FORM - HG - 01 TERMS AND CONDITIONS OF CONSTRUCTION OF PRODUCTION TUBE WELL. BY THE WATER RESOURCES BOARD From the Hydro geological Survey the most favorable location for construction of a tube well has been selected within the premises shown by you. Although the selected location is the most favorable site for the construction of a tube well, the quantity and quality of water which can be obtained from this well cannot be determined prior to completion of the well. Therefore, after the construction of tube well, if the well yield is less than 20 liters per minute, 40 percent of the estimated cost for construction of the tube well will be refunded. In this regard, the well will be back-filled and cement plug will be placed on top of the well, Ifyou aro in agreement with above conditions please complete the attached from and return 10 us. Chairman, Water Resources Board, 2A, Hettor Kobbekaduwa Mawatha, Colombo 07, Chairman, Water Resources Board, 2A, Hettor Kobbekaduwa Mawatha, Colombo 07. AGREEMENT ON THE LOCATION OF THE WELL We. Hereby certify that the proposed location for construction of a well shown to us given in the sketch map of the hydro geological report is within our land premises and does not fall into any government reservation or anyone else’s land. | ensure that there ‘would be no objection from any party for the drilling of the tule: well at this site. I also agree to the terme and conditions given in your form HG - O1 and hereby grant permission to drill the well at this location. Signature & Stamp Date Minister of Agriculture, Rural Economic Affairs, Livestock Development, Irrigation and Fisheries & Aquatic Resources Development WATER RESOURCES BOARD Hydrogeological and Geophysical Investigation Report At Proposed New 0 Factory Badalgama. client M.G. Consultants (Pvt) Ltd, 2" Floor, 03, Swarna Place, Nawala Road, Rajagiriya. oF Water Resources Board 2A, Hector Kobbekaduwa Mawatha Colombo-07 Tele;- 011 2694835, 2697050 Fax;- 011 2689772 wrbmiwm@sItnet.tk Web; - http://www.wrb.gov.lk a. introduc n MG. Consultants (Pvt) Ltd has requested to identify groundwater availability in proposed new Milco factory at Badalgama. Total land area of the proposed project site is around 35, Acres and it is consisting with 7 Acres marshy land. Daily water demand is around 300,000 liters per day and management of the company was decided to fulfill this requirement from deep tube walls. Considering the area and water demand of the project, it is proposed to construct 05 numbers of deep tube wells. Although, it has been already investigated proposed Milco factory premises for groundwater Therefore, proposed 05 number of tube wells are planned to construct at the NLDB land situated nearby. In this context, it was conducted detailed geophysical surveys to identify most favorable locations to construct bore wells in the concern land on the dates of 10,11,16,17 January 2019, Extracted water will use for dairy production and factory uses. And, the hydrogeological and geophysical surveys were conducted to identify most favorable locations to groundwater extraction in given land premise. Study Area

You might also like