PILECAP DESIGN CALCULATIONS

Project Name : AA
Client Name : AA
Engineer Name : AA
Design File : D:\Design file\1191 gandhinagar railway station\Drawing as per tender old\main
building\9-08-2018_PILE\pile 8-08-18\rcdc\21m depth.rcdx
Analysis File : C:\Users\Admin 2\Desktop\Arch\PILE.mdb
Analysis Last Modified : 06-Dec-16 6:33:00 PM
Definitions:
1. a = Coefficient of Thermal Expansion
2. e1 = Strain at level considered,Calculated ignoring the stiffening of the concrete in
tension zone
3. em = Average steel strain at level considered
4. ρact = Percentage steel provided
5. ρcrit = Percentage steel critical as per code
6. A1 = Area of Base for Load Transfer
7. A2 = Area of Bearing under column
8. acr = Distance from the point considered to the surface of the nearest longitudinal
bar
9. AsfrPrv = Area of face reinforcement provided
10. AsfrReq = Area of face reinforcement required
11. AstPrv = Area of tensile reinforcement provided
12. AstReq = Area of tensile reinforcement required
13. AsvPrv = Area of shear reinforcement provided
14. AsvReq = Area of shear reinforcement required
15. Av = Location of section of shear-check from Pile Center
16. Beff = Effective Width for design for bending and shear
17. Beffsfr = Effective Width for design for Face Reinforcement
18. BMux = Factored Bending Moment for pile-cap along column D
19. BMuy = Factored Bending Moment for pile-cap along column B
20. D = Depth of Pilecap
21. Deff = Effective Depth of Pilecap
22. DfCol = Distance of Pile center to face of column
23. Ec = Modulus of elasticity of concrete
24. Es = Modulus of elasticity of steel
25. Fst = Stress in steel
26. Mx = Bending Moment in column along Column D
27. My = Bending Moment in column along Column B
28. P = Axial load in pile due to Ptotal
29. Pcomb = Axial load in column for a load combination
30. Ppile = Axial Load on pile
31. Ptotal = Total vertical load on pile-cap for a load combination
32. Pmx = Axial load on pile due to moment Mx
33. Pmy = Axial load on pile due to moment My
34. sp = Spacing Between bars at outer most layer
35. Tc = Design Shear Strength of Concrete
36. Tce = Enhanced Shear Strength of concrete
37. Temp1 = Peak Hydration temperature

file:///C|/Users/Admin%202/Desktop/pile%20fdn.html[12-Mar-19 5:21:37 PM]


38. Temp2 = Seasonal Temperature Variations
39. Tv = Nominal shear stress
40. Vu = Design shear force
41. Vus = Design shear force for stirrups
42. Wcr = Surface Crack Width

Code References:
IS 456-2000
1. Ptmax : clause 26.5.1.1
2. Ptmin : clause 26.5.2.1
3. Pt : clause 38
4. Tc : clause 40.2.1
5. Tcmax : clause 40.2.3
6. AsvReq : clause 40.4
7. Min Shear Reinf : clause 26.5.1.6
8. Max Stirrup Spacing : clause 26.5.1.5
9. One Way Shear Criteria : clause 34.2.4.2
10. Load transfer : clause 34.4
11. Ptnominal : clause 34.5.2
12. crack width calculation : Annex-F
13. cracking : clause. 35.3.2

IS 2911 Part-1 Section 2


1. Pile capacity check : clause 5.10

BS 8007 (For Early / Initial Thermal Cracking)


1. Surface Zone for suspended : Figure A.1
slab
2. Surface Zone for ground : Figure A.2
slab
3. Factors for the calculation : Table A.1
of minimum reinforcement

Design Code : IS Code


Pilecap No : PC103
Column No : C103 (2000mm X 2000mm)
Member Ref. No : C103

Concrete Grade : M30


Steel Grade : Fe500
Clear Cover : 60 mm
Top of pile-cap below ground : 2.05 M

Density of Soil = 18 KN/cuM


Founding Depth = 3 M
Pile Capacity in compression = 1800 KN
Pile Capacity in tension = 2180 KN

file:///C|/Users/Admin%202/Desktop/pile%20fdn.html[12-Mar-19 5:21:37 PM]


