Training Activity Matrix

Facilities/To Venue
Date &
Training Activity Trainee ols and Remarks
(Workstation Time
Equipment
/ Area)
June 5,
Prayer
Institutional 2018
Recap of Activities
All Learning 8:00 Students
Unfreezing Activities Laptop
trainees Resource AM to are ready for
Feedback of Speaker
Area 8:30 today’s
Training projector
AM activities
Rejoinder/Motivatio
n

CBLM Learning
Laptop Resource
Read information Projector Area
sheet No 2.1-2 on
Pipe Preparation
Group 1

Study and perform Richard


task sheet No.2.1- Jethro June 5,
2 on Preparation Ready to
Glen Welding 2018
and fit up of Pipe proceed to
8:30
June machine the next
to
and 4:30PM activity
Ken accessories
Study operation
sheet no 2.1-2 on Electrode Practical
Operating welding Practical Work Area
machine and Work Area
perform operation
Jig/Table
sheet No. 2.1-2
Testing
plate

Document No.NTTA-TM1-07
SMAW NC II Date Developed: Issued by:
April 17, 2018
Performing Grove
Developed by: Page 2 of 61
Welding on Carbon
Steel Pipe Khen A. Vios
Revision # 000
CBLM Learning
Laptop Resource
Read information Projector Area
sheetNo 2.1-3 on Group 2
Weld Passes Salvacion June 5,
Ready to
Study and perform Jimbo Welding 2018
proceed to
task sheet No.2.1- 8:30 to
Kent machine 4:30PM
the next
3 on Practice Weld and activity
Arvie
accessories
Lyn
Electrode Practical
Practical Work Area
Work Area
Jig/Table
Testing
plate
Study information CBLM Learning
sheetNo. 2.1-4 on Laptop Resource June 5,
Group 3 Projector Area 2018
2G Vertical
Welding Welding 8:30AM
Cardo to
machine Ready to
Micheal 5:00 PM
Study and perform Electrode proceed to
Job Sheet No.2.1- Sherwen the next
Practical June 6,
Pipe activity
4 on Welding 2G Jekem Work Area 2018
Vertical Position Jig/Table 8:00AM
Gabreil to
Grinder 2:30PM

NOTE: Rotation takes place in scheduled time.

Document No.NTTA-TM1-07
SMAW NC II Date Developed: Issued by:
April 17, 2018
Performing Grove
Developed by: Page 3 of 61
Welding on Carbon
Steel Pipe Khen A. Vios
Revision # 000
Document No.NTTA-TM1-07
SMAW NC II Date Developed: Issued by:
April 17, 2018

Developed by: Page 4 of 61


Performing Grove Welding on
Khen A. Vios
Carbon Steel Pipe Revision # 000
Document No.NTTA-TM1-07
SMAW NC II Date Developed: Issued by:
April 17, 2018

Developed by: Page 5 of 61


Performing Grove Welding on
Khen A. Vios
Carbon Steel Pipe Revision # 000
ACHIEVEMENT CHART
Shielded Metal Arc Welding (SMAW) NC II
CORE COMPETENCIES

Weld carbon steel plates in horizontal position (2G)

Weld carbon steel plates in overhead position (4G)

Weld carbon steel pipe in horizontal position (5G)


Weld carbon steel plates in vertical position (3G)

Weld carbon steel pipe in vertical position (6G)


Weld carbon steel plates in flat position (1G)

Weld carbon steel pipe in flat position (2G)


Weld carbon steel pipes using SMAW
Weld carbon steel plates using SMAW
No. NAM E OF TRAINE E

1 Yap, Ri chard B. C C C C C C C C C
2 Cy, Je thro H. C C C C C C C C C
3 Bucol, Gle e n V. C C C C C C C C C
4 Dabodabo, June A. C C C C C C C C C
5 De atras, Ke n B. C C C C C C C C C
6 Ge ne ral, Salvaci on E. C C C C C C C C C
7 Jum awan, Ji m bo L. C C C C C C C C C
8 Ki lat, Ke nt B. C C C C C C C C C
9 Lantaca, Arvi e N. C C C C C C C C C
10 Ogdol, Lyn A. C C C C C C C C C
11 Ogoc, Cardo P. C C C C C C C C C
12 Ontoy, Mi che al A. C C C C C C C C C
13 Pagalan, She rwi n B. C C C C C C C C C
14 Patoy, Je k e m D. C C C C C C C C C
15 Qui m no, Gabri e l D. C C C C C C C C C

