M² -
c) Pasangan Dinding Trasram KM / WC 36.75 M² -
d) Plester Dinding Trasram KM / WC 73.50 M² -
e) Plester Beton Bawah & Samping Tangga 92.50 M² -
1.1.2 Lantai Atas -
a) Pasangan Dinding Bata 1 Pc : 5 Pasir 528.50 M² -
b) Plester Dinding Bata 1 Pc : 5 Pasir 1,021.35 M² -
c) Pasangan Dinding Trasram KM / WC 36.75 M² -
d) Plester Dinding Trasram KM / WC 73.50 M² -
1.2 List Profil & Finishing Dinding -
a) Dinding Finish Batu Alam Andesit Bakar 5 x 40 cm 31.50 M² -
b) Dinding Lapis Conwood 292.85 M² -
1.3 Kusen Pintu & Jendela Aluminium -
a) Type D1 6.000 Bh -
b) Type D1A 2.000 Bh -
c) Type D2 7.000 Bh -
d) Type D3 8.000 Bh -
e) Type D4 2.000 Bh -
e) Type D5 2.000 Bh -
f) Type D6 1.000 Bh -
g) Type D7 2.000 Bh -
h) Type DG1 1.000 Bh -
i) Type DD1 2.000 Bh -
j) Type W1 ( kaca tempered laminated 2x 6mm ) 1.000 Bh -
k) Type W2 ( kaca tempered laminated 2 x 6 mm ) 1.000 Bh -
l) Type W3 + W3A( kaca tempered laminated 2 x 6 mm ) 1.000 Bh -
m) Type W4 ( kaca tempered laminated 2 x 6 mm ) 1.000 Bh -
n) Type W5 4.000 Bh -
o) Type W6 1.000 Bh -
p) Type W6A 2.000 Bh -
q) Type W7 2.000 Bh -
r) Type W8 2.000 Bh -
s) Type W9 1.000 Bh -
t) Type W10 ( kaca tempered laminated 2 x 6 mm ) 1.000 Bh -
u) Type W 11 ( kaca tempered laminated 2 x 6 mm ) 6.000 Bh -
v) Type W12 ( kaca tempered laminated 2 x 6 mm ) 1.000 Bh -
w) Type W13 ( kaca tempered laminated 2 x 6 mm ) 1.000 Bh -

ORF - Architect Page 1 / 8


ARCHITECTURAL WORK
VOLUME DAN HARGA LUMP SUM
(Termasuk Bahan, Peralatan, Upah Dan Pemasangan)

