You are on page 1of 8

Formworkpress

Special Edition April 2014

Meeting of Champions
AluStar panels form Sailing Pool . . . . . . . . . . . 2

Formwork on Special Duty


Europe‘s largest Sailing Pool . . . . . . . . . . . . . . 4

AluStar: Best in Class


Champion in Weight-Performance ratio . . . . . 6

Superlatives à la Suisse
Tallest Tower, Biggest Project, Highest Site . . . . 7

Summiteer on Mt. Matterhorn

The Meeting of
FormworkPress Title Story . . . . . . . . . . . . . . . . 8

Sailing Nation Switzerland

Champions The Swiss Museum of Transport . . . . . . . . . . . 8


Formworkpress
Special Edition April 2014

Meeting of Champions
The Original America Cup Racing Yacht Alinghi SUI 100

The National Swiss Museum of largest sailing pool directly in


Transport in Lucerne is staging a front of the original racing yacht
special exhibition entitled “Sailing Alinghi SUI 100, which was the
Nation Switzerland” from April to first European boat ever to win the
October 2014. MEVA AluStar pan- coveted America Cup.
els are on stage to shape Europe’s

2 FormworkPress Special Edition April 2014


The main attraction during the exhibition “Sailing Nation Switzerland” ist the original racing yacht Alinghi SUI 100. The Swiss-built champion made of carbon
was the first European contendent to win the coveted America Cup in 2003 and defended the title with Ernesto Bertarelli in 2007.

The Swiss Museum of Transport is not and communication industries. One of Switzerland and wrote sailing history
only the largest and most popular in the highlights in 2014 is an exhibition when it became the first European
Switzerland, counting around 725,000 entitled “Sailing Nation Switzerland”, yacht to win the coveted America Cup
visitors from all over the world every whose main attraction is the original in 2003. In 2007 it defended the title
year. It is also a showcase and event racing yacht Alinghi SUI 100. The boat again with Ernesto Bertarelli at the
location for the European transport made of carbon was actually built in helm in Valencia.

FormworkPress Special Edition April 2014 3


Formworkpress
Special Edition April 2014

4
Europe‘s largest sailing pool being set up with AluStar
wall formwork panels: The 36 by 36 m edge construction is
made up of 54 MEVA AluStar wall formwork panels assem-
bled horizontally, each panel 90 cm high and 270 cm long.
When filled with water, the pool edge will stand up to the
pressure of 1,260 m³ of water.

Europe‘s largest sailing pool set up The closed hollow aluminium frame
with AluStar wall formwork panels profile guarantees the stability needed
Another attraction will be Europe’s to resist the water pressure. This, in
largest sailing pool, inviting visitors combination with the all-plastic facing,
to experience the thrill of sailing. motivated the organisers to opt for the
The basin will comprise an unusual MEVA solution for the entire duration
edge construction made up of MEVA of the outdoor exhibition.
AluStar wall formwork panels. When
filled with water, the pool edge will
stand up to the pressure of 1,260 m³
of water. The AluStar panels are set up
horizontally, 90 cm high and 270 cm
long. Their distinguishing feature is a
100 % wood-free panel which, unlike
the plywood normally used, is immune
to weather influences.

FormworkPress Special Edition April 2014 5


Formworkpress
Special Edition April 2014

AluStar: Formwork Champion


Best-in-Class in Weight-Performance ratio

Excellent Weight-Performance
ratio in formwork, just like the
Alinghi SUI 100 at sea
The meeting of champions refers to
the winning results achieved with the
least possible weight – at sea and in
formwork. Indeed, the America cup
champion yacht Alinghi and AluStar
panels are both best in class when it
comes to the relationship between
weight and performance.

And with formwork, used to pour


concrete in construction, performance
is expressed in Kilo-Newton per m²
fresh concrete pressure. AluStar panels,
which are set up by hand thanks to
their low weight, achieve a considerable
60 kN/m². This allows you to pour con-
crete at any speed to the panel height.

Though not used to pour concrete


here, the AluStar panels do have to
withstand both pressure and weather
influence – impossible with the ply-
wood facing conventionally used in
formwork.

