Quality Control Inspection Check Sheets

Select a category of inspection sheet:

1 - Material Control Material Receiving Report


Over Shortage Damage Report
Material Inspection Report
Storage Report INSPECT
Handling Report
Material Request Issue Slip
Stock Card
Material Return Slip
Material Surplus List
Material Accepted Label
Material Rejected Label
Material Hold Label
Conditional Release Label
Material Release Label
Material Transfer Report
Inspection Release Certificate
Conditional Release Certificate
Equipment Preservation Record
Equipment Preservation Log
Equipment Preservation Tag
Equipment Preservation Matrix

2 - Surveys Final Inspection of Intersection


Points, Pipe Support & Crossfalls
Survey Report Pad and Equipment
Area INSPECT
Final Inspection of Pipe Column
Final Inspection of Pipe Column,
Head, Shoe
Final Inspection of Pipe Anchor
Final Inspection of Road Crossing
Final Inspection of Road
Equipment Test
Final Inspection of Secondary Pipe
Fencing Inspection
Survey Report
3 - Building Installation Asphalt Water Proofing Work
Water Proofing Protection
Damproofing Water Repellent Work
Caulking and Joint Filler Installation INSPECT
Tile Work
Wood Work
Roofing Insulation, Roofing and
Siding Work
Down Spouts and Roof Drain Work
Steel Framing Work
Miscellaneous Metals Installation
Inspection of Plaster Wall & Floor
Finish
Fixtures & Hardware Installation
Glass and Glazing Installation
Vinyl Floor Tile Work
Gypsum Board Installation
Acoustic Board Installation
Piping Installation ( part 1 )
Piping Installation ( part 2 )
Sanitary Equipment Installation
Miscellaneous Equipment Installation
Pressure Test
Leakage Test
Fire Protection Equipment
Installation
Test Record of Piping and Ducting
Building Inspection Record
Acceptance of Builing Externals
Acceptance of Builing Internals

4 - H.V.A.C Air Handling Unit & Fans


HVAC System Function Check
HVAC System Noise Measurement
Acceptance Certificate of Building INSPECT
Equipment
HVAC Installation Check List
5 - Earthwork Sewer Piping Work
Open Ditch
Water Leakage and Sewer Line
Installation of Main Sewer INSPECT
Pond Lining
Gabions
Rock Masonry Work
Construction Using Culvert
Placement of Base Course
Placement of Structural Fill
Placement of Structural Fill
Foundation
New Roads Finishing Work
Compaction of Structural Fill
Clearing of New Land
Compaction Test of Sand Bedding
by Clegg Hammer ( part 1 )
Compaction Test of Sand Bedding
by Clegg Hammer ( part 2 )
Inspection of Landscaping
Inspection of Landscaping
Equipment
QC Geotextile Check Sheets
QC Membraines Liners Hot Shoe
Calibration
QC Membraines & Liners Leak Test

5.1 - Road Construction Proctor Test


Release For Backfill
Re-use Of Excavated Materials
Grading Chart For Sub-Base INSPECT
Grading For Base Course
Aggregate Test Report

6 - Concrete Work Trial Mix Test of Concrete


Compress Strength Test of Concrete
Record of Anchor Bolts for Steel
Structure INSPECT
Concrete Pour Record
Tank Foundation Record
Pre-Concrete Inspection Record
Earth & Concrete Work Foundation
Proctor Test
Concrete Aggregates ( Table & Test
Results )
Cable Pull Pits Pre Pouring
Cable Pull Pits Post Pouring
Inspection of Reinforcing Bar
Installation
Cement Test Sheet
Concrete Structure Checks Report
Before Casting
Pre-grouting Inspection Check List
Aggregate Test Report
Comprehensive Strength Test for
Concrete
Concrete Delivery For Ticket
Grouting Inspection Record
Backfilling Embankment Material
Inspection and compaction Report
Soil Testing Request
Sieve Grading Report
Soil Density Test Report
Compaction Test Report
Underground Gravity Sewers
Leakage Test Checklist
Field Steel Work Grouting Checklist
Asphalt Concrete Check Report
Grout Release Form
Aggregate Summary Sheet For
Sundry Test
Geotextile Check Sheet
HDPE Studliner/Geomembrane
Checks and Test Reports
Air Pressure Test Form Check And
Test Reports
Release for Liner/Membrane Laying
Column and Tower Inspection
Checklist
7 - Piping Work Pipework Pre-Test Checklist
Hydrostatic Test Results Part 1
Hydrostatic Test Report Part 2
Flush Blow and Chemical Clean INSPECT
Acceptance Certificate
Flushing and Cleaning Report
Piping Works Installation Checklist
Buried FRP Pipe Installation
Mechanical Completion of Pipework
Pipework Post Test Check List
GRP/FRP Butt & Wrap Lamination
(each Joint)
GRP/FRP Adhesive Joint
Preparation
Hydrolic Actuated Valve
Butterfly Valve
Fire Hydrant
Manually Operated Valve
Mechanically Diverter
Pneumatically Actuated Valve
Motorized Valve
Reciprocating Compressor
Solenoid Operated Valve
Safety Valve