NO URAIAN PEKERJAAN Volume Satuan


Harga Satuan Subtotal Biaya
(Rp) (Rp)
1.4 Pekerjaan Plafond -
1.4.1 Lantai Dasar -
a) Rangka Plafond HOLLOW 40X40 galvanize 0,5 869.500 M² -
b) Plafond Gypsum Tebal 9m/m EX. JAYABOARD 543.500 M² -
c) Plafond Acoustic Tile 60 x 60 cm 326.000 M² -
d) List Profil Shadow Line Aluminium 10 x 10mm ( L1 ) 586.000 M¹ -
1.4.2 Lantai Atas -
a) Rangka Plafond HOLLOW 40X40 galvanize 0,5 721.000 M² -
b) Plafond Gypsum Tebal 9m/m EX. JAYABOARD 272.000 M² -
c) Plafond Acoustic Tile 60 x 60 cm 449.000 M² -
d) List Profil Shadow Line Aluminium 10 x 10mm ( L1 ) 455.000 M¹ -
1.5 Finishing Lantai -
1.5.1 Lantai Dasar -
a) Water Proofing Toilet , Taman & Dak Beton Ex Sika 42.500 M² -
b) Screed Water Proofing 42.500 M² -
c) Finishing Lantai Homogenous Tile 600 x 600 - Roman Granit 402.000 M² -
d) Finishing Lantai Andesit Bakar 300 x 600 - AB 425.000 M¹ -
e) Finishing Lantai Homogenous Tile 600 x 600 - Roman Granit 29.500 M¹ -
f) Plint Andesit Bakar 192.500 M¹ -
g) Plint Homogenous Tile 100 x 600 - Roman Granit HT 151.500 M¹ -
1.5.2 Lantai Atas -
a) Water Proofing Toilet , Taman & Dak Beton Ex Sika 42.500 M² -
b) Water Proofing Dak Beton Ex Sika 235.950 M² -
c) Screed Water Proofing 278.450 M² -
d) Finishing Lantai Homogenous Tile 600 x 600 - Roman Granit 445.000 M² -
e) Finishing Lantai Andesit Bakar 300 x 600 - AB 132.500 M² -
f) Finishing Lantai Homogenous Tile 600 x 600 - Roman Granit 12.000 M² -
g) Plint Andesit Bakar 189.500 M¹ -
h) Plint Homogenous Tile 100 x 600 - Roman Granit Homogenius Tile 141.500 M¹ -
1.5.3 Lantai Atap -
a) Water Proofing Dak Beton Ex Sika 757.15 M² -
b) Screed Water Proofing 757.15 M² -
1.6 Finishing Dinding, lantai Toilet & Dapur -
1.6.1 Toilet Lantai Dasar dan Atas -
a) Lantai Homogenous Tile 60 x 60 cm Roman Granit ( HT1 ) 42.35 M² -

b) Plint Homogenous Tile 10 x 60 cm - Roman Granit ( HT1 ) 75.50 M¹ -

c) Keramik Dinding Homogenius Tile 30 x 60 cm Roman 86.90 M² -


d) Cat Dinding Ex. Mowilex 173.97 M² -
1.7 Finishing Tangga & Railing -
1.7.1 Tangga Entrance Hall -
a) Trap Tangga Finish Batu Andesit Bakar - AB 32.15 M² -
1.7.2 Tangga Office 1 -
a) Trap Tangga Finish Homogenous Tile 60 x 60 cm Roman Granit ( 21.85 M² -
b) Railing Tangga Besi 14.65 M¹ -

ORF - Architect Page 2 / 8


ARCHITECTURAL WORK
VOLUME DAN HARGA LUMP SUM
(Termasuk Bahan, Peralatan, Upah Dan Pemasangan)

