Nro.

De
PARTIDA DESCRIPCION DE PARTIDAS Unidad Veces

REVESTIMIENTO DE RAMPAS Y ESCALERAS


REVESTIMIENTO C/CEMENTO PULIDO PASO Y CONTRAPASO M2
ESCALERA 01 22.00
ESCALERA 02 20.00

REVESTIMIENTO DE FONDO DE ESCALERA M2


ESCALERA 01 TRAMO 1 1.00
DESCANSO INFERIOR 1.00
ESCALERA 02 TRAMO 2 1.00

ESCALERA 02 TRAMO 1 1.00


DESCANSO INFERIOR 1.00
ESCALERA 02 TRAMO 2 1.00

REVESTIMIENTO DE DESCANSOS DE ESCLERA CON MORTERO MEZC M2


ESCALERA 01
DESCANSO 1.00
ESCALERA 02
DESCANSO INFERIOR 1.00

REVESTIMIENTO DE FONDO DE RAMPAS DE CONCRETO M2


RAMPA PEATONAL 01 TRAMO 01 1.00
RAMPA PEATONAL 01 TRAMO 02 1.00
DESCANSO 1.00

RAMPA DE CONCRETO FROTACH. Y BRUÑADO M2


RAMPA PEATONAL 01 TRAMO 01 1.00
RAMPA PEATONAL 01 TRAMO 02 1.00
DESCANSO 1.00

RAMPA PEATONAL 02 1.00

PISO DE PIEDRA LAVADA-RAMPA


RAMPA PEATONAL 03 1.00
RAMPA PEATONAL 04 1.00

CUBIERTAS
CUBIERTA LADRILLO PASTELERO + FRAGUA CON MORTERO 1:1/2:5
LOSA ALIGERADA ALMACEN DE ARCHIVO 1.00
LOSA ALIGERADA SERVICIOS 1.00
LOSA ALIGERADA ALMACEN DIGITILIZACION 1.00
LOSA ALIGERADA ADMINISTRACION 1.00

IMPERMEAB. DE TECHOS CON PINTURA ASFALTICA


LOSA ALIGERADA ALMACEN DE ARCHIVO 1.00
LOSA ALIGERADA SERVICIOS 1.00
LOSA ALIGERADA ALMACEN DIGITILIZACION 1.00
LOSA ALIGERADA ADMINISTRACION 1.00

JARDINERIA
PLANTADO DE ARBUSTOS UND
AREA DE VERDE PRINCIPAL 1.00
AREA DE VERDE 01 1.00

SEMBRADO DE CESPED M2
AREA DE VERDE PRINCIPAL 1.00
AREA DE VERDE 01 1.00
AREA DE VERDE 02 1.00

TRABAJOS DE JARDINERIA M2
AREA DE VERDE PRINCIPAL 1.00
AREA DE VERDE 01 1.00
AREA DE VERDE 02 1.00

IMPERMEAB. DE MUROS CON PINTURA ASFALTICA M2


AREA DE VERDE PRINCIPAL 1.00
AREA DE VERDE 01 1.00
AREA DE VERDE 02 1.00

OTROS
LIMPIZA DE OBRA DURANTE EL PROCESO CONSTRUCTIVO MES
area de construccion 6.00

LIMPIEZA FINAL DE OBRA M2


area de construccion 1.00

ESPEJOS EN PARED DE 4mm p2


SSHH ENTRE ALMACEN ARCHIVOS-AREA ADM
SSHH DAMAS 1ER PISO 1.00
SSHH VARONES 1ER PISO 1.00

SSHH DAMAS 2DO PISO 1.00


SSHH VARONES 2DO PISO 1.00
REVESTIMIENTO
TARRAJEO DE JARDINERA CON ADITIVO IMPERNEABILIZANTE M2
AREA DE VERDE PRINCIPAL 1.00
AREA DE VERDE 01 1.00
AREA DE VERDE 02 1.00