Pile Capacity Reduction = 0 %
Pile Overloading = 10 %
Pile Group Overloading = 10 %
Pile Capacity Increase for EQ = 25 %
Pile Capacity Increase for Wind = 25 %
Live Load Reduction = 0 %

Consider Capacity Design : Yes


Consider Overburden Pressure : Yes

No. of Piles = 4
Pile Diameter = 1200 mm
Pile Spacing = 3 xØ
Alternate Pile Spacing = 3 xØ
Pilecap Size = 5100 X 5100 mm
Pilecap Depth = 950 mm
Soil Wt. + Pile-cap Wt. = 1577.507 KN

Check for Maximum Load on One Pile:


Critical Load Combination : (DEAD) +(LIVE) +0.3 (EQX) +(EQY)
Pcomb = 7300.34 KN
Ptotal = Pcomb + Soil Wt. + Pilecap Wt.
= 8877.85 KN
Mx = 0 KNM
My = 0 KNM
P = Ptotal/ No. of Piles
= 2219.46 KN
Pmx = 0 KN
Pmy = 0 KN

Maximum load on pile = 2219.46 KN


Allowable load on pile = 1800 X 1.25
= 0 KN

Check for Maximum Load on Pile Group:


Critical Load Combination : (DEAD) +(LIVE) +0.3 (EQX) +(EQY)
Pcomb = 7300.34 KN
Ptotal = Pcomb + Soil Wt. + Pilecap Wt.
= 8877.85 KN
Mx = 0 KNM
My = 0 KNM

Maximum load on pile group = 8877.85 KN


Allowable load on pile group = 4 x 1800 + 0.4 x 1800
= 7920 KN

file:///C|/Users/Admin%202/Desktop/pile%20fdn.html[12-Mar-19 5:21:37 PM]


Check for Uplift Load on Pile:
No uplift in any pile

Design for Bending:


Bottom Steel Along Column-D
Ppile = Capacity of pile
= 2700 KN

Deff = 880 mm
Beff = 1500 mm
DfCol = 0.8 M
BMux = Ppile X DfCol
= 2160 KNM
PtReq = 0.46 %
AstReq (BM) = 4078 Sqmm/M
AstPrv = T25 @ 120 c/c
= 4091 Sqmm/M

Top Steel Along Column-D


D = 950 mm
<= 1000 mm, Hence
AstReq (BM) = Min Pt for Top Steel X D X 1000
= 0.4% X 950 X 1000
= 3800 Sqmm/M
AstPrv = T25 @ 125 c/c
= 3927 Sqmm/M

Bottom Steel Along Column-B


Ppile = Capacity of pile
= 2700 KN

Deff = 860 mm
Beff = 1500 mm
DfCol = 0.8 M
BMuy = Ppile X DfCol
= 2160 KNM
PtReq = 0.49 %
AstReq (BM) = 4191 Sqmm/M
AstPrv = T25 @ 115 c/c
= 4268 Sqmm/M

Top Steel Along Column-B


D = 950 mm
<= 1000 mm, Hence
AstReq (BM) = Min Pt for Top Steel X D X 1000
= 0.4% X 950 X 1000
= 3800 Sqmm/M
AstPrv = T25 @ 125 c/c

file:///C|/Users/Admin%202/Desktop/pile%20fdn.html[12-Mar-19 5:21:37 PM]


= 3927 Sqmm/M

Design for One Way Shear:


Along Column-D
Ppile = Capacity of pile
= 2700 KN

Location of critical section is at d/2 from face of column


Section Location from column center = 1440 mm

Data for Piles


Pile No Load (KN) % covered Shear (KN)
P1 2700 20 2160
P2 2700 20 2160
P3 2700 20 2160
P4 2700 20 2160

Design Shear Force (Vu) = Max. of (Shear due to P1+P3, P2+P4)


= 4320 KN
Deff = 880 mm
Beff = 5100 mm
Tv = Vu/(Beff x Deff)
= 0.96 N/Sqmm
Tc = 0.48 N/Sqmm
Av = 2160 mm
Shear enhancement factor = 2 X Deff / Av
= 0.81 mm
Enhanced shear strength (Tce) = 0.48 N/Sqmm
Tv > Tce, Hence Provide Shear Reinforcement
Vus = 2160.36 KN
AsvReq = 1000 X (Vus X 1000)] / (0.87 X fy X Deff)
= 0 Sqmm/M
AsvPrv = 5712 Sqmm/M
= 8L - T10 @ 110 c/c