NO URAIAN PEKERJAAN Volume Satuan


Harga Satuan Subtotal Biaya
(Rp) (Rp)
c) Handrailing Kayu 15.50 M¹ -
1.7.3 Tangga Office 2 -
a) Trap Tangga Finish Homogenous Tile 60 x 60 cm Roman Granit ( 52.50 M² -
b) Railing Tangga Besi 17.90 M¹ -
c) Handrailing Kayu 17.90 M¹ -
1.7.4 Railing -
a) Handrailing Balkon Besi 52.50 M¹ -
1.8 Sanitary -
1.8.1 Toilet Office -
a) Closet Monoblock - Ex TOTO CW 421 J 8.00 Bh -
b) Washtafel - Ex TOTO LW 528 NJ 8.00 Bh -
c) Kran Washtafel - Ex TOTO TX 116 LESV4BR 8.00 Bh -
d) Urinoir - Ex TOTO U 57 M 4.00 Bh -
e) Kran Urinoir - Ex TOTO T 60 P 4.00 Bh -
f) Floor Drain -Ex TOTO TX 1 BN 8.00 Bh -
g) Hand Dryer-Ex TOTO HD 4000 C 4.00 Bh -
1.8.2 Janitor Meeting -
a) Kran Ex TOTO T 23 BQ 13 N 2.00 Bh -
b) Floor Drain -Ex TOTO TX 1 BN 2.00 Bh -
1.9 Cat Luar (Weather Shield) Ex MOWILEX -
a) Cat Dinding Luar Office 1,343.50 M² -
1.10 Cat Dalam (Emulsion) Ex MOWILEX -
2 Cat Dinding Lantai Dasar 798.15 M² -
b) Cat Dinding Lantai Atas 518.50 M² -
c) Cat Plafond Lantai Dasar 753.95 M² -
d) Cat Plafond Lantai Atas 636.25 M² -
1.11 Cat Kayu dan Cat Besi -
a) Cat Handrailing Tangga Kayu 33.40 M¹ -
b) Cat Railing Tangga Besi 32.55 M¹ -
c) Cat Handrailing Balkon Besi 52.50 M¹ -
2 Bangunan Meeting -
2.1 Pasangan & Plesteran Dinding -
2.1.1 Lantai Dasar -
a) Pasangan Dinding Bata 1 Pc : 5 Pasir 275.85 M² -
b) Plester Dinding Bata 1 Pc : 5 Pasir 531.65 M² -
c) Pasangan Dinding Trasram KM / WC 41.25 M² -
d) Plester Dinding Trasram KM / WC 42.50 M² -
e) Plester Beton Bawah & Samping Tangga 145.75 M² -
2.1.2 Lantai Atas -
a) Pasangan Dinding Bata 1 Pc : 5 Pasir 625.50 M² -
b) Plester Dinding Bata 1 Pc : 5 Pasir 1,057.50 M² -
c) Pasangan Dinding Trasram KM / WC 32.90 M² -
d) Plester Dinding Trasram KM / WC 65.80 M² -
2.1.3 Lantai Atap -
a) Pasangan Dinding Bata 1 Pc : 5 Pasir 106.95 M² -
b) Plester Dinding Bata 1 Pc : 5 Pasir 213.90 M² -
2.2 List Profil & Finishing Dinding -
a) Dinding Finish Batu Alam Andesit Bakar 5 x 40 cm 8.700 M² -
b) Dinding Lapis Conwood 212.500 M² -
2.3 Kusen Pintu & Jendela Aluminium -
a) Type D1 8.000 Bh -
b) Type D2 8.000 Bh -
c) Type D3 2.000 Bh -

ORF - Architect Page 3 / 8


ARCHITECTURAL WORK
VOLUME DAN HARGA LUMP SUM
(Termasuk Bahan, Peralatan, Upah Dan Pemasangan)

