113 10 WIND -Z Fx -0.426 Fy 50.161 Fz -22.503
115 10 WIND -Z Fx -0.38 Fy 50.896 Fz -19.645
1407 4.480892
1356
678 2.159236
Mx -6.987 My -0.046 Mz 0.116
Mx -7.07 My 0.039 Mz 0.13
Mx -6.213 My 0.111 Mz 0.125
750 625
1 EL+X 111 Fx -73.386 Fy -82.027 Fz -19.211
1 EL+X 113 Fx -86.034 Fy -8.783 Fz -3.838
1 EL+X 115 Fx -73.373 Fy -90 Fz -9.738
12 12 1356.48 0.90432
Mx -7.344 My -1.282 Mz -25.653
Mx -1.57 My -1.191 Mz -27.545
Mx -3.59 My -1.24 Mz -25.631
61 320 0.190625
151 52.6 98.39872
61 32.2 28.8464
127.2451
80 15.25
Boiler house Refinery Plant ETP & ZLD
1 ID Fan Pile Foundation ISSUED Lvl 4 ISSUED 1 Acid oil tank Pile Foundation ISSUED
Pilecap Lvl 8 ISSUED Pilecap ISSUED
Lvl 12
2 FD Fan Pile Foundation ISSUED Lvl 15 2 Pre treatment skid Pile Foundation ISSUED
Pilecap Lvl 19 Pilecap ISSUED
Lvl 22 lvl 4.5 m framing plan
3 Grid 5 to 9 Pile Foundation ISSUED Lvl 25.6 Staircase
Grid A Pilecap & Brick elevation Lvl 28.6
Lvl 30.6 3 Acid oil Plant Pile Foundation ISSUED
4 Grid 5 to 9 Pile Foundation ISSUED Lvl 34.6 Pilecap
Grid F Pilecap & Brick elevation Framing Plans
Staircase
5 RCC Staircases- 3 STAIR
0 TO 4 ISSUED 4 MEE water tank Pile Foundation ISSUED
6 Lvl 4.5 m Framing plan Cutout has to Add 4 TO 12 ISSUED Sludge Tank Pilecap
Framing Plans
7 Screen House Pile Foundation Staircase
Grid 10-11 Pilecap
Upper floors 5 Wax and Filter press Pile Foundation ISSUED
Pilecap
8 Crusher House Pile Foundation Roof Plan
Grid 10-11 Pilecap
Upper floors
welding length
use ISMB300
Ag = 5626 mm2
Member capacity = Ag x fy
Ym
Span
= 1278.6 KN 5.5 11.5
Bolt Capacity
26.83333
12.42
39.25333
58.88