You are on page 1of 4

JOB NO.: REV. NO.: Page No.

: of
CLIENT.:
Date : Dec. 5, 2005
PROJECT: Prepared by : LYNDON
ITEM: CRANE LOADINGS Checked by :

Reference Design Calculation Results

C. CRANELOAD

crane girder
motor
wheel

W2 W1

limit for hook

S1

S2 L

PLAN LAYOUT FOR CRANE

1. LOADINGS
P= 200.00 kN crane capacity
Cw = 100.00 kN crane girder weight
W= 150.00 kN load per single wheel
C= kN colateral or additional load

2. INPUT PARAMETERS
L= 30000 mm span of crane girder
S1 = 600 mm minimum distance for crane hook
S2 = 200 mm edge distance for railing beam
W1 = 3600 mm distance between wheel
W2 = 4500 mm length of beam supporting wheels

3. LOADING CONDITIONS
CONDITION 1: Loaded at center of crane girder

300.00 kN

R1 R2
15.00 m

30.00 m

R1 = 150.00 kN reaction at left of crane girder


R2 = 150.00 kN reaction at right of crane girder
M= 2250.00 kN-m maximum moment at center

WP = 225.00 kN load transfer for each wheel

developed by: Lyndon Perez 411355809.xls


JOB NO.: REV. NO.: Page No.: of
CLIENT.:
Date : Dec. 5, 2005
PROJECT: Prepared by : LYNDON
ITEM: CRANE LOADINGS Checked by :

Reference Design Calculation Results

developed by: Lyndon Perez 411355809.xls


JOB NO.: REV. NO.: Page No.: of
CLIENT.:
Date : Dec. 5, 2005
PROJECT: Prepared by : LYNDON
ITEM: CRANE LOADINGS Checked by :

Reference Design Calculation Results

CONDITION 2: Loaded at near support of crane girder

200.00 kN 100.00 kN

R1 R2
0.60 m 14.40 m 15.00 m

30.00 m

R1 = 246.00 kN reaction at left of crane girder


R2 = 54.00 kN reaction at right of crane girder
M= 810.00 kN-m maximum moment at center

WPLeft = 273.00 kN load transfer at left wheel


WPRight = 177.00 kN load transfer at right wheel

4. IMPACT LOADS FROM WHEEL TRANSFER TO RAIL BEAM


WHEEL LOAD = maximum reaction 273.00 kN

LATERAL LOAD = 20% of the sum of lifted load and crane trolley 70.00 kN

LONGITUDINAL LOAD = 10% of maximum wheel load 27.30 kN


10% of minimum wheel load 17.70 kN

developed by: Lyndon Perez 411355809.xls


JOB NO.: REV. NO.: Page No.: of
CLIENT.:
Date : Dec. 5, 2005
PROJECT: Prepared by : LYNDON
ITEM: CRANE LOADINGS Checked by :

Reference Design Calculation Results

developed by: Lyndon Perez 411355809.xls