Professional Documents
Culture Documents
CHALLENGE INDUSTRIAL
CO., LTD
Wonix Group Organization
Wonix Group
Chairman:Mr. Mike Huang
Youwon Enterprises., Ltd Challenge Industrial Co., Ltd Gee Bridge International
CEO:Mr. Frank Huang CEO:Mr. Mike Huang CEO:Ms. Sally Huang
Service Industrial
Challenge Industrial Laboratory
Subsidiary
Affiliated Company Challenge Electric (Jiaxing) Co. (China)
Ningbo Yuwon Technology
Electronics Co., Ltd (China) Joint Venture Company
Challenge Industrial Products Sdn. Bhd. (Malaysia)
z Product Information
z Factory Information
2. Service Industrial
z Advanced Electricity Laboratory
3. Distribution
z Imported Electrical Products
Supplier licenses issued by Taiwan-Power Co.
z General Electric
z ABB
z Hitachi
z Fuji Electric
z Nissin Electric
z etc…
M.V. Outdoor Instrument PT’s - VPF Series
1.Rated Voltage:
15 ~ 36 kv
2.Frequency:
50/60 Hz
3.Secondary Voltage:
110V~ 120 V
4.Burden/ACC:
30VA/0.3S
M.V. Outdoor Instrument CT’s - AWF Series
1.Rated Voltage:
15 ~ 36 kv
2.Frequency:
50 / 60Hz
3.Ratio:
Up to 1,200 / 5 A
4.Burden/ACC:
30VA/0.3S
L.V. Instrument CT’s - ROS Series
1.Rated Voltage:
600V
2.Frequency:
50 / 60Hz
2.Ratio:
100 ~ 1,200/5A
3.Burden/ACC:
30VA/0.3S
L.V. Instrument CT – RO Series
1.Rated Voltage:
600V
2.Frequency:
50 / 60Hz
3.Ratio:
100~1200/5A
4.Burden/ACC:
40VA/0.5
L.V. Instrument CT – PIS/POS Series
1.Rated Voltage:
600V
2.Frequency:
50 / 60Hz
3.Ratio:
100~3200/5A
4.Burden/ACC:
40VA/0.5
Split Type Multi-Ratio Current Transformer
1.Rated Voltage:
0.66 KV
2.Ratio:
200mA/1.5mA
3.Burden/ACC.:
10Ω
M.V. Instrument CT– EWF Series
1.Rated Voltage:
12/36KV
2.Frequency:
50 / 60Hz
3.Ratio:
50-3000/5-5A
4.Burden/ACC:
30VA/0.5
M.V. Instrument PT – EPF Series
1. Rated Voltage:
12/36KV
2. Frequency:
50 / 60Hz
3. Secondary Voltage:
120/120√3
4. Burden/ACC:
100VA/0.5
M.V. Instrument CT– EW Series
1.Rated Voltage:
Diagram 1: 11-15KV
Diagram 2: 3.3-3.6KV
2.Frequency:
50 / 60Hz
3.Ratio:
Diagram 1: ≦400/5
Diagram 2: ≦300/5-5
4.Burden/ACC.:
Diagram 1: 40VA/0.5
Diagram 2: 30VA/0.5 (double core)
M.V. Bushing CT for Substation’s CGIS
1. Rated Voltage:
0.6kv,12kv, 24kv
3.Burden/ACC.:
30VA/0.5
M.V. Bushing CT
1.Rated Voltage:
600V or 24KV
2.Ratio:
7,000~20,000/5A
3.Burden/ACC:
45VA/0.2S
Bushing CTs for GIS
1.Rated Voltage:
69 kv, 161 kv , 345 kv
2.Ratio:
4,000/5A
3.Burden/ACC.:
≦C800 & 0.3B0.9
1.Phase/Frequency:
1 Φ / 50 or 60 Hz
2.Rated Voltage :
Vp: 7.2 , 6.9, 6.6, 6.3kv
Vs: 240 / 120 V
3.Capacity:25~100KVA
4.Cooling:AA
Pad Mounted Transformers
1.Phase/Frequency:
1Φ / 50 or 60 Hz
2.Rated Voltage :
Vp: 14,460 / 7,230 , 13,860 /
6,930 , 13,260 / 6,630 V
Vs: 240/120 V
4.Cooling:AA
Epoxy Moulded Transformers
1.Phase/Frequency:
1Φor 3Φ / 50 or 60Hz
2.Rated Voltage :
Vp: 240V ~ 24 KV
Vs: 220 ~ 480 V
3.Capacity: (≦ ) 1000 KVA
4. Connection:
△ -Y (Delta- Star)
△ - △ (Delta-Delta)
5.Cooling:AA or AFA
Indoor F/H-class Non-ventilated Transformer
(Resin Cast) Option: built in surge protector
1.Phase/Frequency:
3Φ / 50 or 60Hz
2.Rated Voltage :
Vp: 220, 380 or 480V
Vs: 110-190 or 120-208V
3.Capacity: 3 - 50 KVA
4.Connection:
△ -Y (Delta- Star)
5.Cooling:AA
two steps
6.Noise: one step
(≦ ) 3-9 KVA / (≦ ) 40 db
(≦ )10-50KVA / (≦ ) 45 db
Motor-Starting Reactors & Compensators
2Hz: 50 or 60
2.Frequency: 50 or 60Hz
4.Phase: 1Φ or 3Φ
5.KVA: P% of Cap(KVAR)
(P=6,7,……..)