TARRAJEO CON IMPERMEABILIZANTES EN MUROS H=1.00 MT M2


COSTADO A AREA DE VERDE PRINCIPAL 1.00
COSTADO A AREA DE VERDE 01 1.00

TARRAJEO EN VIGAS CEMENTO -ARENA M2


Primer Piso
V-01 (0.25x0.50) en eje 1-1: A-G 1
V-01 (0.25x0.50) en eje 2-2: A-G 1
VA-04 (0.25x0.40) en eje 3-3: C-E' 1
V-104 (0.25x0.40) en eje 4-4: B-C 1
V-06 (0.25x0.20) en eje 4-4: E-F 1
V-07 (0.25x0.20) en eje 4-4: F-G 1
V-105 (0.25x0.40) en eje 5-5: B-C 1
V-106 (0.25x0.40) en eje 5'-5': B-C' 1
V-107 (0.25x0.40) en eje 6-6: A'-B' 1
VE-01 (0.20x0.40) en eje 6-6: C-D 1
V-108 (0.25x0.40) en eje 6-6: B'-C' 1
V-108 (0.25x1.10) en eje 6-6: C'-D 1
V-109 (0.25x0.50) en eje 7-7: A'-D 1
V-110 (0.25x0.50) en eje 8-8: B'-D 1
V-111 (0.25x0.50) en eje 9-9: A'-B' 1
V-08 (0.25x0.20) en eje D-D' curvo en ingreso 1
VA-01 (0.25x0.35) en eje 6-'6' curvo en ingreso 1
VA-01 (0.25x0.35) en eje 6-6 curvo en ingreso 1
VA-02 (0.25x0.40) en eje 2-F' curvo en ingreso 1
V-100 (0.30x0.80) en eje A-A : 1-2 1
V-101 (0.30x0.80) en eje B-B, C-C, F-F : 1-2 3
V-102 (0.30x0.80) en eje D-D, E-E : 1-2 2
V-102 (0.30x0.80) en eje G-G: 1-2 1
V-04 (0.25x0.40) en eje B-B: 3-4 1
V-03 (0.25x0.40) en eje B-B: 4-6 1
V-06 (0.25x0.20) en eje B'-B': 3-5 1
V-07 (0.25x0.20) en eje B'-B': 5-6 1
V-112 (0.25x0.40) en eje B'-B': 6-9 1
V-08 (0.25x0.20) en eje B-B': 5-5' 1
V-06 (0.25x0.20) en eje B-B': 6-9 1
V-03 (0.25x0.40) en eje A'-A': 6-9 1
V-03 (0.25x0.40) en eje C-C: 3-4 1
V-04 (0.25x0.40) en eje C-C: 4-5' 1
V-06 (0.25x0.20) termino de rampa 1
VE-02 (0.25x0.40) en eje C'-C': 5'-6' 1
V-10 (0.25x1.10) en eje D-D: 6'-8 1
V-11 (0.25x1.10) en eje D-D: 6'-6' 1
V-07 (0.25x0.20) en eje F-G: 3-5 1
Vig (0.10x0.25) 4
Segundo Piso
V-01 (0.25x0.50) en eje 1-1: A-G 1
V-01A (0.25x0.50) en eje 2-2: A-G 1
V-204 (0.25x0.40) en eje 4-4: B-D 1
V-205 (0.25x0.40) en eje 5-5: B-D 1
V-206 (0.25x0.40) en eje 5'-5': B-D 1
V-207 (0.25x0.40) en eje 6-6: A-B 1
VE-01 (0.25x0.40) en eje 6-6: A-B 1
V-208 (0.25x0.40) en eje 6'-6': B-D 1
V-209 (0.25x0.50) en eje 7-7: A'-D 1
V-210 (0.25x0.50) en eje 7-8: B'-D' 1
V-211 (0.25x0.50) en eje 8-9: A'-B' 1
VA-05 (0.25x0.20) curvo en ingreso 1
V-07(0.25x0.50) en eje 8-9: A'-B' 1
V-200 (0.30x0.80) en eje A-A: 1-2 1
V-203 (0.30x0.80) en eje F-F, G-G: 1-2 1
V-3 (0.25x0.40) en eje B-B: 3-6 1
V-2 (0.25x0.40) en eje C-C: 3-6 1
V-2 (0.25x0.40) en eje D-D: 3-8 1
VE-03 (0.25x0.40) en eje C'-C': 5'-6' 1
V-7 (0.25x0.20) en eje B-C: 5-5' 1
V-212 (0.25x0.40) en eje B'-B': 6-9 1
V-06 (0.25x0.20) en eje A''-A'': 6-9 1
V-03 (0.25x0.40) en eje A'-A': 6-9 1
V-07 (0.25x0.20) muros de escalera 2 1
V-07 (0.25x0.20) muros de escalera 2 1
Vig (0.10x0.25) 4

CARPINTERIA METALICA
PINTURA EN PUERTAS METALICA (2 MANOS ANTICORROSIVO + M2
MANPARA IZQUIERDA 1.00
PUERTA METALICA INGRESO A HALL 1.00
MANPARA DERECHA 1.00
CANTONERA DE PERFIL ESTRIADO DE 4 X 4 X 3/16" C/ ANCLAJES M
ESCALERA 01 22.00
ESCALERA 02 20.00

PINTURA
PINTURA BASE EN MURO INTERIOR Y EXTERIOR M2
MURO INTERIOR
PRIMER NIVEL
EJE 1 / A-B 1.00
EJE 1/ B-C 1.00
EJE 1/C-D 1.00
EJE 1/ D-E 1.00
EJE 1/E-F 1.00
EJE 1/F-G 1.00
EJE A / 1-2 1.00
EJE G / 1-2 1.00
EJE 2/A-B 1.00
EJE 2/B-C 1.00
EJE 2/C-D 1.00
EJE 2/D-E 1.00
EJE 2/E-F 1.00
EJE 3/B-B` 6.00
EJE B` 3.00
EJE B 1.00
MURO BAÑO ENTRE SS.HH VARONES Y SS.HH MUJERES 2.00
MURO BAÑO ENTRE SS.HH VARONES Y SS.HH MUJERES 2.00
EJE 6 / A'-A'' 1.00
EJE 6/ B-B' 1.00
EJE 6/ C`-D 1.00
EJE D/6`-9 1.00
EJE 9/A`-B` 1.00
EJE 8/B`-D 1.00
SEGUNDO NIVEL

EJE 1 / A-B 1.00


EJE 1/ B-C 1.00
EJE 1/C-D 1.00
EJE 1/ D-E 1.00
EJE 1/E-F 1.00
EJE 1/F-G 1.00
EJE A / 1-2 1.00
EJE G / 1-2 1.00
EJE 2/A-B 1.00
EJE 2/B-C 1.00
EJE 2/C-D 1.00
EJE 2/D-E 1.00
EJE 2/E-F 1.00
MURO BAÑO ENTRE SS.HH VARONES Y SS.HH MUJERES 2.00
MURO BAÑO ENTRE SS.HH VARONES Y SS.HH MUJERES 2.00
EJE B`/2-6 1.00
EJE 6 / A'-A'' 1.00
EJE 6/A´-B 1.00
EJE 6´/C´-D 1.00

MURO EXTERIOR
EJE 1 1.00
EJE A 1.00
EJE 2 1.00
EJE B 1.00
EJE 6 1.00
EJE A` 1.00
EJE 9 1.00
EJE B`/8-9 1.00
EJE 8 1.00
EJE D 1.00
MURO EXTERIOR DE SS.HH 1.00
EJE D` 1.00
EJE F` 1.00
ESCALERA PERSONAL-2 GUARDIANIA 1.00
EJEG 1.00

PINTURA LATEX 2 MANOS EN PLACAS Y COLUMNAS M2


1ER NIVEL
BLOQUE OFICINAS
ejes 1 1.00
eje b/ 1-2 5.00
ejes 2 1.00
eje a/1-2 2.00
V-3 1.00
V-2 1.00
V-104 1.00
V-105 1.00
V-106 1.00
V-107 1.00
V-3 1.00
V-111 1.00
V-110 1.00
V-10 1.00
V-108 1.00
V-109 1.00
V-112 1.00
VE-02 1.00
VA-1 2.00