6 FormworkPress Special Edition April 2014


Photo: Wladyslaw Sojka

Superlatives à la Suisse
The Highest Location, Biggest Project, Tallest Builing
MEVA formwork and engineering
expertise is involved on construction
sites that each represent superlatives
in their own right. Above: The F. Hof-
mann-la-Roche Tower in Basle is being
climbed to 175 m with the automatic
hydraulic climbing system MAC and
will be Switzerland’s tallest building.
Right: Switzerland’s highest construc-
tion site is on Mt. Matterhorn, where
the legendary Hörnli Hut is being
rebuilt. Below: the project Linthal 2015
will result in the county’ largest hydro-
power plant and is located in the Alps.

Aluminium formwork AluStar:


The leading hand-set system
During its normal working day, AluStar
is the leading crane-independent,
hand-set wall formwork system in
commercial, industrial and residential
construction. The panels are joined and
aligned with the MEVA clamp, which is
closed with only a few hammer blows.
The panel’s all-plastic facing delivers a
superior concrete finish from the first Photo:
pour to the last. Axpo

FormworkPress Special Edition April 2014 7


Formworkpress
Special Edition April 2014

Special online edition April 2014. Publisher: MEVA SchalungsSysteme GmbH, Industriestr. 5,
D72221 Haiterbach. Layout: M ­ arketing. Reprint and re-use of any editorial ­content only by
copyright permission. We accept no liability for the content of external ­internet sites, nor for a
violation of privacy or any other law arising from these. The site photos show situations which do
not always depict the final assembly of the formwork with regard to safety regulations.

Special Duty
Summiteer on Matterhorn
Facebook “f ” Logo CMYK / .eps Facebook “f ” Logo CMYK / .eps

AluStar hand-set form-


work performed special
duty in rough terrain
on Mount Matterhorn
in the Swiss Alps. The
world famous Hörnli
Hut had to be re-built
and no crane could be
set up.

Find out more in the


FormworkPress X/2013
edition, available in
the download area on
MEVA LIVE meva-international.
Enter MEVA LIVE and follow us on Facebook com.
and YouTube with interesting contributions
and reports of both daily and unusual stories
on MEVA formwork.

Welcome
The “Sailing Nation Switzerland” special
exhibition takes place from 16th April to
19th October 2014 in the Museum of Transport.
Address: Lidostrasse 5, CH-6006 Lucerne, Switzerland
Summer: From 10 am to 6 pm
Winter: From 10 am to 5 pm
Open 365 days a year
2620 GB PDF 04/14, Printed in Germany

Headquarters International Sales and Service GBTamworth, Tel. 01827 60217 PA-Panama City 507 2372222
MEVA Schalungs-Systeme GmbH A-Pfaffstätten, Tel. 02252 20900-0 HBudapest, Tel. 01 2722222 PL-Bialystok, Tel. 085 6768159
Industriestrasse 5 AUS-Adelaide, Tel. 08 82634377 HR-Bestovje, Tel 013 323 666 ROBucuresti, Tel. 0 21 2066460
D-72221 Haiterbach B-Kruibeke, Tel. 03 250 11 11 IND-Mumbai, Tel. 022 27563430 RUSMoskva, Tel. 495 7813737
Tel. +49 7456 692-01 CDN-Toronto, Tel. 416 5766397 LT-Kaunas, Tel. 0684 82795 RUSSankt-Peterburg, Tel. 812 6802890
Fax +49 7456 692-66 CHSeon, Tel. 062 7697100 MAL-Perak, Tel. 12 5209337 SGP-Singapore, Tel. 67354459
info@meva-international.com CO-Bogotá, Tel. 01 5204236 N-Oslo, Tel. 067 154200 SLO-Petrovce, Tel. 03 7131500
www.meva-international.com FSarreguemines, Tel. 0387 959938 NLGouda, Tel. 0182 570770 UAEDubai, Tel. 04 3411180
USASpringfield, Tel. 937 3280022

You might also like