You are on page 1of 2

Project: MANUFACTURING OF MOBILE HOPPER

ANNEXURE OF PAINTING REPORT No.: RVR/P/50


DRAWING Nos : 192-60-008-DRW-ME-N1A-2143 Rev 3 N1A TRESTLES

PART Nos : PRIMER (HEMPEL’ ZINC DUST) 50 INTERMEDIATE (HEMPADUR FAST DRY) 120 FINAL (HEMPATHANE HS ) 2
SPOTS 1 2 3 4 5 Avg 1 2 3 4 5 Avg 1 2 3 4

TR 1/14 56 51 53 57 62 55.8 128 124 129 130 131 128.4 209 204 206 210

TR 1/44 55 51 54 58 56 54.8 127 124 125 129 132 127.4 204 210 211 205

TR 1/49 52 53 54 58 59 55.2 124 126 128 127 129 126.8 205 209 210 206

ARDEE ENGINEERING COMPANY KPCL

Page No. 1 of 2
FACTURING OF MOBILE HOPPER

PAINTING REPORT No.: RVR/P/50


N1A TRESTLES

FINAL (HEMPATHANE HS ) 200


5 Avg

205 206.8

208 207.6

207 207.4

KPCL

Page No. 2 of 2

You might also like