COLUMNAS Y PLACAS
ejes 1 1.00
eje b/ 1-2 5.00
ejes 2 1.00
eje a/1-2 2.00
V-3 1.00
V-2 1.00
V-204 1.00
V-205 1.00
V-206 1.00
V-207 1.00
V-211 1.00
V-210 1.00
V-209 1.00
V-212 1.00
V-208 1.00
VE-03 1.00
VA-5 1.00

columnas
C-2 12.00
C-3 4.00
C-8 8.00
C-10 6.00
C-6 4.00
C-5 12.00
C-13 2.00
PL-4 2.00
C-4 2.00
PL-3 2.00
C-9 8.00
C-7 2.00
PL-8 2.00
PL-9 2.00
C-1 4.00
PL-6 1.00
PL-5 6.00
PL-10 7.00

PINTURA BASE EN VIGAS


Primer Piso
V-01 (0.25x0.50) en eje 1-1: A-G 1
V-01 (0.25x0.50) en eje 2-2: A-G 1
VA-04 (0.25x0.40) en eje 3-3: C-E' 1
V-104 (0.25x0.40) en eje 4-4: B-C 1
V-06 (0.25x0.20) en eje 4-4: E-F 1
V-07 (0.25x0.20) en eje 4-4: F-G 1
V-105 (0.25x0.40) en eje 5-5: B-C 1
V-106 (0.25x0.40) en eje 5'-5': B-C' 1
V-107 (0.25x0.40) en eje 6-6: A'-B' 1
VE-01 (0.20x0.40) en eje 6-6: C-D 1
V-108 (0.25x0.40) en eje 6-6: B'-C' 1
V-108 (0.25x1.10) en eje 6-6: C'-D 1
V-109 (0.25x0.50) en eje 7-7: A'-D 1
V-110 (0.25x0.50) en eje 8-8: B'-D 1
V-111 (0.25x0.50) en eje 9-9: A'-B' 1
V-08 (0.25x0.20) en eje D-D' curvo en ingreso 1
VA-01 (0.25x0.35) en eje 6-'6' curvo en ingreso 1
VA-01 (0.25x0.35) en eje 6-6 curvo en ingreso 1
VA-02 (0.25x0.40) en eje 2-F' curvo en ingreso 1
V-100 (0.30x0.80) en eje A-A : 1-2 1
V-101 (0.30x0.80) en eje B-B, C-C, F-F : 1-2 3
V-102 (0.30x0.80) en eje D-D, E-E : 1-2 2
V-102 (0.30x0.80) en eje G-G: 1-2 1
V-04 (0.25x0.40) en eje B-B: 3-4 1
V-03 (0.25x0.40) en eje B-B: 4-6 1
V-06 (0.25x0.20) en eje B'-B': 3-5 1
V-07 (0.25x0.20) en eje B'-B': 5-6 1
V-112 (0.25x0.40) en eje B'-B': 6-9 1
V-08 (0.25x0.20) en eje B-B': 5-5' 1
V-06 (0.25x0.20) en eje B-B': 6-9 1
V-03 (0.25x0.40) en eje A'-A': 6-9 1
V-03 (0.25x0.40) en eje C-C: 3-4 1
V-04 (0.25x0.40) en eje C-C: 4-5' 1
V-06 (0.25x0.20) termino de rampa 1
VE-02 (0.25x0.40) en eje C'-C': 5'-6' 1
V-10 (0.25x1.10) en eje D-D: 6'-8 1
V-11 (0.25x1.10) en eje D-D: 6'-6' 1
V-07 (0.25x0.20) en eje F-G: 3-5 1
Vig (0.10x0.25) 4
Segundo Piso
V-01 (0.25x0.50) en eje 1-1: A-G 1
V-01A (0.25x0.50) en eje 2-2: A-G 1
V-204 (0.25x0.40) en eje 4-4: B-D 1
V-205 (0.25x0.40) en eje 5-5: B-D 1
V-206 (0.25x0.40) en eje 5'-5': B-D 1
V-207 (0.25x0.40) en eje 6-6: A-B 1
VE-01 (0.25x0.40) en eje 6-6: A-B 1
V-208 (0.25x0.40) en eje 6'-6': B-D 1
V-209 (0.25x0.50) en eje 7-7: A'-D 1
V-210 (0.25x0.50) en eje 7-8: B'-D' 1
V-211 (0.25x0.50) en eje 8-9: A'-B' 1
VA-05 (0.25x0.20) curvo en ingreso 1
V-07(0.25x0.50) en eje 8-9: A'-B' 1
V-200 (0.30x0.80) en eje A-A: 1-2 1
V-203 (0.30x0.80) en eje F-F, G-G: 1-2 1
V-3 (0.25x0.40) en eje B-B: 3-6 1
V-2 (0.25x0.40) en eje C-C: 3-6 1
V-2 (0.25x0.40) en eje D-D: 3-8 1
VE-03 (0.25x0.40) en eje C'-C': 5'-6' 1
V-7 (0.25x0.20) en eje B-C: 5-5' 1
V-212 (0.25x0.40) en eje B'-B': 6-9 1
V-06 (0.25x0.20) en eje A''-A'': 6-9 1
V-03 (0.25x0.40) en eje A'-A': 6-9 1
V-07 (0.25x0.20) muros de escalera 2 1
V-07 (0.25x0.20) muros de escalera 2 1
Vig (0.10x0.25) 4

