Professional Documents
Culture Documents
S.NO QUANTITY
SPACE NAME ROOM SAVER)M OR M.SQ (SQ.M)
8 SECURITY
Supervisor room 12.5sq.m for department head's office 1 person 13
Security control workstation for 1 staff 2.6mX1.8m.12sq.m for equipment
8 SECURITY 30% circulation 3 persons 65
room
Head security room/ 12.5sq.m for department head's office workstation for 1 staff
video surveilance 2 persons 44
-2.6mX1.8m . 30% circulation.
room
Security check 1.5sq.m / person 10 persons 15
Waiting lounge 1.5sq.m per person 30 persons 45
Green room 1.5sq.m / person 15 persons 22.5
Dinning 7sq.m for 4 persons 100 persons 175
9 VIP Pantry 10% 17.5
Confrence room 48.77sq.m for 25 people 12 persons 24
Staff room 1.2sq.m / person 5 persons 6
Gents toilet 2 urinals , 1 washbasin 100 persons 10
Ladies toilet 3 flush toilet , 1 washbasin 10
HVAC 1% 1355
Electrical 0.50% 677
Plumbing 0.50% 677
10 SERVICES
Solar panel 0.50% 677
Lift 2.5x2x12 nos 60
Fire stair 6x2.5x25 nos 375
11 CIRCULATION 30%
THESIS
CASE STUDY-I CASE STUDY-II REMARK/
PROJECT
(JANG-E-AZADI (PUNJAB STATE COMMENTS
AREA
MEMORIAL) WAR MEMORIAL) (RESONING)
(SQ.M)
400
300
10% 1%
400
(2719.45sq.m) (72.11sq,m)
10000
500
2%
200
(543.89sq.m)
4% 3%
650
(1087.79sq.m) (216.34sq.m)
150
150
520
6%
5% (360.56sq.m) 3820
(1631.67sq.m)
24% 23%
(6526.69sq,m) (1658.61sq.m) 5082