CHECK LIST FOR GREEN CONCRETE


(Prior to Pouring)

Contract Name: Contractor:


Contract No: Consultant:
DATE: SUPPLIED BY:
STRUCTURE: LOCATION:

1ST 2ND 3RD 4TH PERMISSIBLE


DESCRIPTION
TRUCK TRUCK TRUCK TRUCK LIMITS / REMARKS

Non-simulated Batching variation for each ingredients


Batch Ticket No. should not be more than 1%
Class of Concrete B5 / B15 / B35
Type of Cement MSRPC type II (for reinforced concrete)
SRC type V (for plain cement concrete
W/C Ratio < / = 0.45
Admixture Used As per approved mix-design
Additives Used (eg. Fiber) As per approved mix-design
Cement Content (Kg/m³) As per approved mix-design
Concrete Batching Time Pouring shall be within 90 minutes after
batching time noted in
Concrete Pouring Time Non-simulated batch ticket
(Started at / Finished at)
Ambient Temperature / Max. 40⁰C / Max. 30⁰C
Concrete Temperature (⁰C)
Slump Actual (mm) 100 +/- 25mm or as per approved mix
(BS 1881 Part 102-1983) design
Total Quantity of Concrete / Minimum delivery per truck should not be
Quantity Delivered (m³) less than2mᶟ
No. of Cubes for Crushing 6 cubes from every 25mᶟ or part therof
Strength (BS 1881 Part 108) (3nos. for age 7 days, and 3 nos. for age
28.
No. of Cubes for Water 3 cubes from every 20mᶟ or part thereof
Permeability Test (DIN
1048)
No. of Cubes for RCP Test 3 cubes from every 20mᶟ or part thereof
(ASTM C 1202) (small pours) and 3 from every 75mᶟ (large
pours)
Wet Unit Weight (Kg/m³) As per appoved mix design
(ASTM C 138)

Aggregate ¾ “ Aggregate ⅜” Aggregate 3/16” Aggregate


Identification
(source and type)
-Verify per approved mix
design

Witnessed By: Reviewed By:

Remarks:

Copy to: RE, RE-MAT, QM, COTRACTOR, LABORATORY


China Harbour Engineering Co.L.L.C.

CONCRETE – (POST POURING RECORD)

Contractor : Date:

Contact No. & Location:

Description of Activity:

Serial No. Location:

Type of Structure:

Item Activity Contractor’s Consultant Date Remarks


QC Check Check
1 Stripping of form work

2 Surface Inspection

3 Check alignment and


verticality

4 Curing

5 Water proofing

10

Comments:

Contractor: (Name, Signature & Date) Consultant: Approved by: (Name, Signature & Date)

CC: QA/QC, RE/ARE