PINTURA LATEX 2 MANOS EN VIGAS

Primer Piso
V-01 (0.25x0.50) en eje 1-1: A-G 1
V-01 (0.25x0.50) en eje 2-2: A-G 1
VA-04 (0.25x0.40) en eje 3-3: C-E' 1
V-104 (0.25x0.40) en eje 4-4: B-C 1
V-06 (0.25x0.20) en eje 4-4: E-F 1
V-07 (0.25x0.20) en eje 4-4: F-G 1
V-105 (0.25x0.40) en eje 5-5: B-C 1
V-106 (0.25x0.40) en eje 5'-5': B-C' 1
V-107 (0.25x0.40) en eje 6-6: A'-B' 1
VE-01 (0.20x0.40) en eje 6-6: C-D 1
V-108 (0.25x0.40) en eje 6-6: B'-C' 1
V-108 (0.25x1.10) en eje 6-6: C'-D 1
V-109 (0.25x0.50) en eje 7-7: A'-D 1
V-110 (0.25x0.50) en eje 8-8: B'-D 1
V-111 (0.25x0.50) en eje 9-9: A'-B' 1
V-08 (0.25x0.20) en eje D-D' curvo en ingreso 1
VA-01 (0.25x0.35) en eje 6-'6' curvo en ingreso 1
VA-01 (0.25x0.35) en eje 6-6 curvo en ingreso 1
VA-02 (0.25x0.40) en eje 2-F' curvo en ingreso 1
V-100 (0.30x0.80) en eje A-A : 1-2 1
V-101 (0.30x0.80) en eje B-B, C-C, F-F : 1-2 3
V-102 (0.30x0.80) en eje D-D, E-E : 1-2 2
V-102 (0.30x0.80) en eje G-G: 1-2 1
V-04 (0.25x0.40) en eje B-B: 3-4 1
V-03 (0.25x0.40) en eje B-B: 4-6 1
V-06 (0.25x0.20) en eje B'-B': 3-5 1
V-07 (0.25x0.20) en eje B'-B': 5-6 1
V-112 (0.25x0.40) en eje B'-B': 6-9 1
V-08 (0.25x0.20) en eje B-B': 5-5' 1
V-06 (0.25x0.20) en eje B-B': 6-9 1
V-03 (0.25x0.40) en eje A'-A': 6-9 1
V-03 (0.25x0.40) en eje C-C: 3-4 1
V-04 (0.25x0.40) en eje C-C: 4-5' 1
V-06 (0.25x0.20) termino de rampa 1
VE-02 (0.25x0.40) en eje C'-C': 5'-6' 1
V-10 (0.25x1.10) en eje D-D: 6'-8 1
V-11 (0.25x1.10) en eje D-D: 6'-6' 1
V-07 (0.25x0.20) en eje F-G: 3-5 1
Vig (0.10x0.25) 4
Segundo Piso
V-01 (0.25x0.50) en eje 1-1: A-G 1
V-01A (0.25x0.50) en eje 2-2: A-G 1
V-204 (0.25x0.40) en eje 4-4: B-D 1
V-205 (0.25x0.40) en eje 5-5: B-D 1
V-206 (0.25x0.40) en eje 5'-5': B-D 1
V-207 (0.25x0.40) en eje 6-6: A-B 1
VE-01 (0.25x0.40) en eje 6-6: A-B 1
V-208 (0.25x0.40) en eje 6'-6': B-D 1
V-209 (0.25x0.50) en eje 7-7: A'-D 1
V-210 (0.25x0.50) en eje 7-8: B'-D' 1
V-211 (0.25x0.50) en eje 8-9: A'-B' 1
VA-05 (0.25x0.20) curvo en ingreso 1
V-07(0.25x0.50) en eje 8-9: A'-B' 1
V-200 (0.30x0.80) en eje A-A: 1-2 1
V-203 (0.30x0.80) en eje F-F, G-G: 1-2 1
V-3 (0.25x0.40) en eje B-B: 3-6 1
V-2 (0.25x0.40) en eje C-C: 3-6 1
V-2 (0.25x0.40) en eje D-D: 3-8 1
VE-03 (0.25x0.40) en eje C'-C': 5'-6' 1
V-7 (0.25x0.20) en eje B-C: 5-5' 1
V-212 (0.25x0.40) en eje B'-B': 6-9 1
V-06 (0.25x0.20) en eje A''-A'': 6-9 1
V-03 (0.25x0.40) en eje A'-A': 6-9 1
V-07 (0.25x0.20) muros de escalera 2 1
V-07 (0.25x0.20) muros de escalera 2 1
Vig (0.10x0.25) 4

ACABADO ESPECIAL
CIELORASO SISTEMA CONSTRUCCION EN SECO M2
Almacen Archivo 1er Piso 1
Almacen Archivo 2do Piso 1
MEDIDAS
PARCIAL TOTAL
Largo Ancho Alto

52.60
1.30 28.60
1.20 24.00

18.71
2.12 1.20 2.54
2.82 1.50 4.23
2.89 1.20 3.47

3.70 1.15 4.26 ADICIONAR


CORREGIR ESTAS
ESTA PARTP
2.60 0.82 2.13
1.81 1.15 2.08 CORREGIR
Home: definir ESTA PART
la cantidad
de mes programado real
considerar en el analisis 02
6.36 peon y herramientas,
cuadirilla 30 rendimiento
mes
2.82 1.50 4.23

