ADT & AADT CALCULATION AS PER IRC:SP:72-2007

District :- Vidisha Block :- Ganj Basoda


Road Name :- Bareth Rd- Maharana Pratap Sq. to BSNL Office to Bareth Road 840 M

1 Total motorised & Non motorized Vehicle. Per Day ( as per traffic survey conducted and fore casting according to specifications of
SP - 72 , 2007 & IRC : 108 )

LCV - Cars/ Vans/ Two Bicycles Bullock Bullock


Jeeps/Three Trucks/Buses (HCV) Tractor / Trollies (MCV) Wheeler cart Cart
Wheelers HCV HCV HCV MCV MCV MCV s (Solid (Pnu.
(Laden) (Unladen) (Over (Laden) (Unladen) (Over Wheel) Tyre)
Loaded) Loaded)
72 77 13 0 40 9 0 54 13 1 0

Total 279

Total Motorised Vehicles 265


Total Non Motorised Vehicles 14

2 Duration of Harvesting Season in Days (From Local enquiry) t = 75

3 Average Traffic During Non Harvesting Season (Considered half of the total Traffic in
T = 140
peak Season )

4 Average Increase in Traffic During Harvesting Season (Total Traffic in peak season -
Traffic During Non Harvesting Season) nT = 140

5 Avg. Annual Traffic AADT = T+((1.2 x nT x t)/365) AADT = 175

6 It is presumed that road will open for traffic after 0.5 yrs. ADT = 180
therefore AADT after 0.5 yrs by considering 6% growth rate ADT = AADT x (1+0.06) n