8 - Piling Survey Report Piling


Test Pile Data
Pile Driving Log Sheet
Pile Extension Record Sheet INSPECT
9 - Structural Steel Work Fabrication Check List
Steel Work Installation Check List
Structure Installation Check List
QC Steel Structure Inspect Check INSPECT
List
QC Structural Checklist Report
QC Structural Release
QC Inspection Structural Steel
Buildings
Inspection Of Structural Steel
Erection
None Destructive Testing Report
Structural
Cutting & Drilling Structural

10 - Structural Steel For Buildings Inspection of Structural Steel


Fabrication
Inspection of Structural Steel
Erection INSPECT

11 - Welding Welder Qualification Test


Procedure Qualification Record (
part 1 )
Procedure Qualification Record ( INSPECT
part 2 )
Welding Procedure Specification
Welders Qualification Log
Welders Performance Chart
Daily Field Weld Report
Weld Travel Sheet
Heat Treatment Instruction Sheet
Consumeable Checklist for Welding
Work
Welding Repair Record
Daily Field Weld Report
WTD Attendance Sheet
Structural Weld Travel Sheet SS2
Structural Weld Travel Sheet SS2
Weekly Welders RT Control Sheet
12 - NDE Special Processes Radiographic Examination Log
Magnetic Particle Examination Log
Liquid Penetrant Examination Log
Ultrasonic Examination Log INSPECT
Radiographic Examination Report
Liquid Penetrant Examination Report
Hardness Testing Report
NDT Qualification log
Contractors Notice for RT Works
RT Examination Report
Welders Control Sheet Weekly
Local Post Weld Heat Treatment
Daily Dosemeter record
Radiographic Record
Calibration intervals
Material List For Positive Material
Inspection
QA Pre-job RT Checklist
Positive Material Inspection(PMI)
Radioactive Isotope Movement
Record
NDE Clearance QC Checklist

13 - Pipe Cleaning Blow Down Pipework Pre-test Checklist


Hydrostatic Test Report
Flushing, Blowing and Chemical
Cleaning Acceptance Certificate INSPECT
Post Pipe Cleaning / Blow Down
Check List
Mechanical Completion of Pipe Work
Preparation Check for Pipe Cleaning
/ Blow Down
14 - Pressure Testing Pipework Pre Test Checklist
Hydrostatic Test Report
Pipework Post Test Check List
INSPECT

15 - Coating Daily Report on Paint Operations


In-process Paint Inspection
Accept Inspection of Paint System
INSPECT

16 - Insulation Insulation Inspection Record


Equipment Piping Release for
Insulation
Field Lining Inspection INSPECT

17 - Static Equipment Shop Fabricated Tank & Vessel


Installation
Heat Exchanger Installation
Inspection INSPECT
Final Vessel Closure
Special Equipment Inspection
Auxiliary Equipment Index
Miscellaneous Items
Fired Heater Installation Inspection
Fired Boiler Inspection
Storage Tank Inspection
Heat Exchanger Installation
Inspection
18 - Rotating Equipment Equipment Protection, Preservation
& Equipment
Alignment Inspection
Equipment Flange Alignment INSPECT
Compressor Inspection
Pump Inspection
Fan & Blower Inspection
Electrical Motor Inspection
Centrifugal Compressor
Gear Box
Pump Motor Running Test
Centrifugal Seperator Static Test
Compressor Running
Coupling Alignment
Centrifugal Seperator