2.60 0.82 2.13

29.47
11.46 1.15 13.18
12.59 1.15 14.48
1.58 1.15 1.82

32.50
11.46 1.15 13.18
12.59 1.15 14.48
1.58 1.15 1.82

1.95 1.55 3.02

12.52
5.30 1.20 6.36
5.60 1.10 6.16

575.99
31.00 11.55 358.05
10.10 11.80 119.18
7.60 7.49 56.92
7.85 5.33 41.84

575.99
31.00 11.55 358.05
10.10 11.80 119.18
7.60 7.49 56.92
7.85 5.33 41.84

9.00
7.00 7.00
2.00 2.00

124.00
Area= 85.00 85.00
Area= 32.00 32.00
Area= 7.00 7.00

124.00
Area= 85.00 85.00
Area= 32.00 32.00
Area= 7.00 7.00

32.30
77.95 0.25 19.49
38.23 0.25 9.56
13.00 0.25 3.25

6.00
6.00

883.00
Area= 883.00 883.00

42.61

2.15 0.60 1.29


1.15 0.60 0.69

2.15 0.60 1.29


1.15 0.60 0.69
Area= 3.96
Cantidad p2 42.61

29.86
40.65 0.40 16.26
21.00 0.40 8.40
13.00 0.40 5.20

54.42
37.20 1.00 37.20
17.22 1.00 17.22

554.05

31.84 Long = 0.85 27.06


31.84 Long = 0.85 27.06
15.30 Long = 1.05 16.07
3.60 Long = 0.65 2.34
1.68 Long = 0.45 0.76
2.57 Long = 0.45 1.16
3.60 Long = 0.65 2.34
5.05 Long = 0.65 3.28
6.90 Long = 0.65 4.49
4.30 Long = 0.80 3.44
3.00 Long = 0.65 1.95
4.35 Long = 2.05 8.92
14.75 Long = 0.85 12.54
7.60 Long = 1.15 8.74
7.39 Long = 1.15 8.50
4.70 Long = 0.55 2.59
17.09 Long = 0.75 12.82
14.41 Long = 0.75 10.81
3.42 Long = 0.85 2.91
11.70 Long = 1.70 19.89
11.20 Long = 1.40 47.04
11.20 Long = 1.40 31.36
11.70 Long = 1.65 19.31
2.49 Long = 0.85 2.12
9.26 Long = 0.85 7.87
6.55 Long = 0.25 1.64
4.80 Long = 0.25 1.20
9.03 Long = 0.65 5.87
3.23 Long = 0.25 0.81
8.64 Long = 0.25 2.16
8.83 Long = 0.85 7.50
2.49 Long = 0.85 2.12
7.33 Long = 0.85 6.23
1.05 Long = 0.55 0.57
3.45 Long = 0.85 2.93
5.33 Long = 2.25 11.99
1.60 Long = 2.05 3.28
4.08 Long = 0.45 1.84
11.20 Long = 0.10 4.48
-
30.70 Long = 0.85 26.10
30.70 Long = 0.85 26.10
9.65 Long = 0.65 6.27
9.65 Long = 0.65 6.27
9.65 Long = 0.65 6.27
6.88 Long = 0.85 5.85
4.35 Long = 0.80 3.48
7.35 Long = 0.65 4.78
14.75 Long = 0.85 12.54
7.60 Long = 1.05 7.98
7.40 Long = 1.05 7.77
18.11 Long = 0.45 8.15
2.90 Long = 0.25 0.73
11.70 Long = 1.65 19.31
11.70 Long = 1.65 19.31
11.75 Long = 0.85 9.99
10.01 Long = 0.65 6.51
17.13 Long = 0.85 14.56
3.45 Long = 0.85 2.93
4.66 Long = 0.25 1.17
8.08 Long = 0.65 5.25
7.54 Long = 0.25 1.89
7.80 Long = 0.85 6.63
2.76 Long = 0.25 0.69
2.50 Long = 0.45 1.13
11.20 Long = 0.10 4.48
-

37.02
3.61 3.48 12.56
3.81 2.95 11.24
3.62 3.65 13.21
52.60
1.30 28.60
1.20 24.00
-

1,408.06

5.30 3.00 15.90


3.50 3.00 10.50
5.00 3.00 15.00
4.80 3.00 14.40
5.51 3.00 16.53
3.44 3.00 10.32
9.30 2.10 19.53
9.30 2.10 19.53
5.28 3.00 15.84
1.95 3.00 5.85
5.00 3.00 15.00
4.79 3.00 14.37
3.36 3.00 10.08
2.30 3.10 42.78
1.55 2.35 10.93
2.00 2.35 4.70
1.30 2.35 6.11
2.05 2.35 9.64
3.40 2.32 7.89
2.05 2.32 4.76
4.02 2.15 8.64
4.50 2.10 9.45
7.40 2.10 15.54
7.90 2.10 16.59

5.30 3.00 15.90


3.50 3.00 10.50
5.00 3.00 15.00
4.80 3.00 14.40
5.51 3.00 16.53
3.44 3.00 10.32
9.30 2.10 19.53
9.30 2.10 19.53
5.28 3.00 15.84
1.95 3.00 5.85
5.00 3.00 15.00
4.79 3.00 14.37
3.36 3.00 10.08
1.30 2.35 6.11
2.05 2.35 9.64
8.75 3.00 26.25
3.40 2.32 7.89
1..20 1.12 1.12
4.05 2.70 10.94

32.44 7.30 236.81


11.70 7.30 85.41
6.50 7.30 47.45
11.44 6.63 75.85
4.15 6.63 27.51
8.89 6.63 58.94
7.90 6.30 49.77
2.16 6.30 13.61
7.85 6.30 49.46
4.61 6.30 29.04
4.42 6.30 27.85
2.12 6.30 13.36
4.56 3.03 13.82
5.20 5.50 28.60
11.55 7.44 85.93

599.54

24.10 0.10 2.41


11.20 0.30 16.80
20.23 0.10 2.02
11.10 0.15 3.33
8.37 0.10 0.84
6.48 0.25 1.62
3.85 0.25 0.96
3..85 0.25 0.25
5.30 0.25 1.33
6.80 0.10 0.68
6.90 0.10 0.69
5.57 0.10 0.56
5.60 0.10 0.56
4.36 0.10 0.44
7.55 0.25 1.89
15.00 0.25 3.75
5.50 0.25 1.38
2.87 0.25 0.72
14.41 0.10 2.88
-
-
24.10 0.10 2.41
11.20 0.30 16.80
20.23 0.10 2.02
11.10 0.15 3.33
14.17 0.10 1.42
14.00 0.25 3.50
9.90 0.25 2.48
9.90 0.25 2.48
9.90 0.25 2.48
7.10 0.10 0.71
5.40 0.10 0.54
5.60 0.10 0.56
14.00 0.25 3.50
7.69 0.25 1.92
7.60 0.25 1.90
2.88 0.25 0.72
18.11 0.47 8.51
-
-
1.27 3.25 49.53
3.39 3.25 44.07
1.30 2.50 26.00
1.40 2.50 21.00
2.00 2.50 20.00
3.20 2.50 96.00
1.60 2.50 8.00
5.04 2.50 25.20
0.67 2.50 3.35
4.24 2.50 21.20
0.50 2.50 10.00
0.45 2.50 2.25
1.40 2.50 7.00
1.60 2.50 8.00
1.20 2.50 12.00
2.13 2.80 5.96
2.70 2.80 45.36
5.50 2.50 96.25