6.Iron Core
7.Dry Type
M.V. Air Core Reactors
(For Series Capacitor Bank)
1.Rated Voltage: ≦25.5 kv
2.Phase/Hz: 1Φ/ 60 or 50 Hz
3.Rated KVA: ≦328
(used as detuned reactors
of capacitor banks)
Epoxy Bushings & Insulators
Epoxy Insulated
Parts For CGIS
(Gas Insulated Switchgear)
Outdoor 24/12KV
Voltage Monitor
W/Specified Signal Cable
Epoxy Bushings & Insulators
7. VACUUM CASTING
3. - First, extract all air content
9. PRIMARY/
in the epoxy when its at liquid form
WAREHOUSE SECONDARY
WINDING
- After the Epoxy becomes
solid form, there will be a
re-furnish procedure to smoothen
CIC
the outer surface of the finished
10 STEP
PROCEDURE product
8. ROUTINE TEST
8. 4. - Every product produced will go thru
ROUTINE IRON CORE A. Partial Discharge Measurement
TEST ASSEMBLY B. Accuracy Test
- Tests upon Customer’s request
such as: IEC6044-1, IEC6044-2
10. CARGO
7. 5. - Fumigation process - to minimize
VACUUM PRE-TEST any catastrophes occurring during
CASTING PRODUCT freight
6.
MOLDIFI
CATION
CIC’s Factory
Pole Mounted TRs
International Laboratory
Global ILAC Accreditation Cooperation
(www.ilac.com)
ILAC Includes 47 nations and 61 associations
Multilateral Arrangement
Advanced Electricity
CIC AEL Laboratory
(Challenge Industrial Lab., -
TAF Member)
Advanced Electricity Laboratory
Test Items
-Power frequency withstand Test. -Accuracy Test.
-Lightning impulse test. -Temperature rise test.
-Polarity test. -Noise measurement.
-Wet test. -Oil insulation test.
-Partial Discharge Measurement. -Induce voltage test.
-Turn ratio measurement. -Efficiency test.
-Thermal over current test.(Ith.) -Open circuit test.
-Dynamic over current test.(Idyn.) -Others.
-Impedance and excitation measurement.
Numbers of ILAC (1)
FULL MEMBERS (MRA SIGNATORIES)
1 National Association of Testing Authorities, Australia (NATA), Australia
2 Bundesministerium fur Wirtschaft und Arbeit (BMWA), Austria
3 Belgische Kalibratir Organisatie/Organisation Belge D’Etalonnage (BELTEST BKO-OBE), Belgium
4 General Coordination for Accreditation (CGCRE/INMETRO), Brazil
5 Standards Council of Canada (SCC), Canada
6 Hong Kong Accreditation Service (HKAS), Hong Kong, China
7 China National Accreditation Board for Laboratories (CNAL), People’s Republic of China
8 Czech Accreditation Institute (CAI), Czech Republic
9 Danish Accreditation (DANAK), Denmark
10 Finnish Accreditation Service (FINAS), Finland
11 Comite Francais d’Accreditation (COFRAC), France
12 DACH, Germany
13 Deutsches Akkreditierungssystem Prüfwesen (DAP), Germany
14 Deutsche Akkreditierungsstelle Mineralöl (DASMIN), Germany
15 German Accreditation Body Technology (DATech), Germany
16 Deutscher Kalibrierdienst (DKD), Germany
17 Hellenic Accreditation Council (ESYD), Greece
18 National Accreditation Board for Testing & Calibration Laboratories (NABL), India
19 National Accreditation Body of Indonesia (KAN), Indonesia
20 Irish National Accreditation Board (INAB), Ireland
21 Israel Laboratory Accreditation Authority (ISRAC), Israel
22 Sistema Nazionale per l’Accreditamento di Laboratori (SINAL), Italy
Numbers of ILAC (2)
23 Servizio di Taratura in Italia (SIT), Italy
24 International Accreditation Japan (IA Japan), Japan
25 The Japan Accreditation Board for Conformity Assessment (JAB), Japan
26 Korea Laboratory Accreditation Scheme (KOLAS), Republic of Korea
27 Department of Standards Malaysia (DSM), Malaysia
28 Raad voor Accreditatie (RvA), Netherlands
29 International Accreditation New Zealand (IANZ), New Zealand
30 Norwegian Accreditation (NA), Norway
31 Polish Centre for Accreditation (PCA), Poland
32 Romanian Accreditation Association (RENAR), Romania
33 Singapore Accreditation Council (SAC), Singapore
34 Slovak National Accreditation Service (SNAS), Slovakia
35 Slovenian Accreditation (SA), Slovenia
36 South African National Accreditation System (SANAS), South Africa
37 Entidad Nacional de Acreditacion (ENAC), Spain
38 Swedish Board for Accreditation and Conformity Assessment (SWEDAC), Sweden
39 Swiss Accreditation Service (SAS), Switzerland
40 Taiwan Accreditation Foundation (TAF), Chinese Taipei
41 The Bureau of Laboratory Quality Standards, Department of Medical Sciences, Ministry of Public Health, Thailand (BLQS-
DMSc), Thailand
42 Thai Industrial Standards Institute (TISI), Thailand
43 United Kingdom Accreditation Service (UKAS), United Kingdom
44 American Association for Lab Accreditation (A2LA), USA
45 International Accreditation Service, Inc (IAS), USA
46 National Voluntary Laboratory Accreditation Program (NVLAP), USA
47 Vietnam Laboratory Accreditation Scheme (VILAS), Vietnam
AEL & Test Report Certificate
Testing Site
Environmental Test
Electricity Test
High Voltage
Test Site
(MWB Germany)
Short Circuit
Test