You are on page 1of 3

DATE: 21/09/2018

REMAINING WORK SCOPE:

1. GATE CONSTRUCTION
 Excavation of trenches
 Concrete blinding/Foundation
 Formwork for concrete columns
 Casting the columns
 Formwork + shuttering for overhang
 Casting overhang

2. EXTERIOR BOUNDARY WALL + CONSTRUCTION BACKFILLING


3. PLUMBING
 Buying of materials
 Installation
 Finishes
4. ELECTRIC FITTINGS (GUEST WING AND BOUNDARY WALL)
 Purchase
 Installations
 Finishes
5. SOAK-PIT AND MAN-HOLE
 Excavation of Man-Hole
 Construction of manholes
 Connections + Finishes

6. DOOR AND WINDOW FITTINGS + TIMBER FRAMED DOOR


 Purchase and Transport to site
 Installations
 Finishes
 Fixing glass panels
7. PLASTERING, PAINTING, TILING, SKIRTING AND CORNICING
 Plastering
 Skirting
 Cornicing
 Painting
8. LEVELING
 Within site
9. LANDSCAPING
 Design of landscape
 Construction
 Finishes
 Installations of seats/Benches
10. FOOD
11. STORE KEEPER
12. CULVERTS + MAN-HOLE

PLUMBING WORKS:

ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT


1.0 PPR PIPES (3/4)” Pieces 4 13,000/ 52,000/
2.0 PPR plain helbows (3/4)” Pieces 12 2,000/ 24,000/
3.0 PPR Tee (3/4)” Pieces 4 2,000/ 8,000/
4.0 PPR Femal helbow (3/4x1/2)” Pieces 8 4,500/ 36,000/
5.0 PPR Femal tees (3/4x1/2)” Pieces 2 3,500/ 7,000/
6.0 PPR Femal socket (3/4x1/2)” Pieces 1 3,000 3,000/
7.0 PPR Global vale (3/4)” Pieces 2 10,000/ 20,000/
8.0 Shower vale (3/4)” Pieces 1 25,000/ 25,000/
9.0 PVC Pipe (1 and 1/2)” Pieces 1 20,000/ 20,000/
1.1 Plain bends (1 and 1/2)” Pieces 4 3,000/ 12,000/
1.2 Tee plugs (1 and 1/2)” Pieces 3 4,500/ 13,500/
1.3 Floor trap (1 way) Pieces 1 15,000/ 15,000/
1.4 Solvent cement medium Pieces 1 7,000/ 7,000/
1.5 Labour Item 1 100,000/ 100,000/
TOTAL: 342,500/

ELECTRIC WORKS:

ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT


1.0 Conduit Pipe (1)” Pieces 10 3,000/ 30,000/
2.0 Conduit Bent (1)” Pieces 10 1,500/ 15,000/
3.0 Circular box (2-way Pieces 14 2,000/ 28,000/
4.0 Metallic MK (Single)” Pieces 4 1,500/ 6,000/
5.0 Concrete Saddle (1)” Pieces 50 500/ 25,000/
6.0 3BA screws Pieces 20 500/ 10,000/
7.0 4BA screws Pieces 20 500/ 10,000/
8.0 Conduit coupler Pieces 10 1,000/ 10,000/
9.0 Cable: Pieces
Red (1.5mm) 100 800 80,000/
Black (1.5mm) 100 800 80,000/
Earth (1.5mm) 100 800 80,000/
1.1 Miscellaneous Item 100,000/ 100,000/
1.2 Labour Item 150,000/ 150,000/
TOTAL: 624,000/

OTHER REQUIREMENTS:

ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT


1.0 Door frame Item 1 80,000/ 80,000/
2.0 Skirting/Cornice Meter
Main rooms (1-3) 33
Verandah 8.0
Kitchen (non-slip) 6.6
Toilet (non-slip) 6.6
Total Area: 5.42
3.0 Tiles Sqm
Main rooms (1-3) 22.5
Verandah 7.8
Kitchen (non-slip) 2.6
Toilet (non-slip) 2.6
4.0 Backfilling Days 5 days 40,000 200,000/
5.0 Store Keeper Days 13 5,000/ 65,000/
6.0 Food Item - 100,000/ 100,000/

TOTAL:

MATERIALS NEEDED:

ACTIVITIES ON-GOING:

 Store keeping – 19 DAYS @5,000/ = 95,000/


 Levelling = 200,000/
 Labor for two (2) days (3&4th-SEPT) = 60,000/

ODONGO = 10,000@ -20,000/


ALI = 20,000@ -40,000/

----------------------------------------------------------------------

TOTAL = 355,000/