1. Revised synopsis 10
Aim
Objective
Methodology
Scope
Limitations
2. Site Analysis 30
All relevant location & zonal plans with detailed site plan
On site considerations:
Dimensions, area, shape, orientation – plan and north position
Contours and levels
Soil condition – bearing capacity and its implications
Existing services in and around site
Existing trees, buildings, other features, condition and type of trees
Existing landmarks and views (from site and towards site)
Zoning and Building Bye laws – landuse, F.A.R., G.F.Coverage, Set back lines, Building
byelaws
Off-site considerations:
Access, surrounding road network – major, secondary, service roads
Traffic movement – volumes and destinations, traffic rotaries
Nalas, streams and water-bodies
Surrounding landscape, views and landmarks
Architectural environs
Local Building Materials, building technology – vernacular const. methods
3. Case Study Analysis 45
Design
Validity and Objective of case study, Architect’s objectives and concept of Design, Development of
the plan and form, Function definition and Usage index of various spaces, Function distribution –
horizontally and vertically, Area distribution – bubble diagrams, Circulation – vehicular, pedestrian,
ramps (within buildings and outside buildings), other, lifts and escalators
Services
Water Supply: Pattern and quantum including overhead and underground tanks – Capacity and size
Structural provisions
Sewerage: Type of disposal system, pattern, Invert Level
Electrical Supply: Availability of Electricity, Distribution system at both micro and macro level
(location of feeder bus-bars etc).
Air-conditioning:System, Plant capacity & location, Machinery and equipment, Space requirements,
Height and circulation, Provision of ramps, ramp gradient, Photographs if possible
Fire prevention: Fire Fighting Equipment, location and working, Firefighting water tanks, capacity, size
and location
Landscape: Scheme and effect, Trees, Hierarchy of open spaces.
Construction technology
Structure: System and validity, Materials used, Market availability, Local construction techniques
Other special features that relate to the topic: Water harvesting system, Acoustical services, Lighting
and illumination, Use of Alternate energy resources, Signage, Security systems etc.
4. Project/Design Criteria 15
Conceptual sketches /Illustrations
Notes:
1. Students are required to submit hard copy of report in proper format( same as Dissertation) before
the Jury date.
Thesis Co coordinator