554.05
31.84 Long = 0.85 27.06
31.84 Long = 0.85 27.06
15.30 Long = 1.05 16.07
3.60 Long = 0.65 2.34
1.68 Long = 0.45 0.76
2.57 Long = 0.45 1.16
3.60 Long = 0.65 2.34
5.05 Long = 0.65 3.28
6.90 Long = 0.65 4.49
4.30 Long = 0.80 3.44
3.00 Long = 0.65 1.95
4.35 Long = 2.05 8.92
14.75 Long = 0.85 12.54
7.60 Long = 1.15 8.74
7.39 Long = 1.15 8.50
4.70 Long = 0.55 2.59
17.09 Long = 0.75 12.82
14.41 Long = 0.75 10.81
3.42 Long = 0.85 2.91
11.70 Long = 1.70 19.89
11.20 Long = 1.40 47.04
11.20 Long = 1.40 31.36
11.70 Long = 1.65 19.31
2.49 Long = 0.85 2.12
9.26 Long = 0.85 7.87
6.55 Long = 0.25 1.64
4.80 Long = 0.25 1.20
9.03 Long = 0.65 5.87
3.23 Long = 0.25 0.81
8.64 Long = 0.25 2.16
8.83 Long = 0.85 7.50
2.49 Long = 0.85 2.12
7.33 Long = 0.85 6.23
1.05 Long = 0.55 0.57
3.45 Long = 0.85 2.93
5.33 Long = 2.25 11.99
1.60 Long = 2.05 3.28
4.08 Long = 0.45 1.84
11.20 Long = 0.10 4.48
-
30.70 Long = 0.85 26.10
30.70 Long = 0.85 26.10
9.65 Long = 0.65 6.27
9.65 Long = 0.65 6.27
9.65 Long = 0.65 6.27
6.88 Long = 0.85 5.85
4.35 Long = 0.80 3.48
7.35 Long = 0.65 4.78
14.75 Long = 0.85 12.54
7.60 Long = 1.05 7.98
7.40 Long = 1.05 7.77
18.11 Long = 0.45 8.15
2.90 Long = 0.25 0.73
11.70 Long = 1.65 19.31
11.70 Long = 1.65 19.31
11.75 Long = 0.85 9.99
10.01 Long = 0.65 6.51
17.13 Long = 0.85 14.56
3.45 Long = 0.85 2.93
4.66 Long = 0.25 1.17
8.08 Long = 0.65 5.25
7.54 Long = 0.25 1.89
7.80 Long = 0.85 6.63
2.76 Long = 0.25 0.69
2.50 Long = 0.45 1.13
11.20 Long = 0.10 4.48

554.05

31.84 Long = 0.85 27.06


31.84 Long = 0.85 27.06
15.30 Long = 1.05 16.07
3.60 Long = 0.65 2.34
1.68 Long = 0.45 0.76
2.57 Long = 0.45 1.16
3.60 Long = 0.65 2.34
5.05 Long = 0.65 3.28
6.90 Long = 0.65 4.49
4.30 Long = 0.80 3.44
3.00 Long = 0.65 1.95
4.35 Long = 2.05 8.92
14.75 Long = 0.85 12.54
7.60 Long = 1.15 8.74
7.39 Long = 1.15 8.50
4.70 Long = 0.55 2.59
17.09 Long = 0.75 12.82
14.41 Long = 0.75 10.81
3.42 Long = 0.85 2.91
11.70 Long = 1.70 19.89
11.20 Long = 1.40 47.04
11.20 Long = 1.40 31.36
11.70 Long = 1.65 19.31
2.49 Long = 0.85 2.12
9.26 Long = 0.85 7.87
6.55 Long = 0.25 1.64
4.80 Long = 0.25 1.20
9.03 Long = 0.65 5.87
3.23 Long = 0.25 0.81
8.64 Long = 0.25 2.16
8.83 Long = 0.85 7.50
2.49 Long = 0.85 2.12
7.33 Long = 0.85 6.23
1.05 Long = 0.55 0.57
3.45 Long = 0.85 2.93
5.33 Long = 2.25 11.99
1.60 Long = 2.05 3.28
4.08 Long = 0.45 1.84
11.20 Long = 0.10 4.48
-
30.70 Long = 0.85 26.10
30.70 Long = 0.85 26.10
9.65 Long = 0.65 6.27
9.65 Long = 0.65 6.27
9.65 Long = 0.65 6.27
6.88 Long = 0.85 5.85
4.35 Long = 0.80 3.48
7.35 Long = 0.65 4.78
14.75 Long = 0.85 12.54
7.60 Long = 1.05 7.98
7.40 Long = 1.05 7.77
18.11 Long = 0.45 8.15
2.90 Long = 0.25 0.73
11.70 Long = 1.65 19.31
11.70 Long = 1.65 19.31
11.75 Long = 0.85 9.99
10.01 Long = 0.65 6.51
17.13 Long = 0.85 14.56
3.45 Long = 0.85 2.93
4.66 Long = 0.25 1.17
8.08 Long = 0.65 5.25
7.54 Long = 0.25 1.89
7.80 Long = 0.85 6.63
2.76 Long = 0.25 0.69
2.50 Long = 0.45 1.13
11.20 Long = 0.10 4.48

755.97
33.45 11.30 377.99
33.45 11.30 377.99
ADICIONAR
CORREGIR ESTAS
ESTA PARTIDAS
PARTIDA

CORREGIR
me: definir ESTA PARTIDA
la cantidad
mes programado real
siderar en el analisis 02
n y herramientas,
dirilla 30 rendimiento
TRABAJOS PROGRAMADOS
OBRA : "FORTALECIMIENTO DEL SISTEMA DEL ARCHIVO CENTRAL DE LA MUNICIPALIDAD PROVINCIAL
REGION : MOQUEGUA
PROVINCIA : ILO
DISTRITO : ILO