NO URAIAN PEKERJAAN Volume Satuan


Harga Satuan Subtotal Biaya
(Rp) (Rp)
d) Type D4 1.000 Bh -
e) Type D5 2.000 Bh -
f) Type D6 2.000 Bh -
g) Type D7 2.000 Bh -
h) Type DG1 ( kaca tempered laminated 2 x 6 mm ) 1.000 Bh -
i) Type DG2 1.000 Bh -
j) Type DG3 2.000 Bh -
k) Type FD1 2.000 Bh -
l) Type W1 8.000 Bh -
m) Type W2 4.000 Bh -
n) Type W4 ( kaca tempered laminated 2 x 6 mm ) 1.000 Bh -
o) Type W5 ( kaca tempered laminated 2 x 6 mm ) 1.000 Bh -
p) Type W6 ( kaca tempered laminated 2 x 6 mm ) 1.000 Bh -
2.4 Pekerjaan Plafond -
2.4.1 Lantai Dasar -
a) Rangka Plafond HOLLOW galvanize 0,5 256.75 M² -
b) Plafond Gypsum Tebal 9m/m EX. JAYABOARD 256.75 M² -
c) List Profil Shadow Line Aluminium 10 x 10mm ( L1 ) 161.20 M¹ -
2.4.2 Lantai Atas -
a) Rangka Plafond HOLLOW galvanize 0,5 282.85 M² -
b) Plafond Gypsum Tebal 9m/m EX. JAYABOARD 282.85 M² -
c) List Profil Shadow Line Aluminium 10 x 10mm ( L1 ) 162.75 M¹ -
2.5 Finishing Lantai -
2.5.1 Lantai Dasar -
a) Water Proofing Toilet , Taman & Dak Beton Ex Sika 52.500 M² -
Screed Water Proofing
b) 52.500 M² -
Finishing Lantai Homogenous Tile 600 x 600 - Roman Granit
c) 176.000 M² -
d)
Finishing Lantai Andesit Bakar 300 x 600 - AB 27.000 M² -
e)
Finishing Lantai Andesit Flame - AF 51.500 M² -
f)
Plint Andesit Bakar 47.500 M¹ -
Plint Homogenous Tile 600 x 600 - Roman Granit Metropolitan
g) 94.750 M¹ -
Black HT
2.5.2 Lantai Atas -
a) Water Proofing Toilet , Taman & Dak Beton Ex Sika 52.500 M² -
b) Screed Water Proofing 52.500 M² -
c) Finishing Lantai Homogenous Tile 600 x 600 - Roman Granit 150.500 M² -
d) Finishing Lantai Andesit Bakar 300 x 600 - AB 93.500 M² -
e) Plint Andesit Bakar 101.500 M¹ -
f) Plint Homogenous Tile 600 x 600 - Roman Granit Metropolitan Black 55.500 M¹ -
2.5.3 Lantai Atap -
a) Water Proofing Dak Beton Ex Sika 409.15 M² -
b) Screed Water Proofing 409.15 M² -
c) Roof Garden 31.50 M² -
2.6 Finishing Dinding, lantai Toilet & Dapur -
2.6.1 Toilet Lantai Dasar -
a) Lantai Homogenous Tile 60 x 60 cm Roman Granit ( HT1 ) 26.40 M² -
b) Plint Homogenous Tile 600 x 600 - Roman Granit ( HT1 ) 49.50 M¹ -

c) Keramik Dinding Homogenius Tile 30 x 60 Roman 32.24 M² -

ORF - Architect Page 4 / 8


ARCHITECTURAL WORK
VOLUME DAN HARGA LUMP SUM
(Termasuk Bahan, Peralatan, Upah Dan Pemasangan)

