You are on page 1of 8

HT INSULATION HAND GLOVES Test report Test DATE: Frequency: Bi- M

S.no. Gloves - No Voltage Level Test Voltage IR value Any Crackness Any Physical Damage
Frequency: Bi- Monthly

Apprerance Test Date Due Date


Principal Employer Organization

FICHTNER Consulting TCI Sanmar Chemicals SAE


Engineers (India) Pvt. Ltd

STEAG Energy Services (India) Talwandi Sabo Power


Pvt. Ltd Limited

VOLTECH Operation & Bharath Aluminimum


Maintenance Pvt. Ltd Company

POWER Engineering Services Neyveli Lignite Corporation

Talwandi Sabo Power


VEDANTA Resources Plc Limited
Duration
Position Location
From To
Assistant Chief Construction Till Date South Port
###
Engineer -Electrical Projects Said,EGYPT.

Deputy Manager -Electrical ### ### Punjab, INDIA.


Operation & Maintenance

Assistant Manager -Electrical Chhattisgarh,


### ###
Operation & Maintenance INDIA.

Assistant Manager -Electrical Tamilnadu,


### ###
Projects INDIA.

Associate Manager -Electrical ### ### Punjab, INDIA.


Projects
Personal Profile
Date of Birth 2/14/1986 Notice Period One Month
Marital Status Married Passport Details
Present CTC 16 Lacs Per Annum Passport No. 3666183
Expected CTC Negotiable Date of issue 9/9/2016
Nationality Indian Date of Expiry 9/8/2026

5242.482 2.3
2.57
3.07

12.6
6.9
60.3
60
2400 4200
1800
4200 3616.67 583.33
S.no Principal Employer Organization

ENMAS Operation &


Maintenance. Finolex industries
1 From:01/12/2018 Ltd.Maharashtra INDIA.
To:Till date

FICHTNER Consulting
Engineers (India) Pvt. Ltd. TCI Sanmar Chemicals
2 From:22/06/2018 SAE. Port Said, EGYPT.
To:30/11/2018

STEAG Energy Services (India)


Pvt. Ltd. Talwandi Sabo Power
3 From:16/10/2017 Limited, Punjab, INDIA.
To:21/06/2018

VOLTECH Operation & Bharath Aluminimum


Maintenance Pvt. Ltd.
4 Company, Chhattisgarh,
From:13/03/2017 INDIA.
To:15/10/2017

POWER Engineering Services. Neyveli Lignite


5 From:23/08/2014 Corporation, Tamilnadu,
To:12/03/2017 INDIA.

VEDANTA Resources Plc. Talwandi Sabo Power


6 From:13/06/2012 Limited, Punjab, INDIA.
To:22/08/2014

VEDANTA Resources Plc. MALCO Power Limited,


7 From:11/06/2009 Tamilnadu, INDIA.
To:12/06/2012

VEDANTA Resources Plc. MALCO Power Limited,


8 From:25/05/2007 Tamilnadu, INDIA.
To:10/06/2009
Position Role Capacity Type

Coal based Sub Critical


In charge
Manager 1 X 43 MW Boiler, with AFBC
Electrical technology

Assistant Chief In charge 2,00,000 MT Poly Vinyl Chloride (PVC)


Construction Electrical plant.
Engineer

Deputy Manager Dy.Incharge 3 X 660 MW Coal based Super Critical


Electrical Boiler, with PF technology

Assistant In charge 4 X 300 MW Coal based Sub Critical


Manager Electrical Boiler, with PF technology

Coal based Sub Critical


Assistant In charge 2 X 250 MW Boiler, with CFBC
Manager Electrical technology

Associate Dy. Incharge 3 X 660 MW Coal based Super Critical


Manager Electrical Boiler, with PF technology

Associate Dy. Incharge 4 X 30 MW


Manager Electrical
Coal based Sub Critical
Boiler, with PF technology
BTG & BOP
Engineer 4 X 30 MW
Operations

You might also like