New Bridge of Important class (Length 180 m)in Turnkey basis at Kashiani -
Gopalgonj Section BR-37.
Package No WD6
Client : Bangladesh Railway
Consultant : ACE Consultant Ltd.
Contractor : Toma Construction & Co. Ltd.
Sl. BOQ
Description Unit No. Length (m.) Width (m.) Height (m.)
no. Item
Bank and Erosion Protection
Cu.m
Works Escavation
Abutment - 01. River Protecton.
AB-1. CS-05 ,CH . 0+202 (R/B) 1 20.000 4.600 0.500
AB-1. CS-05 ,CH . 0+202 (R/B) 1 75.000 20.200 0.500
AB-1. CS-06 , CH.0+172 (R/B) 1 50.000 22.200 0.500
1 A.10.1 AB-1. CS-07 , CH.0+127 (R/B) 1 50.000 22.200 0.500
AB-1. CS-08 , CH.0+082 (R/B) 1 50.000 21.800 0.500
AB-1. CS-09 , CH.0+082 (R/B) 1 50.000 25.800 0.500
AB-1. CS-10 , CH.0+022 (R/B) 1 70.000 27.400 0.500
AB-1. CS-11 , CH.0+022 (R/B) 1 50.000 29.800 0.500
AB-1. CS-11 , CH.0+022 (R/B) 1 20.000 4.600 0.500
Total Qty =
100 mm Thick Sand Filling
Cu.m
(F.M-1.0 - 1.5)
Abutment - 01. River Protecton.
AB-1. CS-05 ,CH . 0+202 (R/B) 1 20.000 4.600 0.100
AB-1. CS-05 ,CH . 0+202 (R/B) 1 75.000 20.200 0.100
AB-1. CS-06 , CH.0+172 (R/B) 1 50.000 22.200 0.100
2 A.10.2 AB-1. CS-07 , CH.0+127 (R/B) 1 50.000 22.200 0.100
AB-1. CS-08 , CH.0+082 (R/B) 1 50.000 21.800 0.100
AB-1. CS-09 , CH.0+082 (R/B) 1 50.000 25.800 0.100
AB-1. CS-10 , CH.0+022 (R/B) 1 70.000 27.400 0.100
AB-1. CS-11 , CH.0+022 (R/B) 1 50.000 29.800 0.100
AB-1. CS-11 , CH.0+022 (R/B) 1 20.000 4.600 0.100
Total Qty =
Geo - Textile Filter Thickness
Sq.m
>3 mm
AB-1. CS-05 ,CH . 0+202 (R/B) 1 20.000 4.600
AB-1. CS-05 ,CH . 0+202 (R/B) 1 75.000 23.200
AB-1. CS-06 , CH.0+172 (R/B) 1 50.000 25.200
AB-1. CS-07 , CH.0+127 (R/B) 1 50.000 25.200
AB-1. CS-08 , CH.0+082 (R/B) 1 50.000 24.800
3 A.10.3
AB-1. CS-09 , CH.0+082 (R/B) 1 50.000 28.800
AB-1. CS-10 , CH.0+022 (R/B) 1 70.000 30.400
3 A.10.3
Sl. BOQ
Description Unit No. Length (m.) Width (m.) Height (m.)
no. Item
AB-1. CS-11 , CH.0+022 (R/B) 1 50.000 32.800
AB-1. CS-11 , CH.0+022 (R/B) 1 20.000 4.600
Total Qty. =
Add Lap Total =
Grand Total Qty.=
100 mm well graded Jhama
Cu.m
brick chips
Abutment - 01. River Protecton.
CS-05 ,CH . 0+202 (R/B) 1 20.000 4.600 0.100
Total Qty.
46.000
757.500
555.000
555.000
545.000
645.000
959.000
745.000
46.000
4853.500
9.200
151.500
111.000
111.000
109.000
129.000
191.800
149.000
9.200
970.700
92.000
1740.000
1260.000
1260.000
1240.000
1440.000
2128.000
Total Qty.
1640.000
92.000
10892.000
653.520
11545.520
9.200
151.500
111.000
111.000
109.000
129.000
191.800
149.000
9.200
970.700
Total Qty.
750.000
500.000
500.000
500.000
500.000
700.000
500.000
660.000
342.800
4952.800
30,955
750.000
500.000
500.000
500.000
500.000
700.000
500.000
660.000
342.800
4952.800
55,031
92.000
1515.000
1110.000
1110.000
1090.000
1290.000
1918.000
1490.000
92.000
Total Qty.
9707.000
60,668.75
19612.600