1 Foundation
2 Plinth Beam
3 Grade Slab
4 Column
5 Buildings 1 Roof Slab
6 Blockworks
7 Plastering
8 Painting
9 Roofing
10 Foundation
11 Plinth Beam
12 Grade Slab
13 Column
14 Buildings 2 Roof Slab
15 Blockworks
16 Plastering
17 Painting
18 Roofing
19 Foundation
20 Plinth Beam
21 Grade Slab
22 Column
23 Buildings 3 Roof Slab
24 Blockworks
25 Plastering
26 Painting
27 Roofing
28 Foundation
29 Plinth Beam
30 Grade Slab
31 Column
32 Kitchen and Dining Roof Slab
33 Blockworks
34 Plastering
Kitchen and Dining
AS PER CLAUSE 14
SL NO. BLDG. ACTIVITY
START FINISH
35 Painting
36 Roofing
37 Foundation
38 Plinth Beam
39 Grade Slab
40 Column
41 Store room Roof Slab
42 Blockworks
43 Plastering
44 Painting
45 Roofing
46 Foundation
47 Plinth Beam
48 Grade Slab
49 Column
50 Water Tank
sub station Compound
51 Roof Slab
52 Blockworks
53 Plastering
54 Painting
55 Roofing
56 Foundation
57 Plinth Beam
58 Grade Slab
59 Column
60 Villa 1 Roof Slab
61 Blockworks
62 Plastering
63 Painting
64 Roofing
65 Foundation
66 Plinth Beam
67 Grade Slab
68 Column
villa 2
AS PER CLAUSE 14
SL NO. BLDG. ACTIVITY
START FINISH
88 PLASTERING
89 PAINTING
90 Foundation
91 Plinth Beam
92 Grade Slab
93 Column
94 GUARD HOUSE Roof Slab
95 Blockworks
96 Plastering
97 Painting
98 Roofing
99 Strip Foundation
102 Column
104 BOUNDARY WALL Blockworks
AS PER CLAUSE 14
SL NO. BLDG. ACTIVITY
BOUNDARY WALL START FINISH
105 Plastering
106 Painting
109 ASPHALT
ROAD WORKS
110 ROAD MARKING
111 SIGN BOARD
ACTUAL RIW REFERENCE