Along Column-B
Ppile = Capacity of pile
= 2700

Location of critical section is at d/2 from face of column


Section Location from column center = 1430 mm

Data for Piles


Pile No Load (KN) % covered Shear (KN)
P1 2700 19.17 2182.5
P2 2700 19.17 2182.5
P3 2700 19.17 2182.5
P4 2700 19.17 2182.5

file:///C|/Users/Admin%202/Desktop/pile%20fdn.html[12-Mar-19 5:21:37 PM]


Design Shear Force (Vu) = Max. of (Shear due to P1+P2, P3+P4)
= 4365 KN
Deff = 860 mm
Beff = 5100 mm
Tv = Vu/(Beff x Deff)
= 1 N/Sqmm
Tc = 0.49 N/Sqmm
Av = 2170 mm
Shear enhancement factor = 2 X Deff / Av
= 0.79
Enhanced shear strength (Tce) = 0.49 N/Sqmm
Tv > Tce, Hence Provide Shear Reinforcement
Vus = 2209.51 KN
AsvReq = 1000 X (Vus X 1000)] / (0.87 X fy X Deff)
= 0 Sqmm/M
AsvPrv = 5984 Sqmm/M
= 8L - T10 @ 105 c/c

Design of Face Reinforcement:


AsfrReq = SFR % X D X Beffsfr
= 0.1 X 950 X 500 / 100
= 475 Sqmm
Asfr Prv = 7 - T10
= 550 Sqmm

Check for Load Transfer from Column to PileCap


Critical Load Combination = 1.5 (DEAD) +1.5 (LIVE)
P = 10734.56 KN
A2 = 4 sqM
A1 = 15.21 sqM
Base Area = 15.21 sqM
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 1.95
Thus, Modification Factor = 1.95
Concrete Bearing Capacity = 0.45 X Fck X Modication Factor X Column Area
= 105300 KN
Concrete Bearing Capacity > P, Hence Safe.

Design Code : IS Code


Pilecap No : PC90
Column No : C90 (2000mm X 2000mm)

file:///C|/Users/Admin%202/Desktop/pile%20fdn.html[12-Mar-19 5:21:37 PM]


Member Ref. No : C90

Concrete Grade : M30


Steel Grade : Fe500
Clear Cover : 60 mm
Top of pile-cap below ground : 2.325 M

Density of Soil = 18 KN/cuM


Founding Depth = 3 M
Pile Capacity in compression = 1500 KN
Pile Capacity in tension = 1740 KN
Pile Capacity Reduction = 0 %
Pile Overloading = 10 %
Pile Group Overloading = 10 %
Pile Capacity Increase for EQ = 25 %
Pile Capacity Increase for Wind = 25 %
Live Load Reduction = 0 %

Consider Capacity Design : Yes


Consider Overburden Pressure : Yes

No. of Piles = 3
Pile Diameter = 1000 mm
Pile Spacing = 3 xØ
Pilecap Size = 3751 mm (edge)
Pilecap Depth = 675 mm
Soil Wt. + Pile-cap Wt. = 688.974 KN

Check for Maximum Load on One Pile:


Critical Load Combination : (DEAD) +(LIVE) -0.3 (EQX) -(EQY)
Pcomb = 4551.11 KN
Ptotal = Pcomb + Soil Wt. + Pilecap Wt.
= 5240.08 KN
Mx = 0 KNM
My = 0 KNM
P = Ptotal/ No. of Piles
= 1746.69 KN
Pmx = 0 KN
Pmy = 0 KN

Maximum load on pile = 1746.69 KN


Allowable load on pile = 1500 X 1.25
= 0 KN

Check for Maximum Load on Pile Group:


Critical Load Combination : (DEAD) +(LIVE) -0.3 (EQX) -(EQY)

file:///C|/Users/Admin%202/Desktop/pile%20fdn.html[12-Mar-19 5:21:37 PM]


Pcomb = 4551.11 KN
Ptotal = Pcomb + Soil Wt. + Pilecap Wt.
= 5240.08 KN
Mx = 0 KNM
My = 0 KNM