NO URAIAN PEKERJAAN Volume Satuan


Harga Satuan Subtotal Biaya
(Rp) (Rp)
d) Cat Dinding Ex. Mowilex 64.48 M² -
2.6.2 Toilet Lantai Atas -
a) Lantai Homogenous Tile 60 x 60 cm Roman Granit ( HT1 ) 21.00 M² -
b) Plint Homogenous Tile 600 x 600 - Roman Granit ( HT1 ) 37.50 M¹ -
c) Keramik Dinding Homogenius Tile 30 x 60 Roman 71.80 M² -
d) Cat Dinding Ex. Mowilex 35.90 M² -
2.6.3 Wudhu Meeting -
a) Lantai Homogenous Tile 60 x 60 cm Roman Granit Metropolitan 10.500 M² -
b) Plint Homogenous Tile 8 x 60 cm - Roman Granit ( HT1 ) 14.000 M¹ -
2.7 Finishing Tangga & Railing -
2.7.1 Tangga Meeting 1 -
a) Trap Tangga Finish Homogenous Tile 60 x 60 cm Roman Granit ( 66.25 M² -
b) Railing Tangga Besi 24.50 M¹ -
c) Handrailing Kayu 24.50 M¹ -
2.7.2 Tangga Meeting 2 -
a) Trap Tangga Finish Homogenous Tile 60 x 60 cm Roman Granit ( 60.25 M² -
b) Railing Tangga Besi 30.75 M¹ -
c) Handrailing Kayu 30.75 M¹ -
2.8 Sanitary -
2.8.1 Toilet meeting -
a) Closet Monoblock - Ex TOTO CW 421 J 8.00 Bh -
b) Washtafel - Ex TOTO LW 528 NJ 8.00 Bh -
c) Kran Washtafel - Ex TOTO TX 116 LESV4BR 8.00 Bh -
d) Urinoir - Ex TOTO U 57 M 6.00 Bh -
e) Kran Urinoir - Ex TOTO T 60 P 6.00 Bh -
f) Floor Drain -Ex TOTO TX 1 BN 8.00 Bh -
g) Hand Dryer-Ex TOTO HD 4000 C 4.00 Bh -
2.8.2 Ruang Wudhu Meeting -
a) Kran Ex TOTO T 23 BQ 13 N 6.00 Bh -
b) Floor Drain -Ex TOTO TX 1 BN 1.00 Bh -
2.8.3 Janitor Meeting -
a) Kran Ex TOTO T 23 BQ 13 N 2.00 Bh -
b) Floor Drain -Ex TOTO TX 1 BN 2.00 Bh -
2.90 Cat Luar ( Weather Shield ) Ex MOWILEX -
a) Cat Dinding Luar Meeting 1,216.77 M² -
2.10 Cat Dalam ( Emulsion ) Ex MOWILEX -
a) Cat Dinding Lantai Dasar 304.85 M² -
b) Cat Dinding Lantai Atas 501.85 M² -
c) Cat Plafond Lantai Dasar 256.75 M² -
d) Cat Plafond Lantai Atas 282.85 M² -
2.11 Cat Kayu dan Cat Besi -
a) Cat Handrailing Tangga Kayu 55.25 M¹ -
b) Cat Railing Tangga Besi 55.25 M¹ -
3 Bangunan Mess -
3.1 Pasangan & Plesteran Dinding -
3.1.1 Lantai Dasar -
a) Pasangan Dinding Bata 1 Pc : 5 Pasir 206.50 M² -
b) Plester Dinding Bata 1 Pc : 5 Pasir 413.00 M² -
c) Pasangan Dinding Trasram KM / WC 40.80 M² -
d) Plester Dinding Trasram KM / WC 81.60 M² -
e) Plester Beton Bawah & Samping Tangga 23.50 M² -
3.1.2 Lantai Atas -

ORF - Architect Page 5 / 8


ARCHITECTURAL WORK
VOLUME DAN HARGA LUMP SUM
(Termasuk Bahan, Peralatan, Upah Dan Pemasangan)

NO URAIAN PEKERJAAN Volume Satuan


Harga Satuan Subtotal Biaya
(Rp) (Rp)
a) Pasangan Dinding Bata 1 Pc : 5 Pasir 372.28 M² -
b) Plester Dinding Bata 1 Pc : 5 Pasir 729.50 M² -
c) Pasangan Dinding Trasram KM / WC 66.90 M² -
d) Plester Dinding Trasram KM / WC 133.80 M² -
3.2 List Profil & Finishing Dinding -
a) Dinding Finish Kamprot / Kasar 22.50 M² -
3.3 Penutup Atap -
a) List Plank Kayu Solid 51.35 M¹ -
b) Atap Genteng 216.75 M² -
c) Talang Atap 35.00 M² -
d) Beton Flashing Pinggiran Genteng 35.50 M¹ -
Pergola Atap Kawat Ram 62.00 M² -
3.4 Kusen Pintu & Jendela Aluminium -
a) Type D1 13.00 Bh -
b) Type D2 13.00 Bh -
c) Type D3 1.00 Bh -
d) Type W1 19.00 Bh -
e) Type W2 12.00 Bh -
f) Type PS1 1.00 Bh -
3.5 Pekerjaan Pagar -
3.5.1 Dinding Pagar Mess -
a) Pasangan Dinding Bata 1 Pc : 5 Pasir 141.70 M² -
b) Plester Dinding Bata 1 Pc : 5 Pasir 283.40 M² -
c) Dinding Pagar Finish Batu Alam 303.75 M² -
3.6 Pekerjaan Plafond -
3.6.1 Lantai Dasar -
a) Rangka Plafond HOLLOW Galvanize 0,5 185.50 M² -
b) Plafond Gypsum Tebal 9m/m EX. JAYABOARD 185.50 M² -
c) List Profil Shadow Line Aluminium 10 x 10mm ( L1 ) 215.50 M¹ -
3.6.2 Lantai Atas -
a) Rangka Plafond HOLLOW Galvanize 0,5 195.50 M² -
b) Plafond Gypsum Tebal 9m/m EX. JAYABOARD 195.50 M² -
c) List Profil Shadow Line Aluminium 10 x 10mm ( L1 ) 282.00 M¹ -
3.7 Finishing Lantai -
3.7.1 Lantai Dasar -
a) Water Proofing Toilet , Taman & Dak Beton Ex Sika 31.875 M² -
b) Screed Water Proofing 31.875 M² -
c) Taman 32.500 M² -
d) Finishing Lantai Homogenius Tile Roman Granit Dportland Taupe 176.000 M² -
e) Finishing Lantai Andesit Bakar 300 x 600 - AB 46.000 M² -
f) Finishing Lantai Koral Tabur 49.000 M² -
g) Finishing Lantai Deck Coonwood - CW 7.000 M¹ -
h) Plint Andesit Bakar 31.500 M¹ -
i) Plint Homogenius Tile Roman 8 X 60 cm 101.200 M¹ -
3.7.2 Lantai Atas -
a) Water Proofing Toilet , Taman & Dak Beton Ex Sika 79.60 M² -
b) Screed Water Proofing 79.60 M² -
c) Bak Bunga 28.00 M² -
d) Finishing Keramik Roman rectifed 32.5 x 65.5 139.75 M² -
e) Plint Keramik Roman rectifed 32.5 x 65.5 182.50 M¹ -

ORF - Architect Page 6 / 8


ARCHITECTURAL WORK
VOLUME DAN HARGA LUMP SUM
(Termasuk Bahan, Peralatan, Upah Dan Pemasangan)

NO URAIAN PEKERJAAN Volume Satuan


Harga Satuan Subtotal Biaya
(Rp) (Rp)
3.7.3 Lantai Atap -
a) Water Proofing Dak Beton Ex Sika 178.50 M² -
b) Screed Water Proofing 178.50 M² -
3.7.4 Kolam -
a) Water Proofing Dinding Kolam Ex Sika 86.50 M² -
b) Dinding Kolam Finish Batu Alam 86.50 M² -
3.8 Finishing Dinding, lantai Toilet & Dapur -
3.8.1 Toilet Mess -
a) Finishing Lantai Homogenius Tile Roman Granit Dportland Taupe 45.86 M² -
b) Plint Homogenius Tile Roman 8 X 60 cm 92.50 M¹ -
c) Cat Dinding 241.95 M² -
3.9 Finishing Tangga & Railing -
3.9.1 Tangga Mess -
a) Finishing Lantai Homogenius Tile Roman Granit Dportland Taupe 18.75 M² -
b) Railing Tangga Besi 9.50 M¹ -
c) Handrailing Kayu 9.50 M¹ -
3.10 Sanitary -
3.10.1 Toilet Mess -
a) Closet Monoblock - Ex TOTO CW 421 J 13.000 Bh -
b) Washtafel - Ex TOTO LW 824 CJ 13.000 Bh -
c) Kran Washtafel - Ex TOTO TX 115 LEBR 13.000 Bh -
d) Hand Shower - Ex TOTO TX 402 SP 12.000 Bh -
e) Urinoir - Ex TOTO U 57 M 1.000 Bh -
f) Floor Drain -Ex TOTO TX 1 BN 13.000 Bh -
g) Hand Dryer-Ex TOTO HD 4000 C 1.000 Bh -
3.11 Cat Luar ( Weather Shield ) Ex MOWILEX -
a) Cat Dinding Luar Mess 1,002.33 M² -
b) Cat Dinding Finish Kamprot / Kasar 22.50 M² -
3.12 Cat Dalam ( Emulsion ) Ex MOWILEX -
a) Cat Dinding Lantai Dasar 218.95 M² -
b) Cat Dinding Lantai Atas 330.50 M² -
c) Cat Plafond Lantai Dasar 185.50 M² -
d) Cat Plafond Lantai Atas 195.50 M² -
3.13 Cat Kayu dan Cat Besi -
a) Cat Handrailing Tangga Kayu 9.50 M¹ -
b) Cat Railing Tangga Besi 9.50 M¹ -
c) Cat Listplank Kayu 51.35 M¹ -
4 Furniture -
4.1 Lantai Dasar -
a) Configuration 5 Staff - Procurement 1.00 Unit -
b) Configuration 2 Staff - 2 Hotdesk 1.00 Unit -
c) Configuration 4 Staff - 1 Staff + 3 Hotdesk 1.00 Unit -
d) Configuration 2 Staff 3.00 Unit -
e) Configuration 3 Staff - 2 Staff + 1 Spv. 1.00 Unit -
f) Freestanding for 1 Staff (Security Room) 1.00 Unit -
g) Freestanding for 1 SPV (Security Room) 1.00 Unit -
h) Freestanding for 1 Hotdesk (Security Room) 1.00 Unit -
i) Freestanding for 1 Supervisor 1.00 Unit -
j) Configuration 1 Team Leader 1.00 Unit -
k) Configuration 2 Team Leader 1.00 Unit -
l) Freestanding for 1 Head 5.00 Unit -
4.2 Lantai Atas -
a) Configuration 2 Staff 2.00 Unit -
b) Configuration 4 Staff 1.00 Unit -

