Professional Documents
Culture Documents
AICT004-3-2-NWN
Networks and Networking
Group Assignment
Intake :
Lecturer :
Email :
LEARNING OUTCOMES:
CLO2 : Apply suitable technique to design a local area network and segmenting a network
using simulation tools (C3, PLO3)
CLO3: Work in a team to propose a network design based on the given scenario (A3,
PLO5)
CLO4: Discuss current trends and issues in computer networking (A2, PLO6)
Note: PLO3 – Problem Solving and Scientific Skills, PLO5 – Social Skills, Team Skills and Responsibility, PLO6
– Values, Attitudes and Professionalism
SCENARIO:
FSC Cinema is one of the new entertainment centre in Kuala Lumpur which provide upscale
services and facilities of a movie theatre to their customers. Located at its own premises, the
company has 3 separate buildings named as Alpha, Beta and Gamma. FSC Cinema offers a
paid membership services for their regular customers and at the same time their movie theatres
are also open to public.
Alpha building is the main office for staff from multiple departments such as Human Resource,
Finance, Administration, Sales and Marketing and Technical Support. There is also a server
room in Alpha building which host the company website, email and other internal applications
Beta building has a total of 10 movie halls with additional facilities such as cafeteria,
merchandise shop, ticketing counter and concession counter for public use. There is a public
WiFi provided at the cafeteria. Next to the ticketing counter, there is a customer service
department to handle customer related issues. There is also a huge screen at the foyer in Beta
building to show movie trailers and other promotional materials. Customers can purchase their
movie ticket at the ticketing counter or through FSC website using debit / credit card or online
banking. Members can purchase tickets at discounted price for any movie shows in Beta
building.
Purchasing
- FSC Website with debit card / credit card
- Online Banking
- Members can purchase ticket at % Price ANY MOVIE
Gamma building entrance is secured with access card and there is a covered parking space
dedicated for members only. At the 1st floor, there are 2 special movie halls with state of the
art facilities which can also be used to stream any movies from the cloud. At the same time,
there are also live telecast and performance showcased in that special movie halls such as
All network facilities in Beta and Gamma building are connected to the server room in Alpha
building.
- HUGE SERVER ROOM
Your team has been selected as the network consultant for this project. The CEO requires your
team’s expertise to take on the responsibility of proposing the network, the necessary
equipment and any other operational requirements for their newly established
entertainment centre.
REQUIREMENTS
1. You are required to complete the assignment in a group of not more than 4 members. No
individual submission is allowed for the 1st attempt.
2. Word count for this assignment is approximately 6000 words (1500 words per students).
All configurations are not included in the word count, and can be shown in the form of
screenshot.
3. You are required to build a complete computer network environment for the new
entertainment centre, supported with a good research work.
4. Design the floor plan using Microsoft Visio and provide configuration of the logical
network diagram using Cisco Packet Tracer. Submit the softcopy of floor plan and
network diagram (configuration) together with the assignment.
5. Apart from the proposed design and configuration, discuss the current trends and issues in
networking such as server technologies (ALPHA) , BYOD (CAFETERIA), cloud
6. You are required to develop a Gantt chart (project plan) that indicates clearly the activities
that are required in order for the project to be a success (Kim).
7. Attach the completed Work Breakdown Structure (WBS) and Marking Scheme in your
final report. WBS must be signed and agreed by all group members (adib).
8. The report has to be well presented and should be typed. Submission of reports that are
unprofessional in its outlook (dirty, disorganised, inconsistent look, varying coloured paper
and size) will not fair well when marks are allocated.
9. Ensure that the report is printed on standard A4 (210 X 297 mm) sized paper. Paper weight
of 80 grams and above is highly recommended.
10. The report should have a one (1”) margin all around the page as illustrated below:
1 inch 1 inch
1 inch
1 inch
1 inch
1 inch 1 inch
11. Every report must have a front cover. A transparent plastic sheet can be placed in front of
the report to protect the front cover. The front cover should have the following details:-
b) Intake code.
c) Subject.
d) Project Title.
12. Plagiarism is a serious offence and will automatically be awarded zero (0) marks.
13. All information, figures and diagrams obtained from external sources MUST be referenced
using the Harvard referencing system accordingly.
*IMPORTANT*
For students who have to re-do the assignment (failed the 1st attempt), produce the
assignment individually. Complete the group section and choose one individual section
for the new submission.
GROUP SECTION
INDIVIDUAL SECTION
d) Discuss current trends and issues in computer networking (reliability and security)
Note:
Students are required to present their Group Section in Week 6 as part of the progress report.
Evaluation will be based on completeness of the work. This progress presentation is weighted
at 5%.
Grand Total (A + B + C)
Technical Accuracy (10)
Demonstration (10)
Configuration (30)
Total Group (A)
Introduction (5)
Reflection (5)
Marking Criteria
Alpha:
Beta:
Gamma:
Integration:
Remarks:
A: CLO3 - Work in a team to propose a network design based on the given scenario (A3,
PLO5)
B: CLO2 - Apply suitable technique to design a local area network and segmenting a network
using simulation tools (C3, PLO3)
C: CLO4 - Discuss current trends and issues in computer networking (A2, PLO6)
Not showing Missed out the Presented the Complete work Very good quality
any progress. progress report progress on presented on of work presented.
schedule. time, but time. However, Well prepared, and
showing work need some not doing last
Incomplete incomplete changes and minute work
Progress
Report
work work. Need modifications for 1 5
presented - major improvement.
has evidence modifications to
of last minute the work done
work
Comments: