1 Wall Conduit
1.1 Ground Floor - Wall Conduit Works Mtr 250 0.48 1,532.57 250 0.48 1,544.40 250.00 0.46 1,457.19
1.2 First Floor - Wall Conduit Works Mtr 140 0.27 858.24 140 0.27 864.86 150.00 0.27 874.32
1.3 Garage - Wall Conduit Works Mtr 10 0.02 61.30 10 0.02 61.78 10.00 0.02 58.29
1.4 Parapet wall Mtr 45 0.09 275.86 45 0.09 277.99 50.00 0.09 291.44
2 DB Backbox Fixing
2.1 Ground Floor -DB Backbox fixing Nos. 1 0.002 6.13 1 0.002 6.18 1.00 0.002 5.83
2.2 First Floor - DB Backbox fixing Nos. 1 0.002 6.13 1 0.002 6.18 1.00 0.002 5.83
3.1 Ground Floor -12U Backbox Fixing Nos. 1 0.002 6.13 1 0.002 6.18 1.00 0.002 5.83
4.1 Garage Area -MDB & Meter Cabinet fixing Nos. 2 0.004 12.26 2 0.004 12.36 2.00 0.004 11.66
5.1 Ground Floor- G.I Box Fixing Nos. 43 0.08 263.60 43 0.08 265.64 43.00 0.08 250.64
5.2 First Floor- G.I Box Fixing Nos. 29 0.06 177.78 25 0.05 154.44 41.00 0.07 238.98