19 - Electrical Equipment Visual Inspection of Cadweld


Connection
Oil Dialectric Strength Test
Construction Drawings Earthing Grid INSPECT
Cable Tray Inspection Check List
Visual Inspection of Earthing Risers
Installation
Cable Pulling Inspection Check List
Overall Completion of Earthing Grid
Megger Reading Power Control Wire
& Cable
Visual Inspection of Earthing Wire
Layout
Meggar Reading Electrical
Equipment inc Motors
Cadweld Connection Earth Wire
High Voltage DC Test Record 1kv
Cable
Insulation Resistance
Ground Well Resistance Readings
Switchgear Inspection
Megger Reading Transformer
Switchgear Inspection Record ( part
1)
Switchgear Inspection Record ( part
2)
480v Switch Rack Inspection Record
Motor Control ( part 1 )
Motor Control ( part 2 )
Liquid Filled Transformer
Pre Commisioning of Power
Transformers( part 1 )
Pre Commisioning of Power
Transformers( part 2 )
Neutral Grounding Resistor
Inspection Record
Battery & Battery Charger Inspection
Record
Replacement of Field Control Station
Test Record
Connection of Existing Loads to New
MCC'c T
Internal Lighting Check Sheet
Small Power Inspection Check List
Distribution Boards Panel Inspection
Check List
Telephone System Inspection Check
Sheet
Underground Conduit Inspection
Check List
Above ground Conduit Inspection
Check List
Diesel Generator Installation Check
List
DCS-Console Desk Installation
Check List
Control Pane Installation Check List
LV Bus Duct Connection Check List
Local Pane & Box Installation Check
List
Lighting Protection Installation
OA System Installation

20 - Instrumentation Site Inspection Certificate for Local


Mounted Instruments
Instrument Power Supply Inspection
Record INSPECT
Alarm Annunciator Test Record
Control System Punch List Record
Control Systems Test Equipment
Calibration
Calibration Form ( part 1 )
Calibration Form ( part 2 )
Installation and Loop Check Record
Megger Reading Instrument Wires
Cable
Instruments Installation Check List

20.5 - Instrumentation Calibration Control Valves


Differential Pressure Transmitter
Transmitter Remote Diaph. Seal
Level Switch With Displacer INSPECT
Level Transmitter With Displacer
Motorized Valve
On/Off Valve Fail Closed
On/Off Valve Fail open
Oriface Plate
Pressure Gauge
Safety and Relief Valve
Pressure Switch
Pressure Transmitter
Temperature Gauge
Temperature Switch
Temperature Transmitter
I/P Transducer
I Transducer
Controller
Temperature Element

21 - Gas Removal System Gas Removal System Check List


Support Structure
Gas removal System Check List
Ejector, Condenser & Separator INSPECT
Installation
Gas Removal System Check List
Vacuum Pump Installation
22 - Overhead Crane Overhead Crane Installation Check
List

INSPECT

23 - Generator Generator Installation Check List (


part 1 )
Generator Installation Check List (
part 2 ) INSPECT
Generator Installation Check List (
part 3 )

24 - Hotwell Pump Hotwell Pump Installation Check List

INSPECT

25 - Cooling Tower Cooling Tower Installation Check List


Cooling Tower Installation Check List
( part 2 )
INSPECT
26 - Turbine Turbine Installation Check List ( part
1)
Turbine Installation Check List ( part
2) INSPECT
Turbine Installation Check List ( part
3)

27 - Condenser Condesner Check Sheet ( part 1 )


Condenser Check Sheet ( part 1 )

INSPECT

28 - General Construction Punchlist ReportGeneral Construction Punchlist


Report ( part 1 )
General Construction Punchlist
Report ( part 2 ) INSPECT

29 - Milestone Completion Certificate Milestone Completion Clearance

INSPECT
30 - Application for Inspection Application for Inspection

INSPECT

98 - ALL QC Construction Check Sheets ALL QC Cheek Sheets Consisting of


332 QC check sheets