PARTIDA DESCRIPCION DE PARTIDAS

02.01 ARCHIVO CENTRAL


02.01.01 REVOQUES ENLUCIDOS Y MOLDURAS
02.01.01.01 TARRAJEO MUROS INTERIORES ACABADO CEMENTO-ARENA

02.01.01.02 TARRAJEO EN MURO EXTERIOR ACABADO CEMENTO-ARENA

02.01.01.03 TARRAJEO PRIMARIO MORTERO C:A 1:5

02.01.01.04 TARRAJEO DE PLACAS Y COLUMNAS

02.01.01.05 TARRAJEO DE VIGAS

02.01.01.06 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS

02.01.01.07 REVESTIMIENTO C/CEMENTO PULIDO PASO Y CONTRAPASO

02.01.01.08 REVESTIMIENTO DE FONDO DE ESCALERA

02.01.01.09 REVESTIMIENTO DE DESCANSOS DE ESCLERA CON MORTERO MEZCLA 1:5 X 2 cm

02.01.01.10 RAMPA DE CONCRETO FROTACH. Y BRUÑADO

02.01.01.11 REVESTIMIENTO DE FONDO DE RAMPAS DE CONCRETO

02.01.02 CIELORRASOS
02.01.02.01 CIELORRASOS CON MEZCLA DE CEMENTO-ARENA

02.01.02.02 FALSO CIELO RASO DESMONTABLE DE PLACA DE CEMENTO

02.01.03 PISOS Y PAVIMENTOS


02.01.03.01 CONTRAPISO E=40mm BASE 3cm MEZC.1:5 ACAB 1cm PASTA 1:2

02.01.03.02 PISOS DE CONCRETO SIN COLOREAR ACABADO BRUÑADO

02.01.03.03 VEREDA DE CONCRETO f'c= 145kg/cm2 DE e= 4"


TRABAJOS PROGRAMADOS
OBRA : "FORTALECIMIENTO DEL SISTEMA DEL ARCHIVO CENTRAL DE LA MUNICIPALIDAD PROVINCIAL
REGION : MOQUEGUA
PROVINCIA : ILO
DISTRITO : ILO

PARTIDA DESCRIPCION DE PARTIDAS

02.01.03.04 PISO DE CERAMICA DE 1RA DE ALTO TRANSITO

02.01.03.05 PISO DE PIEDRA LAVADA-RAMPA

02.01.04 ZOCALOS Y CONTRAZOCALOS


02.01.04.01 ZOCALO DE CERAMICO COLOR OPACO

02.01.04.02 CONTRAZOCALO DE CERAMICO DE COLOR H=11cm

02.01.05 CARPINTERIA DE MADERA


02.01.05.01 PUERTA DE MADERA TABLERO REBAJADO DE 4.5 mm. DE CEDRO 2 HOJAS

02.01.05.02 PANEL DE MELAMINA DE 15MM INCL. COLOCADO Y PUERTA

02.01.05.03 TABIQUERÍA SISTEMA DRYWALL

02.01.06 CARPINTERIA METALICA


02.01.06.01 BARANDAS PARA PUENTES ,MUROS, RAMPAS Y PASARELAS

02.01.06.02 MAMPARA DE TUBO CUADRADO SEGUN DISEÑO

02.01.07 CERRAJERIA
02.01.07.01 BISAGRA ALUMINIZADA CAPUCHINA DE 4" X 4" PARA PUERTAS PRINCIPALES
02.01.07.02 CERRADURA PARA PUERTA PRINCIPAL PESADA
02.01.07.04 MANIJAS CROMADAS PARA PUERTA DE DISCAPACITADOS
02.01.07.05 KIT DE APOYO PARA MOVILIZACION DE DISCAPACITADOS EN SS.HH.
02.01.07.06 MANIJAS DE BRONCE PARA PUERTAS
02.01.07.07 PICAPORTE CUADRADO DE BRONCE 1X2" PARA PUERTAS DE DOBLE HOJA

02.01.08 VIDRIOS, CRISTALES Y SIMILARES


02.01.08.01 VENTANA TIPO SISTEMA MODUGLASS VIDRIO TEMPLADO 6mm INC. ACCESORIOS

02.01.09 PINTURAS
02.01.09.01 PINTURA BASE EN MURO INTERIOR Y EXTERIOR

02.01.09.02 PINTURA LATEX DOS MANOS EN MURO INTERIOR Y EXTERIOR


TRABAJOS PROGRAMADOS
OBRA : "FORTALECIMIENTO DEL SISTEMA DEL ARCHIVO CENTRAL DE LA MUNICIPALIDAD PROVINCIAL
REGION : MOQUEGUA
PROVINCIA : ILO
DISTRITO : ILO

PARTIDA DESCRIPCION DE PARTIDAS

02.01.09.03 PINTURA LATEX 2 MANOS EN PLACAS Y COLUMNAS

02.01.09.04 PINTURA LATEX 2 MANOS EN VIGAS

02.01.09.05 PINTURA LATEX EN CIELO RASO

02.01.09.06 PINTURA EN PUERTAS DE MADERA CON BARNIZ 2 MANOS

02.01.09.07 PINTURA EN PUERTAS METALICAS DOS MANOS ANTICORROSIVO + ESMALTE

02.01.10 SISTEMA DE SEÑALIZACION DE EMERGENCIAS Y SEGURIDAD

02.01.10.01 SUMINISTRO E INSTALACION DE SEÑALES ACRILICOS

02.01.10.02 SUMINISTRO DE EXTINTORES PQS

02.01.10.03 PINTADO DE CIRCULOS DE ZONA DE SEGURIDAD

02.01.11 JARDINERIA

02.01.11.01 PLANTADO DE ARBUSTOS

02.01.11.02 SEMBRADO DE CESPED

02.01.11.03 TRABAJOS DE JARDINERIA

02.01.12 VARIOS
02.01.12.01 JUNTA DE DILATACION CON TECNOPORT e=1"

02.01.12.02 SELLADO DE JUNTA DE DILATACION CON ASFALTO e=1" EN PISOS

02.01.12.03 JUNTA C/ESPUMA PLASTICA+JEBE MICROPOROSO e=1"

02.01.12.04 RODOPASO PARA BORDE DE GRADAS

02.01.12.05 TAPAJUNTAS DE ALUMINO DE e=10cm


TRABAJOS PROGRAMADOS
OBRA : "FORTALECIMIENTO DEL SISTEMA DEL ARCHIVO CENTRAL DE LA MUNICIPALIDAD PROVINCIAL
REGION : MOQUEGUA
PROVINCIA : ILO
DISTRITO : ILO