ORF - Architect Page 7 / 8


ARCHITECTURAL WORK
VOLUME DAN HARGA LUMP SUM
(Termasuk Bahan, Peralatan, Upah Dan Pemasangan)

NO URAIAN PEKERJAAN Volume Satuan


Harga Satuan Subtotal Biaya
(Rp) (Rp)
c) Configuration 6 Staff 1.00 Unit -
d) Configuration 5 Staff - 4 Staff + 1 Team Leader 1.00 Unit -
e) Configuration 4 Staff - 2 Staff + 2 Team Leader 1.00 Unit -
f) Configuration 5 Staff - 1 Staff + 4 Hotdesk 1.00 Unit -
g) Configuration 6 Staff 1.00 Unit -
h) Configuration 5 Staff - 2 Staff + 3 Hotdesk 1.00 Unit -
i) Configuration 3 Staff - 3 Hotdesk 1.00 Unit -
j) Configuration 2 Staff - 2 Hotdesk 2.00 Unit -
k) Configuration 2 Staff - 1 Staff + 1 Hotdesk 1.00 Unit -
l) Freestanding for 1 Staff (Kasir) 1.00 Unit -
m) Configuration for 1 Team Leader 1.00 Unit -
n) Freestanding for 1 Head 2.00 Unit -
o) Freestanding for VP and Field Manager 2.00 Unit -
p) Configuration for Secretary 1.00 Unit -
4.3 Chair -
4.3.1 Staff, Hotdesk, Mailing, Nursing & Clinic -
a) Staff Chair 52.00 Unit -
b) Hot Desk Chair 21.00 Unit -
c) Clinic Chair 4.00 Unit -
d) Nursing & Mailing Chair 2.00 Unit -
4.3.2 Supervisor and Secretary -
a) Supervisor Chair 7.00 Unit -
b) Secretary Chair 1.00 Unit -
4.3.3 Team Leader -
a) Team Leader Chair 8.00 Unit -
b) Visitor Team Leader Chair 16.00 Unit -
4.3.4 Manager/Head -
a) Manager/Head Chair 8.00 Unit -
b) Visitor Manager Chair 16.00 Unit -

TOTAL ARCHITECTURAL WORK

ORF - Architect Page 8 / 8