Maximum load on pile group = 5240.08 KN


Allowable load on pile group = 3 x 1500 x 1.1
= 4950 KN

Check for Uplift Load on Pile:


No uplift in any pile

Design for Bending:


Bottom Steel Along Parallel Edge
Ppile = Capacity of pile
= 2250 KN

Deff = 585 mm
Beff = 1300 mm
DfCol = 0.5 M
BMux = Ppile X DfCol
= 1125 KNM
PtReq = 0.65 %
AstReq (BM) = 3818 Sqmm/M
AstPrv = T25 @ 125 c/c
= 3927 Sqmm/M

Top Steel Along Parallel Edge


D = 675 mm
<= 1000 mm, Hence
AstReq (BM) = Min Pt for Top Steel X D X 1000
= 0.4% X 675 X 1000
= 2700 Sqmm/M
AstPrv = T20 @ 115 c/c
= 2732 Sqmm/M

Bottom Steel Along Perpendicular Edge


Ppile = Capacity of pile
= 2250 KN

Deff = 605 mm
Beff = 1300 mm
DfCol = 0.73 M
BMuy = Ppile X DfCol
= 1647.11 KNM
PtReq = 0.95 %
AstReq (BM) = 5720 Sqmm/M

file:///C|/Users/Admin%202/Desktop/pile%20fdn.html[12-Mar-19 5:21:37 PM]


AstPrv = T32 @ 140 c/c
= 5745 Sqmm/M

Top Steel Along Perpendicular Edge


D = 675 mm
<= 1000 mm, Hence
AstReq (BM) = Min Pt for Top Steel X D X 1000
= 0.4% X 675 X 1000
= 2700 Sqmm/M
AstPrv = T20 @ 115 c/c
= 2732 Sqmm/M

Design for One Way Shear:


Along Parallel Edge
Ppile = Capacity of pile
= 2250 KN

Location of critical section is at d/2 from face of column


Section Location from column center = 1292.5 mm

Data for Piles


Pile No Load (KN) % covered Shear (KN)
P1 2250 0 0
P2 2250 29.25 1591.88
P3 2250 29.25 1591.88

Design Shear Force (Vu) = Max. of (Shear due to P2, P3)


= 1591.88 KN
Deff = 585 mm
Beff = 2309.4 mm
Tv = Vu/(Beff x Deff)
= 1.18 N/Sqmm
Tc = 0.55 N/Sqmm
Av = 207.5 mm
Shear enhancement factor = 2 X Deff / Av
= 5.64 mm
Enhanced shear strength (Tce) = 3.12 N/Sqmm
Tv < Tce, Hence Shear Reinforcement is not required

Along Perpendicular Edge


Ppile = Capacity of pile
= 2250

Location of critical section is at d/2 from face of column


Section Location from column center = 1302.5 mm

Data for Piles


Pile No Load (KN) % covered Shear (KN)

file:///C|/Users/Admin%202/Desktop/pile%20fdn.html[12-Mar-19 5:21:37 PM]


P1 2250 7.04 2091.49
P2 2250 93.65 142.93
P3 2250 93.65 142.93

Design Shear Force (Vu) = Shear Due to P1


= 2091.49 KN
Deff = 605 mm
Beff = 1997.11 mm
Tv = Vu/(Beff x Deff)
= 1.73 N/Sqmm
Tc = 0.64 N/Sqmm
Av = 429.55 mm
Shear enhancement factor = 2 X Deff / Av
= 2.82
Enhanced shear strength (Tce) = 1.81 N/Sqmm
Tv < Tce, Hence Shear Reinforcement is not required

Design of Face Reinforcement:


AsfrReq = SFR % X D X Beffsfr
= 0.1 X 675 X 500 / 100
= 338 Sqmm
Asfr Prv = 5 - T10
= 393 Sqmm

Check for Load Transfer from Column to PileCap


Critical Load Combination = 1.5 (DEAD) +1.5 (LIVE)
P = 6504.78 KN
A2 = 4 sqM
A1 = 4.78 sqM
Base Area = 4.78 sqM
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 1.09
Thus, Modification Factor = 1.09
Concrete Bearing Capacity = 0.45 X Fck X Modication Factor X Column Area
= 59041.944 KN
Concrete Bearing Capacity > P, Hence Safe.