You are on page 1of 1

1.Hard Punch Verification (Drg.no.,Mkd. No.,Sh.

No.,Item no.,Part no.,Qty. No.,Joint no.,Elevation.).


2.Drg Rev. No. & Drg. Weight.
3.Position of job.
4.Dimensions(Length,width,hight,thickness ,hole to
hole distance,hole dia.,section hieght,diagonal,plum)
5.straightnes & oriantation(line dori,plum,water
level,diagonal)
6.layout as per Drg. Dimension.
7.Compare BOM & Drg. Items & Dimensions.
8.All items & gusset plate fittings as per Drg.
(Washer,Gusset plate size,position,notch cutting,no
of holes and hole dia.)
9.All loose items.
10.Material type (Sail,Jindal etc.)
11.Splice joint details (If used).
12.Dodl (If extra material is used excepts Bom)
13.Welding type (ex. Filet,but,V,bevel,full weld,chain
weld,site weld etc.)& thickness as per Drg.
14.Welding Defects,Grinding and finishing(spatters,pin
holes,blow holes,porosity,underfill,undercut, slag,deep
gas cut marks,arc stricke,uneven welding,uneven
bead,incomplete welding,hole burrs).
15.Red oxide in all Tee Bracings.
16. UT on base plate sheare key.(if required)