Legend: C competent

Not Competent

Training Duration: 80 hours Date Started: June 5, 2018

Trainer: KHEN A. VIOS

Document No.NTTA-TM1-07
SMAW NC II Date Developed: Issued by:
April 17, 2018

Developed by: Page 6 of 61


Performing Grove Welding on
Khen A. Vios
Carbon Steel Pipe Revision # 000
Analysis of Pretest and Posttest
Hypothetical Data

Pre- Post-
Student Test Test
Score Score
1 25 22 Graph of Pretest and Posttest Scores
45
2 25 34
40
3 17 28
35
4 24 30 30
5 29 40 25

6 27 38 20
15
7 20 29
10
8 28 33 5
9 30 31 0
Pre-Test Score Post-Test Score
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
10 27 32
11 25 26 Analysis
12 28 36
Posttest scores, in red line, is generally higher than the
13 32 34 pretest scores, in blue line although four students did not show an
14 30 33 increase in test scores.
15 33 36
t-Test: Paired Two Sample for Means
Pre - test scores Post - test scores
Mean 26.66666667 32.13333333
Variance 18.0952381 21.98095238
Observations 15 15
Pearson Correlation 0.539614661
Hypothesized Mean Difference 0
df 14
t Stat -4.915507874
P(T<=t) one-tail 0.000113807
t Critical one-tail 1.761310136
P(T<=t) two-tail 0.000227613
t Critical two-tail 2.144786688

Analysis
The table shows that the t Stat is equal to -4.92.
This is the mean difference between the posttest and pretest
scores. The p-value is 0.0002 which is less than .05 which
means that the test scores are significantly different. Mean
posttest scores are therefore higher than pretest scores.

Conclusion: Training intervention increased the scores of


the trainees.

SMAW NC II Document No.NTTA-TM1-07


Date Developed: Issued by:
April 17, 2018

Performing Grove Developed by: Page 7 of 61


Welding on Carbon Khen A. Vios
Revision # 000
Steel Pipe
Minutes of the Meeting

Minutes of the Meeting Template

Focus Group Discussion

Date: June 15, 2018


Agenda: Assessment on Shielded Metal Arc Welding NCII
Competency-based Training Delivery
Present:

Yap, Richard B.
Cy, Jethro H.

Bucol, Glen V.

Dabodabo, June A.

Deatras, Ken B.

General, Salvacion E.

Jumawan, Jimbo L.

Kilat, Kent B.

Lantaca, Arvie N.

Ogdol, Lyn A.

Ogoc, Cardo P.

Ontoy, Micheal A.

SMAW NC II Document No.NTTA-TM1-07


Date Developed: Issued by:
April 17, 2018

Performing Grove Developed by: Page 8 of 61


Welding on Carbon Khen A. Vios
Revision # 000
Steel Pipe
CBT Concerns Discussions Resolutions/Agreement
1. CBT Layout Work station and Provide labels and
facilities were signage so that trainees
identified and will not be misguided
labeled, well-
organized
2. Monitoring of The trainer was Place attendance sheet
Attendance able to check the at the door for easy
attendance daily attendance signing
with the use of
attendance sheet
3. Utilization of work The work shop area Trainees should practice
area was just enough for maintaining classroom
the trainees to cleanliness and
work on their task orderliness
4. Orientation There was a It is agreed that learners
a. CBT thorough must adhere all of the
b. Roles discussion of each ideas presented so as to
c. TR item. All ideas were have a smooth flow of
d. CBLM presented. training.
e. Facilities Conduct
f. Evaluation system orientation.
Organized learning
Resource / CBLM
Conduct Program
Evaluation
5. RPL The training The learners are
performs the RPL expected to adhere to the
to gather pertinent different requirements in
information of the order to adhere to the
previous experience different requirements in
through collecting. order to address their
needed skills.
6. Teaching methods The trainer will It is agreed that the
and technique discuss the learners should apply
different teaching the different methods
method and and techniques during
technique in the training.
training.

SMAW NC II Document No.NTTA-TM1-07


Date Developed: Issued by:
April 17, 2018

Performing Grove Developed by: Page 9 of 61


Welding on Carbon Khen A. Vios
Revision # 000
Steel Pipe
7. Monitoring of The trainer should
learning activities update their
a. Achievement chart achievement and
b. Progress chart progress chart.
8. Feedback The training
resulted
successfully with
the good
participation of its
training bodies.
9. Slow learners All the trainees
who will find hard
to take the training
were given
materials such as
audio, books, and
magazines at the
same time
demonstration and
lecture by trainer.
10.Other concerns

SMAW NC II Document No.NTTA-TM1-07


Date Developed: Issued by:
April 17, 2018

Performing Grove Developed by: Page 10 of 61


Welding on Carbon Khen A. Vios
Revision # 000
Steel Pipe

You might also like