PARTIDA DESCRIPCION DE PARTIDAS

02.01.10.06 CUBIERTA LADRILLO PASTELERO + FRAGUA CON MORTERO 1:1/2:5

02.01.10.07 IMPERMEAB. DE MUROS CON PINTURA ASFALTICA

02.01.10.08 ESPEJOS EN PARED DE 4mm

02.02 ARCHIVO PERIFERICO


02.02.01 REVOQUES ENLUCIDOS Y MOLDURAS
02.02.01.01 TARRAJEO MUROS INTERIORES ACABADO CEMENTO-ARENA

02.02.01.02 TARRAJEO EN MURO EXTERIOR ACABADO CEMENTO-ARENA

02.02.01.03 TARRAJEO EN COLUMNAS

02.02.01.04 TARRAJEO DE VIGA

02.02.01.05 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS

02.02.02 CIELORRASOS
02.02.02.01 CIELORRASOS CON MEZCLA DE CEMENTO-ARENA

02.02.03 PISOS Y PAVIMENTOS


02.02.03.01 CONTRAPISO E=40mm BASE 3cm MEZC.1:5 ACAB 1cm PASTA 1:2

02.02.03.02 PISO DE CERAMICO 33x33cm DE COLOR ALTO TRANSITO

02.02.04 ZOCALOS Y CONTRAZOCALOS


02.02.04.01 CONTRAZOCALO DE CERAMICO DE COLOR H=11cm

02.02.05 CARPINTERIA DE MADERA


02.02.05.01 PUERTA DE MADERA TABLERO REBAJADO DE 4.5 mm. DE CEDRO 2 HOJAS

02.02.06 CUBIERTAS
02.02.06.01 COBERTURA LADRILLO PASTELERO ASENTADO C/MEZCLA

02.02.07 CERRAJERIA
02.02.07.01 BISAGRA ALUMINIZADA CAPUCHINA DE 4" X 4" PARA PUERTAS PRINCIPALES
02.02.07.02 CERRADURA PARA PUERTA PRINCIPAL PESADA
TRABAJOS PROGRAMADOS
OBRA : "FORTALECIMIENTO DEL SISTEMA DEL ARCHIVO CENTRAL DE LA MUNICIPALIDAD PROVINCIAL
REGION : MOQUEGUA
PROVINCIA : ILO
DISTRITO : ILO

PARTIDA DESCRIPCION DE PARTIDAS

02.02.07.03 MANIJAS DE BRONCE PARA PUERTAS


02.02.07.04 PICAPORTE CUADRADO DE BRONCE 1X2" PARA PUERTAS DE DOBLE HOJA

02.02.08 VIDRIOS, CRISTALES Y SIMILARES


02.02.08.01 VENTANA TIPO SISTEMA MODUGLASS VIDRIO TEMPLADO 6mm INC. ACCESORIOS

02.02.09 PINTURA
02.02.09.01 PINTURA BASE IMPRIMANTE EN MUROS INTERIORES

02.02.09.02 PINTURA BASE IMPRIMANTE EN MUROS EXTERIOR

02.02.09.03 PINTURA BASE IMPRIMANTE EN CIELO RASO

02.02.09.04 PINTURA BASE IMPRIMANTE EN VESTIDURA DE DERRAMES EN PUERTAS Y VENTANAS

02.02.09.05 PINTURA LATEX 2 MANOS EN MUROS INTERIORES

02.02.09.06 PINTURA LATEX 2 MANOS EN MUROS EXTERIOR

02.02.09.07 PINTURA LATEX 2 MANOS EN COLUMNAS

02.02.09.08 PINTURA LATEX 2 MANOS EN VIGAS

02.02.09.09 PINTURA LATEX 2 MANOS EN VESTIDURA DE DERRAMES EN PUERTAS Y VENTANAS

02.02.09.10 PINTURA LATEX EN CIELO RASO

02.02.09.11 PINTURA EN PUERTAS CON BARNIZ 2 MANOS

02.02.10 VARIOS
02.02.10.01 JUNTA DE DILATACION CON TECNOPORT e=1"

02.02.10.02 SELLADO DE JUNTA DE DILATACION CON ASFALTO e=1" EN PISOS

02.02.10.03 JUNTA C/ESPUMA PLASTICA+JEBE MICROPOROSO e=1"


PROGRAMADOS
IPALIDAD PROVINCIAL DE ILO"

Fecha: Octubre del 2012

MEDIDAS
Unidad Nro. De Veces PARCIAL TOTAL
Largo Ancho Alto

m2 564.88

843.40

m2 90.40

m2 524.80

m2 554.05

m2 540.01

m2 52.60

m2 18.71

m2 6.36

M2 32.50

M2 29.47

m2 1,033.63

m2 343.84

m2 1,254.77

m2 20.50

m2 192.84
PROGRAMADOS
IPALIDAD PROVINCIAL DE ILO"

Fecha: Octubre del 2012

MEDIDAS
Unidad Nro. De Veces PARCIAL TOTAL
Largo Ancho Alto
m2 1,180.31

12.52

m2 74.35

m 509.86

m2 83.66

m2 5.25

m2 77.71

m 149.25

m2 143.36

pza 105.00 105.00 105.00


pza 28.00 28.00 28.00
pza 4.00 4.00 4.00
pza 1.00 1.00 1.00
u 28.00 28.00 28.00
pza 7.00 7.00 7.00

m2 111.68

m2 1,408.28

m2 1,408.28
PROGRAMADOS
IPALIDAD PROVINCIAL DE ILO"

Fecha: Octubre del 2012

MEDIDAS
Unidad Nro. De Veces PARCIAL TOTAL
Largo Ancho Alto

m2 599.54

m2 554.05

m2 1,033.63

m2 22.41

m2 37.02

glb 1.00

und 6.00

glb 1.00

und 9.00

m2 124.00

m2 124.00

m 25.40 25.40 25.40

m 40.00

m 17.00 17.00 17.00

m 54.80

m 54.80
PROGRAMADOS
IPALIDAD PROVINCIAL DE ILO"

Fecha: Octubre del 2012

MEDIDAS
Unidad Nro. De Veces PARCIAL TOTAL
Largo Ancho Alto

m2 217.94

m2 32.30

p2 42.61

m2 227.26

m2 59.32

m2 51.74

m2 65.56

m 41.58

m2 164.39

m2 165.01

m2 165.01

m 102.80

m2 12.48

179.42 179.42

pza 16.00 16 16.00


pza 4.00 4 4.00
PROGRAMADOS
IPALIDAD PROVINCIAL DE ILO"

Fecha: Octubre del 2012

MEDIDAS
Unidad Nro. De Veces PARCIAL TOTAL
Largo Ancho Alto
u 4.00 4 4.00
pza 4.00 4 4.00

41.58

m2 227.26

m2 59.32

164.39

m 41.58

m2 227.26

m2 59.32

m2 51.74

m2 65.56

m 41.58

164.39

m2 12.48

m 19.28

m 19.28

m 19.28