China Harbour Engineering Co.L.L.C. INSPECTION AND TESTING PLAN (ITP): FLOOR SCREED WORK

Contractor: Date:
Contract No. & Location:
Description of Activity:
SERIAL No.: PAGE NO.:
Legend for acceptance criteria: *AR = Approval *H = Hold Point *M = Monitoring *S = Surveillance *A = Actual Inspection *T/C = Test Certificate Reqd.

ITEM INSPECTION & ACCEPTANCE REMARKS/FOR


DESCRIPTION SPECSIFICATION
REPORT NO
No. HGC CHEC DORSCH
1.0 MATERIAL&DOCUMENT APPROVALS
1.1 Approval of Screed Mix design (C20/10mm) Mix (1: 3)
Method of Statement, quality control
1.2 procedure, ITP, check sheet & risk assessment Approve by company
approval
2.0 EXECUTION
2.1 Surface preparation Section 01090 of 1990 part 9 ,volume 2 part A
Ensure that inspection of MEP services are
2.2 Section 03350 of volume 2 part B
completed and the area is cleared
2.3 Check the screed mix on delivery Section 03350 of volume 2 part B
Check laying of floor Screed to the required
2.4 level and finish as per the architectural floor Section 03350 of volume 2 part B
finishes
Check control joints are provided and
2.5 completed where required by specifications and Section 07900 of volume 2 part B
as directed by COMPANY
2.6 Protection of floor screed and Curing Section 03390 of volume 2 part B
2.7 Curing and protection of concrete Section 03390 of 27.29&27.31,volume 2 part B
Contractor: (Name, Signature & Date) Consultant: Approved By (Name, Signature